311
National Standard Plumbing Code Committee __________________________________________________________ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC) Proposed Code Changes _____________________________________ July 25, 2013 Tropicana Casino and Resort Brighton and the Boardwalk Atlantic City, New Jersey _________________________________________________________________________________________________ 180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Embed Size (px)

Citation preview

Page 1: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee __________________________________________________________

2013 PROPOSED

CHANGES National Standard

Plumbing Code (NSPC) Proposed Code Changes

_____________________________________ July 25, 2013

Tropicana Casino and Resort Brighton and the Boardwalk Atlantic City, New Jersey

_________________________________________________________________________________________________

180 S. Washington St. Falls Church, VA 22046

1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

Page 2: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee

180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

The National Standard Plumbing Code Committee will conduct a Public Hearing on Proposed Changes to the Code. This Hearing will be held July 25, 2013 at the Tropicana Casino and Resort in Atlantic City, New Jersey. The public is invited to attend and comment will be allowed on the Proposed Changes. Adopted changes shall be published in the 2013 Supplement to the 2012 National Standard Plumbing Code. A continental breakfast will be served in the Mambo Room prior to the 8:00 A.M. start of the Public Hearing. A lunch break will be called at noon, attendees shall be responsible for their own lunch expenses. The meeting will reconvene at 1:00 P.M. or as directed by the Chairman. An afternoon break will be provided with the meeting scheduled to conclude at 5:00 P.M.

Hotel accommodations are available through the Tropicana Casino and Resort, mention the Plumbing-Heating-Cooling Contractors—National Association meeting for group rate availability. The hotel may be contacted by calling 800-247-8767.

The Proposed Changes are available to download from the PHCC—National Association website, phccweb.org, for review. Hard copy of the Proposed Changes book shall be available at the Hearing location.

For questions or further information, contact Charles White, Code Secretariat, at 800-533-7694 or by e-mail, [email protected].

Page 3: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee

180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

HOTEL INFORMATION

A block of rooms has been secured at the Tropicana Casino and Resort, Brighton and the Boardwalk, Atlantic City, New Jersey. Rooms are available for $85.00 per night plus 14% tax and $100 resort fee. Check in is 4:00 P.M., parking is $10.00 per day or $15.00 Valet. Please contact the hotel to make your reservation, you must mention the Plumbing-Heating-Cooling Contractors—National Association meeting to receive this rate. Cutoff date for reservations is July 8, 2013. Guaranteed rooms will be held until 10:00 P.M. on the night of arrival. Rooms must be cancelled 48 hours in advance to avoid one nights charge. Contact the Tropicana Casino and Resort at 800-247-8767 to make your reservations. DIRECTIONS From New York Take the New Jersey Turnpike to the Garden State Parkway (Exit 11). Proceed south on the Parkway to Exit 38 (Atlantic City Expressway). Take the Atlantic City Expressway east. At the base of the Atlantic City Expressway, take Exit 2 and follow signs to Tropicana Casino and Resort, Home of The Quarter. Continue straight onto Albany Avenue. Turn left onto Atlantic Avenue. Turn right at S. Brighton Avenue. From Philadelphia Cross the Benjamin Franklin Bridge or Walt Whitman Bridge and follow the North-South Freeway (Route 42) to the Atlantic City Expressway. Take Atlantic City Expressway east. At the base of the Atlantic City Expressway, take Exit 2 and follow signs to Tropicana Casino and Resort, Home of The Quarter. Continue straight onto Albany Avenue. Turn left onto Atlantic Avenue. Turn right at S. Brighton Avenue. From Baltimore/Washington D.C. Take I-95 North across the Delaware Memorial Bridge and follow Route 40 east to the Atlantic City Expressway. Take the Atlantic City Expressway east. At the base of the Atlantic City Expressway, take Exit 2 and follow signs to Tropicana Casino and Resort, Home of The Quarter. Continue straight onto Albany Avenue. Turn left onto Atlantic Avenue. Turn right at S. Brighton Avenue.

Page 4: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee

2013 National Standard Plumbing Code Committee

180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

J. Richard Wagner, PE, Chairman The Poole & Kent Corporation 4530 Hollins Ferry Rd Baltimore, MD 21227-4670 Phone: (410) 247-2200 Fax: (410) 247-2331 [email protected]

Charlie Chalk Maryland PHCC 10176 Baltimore National Pike, #205 Ellicott City, MD 21042 Phone: (410) 461-5977 Fax: (410) 750-2507 [email protected]

William Chamberlin Chamberlin Plbg. & Htg Company P.O. Box 390 1274 Route 130 South Windsor, NJ 08561 Phone: (609) 448-1848 Fax: (609) 448-8683 [email protected]

Leon LaFreniere City of Manchester, Dept. of Buildings One City Plaza Manchester, NH 03101 Phone: (603) 624-6475 Fax: (603) 624-6324 [email protected]

Frank R. Maddalon F. R. Maddalon Plumbing & Heating 1550 Sylvan Ave Hamilton, NJ 08610-4461 Phone: (609) 587-8317 Fax: (609) 587-9848 [email protected]

Michael Maloney Plumbers & Pipefitters Local #9 2 Iron Ore Rd Manalapan, NJ 07726-8086 Phone: (732) 792-0999 Fax: (732) 792-1144 [email protected]

Thomas C. Pitcherello NJ Department of Community Affairs Codes Assistance Unit 101 S. Broad Street, PO Box 802 Trenton, NJ 08625-0802 Phone: (609) 984-7609 Fax: (609) 984-7717 [email protected] Luis A. Rodriguez, CPD, LEED AP KSi Professional Engineers 149 Yellowbrook Road P.O. Box 628 Farmingdale, NJ 07727 Phone: (732) 938.2666 Ext.109 Fax: (732) 938.2521 www.ksi-pe.com Ronald W. Stiegler Schaefer Mechanical Services, Inc. 620 Old Westminster Pike Westminster, MD 21157 Phone: (410) 876-6825 Fax: (410) 857-0011 [email protected] Alex Tucciarone Old Bridge Plumbing Inspector 58 Lear Ct East Brunswick, NJ 08816-1853 Phone: (732) 721-5600 2420 Fax: (732) 607-7912 [email protected]

Jerry Van Pelt, CIPE GVP Consulting, LLC 9087 Central Avenue Sebastian, FL 32976 Phone: (772) 664-6975 Fax: (772) 664-6976 [email protected] James Galvin Plumbing Manufacturers Institute 5660 Country Lakes Dr. Sarasota, FL 34243 Phone: 941-993-9520 [email protected] Frank R. Maddalon Executive Committee Liaison F. R. Maddalon Plumbing & Heating 1550 Sylvan Ave Hamilton, NJ 08610-4461 Phone: (609) 587-8317 Fax: (609) 587-9848 [email protected] Charles R. White Secretariat & Staff Liaison Plumbing-Heating-Cooling Contractors–National Association 180 S. Washington St., Falls Church, VA 22046 Phone: (703) 237-8100

(800) 533-7694 Fax: (703) 237-7442 e-mail: [email protected] URL: http://www.phccweb.org

Page 5: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline March 31, 2014

-

1) Proposed Code Changes gaining acceptance will appear in the 2015 NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than March 31, 2014.

Contact Information: Person Submitting Change 2 _____________________________________ Date 3 _________________ Jurisdiction/Company/ Mailing Address ______________________________________________________________________ City/State/Zip ________________________________________________________________________ Phone __________________ Fax __________________ E-mail ________________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ___________________________ Basis/Reason for Change: Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 6: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

2012 Proposed Code Changes Instructions

This form is to be used for proposing changes to the National Standard Plumbing Code. Please photocopy this form as needed for multiple change proposals. 1. Fill in the blanks of the change form. If necessary use additional 8 ½ x 11-inch sheet(s). 2. All submittals must be typed. Please use a 12-point font size. NSPC assumes no responsibility for

unclear or illegible submittals. 3. Submittals sent via fax will NOT be accepted. 4. Changes may be submitted electronically in word processor format or via e-mail sent to

[email protected] prior to the cutoff date (see form). 5. To submit proposed changes, please use a separate form for each section. If you are proposing a new

chapter or appendix, it should be submitted in its entirety, rather than each section separately. 6. If the proposed change conflicts with or changes other sections, please submit separate changes for

all sections so affected. 7. Your proposed change must be based on the latest edition and must also reflect the actions of the

most recent changes to the NSPC. 8. Please submit the code section or subsection to be revised in its entirety. Do not leave out unchanged

paragraphs. Strike through all wording to be deleted. Underscore all wording to be added.

Example: THE FOLLOWING AMENDMENT IS SUBMITTED: NSPC Section 12.10.5 In a single dwelling unit, a in which the waste stack which receives the discharge of a kitchen type sink or a 3 DFU three fixture unit fixture may also serve as a wet vent for a laundry or a 3 DFU fixture connected to the stack at the floor below.

Failure to follow any of these instructions may result in your code change being ruled improperly submitted. Please contact Chuck White, if you have any questions about these instructions, at (800) 813-7061 or via e-mail at [email protected]. Please submit changes to:

National Standard Plumbing Code 180 South Washington Street Falls Church, VA 22046-1148 E-mail: [email protected]

Committee Actions The National Standard Plumbing Code Committee will consider proposed changes received on or by the stated cutoff date. The Committee will act upon changes as follows: Accept as Submitted, Accept as Amended, Defeat the proposed change, Table the proposed change, allow Withdrawal of the proposed change, or take other appropriate action.

Page 7: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee

180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

THREE YEAR CYCLE

2013 July 25 NSPC Public Hearing Tropicana Casino & Resort, Atlantic City, New Jersey

October Publish Supplement to 2012 NSPC

2014 March 31 Cutoff for Proposed Changes 2015 NSPC June Committee Meeting September Committee Meeting & Public Hearing

2015 January Publish 2015 NSPC December Cutoff for Proposed Changes 2016 Supplement to NSPC

2016 March Committee Meeting July Committee Meeting & Public Hearing September Publish Supplement to 2015 NSPC

2017 March Cutoff for Proposed Changes 2018 NSPC June Committee Meeting September Committee Meeting & Public Hearing

2018 January Publish 2018 NSPC December Cutoff for Proposed Changes 2019 Supplement to NSPC

2019 March Committee Meeting July Committee Meeting & Public Hearing September Publish Supplement to 2018 NSPC

2020 March Cutoff for Proposed Changes 2021 NSPC June Committee Meeting September Committee Meeting & Public Hearing

Page 8: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

1 3.4.2013 Matrix

Item # Section Number Person Submitting Change Committee Action10-77 10.20.8 and Table 3.1.3 XI Certification NSPC Committee

10-82 12.16 Size and Lengths of Vents NSPC Committee

13-1 1.2 Chemical Dispensing System NSPC Committee

13-2 1.2 Combination Fixture NSPC Committee

13-3 1.2 Continuous Pressure NSPC Committee

13-4 1.2 Plastic Pipe Ratings NSPC Committee

13-5 1.2 Dead Leg Charles Chalk

13-6 1.2 Developed and Equivalent Lengths NSPC Committee

13-7 1.2 Effective Openings NSPC Committee

13-8 1.2 Existing Work NSPC Committee

13-9 Withdrawn NSPC Committee

13-10 1.2 Horizontal Drains NSPC Committee

13-11 1.2 Installed NSPC Committee

13-12 1.2 Radon Gas NSPC Committee

13-13 1.2 Subsoil Drain NSPC Committee

13-14 1.2 Various Vents NSPC Committee

13-14a 1.2 Wash Fountains and Sinks NSPC Committee

13-15 1.2 Water Temperature Control Valve NSPC Committee

13-16 Table 2.3.1 Footnote 2 NSPC Committee

13-16a 2.3.1.a Short Radius Fittiings NSPC Committee

Matrix of changes for theNational Standard Plumbing Code – July 2013

Page 9: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

2 3.4.2013 Matrix

13-17 2.3.3 Back Outlet Fixtures NSPC Committee

13-18 2.12 Pipe Sleeves NSPC Committee

13-19 2.12 Pipe Sleeves Charles Johnston

13-20 2.16.a.2 Building Drains NSPC Committee

13-21 2.20 Requirements for Washrooms, Toilet Rooms, and Bathrooms

NSPC Committee

13-22 2.23 Charles Chalk

13-23 2.25.5 Sanitary Floor Sinks NSPC Committee

13-24 3.3.3 Fixtures NSPC Committee

13-25 3.4.6 Lead Free Plumbing NSPC Committee

13-26 3.7.5 Plastic Storm Drain Piping NSPC Committee

13-27 Table 3.1.3 Part I NSPC Committee

13-28 Table 3.1.3 Part I David Jaffe

13-29 Table 3.1.3 Part I David Jaffe

13-30 Table 3.1.3 Part II NSPC Committee

13-31 Table 3.1.3 Part II Steve Silber ASSE

13-32 Table 3.1.3 Part III NSPC Committee

13-33 Table 3.1.3 Part III Item 69 NSPC Committee

13-34 Table 3.1.3 Part III Item 76 NSPC Committee

13-35 Table 3.1.3 Part III David Ash

13-36 Table 3.1.3 Part IV NSPC Committee

13-37 Table 3.1.3 Part IV Item 10 David Jaffe

13-38 Table 3.1.3 Part IV Item 11 David Jaffe

13-39 Table 3.1.3 Part IV Item 28 David Jaffe

Page 10: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

3 3.4.2013 Matrix

13-40 Table 3.1.3 Part IV ASTM F1476 NSPC Committee

13-41 Table 3.1.3 Part IV ASMEB16.51 NSPC Committee

13-42 Table 3.1.3 Part V NSPC Committee

13-43 Table 3.1.3 Part V Item 19 NSPC Committee

13-44 Table 3.1.3 Part V ASME A112.19.9M NSPC Committee

13-45 Table 3.1.3 Part V Item 24 Steve Silber ASSE

13-46 Table 3.1.3 Part VI NSPC Committee

13-47 Table 3.1.3 Part VI Item 9 NSPC Committee

13-48 Table 3.1.3 Part VII NSPC Committee

13-49 Table 3.1.3 Part VII Steve Silber ASSE

13-50 Table 3.1.3 Part VII Item 20 Sean Mathews

13-51 Table 3.1.3 Part VIII NSPC Committee

13-52 Table 3.1.3 Part VIII ASME A112.4.14 NSPC Committee

13-53 Table 3.1.3 Part VIII Item 11 NSPC Committee

13-54 Table 3.1.3 Part IX Backflow Devices NSPC Committee

13-55 Table 3.1.3 Part IX Backflow Update NSPC Committee

13-56 Table 3.1.3 Part IX ASSE 1004 Steve Silber ASSE

13-57 Table 3.1.3 Part X NSPC Committee

13-58 Table 3.1.3 Part X Steve Silber ASSE

13-59 Table 3.1.3 Part X Home Laundry Equipment

Steve Silber ASSE

13-60 Table 3.1.3 Part XI NSPC Committee

13-61 Table 3.1.3 Part XI ASSE Standards NSPC Committee

13-62 Table 3.1.3 Part XI NFPA 99 NSPC Committee

Page 11: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

4 3.4.2013 Matrix

13-63 Table 3.1.3 Part XI (1) Steve Silber ASSE

13-64 Table 3.1.3 Part XI (2) Steve Silber ASSE

13-65 Table 3.1.3 Part XI (3) Steve Silber ASSE

13-66 Table 3.1.3 Part XI (4) Steve Silber ASSE

13-67 Table 3.4 ASME B16.51 NSPC Committee

13-68 Table 3.4 Items 11, 15, 16 NSPC Committee

13-69 Table 3.4 AWWA C900 & C901 NSPC Committee

13-70 Table 3.4 Under Water Service NSPC Committee

13-71 Table 3.4 CPVC-AL-CPVC David Ash

13-72 Table 3.4, 3.5, 3.7 Titles NSPC Committee

13-73 Table 3.4.2 Update NSPC Committee

13-74 Table 3.4.2 CPVC-AL-CPVC David Ash

13-75 Table 3.4.3 PEX NSPC Committee

13-76 Table 3.4.3 CPVC-AL-CPVC David Ash

13-77 Table 3.4.3 PP Michael Cudahy

13-78 Table 3.5 NSPC Committee

13-79 Table 3.6 NSPC Committee

13-80 Table 3.7 NSPC Committee

13-81 Withdrawn NSPC Committee

13-82 4.2.8 Brazed NFPA 99C NSPC Committee

13-83 4.2.12 Ductile Iron NSPC Committee

13-84 4.2.14.3 Solvent Cement Joints in CPVC Piping

Michael Cudahy

13-85 4.2.14.5 Heat Fusion Joints NSPC Committee

Page 12: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

5 3.4.2013 Matrix

13-86 4.3.8.f Couplings for Drainage NSPC Committee

13-87 4.3.8.h Eccentric Couplings for Drainage NSPC Committee

13-88 4.3.9 Plastic DWV to Other Materials NSPC Committee

13-89 5.1 Separate Traps NSPC Committee

13-90 Withdrawn NSPC Committee

13-91 Table 5.2 NSPC Committee

13-92 5.3.1 Design of Traps NSPC Committee

13-93 5.3.6.b ASSE 1072 NSPC Committee

13-94 5.4.3 Change of Direction NSPC Committee

13-95 5.4.4 Concealed Cleanouts NSPC Committee

13-96 5.4.5.b Inaccessible Cleanouts NSPC Committee

13-97 Table 5.4.9 NSPC Committee

13-98 5.4.13 Cleanout Equivalent NSPC Committee

13-99 5.4.14 Floor Drain Cleanouts NSPC Committee

13-100 5.5.1.d Exception John Heine

13-101 6.2.1.c Delete Dishwashers from Interceptors

NSPC Committee

13-102 6.2.1.1 Rand Ackroyd

13-103 6.2.1.3 Rand Ackroyd

13-104 6.2.1.3 d IAPMO Z1001 NSPC Committee

13-105 6.2.1.4 ASME A112.14.6 NSPC Committee

13-106 6.2.2 Rand Ackroyd

13-107 6.3.1 b Interceptors and Separators NSPC Committee

13-108 6.3.1 e Rainwater in Parking Garages NSPC Committee

Page 13: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

6 3.4.2013 Matrix

13-109 7.2 ADA Standards NSPC Committee

13-110 Chapter 7 Standards NSPC Committee

13-111 7.4.4 & 7.4.9 Water Closets NSPC Committee

13-112 7.5.5 John Heine

13-113 7.5.5 & 7.5.6 Urinals NSPC Committee

13-114 7.5.6 John Heine

13-115 7.7.1 Bidet NSPC Committee

13-116 7.7.4 Bidet Water Supply NSPC Committee

13-117 7.8.4 Bathtub Airgaps NSPC Committee

13-118 7.10.4 b Bathtubs with Multiple Showerheads

NSPC Committee

13-119 7.11 Kitchen Sinks NSPC Committee

13-120 Withdrawn Dan O'Gorman

13-121 7.12 Drinking Water Facilities NSPC Committee

13-122 7.13.1 Compliance NSPC Committee

13-123 7.15.1 Compliance NSPC Committee

13-123a 7.15.4 Commercial dishwashers Dave Bishop

13-124 7.16.1 SS Drains NSPC Committee

13-125 7.16.4 Required Locations for Floor Drains

Dan O'Gorman

13-126 7.16.4 a Floor Drains in Toilet Rooms NSPC Committee

13-127 7.21.4 Editorial NSPC Committee

13-128 7.21.5 b Editorial NSPC Committee

13-129 7.21.5 c Laundry Trays NSPC Committee

13-130 7.21.7 Facilities in Mercantile and Business Occupancies

NSPC Committee

Page 14: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

7 3.4.2013 Matrix

13-131 7.21.7 a John Heine

13-132 7.21.8 Food Service Establishments NSPC Committee

13-133 7.21.9 Family and Assisted-Use Toilet Facilities

NSPC Committee

13-134 7.21.10 Fractional Fixtures NSPC Committee

13-135 Table 7.21.1 NSPC Committee

13-136 7.22 Water Treatment Systes John Heine

13-137 7.22.2 Ultraviolet Lights John Heine

13-138 7.24 e Plumbed Emergency Eyewash and Shower Equipment

Steve Silber ASSE

13-139 7.24 f ASSE 1071 NSPC Committee

13-140 8.5 Pipe Guides NSPC Committee

13-140a 9.1.12 Relief Valve Discharge Piping NSPC Committee

13-141 9.3.1 c Condensing Furnace Condensate NSPC Committee

13-142 9.3.2 Strainers NSPC Committee

13-143 9.4.1.b Vent Piping for Corrosive Wastes NSPC Committee

13-144 9.4.3 Air Conditioning Condensate Waste NSPC Committee

13-145 Table 10.5.2 NSPC Committee

13-146 10.5.3 Backflow Devices NSPC Committee

13-147 10.5.3 (1) Steve Silber ASSE

13-148 10.5.3 (2) Steve Silber ASSE

13-149 10.5.3 (3) Steve Silber ASSE

13-150 10.5.3 a & c (1) Steve Silber ASSE

13-151 10.5.3 a & c (2) Steve Silber ASSE

13-152 10.5.3 d Steve Silber ASSE

Page 15: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

8 3.4.2013 Matrix

13-153 10.5.5 a Steve Silber ASSE

13-154 10.5.5 b Vacuum Breakers for Urinals NSPC Committee

13-155 10.5.6 ASSE Updates NSPC Committee

13-156 10.5.6 d Steve Silber ASSE

13-157 10.5.6 d Nick Azmo

13-158 10.5.7 Tanks & Vats NSPC Committee

13-159 10.5.8 Food Establishments NSPC Committee

13-160 10.5.9 Backflow Prevention NSPC Committee

13-161 10.5.10 Backflow Prevention NSPC Committee

13-162 10.5.12 Hose Connections NSPC Committee

13-163 10.5.13 a Chemical Dispensing System NSPC Committee

13-164 10.5.13 d Water Powered Backup Sump Pumps

NSPC Committee

13-165 10.5.13 e Laboratory sink Faucets NSPC Committee

13-166 10.9.2 Disinfecting NSPC Committee

13-167 10.11 Allowance for Soil and Water NSPC Committee

13-168 Table 10.14.2 b Appendix M NSPC Committee

13-169 10.14.6 b Excessive Pressure NSPC Committee

13-170 10.14.6 d Exception NSPC Committee

13-171 Withdrawn NSPC Committee

13-172 10.15.1 Tempered Water NSPC Committee

13-173 10.15.2 c Greg Towsley

13-174 10.15.6 a ASSE 1016 NSPC Committee

13-175 10.15.6 b Delete old ASSE 1016 NSPC Committee

Page 16: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

9 3.4.2013 Matrix

13-176 10.15.6 j Ronald Veiss

13-177 10.15.6 j Anthony Menafro

13-178 Withdrawn

13-179 10.15.6 Mixed Water Update NSPC Committee

13-180 10.15.9 Drip Pans NSPC Committee

13-181 10.15.9.3 Drip Pan Drainage NSPC Committee

13-182 10.16.6 Relief Valve Piping NSPC Committee

13-183 Withdrawn NSPC Committee

13-184 Withdrawn NSPC Committee

13-185 Withdrawn NSPC Committee

13-186 Withdrawn

13-187 10.16.7 Water Heater Vacuum Relief NSPC Committee

13-188 10.18 Drinking Water Treatment Units NSPC Committee

13-189 Table 10.19 Residential Water Softeners NSPC Committee

13-190 10.20.2 f Lead Free NSPC Committee

13-191 10.20.2 g & h NFPA 13 D Systems NSPC Committee

13-192 10.20.4 Michael Cudahy

13-193 10.20.4 b Flux NSPC Committee

13-194 10.20.4 d Lead Free NSPC Committee

13-195 10.20.8 ASSE 7010 NSPC Committee

13-195a Table 11.4.1 Shower Stall DFU's NSPC Committee

13-196 11.4.3 Diversity Factors NSPC Committee

13-197 Withdrawn

Page 17: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

10 3.4.2013 Matrix

13-197a Table 11.4.1 Wash Sink NSPC Committee

13-198 Table 11.5.1 b 15" Pipe DFU's NSPC Committee

13-199 11.7.10 High Level Alarms Fritz Reuss

13-200 11.7.10 High Level Alarms John Wyckoff

13-201 11.7.11 Fixture Pumps and Ejectors NSPC Committee

13-202 11.10 a Branch Connections to Stack Offsets

NSPC Committee

13-203 12.4.1 b Vent Terminals NSPC Committee

13-204 12.16 Size and Lengths of Vents NSPC Committee

13-205 Table 12.16.4 Size and Lengths of Vent Stacks

NSPC Committee

13-206 12.18.2 Island Sink Vent NSPC Committee

13-207 13.1.1 Where Required Michael Cudahy

13-208 13.3.1 Storm Drain Traps NSPC Committee

13-209 13.4.3 Combined Drainage NSPC Committee

13-210 14.3.1 NFPA 99 NSPC Committee

13-211 14.12 NFPA 99 NSPC Committee

13-212 15.3 John Heine

13-213 15.3 Leak Testing NSPC Committee

13-214 15.3.2 Exception John Heine

13-215 17.9.2 Pitless Adapter NSPC Committee

13-216 17.9.4.2 Pumps Above Wells NSPC Committee

13-217 17.9.6.3 Protective Pipes NSPC Committee

13-218 17.15 Supply Connections NSPC Committee

13-219 Appendix B Title NSPC Committee

Page 18: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

11 3.4.2013 Matrix

13-220 Appendix B 9.7 Total Equivalent Length NSPC Committee

13-221 Appendix C Pipe Sizes NSPC Committee

13-222 Appendix F NSPC Committee

Figures are editorial changes not subject to public review

13-F1Figure 1.2.15 and 13.3.2 Dave Bishop

13-F2Figure 4.3.8-D Delete Center Stops NSPC Committee

13-F3Figure 4.3.9-D Michael Cudahy

13-F4Figure 5.4.3 Cleanout Spacing NSPC Committee

13-F5Figure 7.3.2 NSPC Committee

13-F6Figure 10.16.6 Notes NSPC Committee

Page 19: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee __________________________________________________________

2012 TABLED ITEMS

National Standard Plumbing Code (NSPC)

Proposed Code Changes

_________________________________________________________________________________________________

180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

Page 20: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code __10_/_77__ 2010 Proposed Code Change Form Contact Information: Person Submitting Change ______NSPC Committee__________________ Date ___9/24/10_________ Jurisdiction/Company/ Mailing Address ______________180 S. Washington Street, P.O. Box 6808__ ___________________ City/State/Zip ________________Falls Church, VA 1148_____________________________________ Phone _1-703-237-8100____ Fax __________________ E-mail ________________________________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ____10.20.8 and Table 3.1.3 - Part XI_______________________ 10.20.8 Certification The installers of NFPA 13D multipurpose residential fire sprinkler systems and individuals who provide calculations, details, and layouts shall be certified in accordance with ASSE Standard 7010. Table 3.1.3 - Part XI 21. Plumbing-Based Residential Fire Protection Systems Installers for One- and Two-Family Dwellings ASSE Standard 7010 - 2008 Basis/Reason for Change: To require that installers and designers of NFPA 13D Multipurpose Residential Fire Sprinkler Systems be certified to an industry standard. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 21: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code __10_/_82__ 2010 Proposed Code Change Form Contact Information: Person Submitting Change ______NSPC Committee__________________ Date ___11-06-10_______ Jurisdiction/Company/ Mailing Address ______________180 S. Washington Street, P.O. Box 6808__ ___________________ Phone _1-703-237-8100____ Fax __________________ E-mail ________________________________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ______12.16_____________________ 12.16 SIZE AND LENGTH OF VENTS 12.16.1 Size of Fixture Vents a. Vents for individual fixtures shall be sized according to Table 12.16. b. a. Vents for individual fixtures shall be not less than 1-1/4" size nor less than one-half the size of the fixture drain that they serve. c. b. Where a vent pipe serves two or more fixtures, the size of the combined vent pipe shall be based on the sum of the drainage fixture units (DFU) for all of the drains served. b. Where a section of vent piping connects vents for two or more fixtures or groups of fixtures, each section of the branch vent piping shall be sized according to Table 12.16, based on the sum of the drainage fixture units (DFU) for all of the fixtures served by that section of vent piping. d. Where the fixtures being vented are not connected to the same drain stack, the stack size in Table 12.16 shall be the equivalent stack size for their total combined DFU load, based on Table 11.5.1B. 12.16.2 Size of Circuit or Loop Vents Circuit or loop vents shall not be less than one-half the size of the horizontal drainage branch that they serve. 12.16.3 Size of Relief Vents a.. The size of relief vents for circuit or loop vents of the drainage system shall be not less than one-half the size of the branch drain being served. b. Relief vents, where provided for drain stacks having ten or more branch intervals and relief vents for horizontal offsets in such drain stacks shall be the same size as the vent stack to which they connect.

Page 22: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

12.16.4 Size of Stack Vents and Vent Stacks a. The minimum required size of stack vents and vent stacks shall be in accordance with Table 12.16 12.16.4. For the purpose of sizing, the length of a vent stack or stack vent shall be the developed length from its lowest connection with the drainage system to its termination in the open air, including any vent headers. b. Vent stacks shall be sized based on the total drainage fixture unit load (DFU) at the base of the stack that they serve. Connections of vents to the vent stack on floor levels above the base of the stack shall not increase its size. c. For the purpose of sizing, the length of a vent stack in Table 12.16.4 shall be the developed length from its connection to the base of the stack being vented to its termination in the open air, including any vent headers. 12.16.5 Vent Headers a. Vent headers or portions thereof shall be sized according to Table 12.16. b. The number of fixture units (DFU) used to size vent headers shall be the sum of all fixture units (DFU) on all stacks served by each section of the header. c.. The developed length of vent headers shall be the longest vent length from the vent connection at the base of the most distant stack to the vent terminal in the open air. d. The soil and waste stack size used to size the vent headers shall be the equivalent size capable of handling the fixture unit load (DFU) on the vent header; based on Table 11.5.1B. 12.16.6 Aggregate Size of Vent Terminals a. Each building sewer shall be vented by one or more vents extending from the drainage system, or branches thereof, to the open air above the roof. b. Stack vents and vent stacks shall be sized according to Table 12.16. c. b. The aggregate cross-sectional area of all vent terminals serving a sewer shall be not less than the cross-sectional area of the minimum required size of the building drain that they serve, at the point where it connects to the building sewer. (See Table 12.16.6 for the cross-sectional areas of pipes). EXCEPTION: The aggregate cross-sectional area requirement shall be exclusive of any requirements for larger vent terminals to prevent frost closure of the vent terminal under Section 12.5. d. c. One or more vent terminals having the aggregate cross-sectional area of a 3" vent terminal shall be permitted to vent a 4" building drain if the drainage fixture unit load (DFU) and number of bathroom groups served by the building drain does not exceed the maximum number allowed on a 3" building drain, as permitted by Section 12.16.6.c 11.5.6.c. 12.16.7 Underground Vent Piping The minimum size of vent piping installed underground shall be 1-1/2".

Page 23: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: 1. To coordinate the requirements of Section 12.16 with the necessary changes to the scope of Table 12.16 (proposed Table 12.16.4). 2. Figure 12.16.1 - B in the NSPC Illustrated will have to be revised. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 24: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee __________________________________________________________

2013 PROPOSED

CHANGES

National Standard Plumbing Code (NSPC)

_________________________________________________________________________________________________

180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

Page 25: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 01

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___8-05-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 Definition of Terms Chemical Dispensing System: Equipment that mixes potable water with chemicals to provide the user with a chemical solution that is diluted to a fixed or adjustable amount and is ready for use. Basis/Reason for Change: To define chemical dispensing system. The backflow prevention requirements are in Section 10.5.13.a. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 26: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 02

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___3-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 DEFINITION OF TERMS Combination Plumbing Fixture: A fixture combining one sink and a laundry tray, or a two- or three-compartment sink or laundry tray in one unit. Laundry Tray: A deep and wide sink, typically installed near automatic clothes washers. Similar to a laundry sink or laundry tub. Basis/Reason for Change: To make the text agree with Figure 1.2.19 in the NSPC Illustrated. To define "Laundry Tray". Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 27: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 03

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __6-08-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 DEFINITION OF TERMS Continuous Pressure: With regard to the proper application of backflow prevention devices, continuous pressure is if the device is normally subjected to continuous water supply pressure for periods of twelve (12) hours or more. Basis/Reason for Change: To define "continuous pressure" as used in Section 10.5.3 for required backflow prevention devices. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 28: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 04

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-08-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Chapter 1 - Definitions CTS: An abbreviation for "copper tube size". DR: An abbreviation for the "dimension ratio" of OD controlled plastic pipe that is based on the ratio of the outside diameter of the pipe divided by its minimum wall thickness. Lower DR ratings have higher pressure ratings. DIPS: An abbreviation for "ductile iron pipe size". IDR: An abbreviation for the "dimension ratio" of ID controlled plastic pipe that is based on the ratio of the inside diameter of the pipe divided by its minimum wall thickness. Lower IDR ratings have higher pressure ratings. IPS: An abbreviation for "iron pipe size". PS: An abbreviation for the relative "pipe stiffness" of plastic pipe that is based on the ratio of wall thickness, mean radius, and flexural modulus of elasticity. Higher PS ratings represent stiffer pipe. SDR: An abbreviation for "standard dimensional ratio" that relates to a specific ratio of average specified outside diameter to minimum wall thickness for outside diameter controlled plastic pipe. An abbreviation for the "standard dimension ratio" of OD controlled plastic pipe that is based on the ratio of the outside diameter of the pipe divided by its minimum wall thickness. Lower SDR ratings have higher pressure ratings.

Page 29: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

SIDR: An abbreviation for the "standard inside dimension ratio" of ID controlled plastic pipe that is based on the inside diameter of the pipe divided by its minimum wall thickness. Lower SIDR ratings have higher pressure ratings. Basis/Reason for Change: To clarify the abbreviations used to describe the sizes and ratings of the various pipe materials in the Tables in Chapter 3. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 30: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 05

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 ___Charles L Chalk Jr_________ Date 3 _________________ Jurisdiction/Company/ Mailing Address _______1 Kinwall Place Apt 2C____________________ City/State/Zip __Baltimore, Maryland 21236_____________________________________________ Phone __410-665-1522____ Fax ___Same_________ E-mail [email protected]___________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows ___X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _______1.2_________________ Dead End [dead leg] Potable Water: Any branch water line[s] terminating at a developed Length of more than six times the line size from an active potable water line by means of A valve, plug or cap. Basis/Reason for Change: Piping with no flow is a concern with bacteria growth, harboring stagnant water, legionella Bacteria growth, microbial growth and contaminants introduced through cross-connections. This is to control contaminants of the entire potable water system Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 31: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 06

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ X _ Change subsection to read as follows _____ Delete subsection and substitute as follows __ X_ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 Developed Length and Equivalent Length Developed Length of Pipe: The length of a pipe line measured along the center line of the pipe and its fittings. Where pipe sizing tables are based on only the developed length of pipe, verify that there has been an allowance for an equivalent length of fittings. Equivalent Length of Fittings and Valves: The length of straight pipe of a specific diameter that would produce the same frictional resistances as a particular fitting or line compromised of pipe and fittings. The equivalent length of straight pipe that would produce the same resistance to flow as a specific fitting or valve of the same pipe size. Equivalent Length of Pipe, Fittings, and Valves or Total Equivalent Length: The sum of the developed lengths of pipe in a pipe line and the equivalent lengths of the fittings and valves in that line. Basis/Reason for Change: To clarify the definitions of developed length and equivalent length of pipe, fittings, and valves. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 32: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 07

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___12-10-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 DEFINITION OF TERMS Effective Opening: The minimum cross-sectional area at the point of water supply discharge, measured or expressed in terms of (1) diameter of a circle, or (2) if the opening is not circular, the diameter of a circle of equivalent cross-sectional area. See Figures 1.2.26 and 1.2.27. Basis/Reason for Change: Effective openings are not minimums. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 33: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 08

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __3-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 DEFINITION OF TERMS Existing Plumbing System: An existing A plumbing system, or any part thereof, installed prior to the effective date of the adoption of this Code by the Adopting Agency or Authority Having Jurisdiction. Existing Plumbing Work: An existing plumbing system, or any part thereof, installed prior to the effective date of this Code. Plumbing work installed prior to the effective date of the adoption of this Code by the Adopting Agency or Authority Having Jurisdiction. Basis/Reason for Change: To clarify the definitions. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 34: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 10

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-24-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 DEFINITION OF TERMS Horizontal Branch Drain: A drain pipe extending laterally from a soil stack, waste stack or building drain with or without vertical sections or branches, that receives the waste discharges from one or more fixture drains and conducts the waste to a soil stack, waste stack, or building drain. to a building drain or building sewer, or branches thereof, with or without vertical sections or branches, that receives discharge from two or more fixture drains and is sized as a branch of the building drain in accordance with Table 11.5.1A. Horizontal Fixture Branch: A drain pipe extending laterally to a drain stack with a reduced allowable DFU rating for the branch in Table 11.5.1B to prevent filling the stack at the branch connection, causing pressure fluctuations in the stack and sluggish flow in the branch drain. Basis/Reason for Change: To clarify the difference between horizontal branch drains and horizontal fixture branches. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 35: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 11

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ _ Change subsection to read as follows _____ Delete subsection and substitute as follows __ __ Add new subsection to read as follows __X__ Delete subsection without substitution Code Section: 1.2 Installed . Installed: Altered, changed or a new installation. Basis/Reason for Change: The definition is confusing and unnecessary. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 36: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 12

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-11-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 DEFINITION OF TERMS Radon Gas: A colorless, odorless, tasteless, radioactive, and chemically inert gas that is naturally produced in the ground through the normal decay of uranium, which decays to radium, which then decays to radon. Basis/Reason for Change: To add the source of radon gas. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 37: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 13

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 Subsoil Drain Subsoil Drain: A drain that collects subsurface or seepage water and conveys it to a place point of disposal. Basis/Reason for Change: Subsoil drains terminate at a point rather than a "place". A place has an area. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 38: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 14

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 Stack Vent; Vent, Branch; Vent Header; Vent Stack Stack Vent: The extension of the top of a soil or waste stack above the highest horizontal drain connected to the stack to a vent header or outdoor vent terminal. Vent, Branch: A vent connecting one or more individual fixture vents with to a vent stack, or stack vent, or outdoor vent terminal. Vent Header: Vent piping that connects two or more stack vents or vent stacks to an outdoor vent terminal. Vent Stack: A vertical vent pipe that extends through one or more stories and that is intended to provide circulation of air to and from the drainage system from the base of a drain stack to its stack vent or to an outdoor vent terminal. Basis/Reason for Change: To clarify the definitions of the listed vent piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ___________________________________________________________________________________

Page 39: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 14a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___2-1-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 1.2 DEFINITIONS OF TERMS Wash Fountain: A large circular or semi-circular sink that is equivalent to a lavatory except it serves more than one person. Wash Sink: A long rectangular sink that is equivalent to a lavatory except it serves more than one person. Basis/Reason for Change: Wash fountains and wash sinks are listed in Table 11.4.1 and included in Section 7.6.5 as lavatory equivalents, but are not defined. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 40: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 15

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___7-27-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Section 1.2 Definition of Terms Water Temperature Control Valve: A valve of the pressure balance, thermostatic mixing, or combination pressure balance/thermostatic mixing type that is designed to control water temperature to reduce the risk of thermal shock and/or scalding. Basis/Reason for Change: To indicate that the function of water temperature control valves is to prevent thermal shock as well as scalding. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 41: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 16

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __4-14-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 2.3.1 Footnote (2): Long radius fittings shall not be used to connect fixture trap arms to vertical drain and vent piping. Exception: Long radius fittings are permitted to drain two lavatories into a common drain with a common vent per Section 2.3.1. Figure 2.3.1-A, Note 4: Long pattern radius fittings are not permitted to connect fixture trap arms to vertical drain and vent piping because the vent opening at the end of the trap arm will be below the weir of the trap, causing the trap to self-siphon. Exception: Long radius fittings are permitted to drain two lavatories into a common drain with a common vent per Section 2.3.1 to permit the common drain piping to be cleared with a drain auger or snake. Self-siphonage is not an issue with the low drain flow rate of lavatories. Figure 2.3.1-D, Note 2: Long pattern radius fittings are not permitted to connect fixture trap arms to vertical drain and vent piping because the vent opening at the end of the trap arm will be below the weir of the trap, causing the trap to self-siphon. Exception: Long radius fittings are permitted to drain two lavatories into a common drain with a common vent per Section 2.3.1 to permit the common drain piping to be cleared with a drain auger or snake. Self-siphonage is not an issue with the low drain flow rate of lavatories.

Page 42: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Change "short and long pattern fittings" to "short and long radius fittings" in the following locations: Figure 2.3.1 - A: Note 3. Figure 2.3.1 - B: Note 1 (2 places). Figure 2.3.1 - C: Note 1 (2 places). Figure 2.3.1 - D: Note 1. Figure 2.3.1 - D: Title. Figure 2.3.1 - D: In the diagram (5 places). Figure 2.3.2: Note 2. Basis/Reason for Change: To clarify the Exception to Section 2.3.1 that permits long radius fittings to drain two lavatories into a common drain with a common vent so that the common drain piping can be cleared with a drain auger or snake without crossing over from one lavatory to the other. To change short and long pattern fittings to short and long radius fittings. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 43: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 16a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___2-1-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 2.3.1 Uses for Drainage Fittings a. Changes in direction of drainage piping shall be made with long radius drainage fittings except where short radius fittings are required or permitted. in Table 2.3.1. Refer to Table 2.3.1 for permissible drainage fittings for changes in direction.

1. Short radius fittings are required to connect individual fixture trap arms to vertical drain and vent piping.

2. Short radius fittings may be used in the drain piping for an individual fixture. 3. Short radius fittings shall not be used in drain piping serving two or more fixtures. 4. Short radius fittings shall not be used at the base of stacks. 5. Short radius fittings may be used in vent piping.

Basis/Reason for Change: To clarify where short radius drainage fittings are required or permitted, in lieu of long radius drainage fittings. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 44: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 17

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___4-13-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 2.3.3 Back-to-Back Fixtures 2.3.3 Back-to-Back Back-Outlet Fixtures Basis/Reason for Change: To clarify the title of Section 2.3.3. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 45: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 18

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-31-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 2.12 SLEEVES 2.12 PIPE SLEEVES Basis/Reason for Change: To clarify that the sleeves are required for pipe, not other devices. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 46: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
cwhite
Typewritten Text
13 19
Page 47: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 20

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __10-2-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 2.16 Freezing and Overheating

a.1 Water service piping shall be installed below recorded frost lines. Minimum earth cover above the top of the pipe exterior piping shall be _____ inches.

a.2 Minimum earth cover above the top of exterior building drains and building sewers that connect to public sewer systems shall be _____ inches. Minimum earth cover above the top of exterior building drains and building sewers that connect to individual sewage disposal systems shall be _____ inches. Basis/Reason for Change: To add exterior building drains to the requirements of Section 2.16 for the earth cover over drain piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 48: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 21

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___12-10-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 2.20 WASHROOM & TOILET ROOM REQUIREMENTS REQUIREMENTS FOR WASHROOMS, TOILET ROOMS & BATHROOMS Basis/Reason for Change: To add the requirements for light and ventilation to bathrooms. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 49: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 22

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 ___Charles L Chalk Jr_________ Date 3 _________________ Jurisdiction/Company/ Mailing Address _______1 Kinwall Place Apt 2C____________________ City/State/Zip __Baltimore, Maryland 21236_____________________________________________ Phone __410-665-1522____ Fax ___Same_________ E-mail [email protected]___________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows ___X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _______2.23_________________ C. The installation or removal of any part of a potable water piping system as defined in section 1.2 Creating abandoned piping, valved capped or plugged shall be avoided. Basis/Reason for Change: Piping with no flow is a concern with bacteria growth, harboring stagnant water, legionella Bacteria growth, microbial growth and contaminants introduced through cross-connections. This is to control contaminants of the entire potable water system Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 50: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 23

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-06-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Sections: 2.25.2 & 2.25.5 2.25.2 Food Service Equipment and Fixtures a. All food and/or drink service equipment, including sinks, dishwashers, ice machines, brewers, and dispensers, shall be indirectly connected indirectly discharge to the drainage system through an air gap or air break in accordance with Chapter 9. EXCEPTION: If a properly vented floor drain is installed adjacent to a food service fixture that is properly trapped and vented, the food service fixture shall be permitted to connect directly to the drainage system on the sewer side of the floor drain. b. Where multi-compartment sinks are drained indirectly, each compartment shall discharge separately into a floor sink waste receptor that is capable of draining all of the compartments simultaneously. 2.25.5 Sanitary Floor Sinks a. Where sanitary floor sinks serve as waste receptors in food handling areas, they shall not be located where subject to foot traffic or other loads on their grates, if provided. b. Floor sinks in food handling areas Sanitary floor sinks shall be of the sanitary design with smooth, corrosion-resistant surfaces that can be readily cleaned. They shall include a dome strainer over the outlet opening to prevent clogging the drain or a sediment bucket to collect solids.

Page 51: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: To clarify the requirements for waste receptors in food handling areas and the requirements for sanitary floor sinks in Sections 2.25.2 and 2.25.5. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 52: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 24

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __3-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 3.3.3 Fixtures a. Plumbing fixtures shall be constructed from approved materials having smooth, non-absorbent surfaces and, be free from defects, and except as permitted elsewhere in this Code, shall conform to the standards cited listed in Table 3.1.3. b. Refer to Chapter 7 for the requirements for specific plumbing fixtures. b. c. Materials for special use fixtures not otherwise covered in this Code shall be constructed of materials especially suited to the use for which the fixture is intended. Basis/Reason for Change: To add a Note from the Illustrated NSPC to the body of the Code. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 53: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 25

Page 1 of 7

page 1 of 7 1-11-2013

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-11-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 3.4.6 Limits on Lead Content and related Sections 1.2 Lead Content

a. Material used in potable water supply systems, including piping, faucets, and valves, shall be "lead-free" as defined in the current Federal Law. b. Drinking water system components shall comply with the lead leachate requirements of NSF 61. Refer to Section 3.1.5 for components that are within the scope of NSF 61.

1.2 End-Use Device: A water supply device that dispenses potable water such as a faucet, drinking fountain, kitchen hot water dispenser, bathtub and/or shower faucet, shower head, flush valve, hose bibb, or supply connection to an appliance. 1.2 Lead-Free: “Lead-free” means containing not more than a weighted average of 0.25% lead for the wetted surfaces of pipes, tubes, fittings for pipes and tubes, plumbing supply fittings, and fixtures. "Lead-free" solder and flux contains no more than 0.2% lead. 1.2 Pipe or Tube Fitting: A piping component that connects sections of pipes or tubes, such as a coupling, elbow, reducer, tee, flange, union, or flexible connector. 1.2 Plumbing Supply Fitting: A piping component other than a pipe fitting or tube fitting that performs a required function in potable water supply piping such as a faucet, adapter, valve, strainer, filter, temperature limiting or control device, pressure switch, thermometer well, expansion compensator, or water hammer arrestor.

Page 54: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

page 2 of 7 1-11-2013

1.2 Weighted Average Lead Content: The weighted average lead content of a "lead-free" pipe, pipe fitting, plumbing fitting, or fixture shall be calculated by using the following formula: For each wetted component, the percentage of lead in the component shall be multiplied by the ratio of the wetted surface area of that component to the total wetted surface area of the entire product to arrive at the weighted percentage of lead of the component. The weighted percentage of lead of each wetted component shall be added together, and the sum of these weighted percentages shall constitute the weighted average lead content of the product. The lead content of the material used to produce wetted components shall be used to determine compliance with "lead-free". For lead content of materials that are provided as a range, the maximum content of the range shall be used. Table 3.1.3 - X. MISCELLANOUS:

21. Drinking Water System Components - Health Effects: NSF 61 - 2007 2011 22. Weighted Average Lead Content Evaluation Procedure to a 0.25% Lead Requirement NSF 61-Annex G - 2009. 23. Drinking Water System Components - Lead Content NSF 372 - 2010

3.1.5 Health Effects of Drinking Water Components a. The health effects of drinking water components shall comply with NSF 61. Components within the scope of NSF 61 have surfaces in contact with potable water. Components include, but are not limited to, plastic materials, plastic and metallic pipe, pipe-related products, protective materials, joining and sealing materials, process media, treatment devices, transmission devices, distribution devices, and end-point devices. b. Refer to Section 3.4.6 for the limit on the lead content of pipes, tubes, pipe fittings, tube fittings, plumbing supply fittings, fixtures, and end-use devices that are intended to dispense potable water for human consumption by drinking or cooking. 3.3.6 Plumbing Supply Fittings Reserved Plumbing supply fittings covered under the scope of NSF 61 shall comply with its requirements. Refer to Section 3.1.5 for components that are within the scope of NSF 61. 3.4 POTABLE WATER PIPING 3.4.1 Plastic Piping Plastic piping materials used for the conveyance of potable water shall comply with NSF 14 and be marked accordingly.

Page 55: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

page 3 of 7 1-11-2013

3.4.2 Water Service Piping Water service pipe and pipe fittings piping to the point of entrance into the building through a foundation wall or floor shall be of materials listed in Table 3.4 and shall be water pressure rated not less than 160 psig at 73 deg F. See Table 3.4.2. Water service pipe and fittings shall comply with NSF 61 Section 3.4.6 for the limits on lead content. 3.4.3 Water Distribution Piping Water piping for the distribution of hot or cold water within buildings shall be of material listed in Table 3.4, and shall be water pressure rated for not less than 100 psi at 180 deg F and 160 psi at 73 deg F. Plastic piping used in hot water distribution shall be installed in accordance with the requirements of Section 10.15.8. Water distribution pipe and pipe fittings shall comply with NSF 61 Section 3.4.6 for the limits on lead content. NOTE: The working pressure rating of certain approved plastic piping materials varies depending on the pipe size, material composition, wall thickness, and methods of joining. See Table 3.4.3. 3.4.4 Fittings a. Fittings for water supply piping shall be compatible with the pipe material used. b. Insert fittings for plastic tubing shall be the metallic or plastic type that comply with the standards listed in Table 3.1.3. 3.4.5 Material Ratings and Installation a. Piping used for domestic potable water shall be suitable for the maximum temperature, pressure, and velocity that may be encountered, including temporary increases and surges. b. Relief valve temperature and pressure relief settings shall not exceed the pipe, tubing tube or fitting manufacturer's recommendations. c. Pipe Piping and fittings shall be installed in accordance with the manufacturer's installation instructions and the acceptable material standards, recognizing any limitations in use. 3.4.6 Limit Limits on Lead Content a. Materials used in potable water supply systems, including piping, faucets and valves, shall be "lead-free" as defined by current Federal Law. b. Drinking water system components shall comply with the lead leachate requirements of NSF 61. Refer to Section 3.1.5 for components that are within the scope of NSF 61. a. Pipes, tubes, fittings for pipes and tubes, plumbing supply fittings, fixtures, and end-use devices that are intended to dispense potable water for human consumption by drinking and cooking shall be "lead-free", containing not more than a weighted average of 0.25% lead with respect to the wetted surfaces, as defined in Section 1.2 of this Code. b. Solder and flux for soldered joints in potable water piping shall be "lead-free", containing not more than 0.2% lead. Flux for making soldered joints in "lead-free" piping shall be rated for the temperatures necessary for making joints in "lead-free" piping.

Page 56: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

page 4 of 7 1-11-2013

c. Potable water supply components that are within the scope of NSF 61 for drinking water system components and are required to be "lead-free" shall be certified to comply with NSF 61 and either its Annex G or NSF 372. d. Potable water supply components that are not within the scope of NSF 61 for drinking water system components but are required to be "lead-free" shall be certified to comply with NSF 372. e. Potable water supply components that are not required to be "lead-free" shall be rated for use with potable water and shall not contain more than 4% lead by dry weight for plumbing supply fittings and fixtures or more than 8% lead by dry weight for pipes, tubes, and fittings for pipes and tubes. f. The following potable water end-use devices and water supply piping are considered to be intended to convey water for human consumption through drinking or cooking and shall be "lead-free", including their associated supply piping: 1. kitchen sink faucets 2. bar sink faucets 3. private bathroom sink faucets 4. drinking fountain faucets 5. kitchen hot water dispensers 6. point-of-use water treatment devices 7. the water supply to ice makers 8. the water supply to potable water heaters 9. recirculated hot water piping 10. the water supply to misting systems for produce in food markets 11. the water supply to cooking equipment for food in commercial kitchens 12. the water supply to production equipment for processed food containing water 13. any other end-use devices and piping that convey water for human consumption EXCEPTION: Tank-type water heaters shall not be required to be "lead-free" unless there is an industry standard for "lead-free" tank-type water heaters and they are required to be "lead-free" by the Authority Having Jurisdiction. g. The following piping components shall be "lead-free" when associated with "lead-free" end-use devices and piping that is required to be "lead-free:" 1. main service shutoff valves 2. water service backflow prevention devices 3. water meters 4. pressure booster pumps 5. pressure reducing valves 6. strainers 7. water filters 8. check valves 9. control valves 10. vacuum breakers 11. water hammer arrestors 12. master hot water mixing valves 13. in-line tempering valves 14. hot water recirculating pumps 15. branch piping shutoff valves

Page 57: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

page 5 of 7 1-11-2013

16. balancing valves 17. fixture shutoff valves 18. solenoid valves 19. tankless water heaters 20. any other piping components associated with end-use devices or piping that are required to

be "lead-free" h. The following potable water end-use devices, water supplies, and components are not considered to be intended to convey water for human consumption through drinking or cooking and are not required to be "lead-free", including their associated water supply piping, unless their associated piping also serves end-use devices and water supplies that must be "lead-free". 1. bathtub faucets 2. shower valves, heads, and adapters 3. tank-type water heaters 4. flush valves for water closets 5. flush valves for urinals 6. flush valves for bidets 7. shutoff valves for clothes washing machines 8. lavatory faucets in public toilet rooms 9. laundry sink faucets 10. service sink faucets 11. faucets for laboratory applications 12. hose bibbs 13. trap seal priming devices 14. backflow prevention devices that supply non-potable applications 15. fire hose valves 16. water hammer arresters 17. the water supply to dish washers 18. the water supply to whirlpools, spas, therapy pools, and swimming pools 19. the water supply to boilers and heating hot water generators 20. the water supply to humidifiers 21. the water supply to irrigation systems and other non-potable applications 22. the water supply to food production equipment that does not contact the food 23. any other end-use devices and water supplies that do not convey water for human

consumption EXCEPTION: Tank-type water heaters shall not be required to be "lead-free" unless there is an

industry standard for "lead-free" tank-type water heaters and they are required to be "lead-free" by Section 3.4.6, as dictated by the Authority Having Jurisdiction.

3.4.7 Shutoff Valves a. All gate valves, ball valves, butterfly valves, globe valves, and other shutoff valves in water service piping and water distribution piping shall comply with the requirements of NSF 61. that supply potable water for human consumption by drinking or cooking shall be "lead-free" in accordance with Section 3.4.6. b. Shutoff valves that must be "lead-free" and are within the scope of NSF 61 shall comply with the requirements of NSF 61 and either its Annex G or NSF 372.

Page 58: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

page 6 of 7 1-11-2013

c. Shutoff valves that must be "lead-free" but are not within the scope of NSF 61 shall comply with NSF 372. d. Shutoff valves that are not required to be "lead-free" shall be rated for use with potable water and shall not contain more than 4% lead by dry weight. Section 4.2.4 Soldered f. Flux for making soldered joints in "lead-free" piping shall be rated for the temperatures necessary for making joints in "lead-free" piping. 7.1 FIXTURE STANDARDS 7.1.1 General Plumbing fixtures, plumbing fixture trim, and plumbing appliances shall comply with the standards listed in Table 3.1.3. Plumbing supply fittings covered under the scope of NSF 61 shall comply with the requirements of NSF 61. 7.1.2 Fixture Faucets and other End-Use Devices a. Fixture faucets and other end-use devices that supply potable water for human consumption by drinking or cooking shall be "lead-free" in accordance with Section 3.4.6. b. Fixture faucets and other end-use devices that must be "lead-free" and are within the scope of NSF 61 shall comply with the requirements of NSF 61 and either its Annex G or NSF 372. c. Fixture faucets and other end-use devices that must be "lead-free" but are not within the scope of NSF 61 shall comply with NSF 372. d. Fixture faucets and other end-use devices that are not required to be "lead-free" shall be rated for use with potable water and shall not contain more than 4% lead. 10.1 QUALITY OF WATER SUPPLY a. Only potable water shall be supplied to plumbing fixtures used for drinking, bathing, culinary use, laundry use, cleaning, or the processing of food, medical, or pharmaceutical products. 10.20 NFPA 13D Multipurpose Residential Fire Sprinkler Systems 10.20.2 General f. NFPA 13D multipurpose piping systems shall comply with the "lead-free" requirements of this Code if the piping, including parallel looped branches, supplies one or more end-use devices or equipment that are required to be "lead-free" by Section 3.4.6. The fire sprinklers in such piping shall be "lead-free". EXCEPTIONS: (1) Sprinkler-only branch supply piping to one or more individual sprinklers.

Page 59: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

page 7 of 7 1-11-2013

(2) Sprinklers supplied by individual sprinkler-only branch piping. (3) Plumbing-only branch supply piping to end-use devices or equipment that are not required to

be "lead-free". 10.20.4 Materials for Combined System Piping d. Piping within combined piping systems that conveys water to outlets for human consumption by drinking or cooking shall be "lead-free" in accordance with Section 3.4.6. Basis/Reason for Change: To incorporate the requirements of the Safe Drinking Water Act for "lead-free" plumbing into the National Standard Plumbing Code. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 60: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 26

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 3.7 Storm Drain Piping 3.7.5 Plastic Piping a. Pipe and fittings classified as standard dimension ratio that are underground outside of buildings shall be SDR 35 or heavier (lower SDR number). Pipe and fittings within buildings shall be SDR 26 or heavier (lower SDR number), except that SDR 35 fittings shall be permitted. b. Pipe and fittings classified by pipe stiffness that are underground outside of buildings shall be PS-46 or heavier (higher PS number). Pipe and fittings within buildings shall be PS-100 minimum. Basis/Reason for Change: SDR 26 plastic piping for indoor sanitary drainage and vent piping is not permitted to have SDR 35 fittings. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 61: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 27

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part I 2 ASTM A888-2009 -2011 3 ASTM A377-2003 (2008e1) (2008)e1 3 AWWA C151/A21.51 - 2009 4 AWWA C110/A21.10 - 2008 2012 5 AWWA C104/A21.4 - 2008 w/erratum 2010 6 ASTM A53 - 2010 2012 8 ASME B16.4-2006 -2011 9 ASME B16.3-2006 -2011 13 AWWA C153/A21.53-2006 -2011 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part I. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 62: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 28

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ____David Jaffe_________________ Date 3 ___1/17 /2013___ Jurisdiction/Company/Cast Iron Soil Pipe Institute Mailing Address _1064 Delaware Ave SE ______________ City/State/Zip _____Atlanta, GA Zip Code: 30316___________________ Phone ___404-622-0073____ Fax ___678-973-2845_____ E-mail _______________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __x___ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____Table 3.1.3 I #1 Hub & Spigot Cast Iron Soil Pipe & Fittings:_____ASTM A74-2006____ ASTM A74-2012_____________ Basis/Reason for Change: To update the National Standard Plumbing Code to reflect the most newest revision ASTM A74-2012 Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 63: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 29

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ____David Jaffe___________ Date 3 ________1/17 /2013_________ Jurisdiction/Company/Cast Mailing Address _ Iron Soil Pipe Institute 1064 Delaware Ave SE _________________ City/State/Zip _____Atlanta, GA 30316______________________________ Phone __404-622-0073____ Fax __678-973-2845_____ E-mail ______________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __x_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____Table 3.13 I #2 Hubless Cast Iron Soil Pipe & Fittings:____CISPI 301-2005 and ASTM A888-2007a__________________ CISPI 301-2012 ASTM A888-2012 Basis/Reason for change To update the National Standard Plumbing Code to reflect the most newest revision. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 64: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 30

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-16-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part II 2 ASME B16.15-2006 -2011 3 ASME B16.24-2006 -2011 4 ASME B16.23-2002 (2006) -2011 5 ASME B16.18-2001 (2005) 2012 8 ASTM B302 - 2007 2012 11 ASME B16.29-2007 2012 12 ASME B16.22-2001 (2010) 2012 15 ASME B16.26-2006 -2011 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part II. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 65: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 31

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145_________________________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X___ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ____Various editorial changes – see below_______________________

1. Section 3.1.3 – Change name of organization from American Society of Sanitary Engineers to ASSE International.

2. Table 3.1.3 Part II Item 17 – Change title from Push-Fit Fittings for Copper Water Tube to Push-

Fit Fittings. Change standard designation from ASSE 1061-2006 to ASSE 1061-2011

3. Table 3.1.3 Part III Item 65 – Change title from Push-Fit Fittings for Copper Water Tube to Push-Fit Fittings. Change standard designation from ASSE 1061-2006 to ASSE 1061-2011

4. Table 3.1.3 Part IV Item 29 – Change title from Dielectric Pipe Unions to Dielectric Pipe Union.

Change standard designation from ASSE 1079-2005 to ASSE 1079-2012

5. Table 3.1.3 Part IV Item 30 – Change title from Performance Requirements for Removable and Non-Removable Push-Fit Fittings to Push-Fit Fittings. Change standard designation from ASSE 1061-2006 to ASSE 1061-2011

6. Table 3.1.3 Part V Item 1 – Change title from Anti-Siphon Fill Valves (Ballcocks) for Gravity

Water Closet Flush Tanks to Anti-Siphon Fill Valves for Water Closet Tanks

Page 66: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

7. Table 3.1.3 Part VI Item 2 – Change Designation from ASSE 1016-2005 to ASSE 1016-

2011/ASME A112.1016-2011/CSA B125.16-11

8. Table 3.1.3 Part VI Item 5 – Change title from Flushometers (pressurized flushing devices) to Pressurized Flushing Devices (Flushometers) for Plumbing Fixtures

9. Table 3.1.3 Part VI Item 6 – Change title from Laboratory Faucet Vacuum Breakers to

Laboratory Faucet Backflow Preventers

10. Table 3.1.3 Part VI Item 14 – Change title from Temperature Actuated Flow Reduction (TAFR) Valves for Individual Fixture Fittings to Temperature Actuated, Flow Reduction (TAFR) Valves for Individual Supply Fittings

11. Table 3.1.3 Part VII Item 5 – Change title from Food Waste Disposal Units, Household to

Plumbing Aspects of Residential Food Waste Disposer Units

12. Table 3.1.3 Part VIII Item 2 – Change title from Anti-Siphon Fill Valves (Ballcocks) for Gravity Water Closet Flush Tanks to Anti-Siphon Fill Valves for Water Closet Tanks

13. Table 3.1.3 Part VIII Item 7 – Change title from Flushometers (pressurized flushing devices) to

Pressurized Flushing Devices (Flushometers) for Plumbing Fixtures

14. Table 3.1.3 Part VIII Item 10 – Change title from Water Pressure Reducing Valves to Water Pressure Reducing Valves for Domestic Water Distribution Systems

15. Table 3.1.3 Part VIII Item 19 – Change title from Wall Hydrants, Vacuum Breaker Type, Freeze

Resistant, Automatic Draining to Wall Hydrant with Backflow Protection and Freeze Resistance. Change standard designation from ASSE 1019-2004 to ASSE 1019-2011

16. Table 3.1.3 Part VIII Item 20 – Change title from Trap Seal Primer Devices – Drainage and

Electronic Types to Trap Seal Primer Devices – Drainage Types and Electronic Design Types

17. Table 3.1.3 Part VIII Item 21 – Change title from Wall Hydrants, Dual Check Backflow Type, Freeze Resistant to Dual Check Backflow Preventer Wall Hydrants – Freeze Resistant Type

18. Table 3.1.3 Part VIII Item 22 – Change title from Pressure Balancing In-Line Mixing Valves for

Individual Fixture Fittings to Individual Pressure Balancing In-Line Valves for Individual Fixture Fittings

19. Table 3.1.3 Part IX Item 2 – Change title from Backflow Preventers with Intermediate

Atmospheric Vent to Backflow Preventers with an Intermediate Atmospheric Vent

20. Table 3.1.3 Part IX Item 3 – Change title from Detector Assembly, Double Check Type to Double Check Detector Fire Protection Backflow Prevention Assemblies. Change standard designation from ASSE 1048-2009 to ASSE 1048-2011

21. Table 3.1.3 Part IX Item 4 – Change title from Detector Assembly, Reduced Pressure Type to

Reduced Pressure Detector Fire Protection Backflow Prevention Assemblies. Change standard designation from ASSE 1047-2009 to ASSE 1047-2011

Page 67: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

22. Table 3.1.3 Part IX Item 5 – Change title from Double Check Valve Assembly to Double Check

Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies. Change standard designation from ASSE 1015-2009 to ASSE 1015-2011

23. Table 3.1.3 Part IX Item 6 – Change title from Dual Check Valve Type Backflow Preventer to

Dual Check Backflow Preventers

24. Table 3.1.3 Part IX Item 8 – Change title from Reduced Pressure Principle Backflow Preventer to Reduced Pressure Principle Backflow Preventers and Reduced Pressure Principle Fire Protection Backflow Preventers. Change standard designation from ASSE 1013-2009 to ASSE 1013-2011

25. Table 3.1.3 Part IX Item 9 – Change title from Vacuum Breaker, Atmospheric (pipe-applied) to

Atmospheric Type Vacuum Breakers

26. Table 3.1.3 Part IX Item 10 – Change title from Vacuum Breakers, Hose Connection to Hose Connection Vacuum Breakers

27. Table 3.1.3 Part IX Item 11 – Change title from Vacuum Breaker, Laboratory Faucet to

Laboratory Faucet Backflow Preventers

28. Table 3.1.3 Part IX Item 12 – Change title from Vacuum Breaker, Pressure to Pressure Vacuum Breaker Assembly

29. Table 3.1.3 Part IX Item 14 – Change title from Vacuum Breakers, Spill Resistant to Spill Resistant Vacuum Breakers

30. Table 3.1.3 Part IX Item 19 – Change title from Outdoor Enclosures for Backflow Prevention

Devices to Outdoor Enclosures for Fluid Conveying Components

31. Table 3.1.3 Part IX Item 21 – Change title from Backflow Preventors for (Carbonated) Beverage Dispensing Equipment to Backflow Preventer for Beverage Dispensing Equipment

32. Table 3.1.3 Part XI Item 11 – Change title from Field Test Procedures for Backflow Prevention

Devices to Backflow Prevention Assembly Testers and change designation from ASSE 5010-2009 to ASSE/IAPMO/ANSI 5110-2009.

33. Table 3.1.3 Part XI Item 12 – Change title from Professional Qualification Standard for Backflow Prevention Assembly Testers, Repairers, and Surveyors to Cross-Connection Control Professional Qualifications Standard. Change standard designation from ASSE Series 5000-2009 to ASSE/IAPMO/ANSI Series 5000-2009.

34. Table 3.1.3 Part XI Item 18 – Change title from Professional Qualification Standard for Medical

Gas Personnel to Professional Qualifications Standard for Medical Gas Systems Personnel. Change standard designation from ASSE Series 6000-2006 to ASSE/IAPMO/ANSI Series 6000-2012.

35. Section E.8.6 a. – Change standard designation from ASSE 1050-2002 to ASSE 1050-2009

Page 68: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

36. Section E.8.6 b. – Change standard designation from ASSE 1051-2002 to ASSE 1051-2009. Change title from Individual and Branch Type Air Admittance Valves for Plumbing Drainage Systems to Individual and Branch Type Air Admittance Valves for Sanitary Drainage Systems

Basis/Reason for Change:

1. Table 3.1.3 Part II Item 17 – Editorial change to correct standard title and designation of current

year of edition.

2. Table 3.1.3 Part III Item 65 – Editorial change to correct standard title and designation of current year of edition.

3. Table 3.1.3 Part IV Item 29 – Editorial change to correct standard title and designation of current

year of edition.

4. Table 3.1.3 Part IV Item 30 – Editorial change to correct standard title and designation of current year of edition.

5. Table 3.1.3 Part V Item 1 – Editorial change to correct standard title.

6. Table 3.1.3 Part VI Item 2 – Editorial change to reflect harmonization of standard with ASME and CSA and designation of current year of edition.

7. Table 3.1.3 Part VI Item 5 – Editorial change to correct standard title.

8. Table 3.1.3 Part VI Item 6 – Editorial change to correct standard title.

9. Table 3.1.3 Part VI Item 14 – Editorial change to correct standard title.

10. Table 3.1.3 Part VII Item 5 – Editorial change to correct standard title.

11. Table 3.1.3 Part VIII Item 2 – Editorial change to correct standard title.

12. Table 3.1.3 Part VIII Item 7 – Editorial change to correct standard title.

13. Table 3.1.3 Part VIII Item 10 – Editorial change to correct standard title.

14. Table 3.1.3 Part VIII Item 19 – Editorial change to correct standard title and designation of

current year of edition.

15. Table 3.1.3 Part VIII Item 20 – Editorial change to correct standard title.

16. Table 3.1.3 Part VIII Item 21 – Editorial change to correct standard title.

17. Table 3.1.3 Part VIII Item 22 – Editorial change to correct standard title.

18. Table 3.1.3 Part IX Item 2 – Editorial change to correct standard title.

19. Table 3.1.3 Part IX Item 3 – Editorial change to correct standard title and designation of current year of edition.

Page 69: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

20. Table 3.1.3 Part IX Item 4 – Editorial change to correct standard title and designation of current

year of edition.

21. Table 3.1.3 Part IX Item 5 – Editorial change to correct standard title and designation of current year of edition.

22. Table 3.1.3 Part IX Item 6 – Editorial change to correct standard title.

23. Table 3.1.3 Part IX Item 8 – Editorial change to correct standard title and designation of current

year of edition.

24. Table 3.1.3 Part IX Item 9 – Editorial change to correct standard title.

25. Table 3.1.3 Part IX Item 10 – Editorial change to correct standard title.

26. Table 3.1.3 Part IX Item 11 – Editorial change to correct standard title.

27. Table 3.1.3 Part IX Item 12 – Editorial change to correct standard title.

28. Table 3.1.3 Part IX Item 14 – Editorial change to correct standard title.

29. Table 3.1.3 Part IX Item 19 – Editorial change to correct standard title.

30. Table 3.1.3 Part IX Item 21 – Editorial change to correct standard title.

31. Table 3.1.3 Part XI Item 11 – Editorial change to correct standard title and designation.

32. Table 3.1.3 Part XI Item 12 – Editorial change to correct standard title.

33. Table 3.1.3 Part XI Item 18 – Editorial change to correct standard title and designation of current year of edition.

34. Section E.8.6 a. – Editorial change to correct designation of current year of edition.

35. Section E.8.6 b. – Editorial change to correct standard title and designation of current year of

edition. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ________________________________________________________________________________

Page 70: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 32

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-16-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part III 4 ASTM D2661-2008 -2011 8 AWWA C900-2007 (2008) 9 ASTM D1785-2006 -2012 14 ASTM D2665-2009 -2012 16 ASTM D2949-2001a (2008)e1 -2010 17 ASTM D2729-2003 -2011 23 ASTM D2846-2009b -2009be1 24 ASTM F442-2009 -2012 25 ASTM F441-2009 -2012 26 ASTM F439-2009 -2011 29 ASTM D3035-2010 -2012e1 30 ASTM D2239-2003 -2012a 33 ASTM D2737-2003 -2012a 34 ASTM D3261-2010a -2012 40 ASTM D3517-2006 -2011 41 ASTM D3754-2006 -2011 42 ASTM D3262-2006 -2011 45 ASTM C700-2009 -2011 46 ASTM C412-2005a -2011 47 ASTM C14-2007 -2011 48 ASTM C76-2010a -2012

Page 71: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

50 ASTM F877-2007 -2011a 51 ASTM F876-2010 -2010e1 52 ASTM F1807-2010e1 -2011ae1 53 ASTM F1960-2010 -2011e1 54 ASTM F1281-2007 -2011 57 CSA B137.9-2009 w/update 1 59 ASTM F714-2010 -2012a 63 ASTM F1335-2004 Reserved 64 ASTM F2080-2009 -2012 69 ASTM D3261-2010a -2012 71 ASTM F1055-1998 (2006) -2011 79 ASTM F2159-2010 -2011 83 ASTM F1760-2001 (2005) -(2011) 84 ASTM F1760-2001 (2005) -(2011) Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part III. ASTM F1335-2004 Pressure-rated Composite Pipe and Fittings at Elevated Temperature Service, Classes 1 and 2 was withdrawn by ASTM in 2011. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________ Table 3.1.3 - Part III page 2 of 2

Page 72: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 33

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___8-05-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part III Non-Metallic Pipe and Fittings 34 Butt Heat Fusion Polyethylene (PE) Plastic Pipe Fittings for Polyethylene Plastic Pipe and

Fittings (1/2" to 48") ASTM D3261-2010a 69 Reserved Butt Heat Fusion Polyethylene (PE) Plastic Fittings for PE Pipe and Tubing

(1/2" to 48") ASTM D3261-2010a Basis/Reason for Change: To delete the duplicate listing of a standard for PE plastic pipe fittings. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 73: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 34

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part III. Non-Metallic Pipe and Fittings 76 Flexible Pre-Insulated Piping: (ASTM D2104, ASTM D2239, ASTM D3035, ASTM F714, ASTM

F876, ASTM F877, ASTM F1281, ASTM F1282) ASTM F2165-2002 (2008) Basis/Reason for Change: To add the piping that is within the scope of ASTM F2165. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 74: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 35

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 _David W. Ash_________ Date 3 _September 11, 2012_ Jurisdiction/Company/ Mailing Address _9911 Brecksville Road ___________________ City/State/Zip _Cleveland, Ohio 44141___________ Phone _216-447-7239___ Fax __________________ E-mail [email protected]___ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _Table 3.1.3, Part III__________________________ Add the following to this table: Chlorinated Poly(Vinyl Chloride) – Aluminum – Chlorinated Poly(Vinyl Chloride) (CPVC-AL-CPVC) ASTM F2855-2012 Basis/Reason for Change: CPVC/AL/CPVC pipe has been developed that is suitable for use as potable water piping, both as water service pipe and water distribution pipe. This product has been used successfully on a limited basis since 2007 based on an NSF standard 61 listing and a special engineered standard (SE) from NSF International. An ASTM standard has now been issued. Including this product in the NSPC will recognize another plumbing pipe option for installers. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 75: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 36

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-16-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part IV 4 AWS A5.8-2004 -2011 6 AWWA C606-2006 -2011 7 ASTM C1173-2008 -2010e1 9 AWWA C111/A21.11 -2012 13 ASTM C443-2010 -2011 15 ASTM D3139-1998 (2005) (2011) 19 ASTM D2235-2004 (2011) 20 ASTM D2564-2004 (2009)e1 -2012 21 ASTM D3138-2004 (2011) 31 AWWA C606-2006 -2011 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part IV. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 76: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 37

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ____David Jaffe___________ Date 3 ___1/17 /2013_____ Jurisdiction/Company/Cast Iron Soil Pipe Institute Mailing Address _1064 Delaware Ave SE________________ City/State/Zip _____Atlanta, GA 30316_________ Phone __404-622-0073_____ Fax _678-973-2845__ E-mail ________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __x_ Amend section with this editorial change _____ Change subsection to read as follows ____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _Table 3.13 IV #10 Rubber Gaskets for Cast Iron Soil Pipe And Fittings: ASTM C564-2003a__ ASTM C564-2009a__________________ Basis/Reason for Chan: To update the National Standard Plumbing Code to reflect the newest revision. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ___________________________________________________________________________________

Page 77: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 38

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ____David Jaffe____________ Date 3 _1/17 /2013___ Jurisdiction/Company/ Cast Iron Soil Pipe Institute Mailing Address _1064 Delaware Ave SE ___________________ City/State/Zip _____Atlanta, GA 30316________ Phone ___404-622-0073______ Fax ___678-973-2845__ E-mail ___________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __x_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ______Table 3.1.3Part IV #11 CISPI 310-2006_ ASTM C1277-2006_ __CISPI 310-2012 ASTM C1277-2012_________________ Basis/Reason for Change: To update the National Standard Plumbing Code to reflect the newest revision. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 78: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 39

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ____David Jaffe___________ Date 3 __1/17 /2013_____ Jurisdiction/Company/ Cast Iron Soil Pipe Institute Mailing Address _1064 Delaware Ave SE___________________ City/State/Zip _____Atlanta, GA 30316__________________ Phone ___404-622-0073_ Fax _678-973-2845___ E-mail _________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __x_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____Table 3.1.3 IV #28 Heavy Duty Couplings for Hubless Pipe and Fittings: C1540-2004_______ ASTM C1540-2011__________ Basis/Reason for Change: To update the National Standard Plumbing Code to reflect the newest revision. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 79: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 40

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __4-22-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part IV Pipe Joints, Joining Materials, Couplings, Gaskets 6. Grooved and Shouldered Joints (Split Couplings) AWWA C606-2006 ASTM F1476-2007 Basis/Reason for Change: To add ASTM F1476 to Table 3.1.3 as referenced in Section 4.2.17 - Split Couplings. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 80: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 41

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Tables 3.1.3 - Part IV and Table 3.4 Table 3.1.3 - Part IV IV-32: Copper and Copper Alloy Press-Connect Pressure Fittings: ASME B16.51 - 2011 Table 3.4 - Line Item 5. under Fittings: ASME B16.51 (press-connect) Table 3.4 - Line Item 6, under Fittings: ASME B16.51 (press-connect) Basis/Reason for Change: To add ASME B16.51 press-connect fittings for copper tubing for water piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 81: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 42

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-11-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part V 1 IAPMO Z124.1.2-2005 -2011 1 CSA B45.5-2002 (2008) -2011 w/update 1 2 CSA B45.1-2008 w/updates 1-2 2 ASME A112.19.2-2008 w/updates 1-2 3 ASME A112.18.2-2005 -2011 3 CSA B125.2-2005 -2011 5 ASME A112.91.1M-2008 w/updates 1-2 5 CSA B45.2-2008 w/updates 1-2 6 ASME A112.19.1-2008 w/updates 1-2 6 CSA B45.2-2008 w/updates 1-2 8 IAPMO Z124.3-2005 -2011 8 CSA B45.5-2002 (2008) -2011 w/update 1 9 ASME A112.6.4-2003 (2008) (2012) 10 IAPMO Z124.1.2-2005 -2011 10 CSA B45.5-2002 (2008) -2011 w/update 1 11 ASME A112.19.3-2008 w/updates 1-2 11 CSA B45.4-2008 w/updates 1-2 12 ASME A112.19.2-2008 w/updates 1-2 12 CSA B45.1-2008 w/updates 1-2 13 IAPMO Z124.4-2006 -2011 13 ASME A112.19.2-2008 w/updates 1-2 13 CSA B45.5-2002 (2008) -2011 w/update1

Page 82: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

14 ASME A112.19.7-2006 2012 14 CSA B45.10-2012 16 IAPMO Z124.9-2004 -2011 16 CSA B45.5-2002 (2008) -2011 w/update 1 16a ASME A112.19.19-2006 (2011) 17 ASME A112.19.3-2008 w/updates 1-2 17 CSA B45.4-2008 w/updates 1-2 18 ASME A112.19.2-2008 w/updates 1-2 18 CSA B45.1-2008 w/updates 1-2 20 IAPMO Z124.6-2007 -2011 20 CSA B45.5-2002 (2008) -2011 w/update 1 23 ASME A112.19.15-2005 (2010) -2012 25 ASME A112.19.14-2006 (2011) 26 ASME A112.19.2-2008 w/updates 1-2 27 ASME A112.6.7-2001 (2007) -2010 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part V. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 83: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 43

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-15-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part V-19 V-19. Wall Mounted and Pedestal Mounted Adjustable and Pivoting Lavatory and Sink Carrier Systems Wall Mounted, Pedestal Mounted, Adjustable, Elevating, Tilting, and Pivoting Lavatory Sink and Shampoo Bowl Carrier Systems and Drain Waste Systems ASME A112.19.12 - 2006 (2011) Basis/Reason for Change: To update the title and edition of ASME A112.19.12. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 84: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 44

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-15-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part V Plumbing Fixtures V-28 Non-Vitreous Ceramic Plumbing Fixtures ASME A112.19.9M - 1991 (2008) Basis/Reason for Change: Reference to the standard was added to the 2012 NSPC in Section 7.7.1 for bidets. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 85: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 45

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145 Phone _440-835-3040__ Fax _440-835-3488___ E-mail ______________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __ Table 3.1.3 Part V, Item 24___ Revise Table 3.1.3 Part V Item 24 to read ISEA Z358.1-2009, ASSE 1071-2012

Basis/Reason for Change: ASSE 1071 is ANSI Approved standard developed under the consensus process and establishes performance requirements for plumbed emergency equipment. NOTE: NOTE: ASSE has submitted companion change to add ASSE Standard 1071 to Section 7.24e. This change should only be accepted if the companion change is accepted. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 86: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 46

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-11-2011_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part VI 1 CSA B125.3-2005 -2011 2 ASSE 1016-2005 -2011 2 ASME A112.1016 - 2011 w/update 1 2 CSA B125.16 - 2011 w/update 1 2a ASME A112.18.1-2005 2011 2a CSA B125.1-2005 -2011 4 ASME A112.18.1-2005 2011 4 CSA B125.1-2005 -2011 5 CSA B125.3-2005 -2011 7 ASME A112.18.1-2005 2011 7 CSA B125.1-2005 -2011 10 CSA B125.3-2005 -2011 12 ASME A112.19.8b - 2007 w/addendums A-B 13 ASME A112.18.3-2002 (2008) (2012) 17 ASME A112.18.2-2005 -2011 17 CSA B125.2-2005 -2011 18 ASTM F409-2002 (2008) -2012 18 ASME A112.18.2-2005 -2011 18 CSA B125.2-2005 -2011

Page 87: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part VI. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________ Table 3.1.3 - Part VI page 2 of 2 1-11-2013

Page 88: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 47

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-15-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part VI 9. Trim for Water Closet Bowls, Tanks, and Urinals (dimensional standards) Flush Valves and Spuds for Water Closets, Urinals, and Tanks ASME A112.19.5 - 2005 2011 CSA B125.3 - 2005 2011 Basis/Reason for Change: To update the title and issue dates of the listed standards. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 89: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 48

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-11-2013_______ Jurisdiction/Company/ Mailing Address _180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046_ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part VII 2 UL 921 Ed.6-2006 (2012) 5 UL 430 Ed.7-2009 (2011) 7 ANSI Z21.10.1a-2009 CSA ANSI Z21.10.1a - 2009 CSA ANSI Z21.10.1b - 2009 CSA ANSI Z21.10.1c - 2009 7 CSA 4.1 - 2009 CSA 4.1a - 2009 CSA 6.5 - 2011 8 ANSI Z21.10.3b - 2008 CSA ANSI Z21.10.3 - 2011 8 CSA 4.3b-2004 4.3 - 2011 9 UL 174 Ed.11 - 2004 (2012) 10 UL 499 Ed.13 - 2005 (2012) 11 UL 732 Ed.5 - 1995 (2010) 13 NSF 44 - 2009 2012 14 NSF 58 - 2009 2012 16 NSF 42 - 2009 2011 17 NSF 53 - 2009e 2011a 18 NSF 55 - 2009 2012 19 CSA B483.1-2007 (2012) w/updates 1-2 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part VII. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 90: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 49

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013__ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road__ City/State/Zip __Westlake, OH 44145____________________ Phone _440-835-3040__ Fax _440-835-3488_ E-mail ___________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Table 3.1.3___ Add ASSE 1057-2012 with title Freeze Resistant Sanitary Yard Hydrant with Backflow Protection to Table 3.1.3, Part VII, Item 24 Basis/Reason for Change: ASSE 1057 is a product standard for performance requirements for Freeze Resistant Sanitary Yard Hydrants with Backflow Protection that has been accepted throughout the industry. NOTE: ASSE has submitted companion change to add ASSE Standard 1057 to Section 10.5.3.This change should only be accepted if the companion change is accepted. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 91: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
13 50
cwhite
Typewritten Text
Page 92: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 51

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-15-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part VIII 1 ASME A112.14.1 - 2003 (2008) (2012) 1 CSA B181.1-2006 of CSA B1800 Series (ABS) -2011 (ABS) 1 CSA B181.2-2006 of CSA B1800 Series (PVC) -2011 (PVC) 2 CSA B125.3-2005 -2011 4 MSS SP-71-2005 -2011 5 ASME A112.36.2M - 1991 (2008) (2012) 7 CSA B125.3-2005 -2011 8 MSS SP-70-2006 -2011 12 CSA B125.3-2005 -2011 15 IAPMO PS 88-2002 -2012 19 ASSE 1019-2004 -2011 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part VIII. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 93: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 52

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-04-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part VIII Valves and Appurtenances VIII-6: Reserved. Manually Operated Quarter-Turn Shutoff Valves for Use in Plumbing Systems ASME A112.4.14 - 2004 (2010) Basis/Reason for Change: To add ASME A112.4.14 ball valves to Table 3.1.3. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 94: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 53

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-15-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part VIII 11. Relief Valves and Automatic Gas Shut-off Devices for Hot Water Supply ANSI Z21.22b-2001 (2008) CSA 4.4b-2001 (2008) Relief Valves for Hot Water Supply Systems ANSI Z21.22-1999 (2008)/CSA 4.4-1999 (2008) ANSI Z21.22a-2000 (2008)/CSA 4.4a-2000 (2008) ANSI Z21.22b-2001 (2008)/CSA 4.4b-2001 (2008) Basis/Reason for Change: The title of the standard has changed. The addenda to ANSI Z21.22/CSA 4.4 are published as amendments to the base document. Some standards sales organizations only list the most current addenda and not the base document. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 95: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 54

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part IX Backflow Prevention Devices Add the following: IX-1: Reserved Wall Hydrants, Vacuum Breaker Type, Freeze Resistant, Automatic Draining ASSE 1019 - 2011 IX-7: Reserved Wall Hydrants, Dual Check Backflow Type, Freeze Resistant ASSE 1053 - 2004 Basis/Reason for Change: To list ASSE 1019 and ASSE 1053 in Part IX - Backflow Prevention Devices as well as Part VIII - Valves and Appurtenances. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 96: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 55

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-16-2013_______ Mailing Address 180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046 Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part IX Backflow Prevention Devices 3 Detector Assembly, Double Check Type: ASSE 1048 - 2009 2011

Double Check Detector Fire Protection Backflow Prevention Assemblies: (DCDA) Double Check Detector Fire Protection Backflow Prevention Assemblies-Type II: (DCDA-II)

4 Detector Assembly, Reduced Pressure Type: ASSE 1047 - 2009 2011 Reduced Pressure Detector Fire Protection Backflow Prevention Assemblies: (RPDA) Reduced Pressure Detector Fire Protection Backflow Prevention Assemblies-Type II:(RPDA-II)

5 Double Check Valve Assembly: ASSE 1015 - 2009 Double Check Backflow Prevention Assemblies (DC): ASSE 1015 - 2011 Double Check Detector Fire Protection Backflow Prevention Assemblies (DCF):

8 Reduced Pressure Principle Backflow Preventer: ASSE 1013 - 2009 Reduced Pressure Principle Backflow Preventers (RP): ASSE 1013 - 2011 Reduced Pressure Fire Protection Backflow Preventers (RPF):

16 Air Gaps in Plumbing Systems (for Plumbing Fixtures and Water-Connected Receptors) ASME A112.1.2 - 2004 2012

17 Performance Requirements for Backflow Protection Devices and Systems in ASME A112.18.3 Plumbing Fixture Fittings ASME A112.18.3 - 2002 (2008) Backflow Devices and Systems for Plumbing Fixture Fittings

18 Air Gap Fittings for use with Plumbing Fixtures, Appliances, and Appurtenances ASME A112.1.3 - 2000 (2005) (2010)

Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part IX for backflow prevention devices. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle ___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

__________________________________________________________________________________

Page 97: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 56

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145_________________________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Table 3.1.3, Part IX, Item TBD_________________________ Add ASSE 1004-2008 with title Backflow Prevention Requirements for Commercial Dishwashing Machines to Table 3.1.3 Part IX Basis/Reason for Change: ASSE 1004 is referenced in the narrative of the code in Section 7.15.1 and should be included in Reference Table 3.1.3 Part IX. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 98: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 57

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-15-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part X 1 ASTM B370-2009 -2012 4 ASTM D4551-1996 (2008e1) - 2012 5 ASTM D4551-1996 (2008e1) - 2012 9 ASME A112.6.1M - 1997 (2008) (2012) 11 NSF 14-2010 -2011 12 NSF 61-2010a -2012 13 ASME A112.14.4 - 2001 (2007) (2012) 16 NFPA 13 - 2010 2013 17 NFPA 13D - 2010 2013 18 NFPA 13R - 2010 2013 20 ANSI/ICC A117.1-2009 ICC ANSI A117.1-2009 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part X. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 99: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 58

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145__________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _Table 3.1.3, Part X, Item TBD__________________________ Add ASSE 1006-1986 with title Residential Use Dishwashers to Table 3.1.3 Part X Basis/Reason for Change: ASSE 1006 is referenced in the narrative of the code in Section 7.15.1 and should be included in Reference Table 3.1.3 Part X. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 100: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 59

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145____________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail ____________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Table 3.1.3, Part X, Item TBD_________________________ Add ASSE 1007-1986 with title Home Laundry Equipment to Table 3.1.3 Part X Basis/Reason for Change: ASSE 1007 is referenced in the narrative of the code in Section 7.13.1 and should be included in Reference Table 3.1.3 Part X. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 101: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 60

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-15-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part XI 3 ASTM F402 - 2005 (2012) 5 ASTM D2774 - 2008 2012 6 ASTM D2321-2009 -2011 8 ASTM D3311-2009a -2011 11 ASSE 5010 5130 - 2009 14 ASTM F1290-1998a (2004) (2011) 16 NFPA 99 - 2005 2012 18 ASSE Series 6000 - 2006 2012 Basis/Reason for Change: To update the standards listed in Table 3.1.3 - Part XI. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 102: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 61

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: __X__ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part XI XI-12 Professional Qualification Standard for Backflow Prevention Assembly Testers, Repairers, and Surveyors: Cross-Connection Control Professional Qualifications Standard: ASSE/IAPMO/ANSI Series 5000 - 2009 XI-18 Professional Qualification Qualifications Standard for Medical Gas Systems Personnel: ASSE/IAPMO/ANSI Standard Series 6000 - 2006 2012 Basis/Reason for Change: To update the titles of the ASSE Standards listed in Table 3.1.3 - Part XI. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 103: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 62

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___6-12-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ X _ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.1.3 - Part XI . 16: Standard for Health Care Facilities (for medical gas and vacuum) NFPA 99 - 2005 Health Care Facilities Code (for medical gas and vacuum piping systems) NFPA 99 - 2012 17: Gas and Vacuum Systems (in health care facilities) NFPA 99C - 2005 Reserved Basis/Reason for Change: NFPA 99 has been updated and changed from a standard to a code. NFPA 99C is no longer active. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 104: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 63

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee_ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_____ City/State/Zip __Westlake, OH 44145_________________________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __ Table 3.1.3 Part XI, Item TBD_____________ Add ASSE Series 7000-2008 with title Professional Qualifications Standard for Plumbing-Based Residential Fire Protection Systems Installers and Inspectors to Table 3.1.3, Part XI, Item TBD Basis/Reason for Change: ASSE Series 7000 is an ANSI Approved standard developed under the consensus process and establishes minimum criteria for installers and inspectors for fire protection systems in one-and two-family dwellings. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 105: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 64

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee__ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145__________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail ___________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __ Table 3.1.3 Part XI, Item TBD_____________ Add ASSE/IAPMO/ANSI Series 8000-2010 with title Self-Contained Breathing Apparatus (SCBA) Replenishment Systems Professional Qualifications Standard to Table 3.1.3, Part XI, Item TBD Basis/Reason for Change: ASSE/IAPMO/ANSI Series 8000 is an ANSI Approved standard developed under the consensus process and establishes minimum criteria for installers, inspectors and verifiers for self-contained breathing apparatus replenishment systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 106: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 65

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145_________________________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows X___ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __ Table 3.1.3 Part XI, Item TBD_____________ Add ASSE/IAPMO/ANSI Series 10000-2010 with title Professional Qualifications Standard for Green Plumbing Systems Installers to Table 3.1.3, Part XI, Item TBD Basis/Reason for Change: ASSE/IAPMO/ANSI Series 10000 is an ANSI Approved standard developed under the consensus process and establishes the level of competency necessary for the installation of sustainable plumbing and mechanical systems and products to protect public health, safety and the environment. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 107: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 66

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road______ City/State/Zip __Westlake, OH 44145__________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail ___________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __ Table 3.1.3 Part XI, Item TBD_____________ Add ASSE/IAPMO/ANSI Series 16000-2012 with title Professional Qualifications Standard for the Plumbing Inspector to Table 3.1.3, Part XI, Item TBD Basis/Reason for Change: ASSE/IAPMO/ANSI Series 16000 is an ANSI Approved standard developed under the consensus process and references the experience, education, training and general knowledge requirements for Plumbing Inspectors. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 108: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 67

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-04-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.4 Materials for Potable Water Add ASME B16.51 to Table 3.4 Items 5 & 6 - Fittings for Copper Tube, seamless, Types K, L or M. ASME B16.51 (cast or wrought press-connect for hard drawn tube) Table 3.1.3 - Part II Non-Ferrous Metallic Pipe and Fittings II-10. Reserved Copper and Copper Alloy Press-Connect Pressure Fittings ASME B16.51 - 2011 Basis/Reason for Change: To add ASME B16.51 press-connect copper fittings to Table 3.4 and Table 3.1.3 as referenced in Section 4.2.6. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 109: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 68

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 _________________ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.4 Materials for Potable Water 11 Ductile Iron Pipe, cement-motar mortar lined: ASTM A377, AWWA C151/A21.50 A21.51 15 PE Plastic Pipe, schedule 40: ASTM D2447 Reserved 16 PE Plastic Pipe, schedule 80: ASTM D2447 Reserved Basis/Reason for Change: To correct typographical errors in Item 11. ASTM D2447 was withdrawn in 2010. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 110: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 69

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __7-14-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X_ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.4 Materials for Potable Water Add AWWA C900 and AWWA C901 to Table 3.4 as follows: xx. PVC Pressure Pipe and Fittings Water Service = A Cold Water Distribution = X Hot Water Distribution = X Pipe = AWWA C900 Fittings = AWWA C900 xx. PE Pressure Pipe and Tubing Water Service = A Cold Water Distribution = X Hot Water Distribution = X Pipe = AWWA C901 Fittings = (blank) Basis/Reason for Change: AWWA C900 and C901 are listed in Table 3.4.2 but not in Table 3.4. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 111: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 70

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___7-14-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.4 Materials for Potable Water Under WATER SERVICE, change the following items from Approved (A) to Disapproved (X): Item 10: CPVC Plastic Hot and Cold Water Distribution - ASTM D2846 (SDR 11) CTS Item 19a: Polyethylene of Raised Temperature (PE-RT) Plastic Hot and Cold-Water Tubing and

Distribution Systems - ASTM F2769 Item 22 PEX Plastic Hot and Cold Water Distribution - ASTM F877 (SDR 9) Basis/Reason for Change: Hot and cold water distribution piping systems are not intended for water service. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 112: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 71

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 _David W. Ash_____________ Date 3 _September 11, 2012_ Jurisdiction/Company/ Mailing Address _9911 Brecksville Road ______________________ City/State/Zip _Cleveland, Ohio 44141____________________ Phone _216-447-7239______ Fax __________________ E-mail [email protected]___ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _Table 3.4__________________________ Add the following to this table Cold Water Hot Water Water Service Distribution Distribution Pipe CPVC-AL-CPVC Plastic Pipe A A A ASTM F2855 Fittings ASTM D2846 Basis/Reason for Change: CPVC/AL/CPVC pipe has been developed that is suitable for use as potable water piping, both as water service pipe and water distribution pipe. This product has been used successfully on a limited basis since 2007 based on an NSF standard 61 listing and a special engineered standard (SE) from NSF International. An ASTM standard has now been issued. Including this product in the NSPC will recognize another plumbing pipe option for installers. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle ___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

Page 113: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 72

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-07-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Sections: Tables 3.4, 3.5, and 3.7 Table 3.4 MATERIALS FOR POTABLE WATER PIPING Table 3.5 MATERIALS FOR SANITARY WASTE AND DRAIN PIPING (3) Table 3.7 MATERIALS FOR STORM DRAINAGE DRAIN PIPING (1) Basis/Reason for Change: To clarify that the tables apply to piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 114: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
13 73
Page 115: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 116: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 117: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 118: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 119: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 120: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 74

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 _David W. Ash______________ Date 3 _September 11, 2012_ Jurisdiction/Company/ Mailing Address _9911 Brecksville Road ______________________ City/State/Zip _Cleveland, Ohio 44141_____ Phone _216-447-7239___ Fax __________________ E-mail [email protected]___ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _Table 3.4.2__________________________ Add the following to this table: Material Composition Dimensions Joints Pipe sizes CPVC-AL-CPVC CPVC-AL-CPVC ASTM F2855 not threaded all sizes (ASTM F2855) Basis/Reason for Change: CPVC/AL/CPVC pipe has been developed that is suitable for use as potable water piping, both as water service pipe and water distribution pipe. This product has been used successfully on a limited basis since 2007 based on an NSF standard 61 listing and a special engineered standard (SE) from NSF International. An ASTM standard has now been issued. Including this product in the NSPC will recognize another plumbing pipe option for installers. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle ___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

Page 121: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 75

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___10-06-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.4.3 Plastic Hot and Cold Water Distribution Piping PEX (ASTM F876) PEX 1006 PEX 1008 PEX SDR 9 not threaded all sizes PEX (ASTM F877) PEX 1006 PEX 1008 PEX SDR 9 not threaded all sizes Composite Pipe (ASTM F1335) PE-AL-PE ASTM F1335 compression all sizes Composite Pipe (ASTM F1335) PEX-AL-PEX ASTM F1335 compression all sizes Basis/Reason for Change: ASTM F876 and F877 can have other PEX designations besides 1006 and 1008. ASTM F1335 was withdrawn by ASTM in 2010. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 122: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 76

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 _David W. Ash___________ Date 3 _September 11, 2012_ Jurisdiction/Company/ Mailing Address _9911 Brecksville Road ________________________ City/State/Zip _Cleveland, Ohio 44141_____________________ Phone _216-447-7239______ Fax __________________ E-mail [email protected]___ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _Table 3.4.3__________________________ Add the following to this table: Material Composition Dimensions Joints Pipe sizes CPVC-AL-CPVC CPVC-AL-CPVC ASTM F2855 not threaded all sizes (ASTM F2855) Basis/Reason for Change: CPVC/AL/CPVC pipe has been developed that is suitable for use as potable water piping, both as water service pipe and water distribution pipe. This product has been used successfully on a limited basis since 2007 based on an NSF standard 61 listing and a special engineered standard (SE) from NSF International. An ASTM standard has now been issued. Including this product in the NSPC will recognize another plumbing pipe option for installers. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle ___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

Page 123: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 77

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 _____Michael Cudahy__________________ Date 3 ___Aug 25 2012____ Jurisdiction/Company/ Mailing Address Plastic Pipe and Fittings Association 800 Roosevelt Rd Bld C Ste 312__________ City/State/Zip __Glen Ellyn / IL / 60137 Phone ___630 363 7933______ Fax __630 858 654___ [email protected]_______ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____Table 3.4.3 Plastic Hot and Cold Water Distribution Piping

PP (ASTM F2389) | PP | Metric SDR 7.4, 6, 5 | fusion welded | all sizes Basis/Reason for Change: PP made in metric dimensions and SDR 7.4, 6 and 5 wall thicknesses to ASTM F2389 is suitable for potable and hot and cold water systems. Per the standard, “This specification establishes the requirements for polypropylene (PP) piping system components such as pipe, fittings, valves, and manifolds used in water service lines, hot-and-cold water distribution, hydronic heating, and irrigation systems to transport industrial process fluids, effluents, slurries, municipal sewage, etc. The piping system components covered here are made to metric sizes and IPS schedule 80 sizes, and pressure rated for water service and distribution supply.” Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 124: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 78

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-08-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.5 Materials for Sanitary Waste and Drain Item 16: PIPE: ASTM F891 (2) Item 17: Sewers Outside of Buildings: (change "A" to "X") Item 19: PVC Plastic Sewer Pipe (PSM) and Fittings ASTM D3034 (1) Type PSM PVC Sewer Pipe and Fittings ASTM D3034 (1) Item 27: Underground Within Buildings: (change "A" to "X") PIPE: ASTM F1760, Sewer-Drain, PS 46 NOTES FOR TABLE 3.5 (1) Plastic waste and drain piping classified by standard dimension ratio shall be SDR 26 or heavier (lower SDR number). (1) ASTM D3024 PVC sewer and drain piping shall be SDR 26, SDR 35, or SDR 41, as required by the Authority Having Jurisdiction. (2) Plastic sewer pipe classified by pipe stiffness shall be PS-46 or stiffer (higher PS number). (2) ASTM F891 PVC sewer and drain piping shall be PS 100 or PS 50, as required by the Authority Having Jurisdiction. (4) PS-100 pipe or stiffer (higher PS number) is required for underground cellular core PVC sewer and drain pipe underground within buildings. (4) ASTM 891 PVC sewer and drain piping underground within buildings shall be PS-100.

Page 125: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: To update the requirements for ASTM D3034 and ASTM F891 plastic piping in Table 3.5. 1. In ASTM D3024, there are no heavier (lower SDR numbers) than SDR 26. The AHJ should coordinate the SDR of building sewers outside of buildings with the SDR of their public sewers. 2. ASTM F891 includes PVC sewer and drain piping with PS 100, PS 50, PS 25, and PS 12.5, but PS 25 and PS 12.5 have limited pipe sizes (4", 6", 8" and 6") and have wall thicknesses that are significantly less than PS 100 and PS 50. PS 100 and PS 50 are available 3", 4", 6", 8", 10", 12", 15", and 18". 3. ASTM F1760 PVC sewer and drain piping is PS 46. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 126: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 79

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-08-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.6 Materials for Vent Piping Item 10: PIPE: ASTM F891 (3), (4) NOTES FOR TABLE 3.6 (3) ASTM F891 PVC sewer and drain piping shall be PS 100 or PS 50, as required by the Authority Having Jurisdiction. (4) ASTM F891 PVC sewer and drain piping underground within buildings shall be PS-100. Basis/Reason for Change: To update the requirements for ASTM F891 plastic piping in Table 3.6. ASTM F891 includes PVC sewer and drain piping with PS 100, PS 50, PS 25, and PS 12.5, but PS 25 and PS 12.5 have limited pipe sizes (4", 6", 8", and 6") and have wall thicknesses that are significantly less than PS 50 and PS 100. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 127: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 80

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-08-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 3.7 Materials for Storm Drainage Item 15: PIPE: ASTM F891 (7) Item 16: Sewers Outside of Building (change "A" to "X") Item 18: PVC Plastic Sewer Pipe (PSM) and Fittings ASTM D3034 Type PSM PVC Sewer Pipe and Fittings ASTM D3034 (8) NOTES FOR TABLE 3.7 (4) PS-100 pipe or stiffer (higher PS number) (4) ASTM 891 PVC drain piping underground within buildings shall be PS-100. (7) ASTM F891 PVC sewer piping shall be PS 100 or PS 50, as required by the Authority Having Jurisdiction. (8) ASTM D3024 PVC sewer drain piping shall be SDR 26, SDR 35, or SDR 41, as required by the Authority Having Jurisdiction.

Page 128: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: To update the requirements for ASTM F891 and ASTM D3024 plastic piping in Table 3.7. 1. ASTM F891 includes PVC sewer and drain piping with PS 100, PS 50, PS 25, and PS 12.5, but PS 25 and PS 12.5 have limited pipe sizes (4", 6", 8" and 6" ) and have wall thicknesses that are significantly less than PS100 and PS 50. PS 100 and PS 50 are available 3", 4", 6", 8" 10", 12" 15" and 18". 2. ASTM D3024 is available as SDR 26, SDR 35, or SDR 41. Public sewers are frequently SDR 35. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 129: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 82

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __4-13-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 4.2.8 Brazed 4.2.8.1 General a. (no change) b. Brazed joints in medical gas and vacuum piping shall be made in accordance with NFPA 99 or NFPA 99C. 4.2.8.2 Fittings a. (no change) b. Fittings for medical gas and vacuum piping shall be as required by NFPA 99 or NFPA 99C. 4.2.8.3 Mechanically Formed Tee Branches a. (no change) b. (no change) Basis/Reason for Change: NFPA 99C is no longer published. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 130: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 83

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___11-10-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 4.2.12 4.2.12 Reserved Ductile Iron Pressure Piping a. Ductile iron pressure pipe and fittings shall comply with standards listed in Table 3.1.3 and shall be applied and installed in accordance with the manufacturer's instructions. Joints shall be the push-on type, mechanical type, grooved and shouldered, or flanged. Rubber gaskets shall be suitable for the maximum service temperature. b. Flexible, unshielded couplings shall not be used for joints in ductile iron pressure piping. c. With push-on and mechanical joints, spigot ends shall be inserted into bells, as recommended by the manufacturer, rather than bells on to spigot ends. d. Transitions with plastic or other pressure piping shall be made with transition fittings using push-on or mechanical joints sized for the piping being joined. Basis/Reason for Change: To add requirements for the installation of the ductile iron pipe and fittings that are listed in Table 3.1.3. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 131: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 84

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 _____Michael Cudahy__________________ Date 3 ___July 5 2012____ Jurisdiction/Company/ Mailing Address Plastic Pipe and Fittings Association 800 Roosevelt Rd Bld C Ste 312__________ City/State/Zip __Glen Ellyn / IL / 60137 Phone ___630 363 7933______ Fax __630 858 654___ [email protected]_______ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____4.2.14.3__________________ 4.2.14.3 Solvent Cement Joints in CPVC Piping

Primers (where used) and solvent cements shall be suitable for joints in CPVC piping. Primer shall be purple in color and solvent cements shall be orange in color. Primers (where used) shall not be orange in color. Single-step solvent cement used without a primer on piping ½ inch through 2 inch in diameter shall be yellow in color. One step solvent cement used for joining CPVC fire sprinkler pipe shall be rated listed for fire protection use. Basis/Reason for Change: PPFA recommends that the term “listed” be used in place of “rated” for CPVC fire protection system cements. This indicates the products are evaluated and certified for the use. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 132: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 85

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-12-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 4.2 Types of Joints in Piping Materials 4.2.14.5 Heat Fusion Joints in PE Water Piping Heat fusion joints in PE water piping complying with ASTM F714, ASTM D3035, AWWA C901, or AWWA C906 shall be made in accordance with the applicable requirements of ASTM F2620. Table 3.1.3 - Part XI 21. Heat Fusion Joining of Polyethylene Pipe and Fittings ASTM F2620-2011e1 Basis/Reason for Change: To add heat fusion of PE water piping to Section 4.2 Types of Joints in Piping Materials Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 133: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 86

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-25-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 4.3 Types of Joints Between Different Piping Materials 4.3.8 Special Joints and Couplings for Drainage Piping f. Couplings installed aboveground shall include center stops. EXCEPTION EXCEPTIONS: (1) Slip-on repair couplings used for repair or rework. (2) Flexible drain couplings for different pipe sizes. Basis/Reason for Change: Flexible drain couplings do not have center stops because of the two different pipe sizes that are being joined. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 134: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 87

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 4.3 Types of Joints Between Different Piping Materials 4.3.8 Special Joints and Couplings for Drainage Piping h. Where eccentric flexible unshielded couplings are used to maintain the invert of a drain line, the couplings shall align the inverts of the inside walls of the pipes being joined to prevent an obstruction to free flow. Basis/Reason for Change: To establish a requirement for the use of eccentric flexible unshielded couplings. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 135: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 88

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-05-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 4.3.9 Plastic DWV Pipe to Other Materials a. Joints between plastic DWV pipe and piping of other materials shall be made in accordance with the manufacturer's instructions for the pipe and fittings unless prohibited by this Code. a. b. Threaded Joints: Threaded joints for connecting plastic drainage piping to other materials shall be made with proper male or female threaded plastic adapters. Joints shall not be over-tightened. After hand tightening, one-half to one full turn shall be made with a strap wrench. b. c. Solid Wall Plastic Pipe to Cast-iron PVC Schedule 40 DWV Plastic Pipe to Cast-Iron Hub Ends: Joints shall be made by caulking the plastic pipe into the hub end with molten lead and oakum or by use of a compression gasket that is compressed when the plastic pipe is inserted into the hub end. Joints shall be permitted to be made with or without a hub end adapter. Adapters without a caulking bead shall be permitted. See Figures 4.3.9-B though 4.3.9-D c. d. Cellular Core Plastic Pipe to Cast-iron PVC Schedule 40 DWV Plastic Pipe to Cast-Iron Hub Ends: Joints shall be made by caulking a solid plastic adapter into the cast-iron hub end with molten lead and oakum or by use of a compression gasket that is compressed when the plastic pipe is inserted into the hub end. Adapters without a caulking bead shall be permitted. Cellular core plastic pipe shall not be lead caulked. d. e. Plastic Pipe to Galvanized Steel, Copper or Stainless Steel DWV Tube, or Cast-iron Spigot Ends: Joints between plastic pipe and the listed materials shall be made with the proper transition fittings. e. f. ABS and PVC Plastic Pipe: Solvent cemented non-pressure joints between ABS and PVC DWV piping systems shall be made with ASTM D3138 solvent cement intended for such transition joints. Transition cement shall not be permitted to be used within buildings. Transition joints shall be a minimum of 3 feet outside of buildings.

Page 136: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: To clarify the requirements for joints between plastic DWV pipe and other materials. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 137: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 89

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __3-25-2012_______ Mailing Address 180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046 Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: __X__ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.1 SEPARATE TRAPS FOR EACH FIXTURE a. Plumbing fixtures shall be separately trapped by a water seal trap placed as close as possible to the fixture outlet. b. The vertical distance from the fixture outlet to the trap weir shall not exceed 24 inches. c. Fixtures shall not be double-trapped unless a relief vent is provided between the two traps. d. Fixture designs having integral dual traps within the fixture shall be permitted. EXCEPTIONS: (1) Fixtures that have integral traps. (2) Interceptors in Chapter 6 that provide the required trap seal. Note: Interceptors in Chapter 6 that do not provide the required trap seal shall be provided with a separate trap. (3) A combination plumbing fixture may be installed on one trap provided the waste outlets are not more than 30 inches apart. (4) One trap may be installed for a 2 or 3-compartment sink or up to three (3) lavatories that are immediately adjacent to each other in the same room with their waste outlets no more than 30 inches from the trap, and were the trap is centrally located when three such fixtures are installed. (5) No clothes washer or laundry sink shall be discharged to a trap serving a kitchen sink. (6) As otherwise permitted by this Code. Basis/Reason for Change: To clarify the requirements for traps. Exception (1) applies to fixtures with integral traps, making 5.1.d unnecessary. Multi-compartment sinks in Exception (4) are combination plumbing fixtures, which are covered by Exception (3). Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ___________________________________________________________________________________

Page 138: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 89a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-31-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.1 SEPARATE TRAPS FOR EACH FIXTURE c. Fixtures shall not be double-trapped unless a relief vent is provided between the two traps. Basis/Reason for Change: There is no reason to double trap individual fixtures. Other model plumbing codes prohibit double traps for individual fixtures. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 139: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 91

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___3-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows __X__ Delete subsection without substitution Code Section: Table 5.2 Minimum Size of Non-Integral Traps Combination sink and wash (laundry) sink with food waste grinder unit 1-1/2(1)

NOTES FOR TABLE 5.2 (1) Separate trap required for wash tray and separate trap required for sink compartment with food waste grinder. Basis/Reason for Change: This has been in the NSPC since the 1987 edition. Modern laundry equipment is frequently installed in residential kitchens, particularly in apartments. There are laundry sinks that architecturally match kitchen sinks but there do not appear to be any one-piece combination kitchen/laundry sinks. Laundry sinks do not have food waste grinders. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 140: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 91a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-31-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 5.2 MINIMUM SIZE OF NON-INTERGRAL TRAPS Plumbing Fixture Trap Size in inches Shower stall or shower drain (multiple shower heads) 2, 3, 4 (2) NOTES FOR TABLE 5.2 (2) See Section 7.10.4.b. Basis/Reason for Change: To make the Table agree with Section 7.10.4.b for multiple shower heads, which has requirements for 2" 3" and 4" drains. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 141: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 92

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___12-10-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: __X__ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.3.1 Design of Traps Fixture traps shall be self-scouring and shall have no interior partitions except where such traps are integral with the fixture or where corrosion resistant materials of plastic or glass are used. Solid connections, slip joints, or couplings may be used on the trap inlet, trap outlet, or within the trap seal. (See Section 7.4.6). See Figures 5.3.1-A through -C. Refer to Sections 4.2.15 and 7.3.7 for slip joints and their required access. Basis/Reason for Change: Section 7.4.6 does not apply to traps. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 142: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 93

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___7-28-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.3.6 Trap Seal Maintenance b. Floor drains that comply with ASME A112.6.3 shall be permitted to be fitted with a barrier type floor drain trap seal protection device complying with ASSE 1072. The device shall have an application designation marking for the type of floor and environment it has been designed and tested for (AF, AF-GW, SF, CF, CT, WF). Basis/Reason for Change: To add the requirement that ASSE 1072 devices be coordinated with the type of floor and environment they have been designed and tested for. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 143: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 93a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-31-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.4.1 Cleanout Spacing b. The distance distances referred to in Sections 5.4.1a Section 5.4.1.a shall include the developed length of the cleanout pipe from a cleanout opening to the connection of the next downstream cleanout or cleanout pipe. Basis/Reason for Change: To clarify the requirement for cleanout spacing as indicated in Figure 5.4.1. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 144: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 94

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-11-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.4.3 Change of Direction a. Cleanouts shall be installed at changes of direction in drainage piping made with 60o, 72o, and 90o fittings. EXCEPTION: Where there are multiple changes of direction, not more than one cleanout shall be required in less than 40 feet of run. b. Cleanouts shall not be required where changes of direction are made with one or more 22-1/2o or 45o fittings. Basis/Reason for Change: To make the text agree with Figure 5.4.3 in the NSPC Illustrated. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 145: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 95

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.4 Drainage Pipe Cleanouts 5.4.4 Cleanouts for Concealed Piping Cleanouts for concealed piping shall be extended through and terminate flush with the finished wall or floor. If in pits or chases. cleanouts may be left in the wall or floor provided they are of sufficient size to permit removal of the cleanout plug and proper cleaning of the system. Cleanouts for concealed piping in finished walls or ceilings shall be accessible through access doors or cover plates which provide clearance for removal of the cleanout plug and insertion of the drain cleaning equipment. See Figure 5.4.4 Basis/Reason for Change: To clarify the requirements for access to cleanouts for concealed piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 146: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 96

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___10-2-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.4.5 Base of Stacks b. For buildings with a floor slab, a crawl space of less than 18 inches clear height, or where a stack cleanout is not accessible from within the building, the cleanout shall be installed in the building drain or building sewer, not more than five feet outside the building wall. Basis/Reason for Change: To clarify where inaccessible cleanouts for the base of stacks can be installed. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 147: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 97

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___10-1-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 5.4.9 Size of Cleanouts Nominal Drain Pipe Size (inches): 4 & 6 4, 5, 6 Basis/Reason for Change: To add 5" drain pipe to Table 5.4.9 for the size of cleanouts Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 148: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 98

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___12-10-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 5.4.13 Cleanout Equivalent Where the piping is concealed, a fixture trap or a fixture with integral trap, removable without disturbing concealed roughing work, shall be acceptable as a cleanout equivalent, provided the opening to be used as a cleanout opening is the size required by Table 5.4.9. EXCEPTIONS: (1) The trap arm of a floor drain with a removable strainer. (2) Fixtures with removable traps that are not more than one pipe size smaller than the drain served shall be permitted as cleanout equivalents. See Figure 5.4.13-A and -B Basis/Reason for Change: Section 7.16.2.a requires that all floor drains have removable strainers. Cleanout access is not through the strainer when the trap is removed. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 149: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 99

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows __X__ Delete subsection without substitution Code Section: 5.4 Drainage Pipe Cleanouts 5.4.14 Cleanouts for Floor Drains A cleanout shall be provided immediately downstream from a floor drain whose strainer is not removable. Basis/Reason for Change: Section 7.16.2.a requires that floor drains have removable strainers. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 150: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change

2 __John Heine_____________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address ______________________________________________________________________

City/State/Zip ________________________________________________________________________

Phone ___609-987-0500_______________ Fax _ 609-987-0511 E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

_____ Change subsection to read as follows _____ Delete subsection and substitute as follows

___X__ Add new subsection to read as follows ___ Delete subsection without substitution

Code Section: 5.5.1d Exception: Existing buildings shall be permitted to drain through a backwater valve that serves all the

fixtures in a building if the floor elevation that the fixtures are on is above the next upstream manhole

cover.

Basis/Reason for Change: Existing buildings that have experienced a sewage backup that was

caused by problems in an existing public sewer main should be allowed to install a backwater valve in

the main building drain or sewer to protect the property. This change would allow the installation of a

backwater valve in a system where the existing drainage system discharges to the public sewer at an

elevation below the top of the next upstream manhole without having to repipe an existing system where

the total system is discharging through a common drain.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

NJ PHCC Code Committee, (Chairman) / PO Box 2067

Princeton, NJ 08543

cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
13 100
Page 151: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 101

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ X _ Change subsection to read as follows _____ Delete subsection and substitute as follows __ ___ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 6.2.1 General c. Grease interceptors shall be provided to receive the waste discharges from fixtures in food handling areas that introduce grease into the sanitary drainage system. Fixtures include, but are not limited to pot washing sinks, utensil soak sinks, pre-rinse sinks at dishwashers, dishwashers, wok range stations, drains from wash-down ventilation hoods, can washing drains, floor drains and floor sinks around grease producing fixtures, and similar fixtures. Basis/Reason for Change: To clarify that dishwashers are permitted to discharge through grease interceptors in Section 6.2.6.a but it is not a mandatory requirement. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 152: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 102

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 __Rand Ackroyd__________________ Date 3 Jan. 23, 2013_________ Jurisdiction/Company/ Mailing Address _____290 High St_________________________ City/State/Zip Newburyport, Ma 01950____________________ Phone 978 985 6980 Fax ___________ E-mail [email protected]________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _602.1.1 Type 1 Hydro-Mechanical Grease Interceptor_ Basis/Reason for Change: Type I is not the title of the grease interceptors in the Standards PDI G101, ASME A112.14.3, it is simple Hydro-Mechanical Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 153: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 103

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 __Rand Ackroyd_______________ Date 3 Jan. 23, 2013_________ Jurisdiction/Company/ Mailing Address _____290 High St_____________________ City/State/Zip Newburyport, Ma 01950________________ Phone: 978 985 6980 Fax _________ E-mail: [email protected]___________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: X _ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _602.1.3 Type II Gravity Grease Interceptors_ Basis/Reason for Change: Type II is not the title of the grease interceptors in the Standards IAPMO Z1001, it is simple Gravity Grease Interceptor Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 154: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 104

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-04-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 6.2.1.3 Type II Gravity Grease Interceptors d. Prefabricated gravity grease interceptors shall comply with IAPMO/ANSI Z1001. Table 3.1.3 - Part X - Miscellaneous X-22: Prefabricated Gravity Grease Interceptors IAPMO/ANSI Z1001 - 2007 Basis/Reason for Change: To add a standard for prefabricated gravity grease interceptors. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 155: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 105

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-04-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 6.2 Grease Interceptors 6.2.1 General a. Grease interceptors shall comply with the requirements of the Adopting Agency. b. Grease interceptors shall include the following types: 1. Type I Hydro-mechanical interceptors 2. Grease removal (or recovery) devices (GRD) 3. Type II Gravity interceptors 4. FOG (fats, oils, and greases) disposal systems 6.2.1.4 FOG (Fats, Oils, and Greases) Disposal Systems a. Fog disposal systems shall be designed to: 1. remove FOG from the effluent, 2. retain the separated FOG, 3. internally dispose of the retained FOG by means of mass and volume reduction by thermal,

chemical, electrical, biological or other approved processes. b. FOG disposal systems shall comply with ASME A112.14.6 and be installed according to the

manufacturer's instructions. Table 3.1.3 - Part X Miscellaneous X-14. Reserved FOG (Fats, Oils, and Greases) Disposal Systems ASME A112.14.6 - 2010 Basis/Reason for Change: To add ASME A112.14.6 FOG Disposal Systems to the Code. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 156: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 106

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 __Rand Ackroyd______________ Date 3 Jan. 23,2013_____ Jurisdiction/Company/ Mailing Address: _____290 High St_________________________________ City/State/Zip: Newburyport, Ma 01950_________________________ Phone: 978 985 6980 Fax: ______________ E-mail: [email protected]______ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: X _ Amend section with this editorial change X __ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _602.2 Compliance for Hydro- Mechanical Grease Interceptors Sizes Up to 100GPM a. Type I hydro-mechanical grease interceptors shall comply ASME A112.14.3 and Sections 6.2.1.1 and be installed in accordance with the recommendations of PDI G101 and the manufactures instructions. They shall have a grease retention capacity of not less than two pounds for each gpm of rated flow. Basis/Reason for Change: This section only applies to Hydro-Mechanical grease interceptors. Standard for Hydro-mechanical like PDI G101 no longer restrict size to 100 gpm Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 157: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 107

Contact Information: Person Submitting Change 2 ______NSPC Committee________________ Date 3 ___9-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 ____________________ City/State/Zip _________________Falls Church, VA 22046__________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 6.3 Oil/Water Separators

6.3.1 Where Required and Approved Point of Discharge

b. Sand interceptors and oil separators shall be provided wherever floors, pits, or surface areas subject to accumulation of grease or oil from service or repair operations are drained and washed into a drainage system. Such locations include, but are not limited to, car and truck washing facilities, engine cleaning facilities, and similar operations. The drainage and effluent from the interceptors and separators in such locations shall be connected to the sanitary sewer.

Basis/Reason for Change: To clarify the requirements of Section 6.3.1.b. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 158: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 108

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 6.3 Oil/Water Separators

6.3.1 Where Required and Approved Point of Discharge e. Where parking garages without provisions for vehicle washing or floor rinsing require storm water drainage, drains shall be permitted to connect to the storm sewer without a sand interceptor and oil separator. Such drainage, including rainwater, melting snow, and ice or rainwater runoff from vehicles, shall not be connected to the sanitary sewer.

Basis/Reason for Change: To clarify that in a parking garage without vehicle washing or floor rinsing, direct rainwater can be discharged to the storm sewer without a sand interceptor and oil separator Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 159: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 109

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-15-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.2 and Table 3.1.3 7.2 FIXTURES FOR ACCESSIBLE USE a. Plumbing fixtures for accessible use and their installation shall conform to the requirements of the 2010 ADA Standards for Accessible Design, ANSI/ICC ICC ANSI A117.1, or the Authority Having Jurisdiction. b. Exposed waste and water supply piping for accessible fixtures shall be covered with protectors or insulators that comply with ASME A112.18.9. TABLE 3.1.3 VI-20: Reserved Protectors/Insulators for Exposed Waste and Supplies for Accessible Fixtures ASME A112.18.9 - 2011 X-21: 2010 ADA Standards for Accessible Design ADA Standards - 2010 Basis/Reason for Change: To add ASME A112.18.9 and the current ADA Standards for Accessible Design. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 160: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 110

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __2-25-2012_______ Mailing Address 180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046 Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Chapter 7 - Plumbing Fixtures, Fixture Fittings, and Plumbing Appliances 7.4.1 Vitreous china water closets shall comply with ASME A112.19.2M 19.2. Plastic water closets

shall comply with ANSI IAPMO Z124.4. 7.4.2 Water closets, whether operated by flush tank, flushometer tank, or flushometer valve, shall

comply with ASME A112.19.2M 19.2 or ANSI IAPMO Z124.4 and shall be the low-consumption type having an average consumption of not more than 1.6 gallons per flush when tested in accordance with ASME A112.19.6 19.2 or IAPMO Z124.4.

EXCEPTION: Blow-out water closets and clinical sinks. 7.4.5 Seats for water closets shall be of smooth, non-absorbent materials, be properly sized to fit the

water closet bowl, and comply with ANSI IAPMO Z124.5. EXCEPTION: Water closets in single dwelling units are not required to comply with ANSI

IAPMO Z124.5. 7.4.6 Water closets in hotels, motels, dormitories, boarding houses, and similar occupancies shall be

the elongated type complying with ASME A112.19.2 or ANSI IAPMO Z124.4, and ASME A112.19.6 and with open-front seats complying with ANSI IAPMO Z124.5.

EXCEPTIONS: (1) Closed-front seats shall be permitted in hotel and motel guest rooms. (2) Closed-front seats that are provided with automatic seat cover protection. 7.5.1 a. Water-fed vitreous china urinals shall comply with ASME A112.19.2. b. Non-water vitreous china urinals shall comply with ASME A112.19.19. c. Water-fed and non-water plastic urinals shall comply with ANSI IAPMO Z124.9. d. Non-water urinals shall have a liquid trap seal as required by Section 5.3.2, ASME

A112.19.19, and ANSI IAPMO Z124.9. e. Water-fed urinals with a concealed trap seal and/or an outlet strainer shall be supplied by an

automatic flushing device. 7.5.2 Water-fed urinals shall be the low-consumption type having an average water consumption of

not more than 1.0 gallons per flush when tested in accordance with ASME A112.9.6 19.2.

Page 161: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

7.6.1 a. Lavatories shall comply with the following standards: 1. Ceramic, non-vitreous; ASME A112.19.9M 19.2 2. Enameled cast-iron; ASME A112.19.1M 19.1 3. Enameled steel; ASME A112.19.4M 19.1 4. Plastic; ANSI IAPMO Z124.3 5. Stainless steel; ASME A112.19.3M 19.3 6. Vitreous china; ASME A112.19.2M 19.2 7.7.1 Vitreous china bidets shall comply with ASME A112.19.2M 19.2. Bidet faucets shall comply

with ASME A112.18.1/CSA B125.1. 7.8.1 a. Bathtubs shall comply with the following standards: 1. Plastic, cultured, and other synthetic products or finishes; ANSI IAPMO Z124.1 1.2 2. Enameled cast-iron; ASME A112.19.1 3. Enameled steel; ASME A112.19.4 19.1 4. Bathtubs with pressure sealed doors; ASME A112.19.15 7.8.4 Unless equipped with an atmospheric backflow preventer in accordance with ASSE 1001 or

ASME A112.18.7 or ASSE 1001, the bathtub filler shall be equipped with an air gap between the end of the over-rim tub filler spout and the overflow rim of the tub that complies with Section 10.5.

7.9.2 Whirlpool bathtubs shall comply with ASME A112.19.7M 19.7. 7.10.1 Plastic shower receptors and stalls shall comply with ANSI IAPMO Z124.2 1.2. 7.11.1 a. Sinks shall comply with the following standards: 1. Enameled cast-iron; ASME A112.19.1M 19.1 2. Enameled steel; ASME A112.19.4M 19.1 3. Stainless steel; ASME A112.19.3M 19.3 4. Plastic; ANSI IAPMO Z124.6. 7.15.1 Domestic dishwashing machines shall comply with UL 749 and either AHAM DW-2PR or ASSE 1006. Commercial dishwashing machines shall comply with UL 921 and ASSE 1004. The water supply to dishwashing machines shall be protected from back-siphonage by an integral air gap or other internal means. Basis/Reason for Change: To update the referenced standards in Chapter 7. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 162: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 111

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___11-19-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.4.4, 7.4.9, Table 7.4.9 7.4.4 Bowl Height The height of water closet bowls shall be a minimum of 13-1/2 inches 13-1/2 to 17 inches from the finished floor to the top of the rim. EXCEPTIONS EXCEPTION: (1) Bowls intended for children's use (5 years and younger) are permitted to be 9-1/2" to 10-1/2" high to the rim and juvenile use (6-12 years) are permitted to be 10-1/2" to 13-1/2" to the rim. (2) The height of bowls intended specifically for children's accessible use (12 years and younger) shall be such that the top of the rim is 11" to 17" above the floor and comply with Section 7.2. (3) The height of bowls intended for adult accessible use (13 years and older) shall be such that the top of the seat is 17" to 19" above the floor and comply with Section 7.2. 7.4.9 Water Closets for Accessible Use (a) Water closets for accessible use shall comply with Section 7.2. (b) For adult use (13 years and older): 1. The height of water closet bowls shall be such that the top of the seat is 17 to 19 inches above the finished floor.

Page 163: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

2. Wheelchair accessible water closets shall be located so that their centerlines are 16 to 18 inches from a side wall or partition with a grab bar. 3. Ambulatory accessible water closets shall be located so that their centerlines are 17 to 19 inches from a side wall or partition with a grab bar. (c) For children's use, the toilet seat height and centerline to a side wall or partition with a grab bar shall be in accordance with Table 7.4.9.

Table 7.4.9 DIMENSIONS FOR ACCESSIBLE WATER CLOSETS FOR CHILDREN Dimension Ages

3 and 4 Years 5 thru 8 Years 9 thru 12 Years Seat Height above the Finished Floor 11" to 12" 12" to 15" 15" to 17" Centerline to a Side Wall (1) 12" 12" to 15" 15" to 18" NOTES FOR TABLE 7.4.9 (1) Clearance to a side wall or partition with a grab bar. Basis/Reason for Change: To update the requirements for accessible water closets in accordance with the 2010 ADA Standards for Accessible Design and ANSI/ICC A117.1 - Accessible and Usable Buildings and Facilities. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 164: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change

2 __John Heine_____________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address ______________________________________________________________________

City/State/Zip ________________________________________________________________________

Phone ___609-987-0500_______________ Fax _ 609-987-0511 E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

___ __ Change subsection to read as follows _____ Delete subsection and substitute as follows

_____ Add new subsection to read as follows __X___ Delete subsection without substitution

Code Section: _7.5.5 _____________________ Wall hung urinals for accessible use shall have an elongated rim not more than 17 inches above the

finished floor

Basis/Reason for Change:

This is covered in ADA

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

NJ PHCC Code Committee, (Chairman) / PO Box 2067

Princeton, NJ 08543

cwhite
Typewritten Text
13 112
Page 165: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 113

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-24-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.5.5 7.5.5 Accessible Use Wall-hung urinals for accessible use shall have an elongated rim that is not more than 17 inches above the finished floor. (a) Urinals for accessible use shall comply with Section 7.2. (b) The outer face of the rim on wall-hung and stall-type urinals for accessible use shall be not less than 13-1/2 inches from the back of the fixture. (c) The mounting height to the rim of wall-hung urinals for accessible use shall be not more than 17 inches above the finished floor. Basis/Reason for Change: To update the requirements for accessible urinals in accordance with the 2010 ADA Standards for Accessible Design and ANSI/ICC A117.1 - Accessible and Usable Buildings and Facilities. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 166: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information:

Contact Information: Person Submitting Change

2 __John Heine_____________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address ______________________________________________________________________

City/State/Zip ________________________________________________________________________

Phone ___609-987-0500_______________ Fax _ 609-987-0511 E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

__X_ __ Change subsection to read as follows _____ Delete subsection and substitute as

follows

_____ Add new subsection to read as follows _____ Delete subsection without substitution

Code Section: _7.5.6 _____________________ 7.5.6a Non watering urinals shall not be installed in facilities that do not have provisions for necessary

maintenance.or where the fixtures may be abused by the occupants. Change B to A and C to B.

Basis/Reason for Change:

Restrooms have no control over people abusing the fixtures. Left as written there is no place a waterless

urinal could be used as there is no way to prevent abuse

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

NJ PHCC Code Committee, (Chairman) / PO Box 2067

Princeton, NJ 08543

cwhite
Typewritten Text
13 114
Page 167: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 115

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___3-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.7 BIDETS 7.7.1 Compliance Vitreous china bidets shall comply with ASME A112.19.2/CSA B45.1. Non-vitreous ceramic bidets shall comply with ASME A112.19.9M/CSA B45.1. Bidet faucets shall comply with ASME A112.18.1/CSA B125.1. Bidet sprays shall comply with ASME A112.4.2. Basis/Reason for Change: To add the standard for bidet sprays. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 168: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 116

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___11-07-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.7 Bidets 7.7.4 Control of Mixed Water Temperature The control of mixed water temperature from for bidets shall comply with Section 10.15.6. Basis/Reason for Change: The water supply is for bidets, not from bidets. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 169: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 117

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ____1-24-2013_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.8 Bathtubs

7.8.4 Backflow Prevention Unless equipped with an atmospheric backflow preventer the water supplies to a bathtub are protected by vacuum breakers in accordance with ASSE 1001 or ASME A112.18.7, the bathtub filler spout shall be equipped with provide an air gap between the end of the over-the-rim tub filler spout and the overflow rim of the tub that complies with Section 10.5 10.5.2 and Table 10.5.2.

Basis/Reason for Change: To clarify the requirements for backflow prevention from bathtubs. ASME A112.18.7 was withdrawn by ASME in February 2012. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 170: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 118

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-26-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.10.4 Shower Waste Outlets a. (No change) b. Showers with multiple shower heads shall have a 2" waste outlet pipe size for up to 10 5 gpm, a

3" waste outlet pipe size for up to 20 10 gpm, or a 4" waste outlet pipe size for up to 50 15 gpm. Multiple waste outlets shall be provided where necessary to handle the total water flow from the shower heads.

EXCEPTION: Bathtubs Combination bath/showers with multiple two 2.5 gpm shower heads. c. (No change) d. (No change) e. (No change) COMMENT: Increased waste outlet pipe sizes are not required for combination bath/showers with multiple shower heads because of the depth of bathtubs compared to possible overflow from shower pans. Basis/Reason for Change: To reduce the maximum water flow rates for showers having multiple shower heads from the maximum capacity of horizontal drain piping flowing half full to better coordinate the allowable drain flow rates with the revised DFU values for shower stalls in Table 11.4.1. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 171: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 119

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.11 Sinks 7.11.2 Domestic Kitchen Sinks and Bar Sinks a. Each compartment in a kitchen sink or bar sink shall have an outlet suitable for either a domestic food waste grinder or a basket strainer. The waste outlet for each compartment shall be 1-1/2" nominal size. Outlet fittings shall have crossbars or other provisions for protecting the drain outlet and shall include a means of closing the drain outlet. See Figure 7.11.2 b. Faucets for kitchen sinks and bar sinks shall be designed and manufactured so that they will not exceed a water flow rate of 2.2 gallons per minute when tested in accordance with ASME A112,18.1/CSA B125.1. See Figure 7.11.2 7.11.5 Sink Faucets b. Faucets for kitchen sinks shall be designed and manufactured so that they will not exceed the flow rate for kitchen faucets specified in ASME A112.18.1/CSA B125.1. Basis/Reason for Change: To move reference to Figure 7.11.2 to Section 7.11.2.a. The reference to the flow rate for kitchen faucets in Section 7.11.5.b is already included in Section 7.11.2.b. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 172: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 121

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-15-2013______ Mailing Address 180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046 Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.12 Drinking Fountains and Water Coolers Drinking Water Facilities 7.12.1 Compliance Refrigerated drinking fountains and water coolers shall comply with ARI 1010 and UL 399. 7.12.2 Prohibited Locations Drinking fountains and water coolers shall not be located in public toilet rooms. EXCEPTION: Convertible lavatory faucets and fixture fittings that provide a discharge stream similar to a drinking fountain shall be permitted in bathrooms in dwelling units. 7.12.3 Outdoor Drinking Fountains Freeze-resistant drinking fountains shall be the sanitary type. Weep hole drains that form a cross connection between ground water and the potable water supply shall not be permitted. 7.12.1 Compliance a. Drinking water facilities shall comply with the lead limits of NSF 61. b. Drinking water facilities for accessible use shall comply with Section 7.2. c. Drinking fountains shall comply with ASME A112.19.1/CSA B45.2, ASME A112.19.2/CSA B45.1, ASME A112.19.3/CSA B45.4, or ASME A112.19.9. d. Drinking water coolers with self-contained refrigeration units shall comply with UL 399 and ASHRAE Standard 18. e. Water bottle filling stations shall comply with applicable standards. Stations with self-contained refrigeration units for chilled water shall comply with UL 399 and ASHRAE Standard 18. 7.12.2 Prohibited Locations Drinking water facilities shall not be located in public toilet rooms. EXCEPTION: Convertible lavatory faucets that provide a discharge stream similar to a drinking fountain shall only be permitted in bathrooms in dwelling units.

Page 173: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

7.12.3 Minimum Number of Required Facilities a. The minimum number of drinking water facilities shall be in accordance with Table 7.21.1. EXCEPTIONS: (1) No fewer than two drinking water facilities shall be provided, one for accessible wheelchair use and one for standing persons. (2) Where a drinking water facility provides service for two people simultaneously, one for accessible wheelchair use and one for standing persons, it may be counted as two drinking water facilities. b. Water bottle filling stations shall be permitted to substitute for up to 50% of the required drinking water facilities. c. Bottled water dispensers shall not be permitted to substitute for required drinking water facilities. 7.12.4 Outdoor Drinking Fountains Freeze-resistant drinking fountains shall be the sanitary type. Weep hole drains that form a cross connection between ground water and the potable water supply shall not be permitted. Section 1.2 Definition of Terms Water Bottle Filling Station: A drinking water supply fixture that is connected to the domestic water supply and drain piping and provides for individuals to fill personal-use water bottles. Stations can be recessed or wall-mounted and can include filtration units, self-contained refrigeration units, and drinking fountains. Table 3.1.3 - Part V V-4: Drinking Fountains and Water Coolers, Self-Contained, Mechanically Refrigerated: Drinking-Water Coolers ARI 1010-2002, UL 399 Edition 7 - 2008 UL 399 Ed.7 - 2008 (2012) V-15: Reserved Methods of Testing for Rating Drinking-Water Coolers with Self-Contained Mechanical Refrigeration…………………………………..…ASHRAE Standard 18 - 2008. Basis/Reason for Change: To update the requirements for drinking water facilities. Bottled water dispensers with no plumbing are not considered to be permanent and can be removed after building occupancy. Water bottle filling stations are popular in colleges and other facilities were people carry personal water bottles during the day. Their use reduces the use of bottled water dispensers and the number of used bottled water containers that end up in landfills. ARI 1010 has been withdrawn. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 174: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 122

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-11-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.13 Automatic Clothes Washers 7.13.1 Compliance a. Automatic clothes washers for domestic use or use by the general public shall comply with AHAM HLW-2PR HLW-1 or ASSE 1007 or UL 2157, and shall have an air gap incorporated in the internal tub fill line. b. Commercial electric clothes washers shall comply with UL 1206 and include back-flow prevention. Table 3.1.3 - Part VII VII-20: Electric Clothes Washing Machines and Extractors UL 2157 Edition 2 - 1997 (2010) VII-21: Electric Commercial Clothes-Washing Equipment UL 1206 Edition 4 - 2003

Page 175: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: AHAM HLW-2PR has been replaced by AHAM HLW-1. ASSE 1007 has not been updated in 26 years. It is no longer referenced by most manufacturers of automatic clothes washers. To add requirements for commercial clothes washers. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________ Section 7.13.1 page 2 of 2 1-11-2013

Page 176: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 123

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-13-2013______ Mailing Address 180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046 Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.15 Dishwashing Machines 7.15.1 Compliance a. Domestic dishwashing machines shall comply with UL 749 and either AHAM DW-2PR or ASSE 1006 or AHAM DW-1. Commercial dishwashing machines shall comply with UL 921 and ASSE 1004. The water supply to domestic dishwashing machines shall be protected from back-siphonage by an internal air gap, vacuum breaker, or other internal means. b. Commercial dishwashing machines shall comply with UL 921 or NSF 3. Backflow prevention shall comply with ASSE 1004. 7.15.2 Residential Sink and Dishwasher (no change) 7.15.3 Residential Sink, Dishwasher, and Food-Waste-Grinder (no change) 7.15.4 Commercial Dishwashing Machine (no change) Table 3.1.3 - Part VII VII-2: Dishwashing Machines, Commercial UL 921 Edition 6-2006 (2012) NSF 3 - 2010 ASSE 1004 - 2008 Basis/Reason for Change: ASSE 1006 is inactive. It had not been updated in 26 years. It is no longer referenced by most manufacturers of dishwashing machines. AHAM DW-2PR has been replaced by AHAM DW-1. ASSE 1004 has the backflow prevention requirements for commercial dishwashing machines. NSF 3 is for commercial warewashing equipment. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 177: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 123a

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ___Dave Bishop___________________ Date 3 _1/31/13____________ Jurisdiction/Company/ Mailing Address _________1001 Parsippany Blvd________________________________ City/State/Zip _______Parsippany New Jersey 07054____________________ Phone __973-229-4735____ Fax _973-263-1488_____ E-mail [email protected]___ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ____7.15.4.b__________________ Commercial dishwashers shall be permitted to discharge through a grease interceptor in accordance with Section 6.4.2. Remove Section 6.4.2 and change it to 6.2.1 Basis/Reason for Change: Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 178: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 124

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-15-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.16.1 Compliance Floor and trench drains shall comply with ASME A112.6.3 or, if stainless steel, ASME A112.3.1. Basis/Reason for Change: To clarify that ASME A112.3.1 applies to drains in stainless steel DWV piping systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 179: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 125

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 Dan O’Gorman Date 3 January 27, 2013 Jurisdiction/Company/ Mailing Address 10 Albany Street City/State/Zip Edison, New Jersey 08837 Phone 732-661-1935 Fax 732-661-9326 E-mail [email protected] IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change X Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.16.4 Required Locations for floor Drains 3. Common laundry rooms in commercial buildings and buildings having more two dwelling units Basis/Reason for Change: To clarity floor drains are not required in individual units and are required for common laundry rooms in commercial and other than dwelling units (condominiums and apartments) Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 180: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 126

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.16 Floor and Trench Drains

7.16.4 Required Locations for Floor Drains a. Floor drains shall be installed in the following areas: 1. Toilet rooms containing either two or more water closets or wall hung urinals or a

combination of one or more water closets and one or more wall hung urinals, except in a dwelling unit.

2. Commercial kitchens. 3. Common laundry rooms in commercial buildings and buildings having more than two

dwelling units. Basis/Reason for Change: To clarify the requirements for floor drains in toilet rooms. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 181: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 127

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.21.4.(4) (4) In mercantile occupancies with a net occupiable floor area of 1500 square feet or less that is accessible to customers, one toilet facility designed for use by only one person at a time shall satisfy the requirements for serving customers and employees of both sexes. person at a time, shall be permitted for use by both sexes. Comment: Net occupiable floor area in mercantile occupancies does not include display cases and space occupied by merchandise. Basis/Reason for Change: To correct an editorial error. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 182: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 128

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___7-27-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.21.5 Substitution and Omission of Fixtures b. Drinking Water Facilities: A kitchen or bar sink shall be considered as meeting the requirements for drinking water facilities for employees who have access to the facilities. Basis/Reason for Change: To clarify the requirements of Section 7.21.5.b. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 183: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 129

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ____1-18-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.21.5.c 7.21.5.c Laundry Trays: Multiple dwelling units or boarding houses without public laundry rooms shall not require laundry trays. Provisions for Clothes Washers: Apartment buildings and condominiums without laundry rooms for their occupants shall not require provisions for centralized clothes washers for use by multiple occupants. Basis/Reason for Change: To coordinate Section 7.21.5.c with the proposed changes to Table 7.21.1 with regard to provisions for clothes washers for multiple occupants in apartment buildings and condominiums. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 184: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 130

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-19-2013______ Mailing Address 180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046 Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.21.7 Facilities in Mercantile and Business Occupancies Serving Customers a. Within a single establishment, facilities for customers and employees shall be permitted to be met with a single set of restrooms accessible to both groups. The required number of fixtures shall be based on the total number of customers and employees. b. Fixtures for customer and employee use shall be permitted to be met by providing centrally located facilities accessible to several multiple establishments. The maximum distance of entry from each of the several establishments to these facilities shall not exceed 500 feet from the entrance of any establishment served. c. In establishments with a floor area of 150 square feet or less, the requirement to provide facilities for employees shall be permitted to be met by providing centrally located facilities accessible to several establishments. The maximum distance of entry from each of the several establishments to these facilities shall not exceed 300 feet. d. c. Drinking water facilities are not shall not be required for customers where normal occupancy is short term. e. d. For establishments less than 1500 square feet in total floor area, one water closet and one lavatory in a restroom shall be permitted to provide the requirements for serving both customers and employees. Basis/Reason for Change: To clarify the requirements for toilet facilities for employees and customers in mercantile and business occupancies. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 185: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change

2 __John Heine_____________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address ______________________________________________________________________

City/State/Zip ________________________________________________________________________

Phone ___609-987-0500_______________ Fax _ 609-987-0511 E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

___X__ Change subsection to read as follows _____ Delete subsection and substitute as follows

_____ Add new subsection to read as follows _____ Delete subsection without substitution

Code Section: _7.21.7a__________________________ Within a single establishment, facilities for customers and employees shall be permitted to be met with

a single set of restrooms accessible to both groups. The required number of fixtures shall be based on

the total number of customers and employees, whichever is greater.

or

Basis/Reason for Change:

Revert to 2009 and previous editions because there were no problems with previous editions. This will

conform with previous intent. There is no reason to add fixtures incurring additional expense.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

NJ PHCC Code Committee, (Chairman) / PO Box 2067

Princeton, NJ 08543

cwhite
Typewritten Text
13 131
Page 186: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 132

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.21.8 Food Service Establishments . a. Restaurants and other food service establishments with an a seated occupant load exceeding 100 customers shall be provided with separate toilet facilities for employees and customers. Customer and employee toilet facilities may be combined for seated customer loads of 100 or less. For employees of 15 or less, one employee toilet facility, designed for use by no more than one person at a time, shall be permitted to be used by both sexes. b. Where food service establishments and food courts are open to public areas in malls and transportation terminals, toilet facilities that serve both customers and employees may be centrally located and serve multiple establishments. The maximum distance of entry to central toilet facilities shall be 500 feet from any establishment or food court served. b. c. Drinking water facilities are not shall not be required in restaurants or other food service establishments if drinking water service is provided or available on request. Basis/Reason for Change: To permit centrally located toilet facilities in malls and transportation terminals to satisfy the requirements for toilet facilities in food service establishments.

Page 187: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 188: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 133

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ _ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.21 Minimum Number of Required Fixtures . 7.21.9 Family and Assisted-Use Toilet Rooms a. Accessible family or assisted-use toilet rooms containing one water closet and one lavatory shall be provided as required by the applicable building code. b. In assembly and mercantile occupancies, the plumbing fixtures within family and assisted-use toilet rooms may be counted as part of the minimum required fixtures for males or for females. Basis/Reason for Change: To address the plumbing fixtures in family and assisted-use toilet rooms. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 189: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 134

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-18-2012______ Mailing Address 180 S. Washington Street, P.O. Box 6808 City/State/Zip Falls Church, VA 22046 Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X_ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.21.10 Fractions of the Minimum Number of Required Plumbing Fixtures a. In Table 7.21.1, where the number of persons of each sex is less than 100% of a particular group, the number of fixtures required for that group may be reduced by the fraction of the persons in that group. The fraction of the required fixtures shall be rounded up to the next whole number. b. Where a facility includes two or more different occupancy classifications with access to the same installed plumbing fixtures, the fraction of the required fixtures for each classification may be added and the total combined fraction of the required fixtures shall be rounded up to the next whole number. COMMENTS (for the NSPC Illustrated) If a group of 101 - 200 persons of each sex requires 2 additional fixtures and the group only consists of 35 persons, then only 35/100 = 0.35 x 2 fixtures = 0.70 additional fixtures required, which can be rounded up to 1 additional fixture for each sex. If a facility includes two different occupancy classifications with access to the same installed fixtures, if one group requires 0.6 additional fixture and the other group requires 0.2 additional fixture, the total of 0.8 additional fixture for the two occupancy classifications can be rounded up to 1 additional fixture for each sex. Basis/Reason for Change: To more accurately determine the number of required fixtures where more than one fixture is required in Table 7.21.1 for a group of persons of each sex. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 190: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
cwhite
Typewritten Text
13 135
Page 191: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 192: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 193: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 194: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 195: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 196: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 197: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 198: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 199: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 200: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 201: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change

2 _John H. Heine, L.M.P___________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address Heine Plumbing and Heating/ 270 Sparta Ave., Suite 104, PMB 139______

City/State/Zip _Sparta, NJ 07871

Phone 973-383-0392 _ Fax 973-383-0536_ E-mail [email protected]

______________

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

___X__ Change subsection to read as follows _____ Delete subsection and substitute as follows

_____ Add new subsection to read as follows ___ Delete subsection without substitution

Code Section: 7.22 Water Treatment Systems

Water softeners, Reverse osmosis water treatment units, and other drinking water treatment systems

shall meet the requirements of the appropriate standards listed in Table 3.1.3. Waste discharge from

such equipment shall enter the drainage system through an air gap. Discharge piping shall be of a

material approved for potable water, sanitary drainage or storm drainage.

Basis/Reason for Change: The purpose for this change is to protect any type of water treatment unit that discharges from

failure due to piping material collapse, pinching, or any other means of distortion due to lack of

structural integrity. These failures can go un-noticed by homeowners for extended periods of time

which can result in health and/or safety hazards. In addition, the failure of such discharge lines due to

lack of structural integrity can lead to profuse water leakage, resulting in significant property damage

and the possibly of creating a health hazard through mold and mildew growth.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

cwhite
Typewritten Text
13 136
Page 202: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

Contact Information: Person Submitting Change

2 _John H. Heine, L.M.P.___________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address Heine Plumbing and Heating/ 270 Sparta Ave., Suite 104, PMB 139______

City/State/Zip _Sparta, NJ 07871

Phone 973-383-0392 _ Fax 973-383-0536_ E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

_____ Change subsection to read as follows _____ Delete subsection and substitute as follows

_X____ Add new subsection to read as follows ___Delete subsection without substitution

7.22.2 Ultraviolet Lights

1. Ultra-violet tubes shall be jacketed so that a temperature of 105 degrees Fahrenheit is maintained.

2. The jacket on the ultra-violet light tubes shall be quartz or high-silica glass with similar optical

characteristics.

3. The ultra-violet light disinfection unit shall be designed and installed to permit frequent cleaning

of the water contact surface of the ultra-violet light tube jacket.

4. The maximum water depth in the disinfection chamber, measured from the ultra-violet light tube

surface to the outer walls of the chamber, shall not exceed three inches.

5. Ultra-violet radiation at a level of 2,537 Angstrom shall be applied at all points throughout the

disinfection chamber at a minimum rate of 16,000 microwatt seconds per square centimeter.

6. An automatic flow control valve, accurate within the expected pressure range, shall be installed to

restrict flow to the maximum design flow of the ultra-violet disinfection unit.

An accurately calibrated ultra-violet light intensity meter, filtered to confine its sensitivity to the

range of disinfection spectrum, shall be installed in the wall of the disinfection chamber at the

point of greatest water depth from the light transmitting source.

8. A flow diversion valve or automatic shut-off valve controlled by the ultra-violet light intensity

meter shall be installed so as to permit water flow into the water system only when the minimum

radiation level specified at (c)5 is applied. When power is not being supplied to the unit, the

valve shall be in a closed (fail-safe) position to prevent the flow of water into the water system.

9. The ultra-violet light disinfection unit shall be installed in a manner such that it cannot be bypassed.

10. The ultra-violet light disinfection unit shall be installed downstream of any other water

conditioning/filtering equipment.

cwhite
Typewritten Text
13 137
Page 203: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: The reason for this change is to ensure proper disinfection of

contaminated public and nonpublic water systems as well as to ensure all disinfection equipment is properly

protected and can be properly maintained to prevent significant health risks from drinking contaminated water.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

Page 204: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 138

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145___________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __X_ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Section 7.24 e. Revise 7.24 e. to read as follows: 7.24 Plumbed Emergency Eyewash and Shower Equipment

e. The temperature of the flushing fluid shall be from 65°F to 95°F in accordance with ASSE 1071, unless the facility designer has indicated that other specific temperatures are required to provide protection for a particular hazard.

Basis/Reason for Change: ASSE 1071 is ANSI Approved standard developed under the consensus process and establishes performance requirements for plumbed emergency equipment. The temperature requirement for flushing fluid is consistent with ASSE 1071. NOTE: ASSE has submitted a companion change to this proposal that affects Table 3.1.3 Part V Item 24. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 205: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 139

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 __1-19-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ _ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 7.24 Plumbed Emergency Eyewash And Shower Equipment . Add the following: 7.24.f. Temperature actuated mixing valves for plumbed emergency equipment shall comply with ASSE 1071. Add to Table 3.1.3 - Part VIII: Temperature Actuated Mixing Valves for Plumbed Emergency Equipment: ASSE 1071 - 2012 Basis/Reason for Change: To add the standard for temperature actuated mixing valves for plumbed emergency equipment. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 206: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 140

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-24-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Chapter 8 Hangers and Supports

8.5 Strain and Stress in Pipe

a. Piping in the plumbing system shall be installed so as to prevent strains and stresses that will exceed the allowable stress for the pipe. Provision shall be made for expansion and contraction of the piping material installed. (See Sections 4.1.3 and 4.2.16). b. Pipe guides shall be provided on each side of expansion loops and expansion compensators. See Figures 8.5-A, 8.5-B, and 8.5-C.

Basis/Reason for Change: To add the requirement for pipe guides for expansion loops and expansion compensators. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 207: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 140a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-24-2013______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 9.1.12 Relief Valve Discharge Piping

a. Discharge piping from pressure relief valves, temperature relief valves, and any associated indirect waste piping shall be in accordance with Section 10.16.6 this section.

b. The minimum size of drain or indirect waste piping for individual relief valve discharge pipes shall be as indicated in Table 9.1.12.

c. Where two or more relief valves serving different pressure vessels, water heaters, or piping systems are located in the same area, each shall be indirectly discharged separately. If any of the relief valves discharge into the same receptor, the receptor drain shall be sized according to Table 9.1.12 for the largest relief valve discharge pipe served.

d. Where two or more relief valves serve the same pressure vessel, water heater, or piping system,

each shall be indirectly discharged separately. If any of the relief valves discharge into the same indirect waste receptor, the inside (ID) area of the drain of that indirect receptor shall be not less than five times the sum of the inside (ID) areas of the individual discharge pipes served, as indicated in Table 9.1.12.

Page 208: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

TABLE 9.1.12 SIZE OF DRAINS OR WASTE PIPES RECEIVING RELIEF VALVE DISCHARGE Relief Valve Discharge Pipe Size (1)

(ID Area – sq. in.) Minimum Drain or Indirect Waste Pipe Size

(ID Area – sq. in.) 1/2” (0.2 sq. in.) 1 1/4” (1.2 sq. in.)

3/4” (0.4 sq. in.) 2” (3.1 sq. in.)

1” (0.8 sq. in.) 3” (7.1 sq. in.)

1 1/4” (1.2 sq. in.) 3” (7.1 sq. in.)

1 1/2” (1.8 sq. in.) 4” (12.6 sq. in.)

2” (3.1 sq. in.) 4” (12.6 sq. in.)

2 1/2” (4.9 sq. in.) 5” (19.6 sq. in.)

3” (7.1 sq. in.) 6” (28.3 sq. in.)

4” (12.6 sq. in.) 8” (50.3 sq. in.)

12” (113.1 sq. in.)

15” (176.7 sq. in.) NOTES FOR TABLE 9.1.12

(1) Where 2 or more discharge pipes discharge into the same indirect waste pipe, Add their ID areas, multiply by five, and select a drain or indirect waste pipe size That has not less than that total area.

Basis/Reason for Change: To include the requirements for indirect waste and drain piping for relief valve discharge in Chapter 9 instead of Chapter 10. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 209: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 141

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 9.3 Indirect Waste Receptors

9.3.1 General

c. Plumbing fixtures that are used for domestic or culinary purposes shall not be used as receptors for indirect wastes except as follows:

1. In a dwelling unit, a kitchen sink trap or food waste grinder, shall be permitted to receive the discharge from a dishwasher. 2. In a dwelling unit, a laundry sink, provided that an air gap is maintained for any potable clear-water waste, shall be an acceptable receptor for:

a) Air conditioning condensate. b) Automatic clothes washer. c) Water treatment unit. d) Water heater relief discharge. e) Condensing furnace condensate.

3. A service sink or mop basin shall be an acceptable receptor for air conditioning and condensing furnace condensate and any infrequent potable clear-water waste if the required air gap is provided for the potable clear water waste.

See Figures 7.15.2, 7.15.3, 7.15.4, 9.1.5-A, 9.1.5-B, and 9.1.10. Basis/Reason for Change: To add condensing furnace condensate to the acceptable discharges to indirect waste receptors. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 210: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 142

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 9.3 Indirect Waste Receptors

9.3.2 Strainers or Baskets Floor sinks and floor drains that handle other than clear-water wastes shall include an internal strainer or a removable metal basket to retain solids. See Figure 9.3.2

Basis/Reason for Change: To clarify the requirement for a strainer or basket for indirect waste receptors. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 211: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 143

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___1-18-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X_ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 9.4.1 Treatment of Corrosive Wastes . a. Corrosive liquids, spent acids, or other harmful chemicals that may damage a drain, sewer, soil or waste pipe, create noxious or toxic fumes, or interfere with sewage treatment processes shall not be discharged into the plumbing system without being thoroughly neutralized or treated by passing through a properly constructed and approved neutralizing device. Such devices shall be provided automatically with a sufficient supply of neutralizing medium, so as to make its contents non-injurious before discharge into the drainage system. The nature of the corrosive or harmful waste and the proposed method of treatment shall be submitted to and approved by the Authority Having Jurisdiction prior to installation. b. Vent piping for corrosive waste drainage piping shall be separate from vent piping for sanitary waste and drainage piping and shall terminate outdoors in accordance with Section 12.4. Basis/Reason for Change: To address vent piping for corrosive wastes. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 212: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 144

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___4-13-2012______ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 9.4.3 Air Conditioning Condensate a. Indirect waste piping from air conditioning units shall be sized according to the condensate-generating capacity of the units served. Branches from individual units shall be no smaller than the drain opening or drain connection on the unit. Traps shall be provided at each air conditioning unit or cooling coil to maintain atmospheric pressure in the waste piping. b. Gravity condensate waste piping shall be sloped not less than 1/8" per foot. Drainage fittings shall be used in sizes 1-1/4" and larger. Minimum pipe sizes for gravity flow shall be as follows: 3/4" pipe size through 3-ton cooling capacity 1" pipe size through 20-ton cooling capacity 1-1/4" pipe size through 100-ton cooling capacity 1-1/2" pipe size through 300-ton cooling capacity 2" pipe size through 600-ton cooling capacity c. Discharge of air conditioning condensate shall not be permitted to create a nuisance such as flowing across the ground or paved surfaces. Unless expressly prohibited by the Authority Having Jurisdiction, the point of indirect discharge shall be one of the following: 1. the building sanitary drainage system 2. the building storm drainage system 3. a sump pump 4. a subsurface absorption pit or trench 5. within dwellings, a tub waste and overflow, or lavatory tailpiece, or laundry sink within the same dwelling. Basis/Reason for Change: To add laundry sinks as a discharge point for air conditioning condensate, as permitted by Section 9.3.1 Exception (2). Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 213: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 145

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __8-05-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Notes for Table 10.5.2 2. Vertical walls, ribs, or similar obstructions extending from the water surface to or above the horizontal plane of the spout opening require a greater air gap when spaced closer to the nearest inside edge of the spout opening than specified in Note 1 above. The effect of three or more such vertical walls or ribs has not been determined. In such cases, the air gap shall be measured from the top of the wall. Basis/Reason for Change: To clarify when the requirements for air gaps when affected by a near wall. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 214: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 146

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-25-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.3

10.5.3 Required Backflow Prevention Devices

The following requirements shall apply: A. Backsiphonage, Non-Continuous Pressure, Non-Health Hazard

1. Atmospheric vacuum breaker - ASSE 1001 (AVB) 2. Hose connection vacuum breaker - ASSE 1011 3. Any backflow protection device approved for protection against backsiphonage with

non-continuous or continuous pressure and a non-health hazard or health hazard. B. Backsiphonage, Continuous Pressure, Non-Health-Health Hazard

1. Pressure vacuum breaker - ASSE 1020 (PVB) 2. Spill-resistant vacuum breaker - ASSE 1056 (SVB) 3. Backflow preventer with intermediate atmospheric port - ASSE 1012 4. Double check valve assembly ASSE 1015 (DC and DCVA) 5. Any backflow protection device approved for protection against backsiphonage

with continuous pressure and a non-health hazard or health hazard. C. Backsiphonage, Non-Continuous Pressure, Health Hazard

1. Atmospheric vacuum breaker - ASSE 1001 (AVB) 2. Hose connection backflow preventer - ASSE 1052 3. Any backflow protection device approved for protection against backsiphonage with

non-continuous or continuous pressure and a health hazard. D. Backsiphonage, Continuous Pressure, Health Hazard

1. Pressure vacuum breaker - ASSE 1020 (PVB) 2. Spill-resistant vacuum breaker - ASSE 1056 (SVB) 3. Reduced pressure backflow preventer assembly - ASSE 1013 (RP, RPZ, and RPBA) 4. Any backflow protection device approved for protection against backsiphonage with

continuous pressure and a health hazard.

Page 215: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

E. Back Pressure, Non-Health Hazard 1. Dual check backflow preventer - ASSE -1024 (DuCh) 2. Double check valve assembly - ASSE 1015 (DC)(DCVA) 3. Reduced pressure backflow preventer assembly - ASSE 1013 (RP)(RPZ)(RPBA)

F. Back Pressure, Health Hazard 1. Reduced pressure backflow preventer assembly - ASSE 1013 (RP)(RPZ)(RPBA)

10.5.3 Backflow Prevention Devices, Assemblies, and Devices that Include Backflow Protection

A. Back Siphonage Only, Non-Continuous Water Pressure, Non-Health Hazards 1. Hose connection vacuum breaker - ASSE 1011 2. Backflow prevention devices for hand-held showers - ASSE 1014 3. Wall hydrant with backflow protection and freeze resistance - ASSE 1019 4. Backflow preventer for beverage dispensing equipment - ASSE 1022 5. Laboratory faucet backflow preventer - ASSE 1035 6. Hose connection backflow preventer - ASSE 1052 7. Dual check backflow preventer wall hydrant - freeze resistant - ASSE 1053 8. Freeze resistant sanitary yard hydrants with backflow protection - ASSE 1057

B. Back Siphonage Only, Non-Continuous Water Pressure, Health and Non-Health Hazards 1. Air gaps in plumbing systems - ASME A112.1.2 2. Air gap fittings for use in plumbing fixtures, appliances, and appurtenances - ASME

A112.1.3 3. Atmospheric type vacuum breaker - ASSE 1001

C. Back Siphonage Only, Continuous Water Pressure, Health or Non-Health Hazards 1. Pressure vacuum breaker assembly - ASSE 1020 2. Spill resistant vacuum breaker - ASSE 1056 (SVB)

D. Back Siphonage and Back Pressure, Continuous Water Pressure, Non-Health Hazards 1. Backflow preventer with intermediate atmospheric vent - ASSE 1012 2. Double check backflow prevention assembly - ASSE 1015 (DC) 3. Double check fire protection backflow prevention assembly - ASSE 1015 (DCF) 4. Dual check backflow preventer - ASSE 1024 5. Double check detector fire protection backflow prevention assembly - ASSE 1048 (DCDA) 6. Double check detector fire protection backflow prevention assembly - type II - ASSE 1048

(DCDA-II)

E. Back Siphonage and Back Pressure, Continuous Water Pressure, Health and Non-Health Hazards 1. Reduced pressure principle backflow preventer - ASSE 1013 (RP) 2. Reduced pressure principle fire protection backflow preventer - ASSE 1013 (RPF) 3. Reduced pressure detector fire protection backflow prevention assembly - ASSE 1047

(RPDA) 4. Reduced pressure detector fire protection backflow prevention assembly - type II ASSE 1047 (RPDA-II)

Page 216: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

F. Restrictions 1. Backflow prevention devices shall be applied within the ratings of their standard and their

manufacturer's instructions. 2. Backflow prevention devices with atmospheric vents shall not be located where discharge

from their vent will cause water damage. 3. The following devices must not be subjected to more than 10 feet of water back pressure

from elevated hoses: a. ASSE 1011 hose connection vacuum breakers b. ASSE 1019 wall hydrants with backflow protection and freeze resistance c. ASSE 1052 hose connection backflow preventers d. ASSE 1053 dual check backflow preventer wall hydrant - freeze resistant e. ASSE 1057 freeze resistant sanitary yard hydrants with backflow prevention

4. ASSE 1035 laboratory faucet backflow preventers must not be subjected to more than 6 inches of water back pressure from elevated discharge hoses.

Basis/Reason for Change: 1 To revise the format of Section 10.5.3 to avoid listing devices under more than one heading. 2. To add the backflow prevention devices covered by ASME A112.1.2, ASME A112.1.3, ASSE 1014,

ASSE 1019, ASSE 1022, ASSE 1035, ASSE 1047, ASSE 1048, ASSE 1053, and ASSE 1057. 3. To indicate that ASSE 1013 and ASSE 1015 now each include a fire protection model. 4. To indicate that ASSE 1047 and ASSE 1048 now each include two variations of the detector portion. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 217: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 147

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 _Steve Silber, International President – representing ASSE Code Committee_ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail ____________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ___________________________ Add ASSE 1014 to Section 10.5.3 under category A & C to read Backflow Prevention Devices for Hand-Held Showers – ASSE 1014

Basis/Reason for Change: ASSE 1014 is referenced in Table 3.1.3, Part IX, Item 20 and should be included in the narrative of the code. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 218: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 148

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 _Steve Silber, International President – representing ASSE Code Committee_ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_____ City/State/Zip __Westlake, OH 44145_________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail ___________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X_ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ___________________________ Add ASSE 1019 to Section 10.5.3 under category A & C to read Wall Hydrant with Backflow Protection and Freeze Resistance – ASSE 1019

Basis/Reason for Change: ASSE 1019 is referenced in Table 3.1.3, Part VIII, Item 19 and should be included in the narrative of the code.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 219: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 149

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee__ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145_________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _______________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ___________________________ Add ASSE 1035 to Section 10.5.3 under category A & C to read Laboratory Faucet Backflow Preventers – ASSE 1035

Basis/Reason for Change: ASSE 1035 is referenced in Table 3.1.3, Part VI, Item 6 and Table 3.1.3, Part IX, Item 11 and should be included in the narrative of the code. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 220: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 150

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee___ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145_________________________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Section 10.5.3 Category A & C_________________________ Add ASSE 1053 to Section 10.5.3 under category A & C to read Dual Check Backflow Preventer Wall Hydrants – Freeze Resistant Type – ASSE 1053

Basis/Reason for Change: ASSE 1053 is referenced in Table 3.1.3, Part VIII, Item 21 and should be included in the narrative of the code.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 221: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 151

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee__ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145__________________________ Phone _440-835-3040__ Fax _440-835-3488__ E-mail ____________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __ Section 10.5.3 Category A & C_____________ Add ASSE 1057 to Section 10.5.3 under category A & C to read Freeze Resistant Sanitary Yard Hydrant with Backflow Protection – ASSE 1057 Basis/Reason for Change: ASSE 1057 is a product standard for performance requirements for Freeze Resistant Sanitary Yard Hydrants with Backflow Protection that has been accepted throughout the industry. NOTE: ASSE has submitted a companion change to this proposal that affects Table 3.1.3. Part VII, Item 24. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 222: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 152

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee_ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145__________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail ___________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Section 10.5.3 d. and Table 3.1.3 Part XI, Item TBD_____________ In Section 10.5.3 d., the reference to ASSE 5030 is incorrect and should be replaced with ASSE/IAPMO/ANSI 5130 Add to Table 3.1.3, Part XI, Item TBD with title Backflow Prevention Assembly Repairers and designation of ASSE/IAPMO/ANSI 5130-2009 Basis/Reason for Change: ASSE 5030 is incorrect as a reference to ASSE certification for repair. The correct reference is 5130. Once corrected as per above, the ASSE 5130 Certification reference will be included correctly in the narrative of the code and should be included in the Reference Table. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 223: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 153

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee__ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145___________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail ______________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __X_ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Section 10.5.5 a.___________________________________ Revise 10.5.5 a. to read as follows: 10.5.5 Installation of Backflow Preventers

a. Devices of All Types: All backflow prevention devices shall be accessible for testing (if testable), maintenance, repair and replacement. Clearances shall be as recommended by the manufacturer. Backflow prevention devices having atmospheric vents shall not be installed in pits, vaults, or similar potentially submerged locations. Vacuum breakers and other devices with vents shall not be located with fume hoods. Where required by the Authority Having Jurisdiction, backflow prevention devices and assemblies shall be installed in an enclosure in accordance with ASSE 1060.

Basis/Reason for Change: ASSE 1060 is referenced in Table 3.1.3, Part IX, Item 19 and should be included in the narrative of the code. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 224: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 154

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___8-05-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.5 Installation of Backflow Preventers b. Atmospheric Vacuum Breakers: Pipe-applied atmospheric vacuum breakers shall be installed with the their critical level at least six inches above the flood level rim or highest point of discharge of the fixture being served. Approved deck-mounted and pipe-applied vacuum breakers and vacuum breakers within equipment ……………………… Vacuum breakers on urinals shall be installed with the critical level six inches above the flood level rim. Basis/Reason for Change: The critical levels of the atmospheric vacuum breakers on flushometer valves for urinals are typically more than six inches above the flood level rim of the fixture. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 225: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 155

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-15-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Section 10.5.6

10.5.6 Testing and Maintenance and Testing of Backflow Prevention Devices b. a. Devices that are designed to be field tested shall be tested prior to final inspection of

the initial installation and once each year thereafter, using field test procedures conforming to ASSE 5010 Series Professional Qualifications Standards or equivalent.

a. b. Devices installed in a building potable water supply distribution system for protection against backflow shall be maintained in good working condition by the person or persons responsible for the maintenance of the system and be repaired when necessary.

c.NOTE: Testable devices are those backflow prevention devices having test cocks or test procedures and include, but are not limited, to the following:

1. Pressure vacuum breakers 2. Spill-resistant vacuum breakers 3. Double check valve assemblies 4. Double check detector assemblies 5. Reduced pressure backflow preventer assemblies 6. Reduced pressure detector assemblies 1. Reduced pressure principle backflow preventers (1013) 2. Reduced pressure fire protection principle backflow preventers (1013) 3. Double check backflow prevention assemblies (1015) 4. Double check fire protection backflow prevention assemblies (1015) 5. Pressure vacuum breaker assemblies (ASSE 1020) 6. Reduced pressure detector fire protection backflow prevention assemblies (1047) 7. Double check detector fire protection backflow prevention assemblies (1048) 8. Hose connection backflow preventers (1052) 9. Spill resistant vacuum breakers (1056)

Page 226: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

c. d. Where tests indicate that the device is not functioning properly, it shall be serviced or repaired in accordance with the manufacturer’s instructions and be retested.

d. e. Testing and repair of devices shall be performed by certified individuals approved by an

agency acceptable to the Authority Having Jurisdiction. Certification for testing shall be in accordance with ASSE 5000 or equivalent Certification for repair shall be in accordance with ASSE 5030 or equivalent. Certification shall include not less than 32 hours of combined classroom and practice training and successful completion of a written and practical examination.

f. Certification for testing and repair shall be in accordance with the appropriate sections of

ASSE 5000 Cross-Connection Control Professional Qualification Standard. Testing shall be in accordance with ASSE 5110 Backflow Prevention Assembly Testers. Repair shall be in accordance with ASSE 5130 Backflow Prevention Assembly Repairers.

e. g. Copies of test reports for the initial installation shall be sent to the Authority Having

Jurisdiction and the water supplier. Copies of annual test reports shall be sent to the water supplier.

f. h. Where a continuous water supply is critical and cannot be interrupted for the periodic

testing of a backflow prevention device, multiple backflow prevention devices or other means of maintaining a continuous supply shall be provided that does not create a potential cross connection.

Table 3.1.3 - Part XI XI-11: Field Test Procedures for Backflow Prevention Devices Reserved ASSE 5010-2009 Basis/Reason for Change: To update the requirements of Section 10.5.6 with the changes in ASSE 1047-2011, ASSE 1048-2011, ASSE Series 5000-2009 and the addition of ASSE 1053. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 227: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 156

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013

Contact Information: Person Submitting Change 2 __Steve Silber, International President – representing ASSE Code Committee_ Date 3 _1/29/2013______ Jurisdiction/Company/ Mailing Address __ASSE International, 901 Canterbury Road_______ City/State/Zip __Westlake, OH 44145_________________________________________ Phone _440-835-3040__ Fax _440-835-3488___ E-mail _____________________________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: __X_ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: __Section 10.5.6 d. and Table 3.1.3 Part XI, Item TBD_____________ In Section 10.5.6 d., the reference to ASSE 5030 is incorrect and should be replaced with ASSE/IAPMO/ANSI 5130 Add to Table 3.1.3, Part XI, Item TBD with title Backflow Prevention Assembly Repairers and designation of ASSE/IAPMO/ANSI 5130-2009 Basis/Reason for Change: ASSE 5030 is incorrect as a reference to ASSE certification for repair. The correct reference is 5130. Once corrected as per above, the ASSE 5130 Certification reference will be included correctly in the narrative of the code and should be included in the Reference Table. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 228: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2015 Proposed Code Change Form Deadline January 31, 2013

13 - 157

1) Proposed Code Changes gaining acceptance will appear in the 2015 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, January 31, 2013

Contact Information: Person Submitting Change 2 Nick Azmo Date 3 1/25/2013 Jurisdiction/Company/ Mailing Address: 447 So. Washington Ave. City/State/Zip: Piscataway, NJ 08854 Phone: (732) 424-9700 Fax: (732) 424-9345 E-mail: [email protected] IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows ____ Add new subsection to read as follow _____ Delete subsection without substitution Code Section: 10.5.6d d. Testing and repair of devices assemblies shall be performed by certified individuals approved by an agency acceptable to the Authority Having Jurisdiction. Certification for testing shall be in accordance with ASSE 5000 5110 or equivalent. Certification for repair shall be in accordance with ASSE 5030 5130 or equivalent. Testing Certification shall include not less than 32 40-hours, Repair Certification shall include not less than 20-hours of combined classroom and practice training and successful completion of a written and practical examination. Basis/Reason for Change: These are typographical errors. Devices are not testable, Standard 5000 refers to the overall backflow prevention and cross-connection control standards, standard 5110 specifically refers to the testing standard and standard 5130 specifically refers to the repair standard. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 229: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 158

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __8-05-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.7 Tanks and Vats - Below Rim Supply a. Where a potable water outlet inlet terminates below the rim of the tank or vat and the tank or vat has an overflow of a diameter not less than given in Table 10.8.3, the overflow pipe shall be provided with an air gap as close to the tank as possible. b. The potable water supply outlet inlet to the tank or vat shall terminate a distance not less than 1-1/2 times the height to which water can rise in the tank above the top of the overflow. This level shall be established at the maximum flow rate of the supply to the tank or vat and with all outlets closed except the air-gapped overflow outlet. c. The distance from the outlet to the high water level shall be measured from the critical point of the potable water supply outlet. An alternate to 10.5.7.b is a vacuum breaker on the water supply inlet pipe above the rim of the tank or vat. Basis/Reason for Change: To refer to the water supply inlet to the tank or vat rather than the water supply outlet to avoid confusion with the tank outlet. Water supply inlet pipes do not have critical levels. To provide an alternate using a vacuum breaker on the water supply inlet. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 230: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 159

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-25-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.8 10.5.8 Connections to Carbonated Beverage Dispensers

a. The water supply to a carbonated beverage dispenser shall be protected against backflow with an integral backflow preventer conforming to ASSE 1022 or an air gap. Carbonated beverage dispensers and carbonated beverage systems without an integral backflow preventer conforming to ASSE 1022 or an air gap shall have the water supply protected by a double check valve with atmospheric vent conforming to ASSE 1022.

b. When an ASSE 1022 device must be installed in the water supply piping external to the carbonated beverage dispenser, the piping from the device to the beverage dispenser shall be acid resistant and not copper. 10.5.8 Protection from Equipment in Food Establishments

a. Food preparation and service equipment in food establishments that is connected to potable water piping or drained to waste piping shall be protected from backflow to the potable water system and from contamination of equipment, food, and utensils.

b. Fixtures that require an air gap in their water supply above the flood level rim of the fixture include, but are not limited to, sink faucets, dipper wells, pot fillers, and spray arms in dish areas.

c. Equipment that requires an air gapped waste line includes, but is not limited to, walk-in coolers, food prep sinks, dipper wells, ice machines, ice bins, steam tables, bains-marie, Chinese ranges (woks), combination steamer/ovens, rethermalizers, steamers, kettles, non-evaporating reach-in coolers, soda gun holsters, and water treatment systems.

Page 231: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

d. Equipment that requires a pressure vacuum breaker or spill resistant vacuum breaker in its water

supply includes, but is not limited to, Chinese ranges (woks), rethermalizers, hoses with a pressure nozzle, and pasta cookers.

e. Equipment that requires an atmospheric vacuum breaker in its water supply includes, but is not limited to, garbage disposals, automatic dishwashers, dish machine automatic detergent feeders, detergent feeders for 3-compartment sinks, wall-mounted chemical feeders, garbage can washers, mop sinks, steam tables with submerged inlets, and dish troughs with submerged inlets.

f. Equipment that requires a vented double check valve or equivalent in its water supply includes, but is not limited to, untreated boilers such as expresso machines, the oven in combination steamer/ovens, carbonated beverage machines, beverage carbonators, non-carbonated beverage machines, coffee machines, iced tea machines, hot chocolate machines, cappuccino machines, instant hot water dispensers, slushy machines, and any other beverage equipment.

g. The water supply to a post-mix carbonated beverage dispenser shall be protected against backflow with an integral backflow preventer conforming to ASSE 1022 or an air gap.

1. Post-mix carbonated beverage dispensers and carbonated beverage systems with an integral dual check backflow preventer without an atmospheric vent (ASSE 1032) or without an integral backflow preventer conforming to ASSE 1022 or without an integral air gap shall have the water supply connection to the dispenser protected by a double check valve with atmospheric vent port conforming to ASSE 1022.

2. When an ASSE 1022 device must be installed in the water supply piping external to the carbonated beverage dispenser, the piping from the device to the beverage dispenser shall be acid resistant and not copper.

3. ASSE 1012 backflow preventers with intermediate atmospheric vents are not constructed for use with carbonated beverages and shall not be used for backflow prevention from post-mix carbonated beverage dispensers.

h. All backflow prevention devices shall be installed in accordance with their manufacturer's

instructions for the particular application. Basis/Reason for Change: To include the requirements for backflow prevention from fixtures and equipment in food establish-ments. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 232: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 160

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __6-30-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.9 10.5.9 Protection from Fire Systems

a. Potable water supplies to water-based fire protection systems, including but not limited to standpipes and automatic sprinkler systems, shall be protected from back pressure and back-siphonage back siphonage by one of the following testable devices:

1. double check fire protection backflow preventer prevention assembly - ASSE 1015 (DCF) 2. double check detector fire protection backflow preventer prevention assembly - ASSE

1048 (DCDF) (DCDA or DCDA-II). 3. reduced pressure fire protection principle backflow preventer assembly - ASSE 1013 (RPF) 4. reduced pressure detector fire protection backflow preventer prevention assembly - ASSE

1047 (RPDF) (RPDA or RPDA-II). EXCEPTIONS

(1) ASSE 1024 dual check valves backflow preventers shall be permitted in stand-alone residential fire sprinkler systems that comply with NFPA 13D or NFPA 13R, do not supply plumbing fixtures, and do not include a fire department connection.

(2) Backflow preventers shall not be required in NFPA 13D multi-purpose multipurpose or network residential fire sprinkler systems that supply both plumbing fixtures and residential fire sprinklers in accordance with NFPA 13D. The piping in such systems shall be approved for potable water. Such systems shall not have a fire department connection.

Page 233: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

(3) ASSE 1024 dual check valves backflow preventers shall be permitted in limited area fire

sprinkler systems that comply with NFPA 13 and do not have a fire department connection. (4) Where fire protection systems include a fire department connection, ASSE 1013 reduced

pressure assemblies (RPF or RPDF) fire protection principle backflow preventers (RPF) or ASSE 1047 reduced pressure detector fire protection backflow prevention assmblies (RPDA or RPDA-II) shall be required.

(5) Where fire protection systems are filled with solutions that are considered to be health hazards as defined in Section 1.2, reduced pressure assemblies (RPF or RPDF) ASSE 1013 reduced pressure fire protection principle backflow preventers (RPF) or ASSE 1047 reduced pressure detector fire protection backflow prevention assemblies (RPDA or RPDA-II shall be required. b. Whenever a backflow protection prevention device is installed in a potable water supply to a fire

protection system, the hydraulic design of the fire protection system shall account for the pressure drop through the backflow protection prevention device.

c. If a backflow protection prevention devices are device is retrofitted for an existing fire protection

system, the hydraulics of the fire protection system shall be checked to verify that there is will be sufficient water pressure available for satisfactory operation of the fire protection system with the backflow prevention device in place. Basis/Reason for Change: To update Section 10.5.9 with the current titles and designations of the ASSE backflow prevention devices. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 234: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 161

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __6-25-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.10 10.5.10 Protection from Lawn Sprinklers and Irrigation Systems

a. Potable water supplies to systems having no pumps or connections for pumping equipment, and no chemical injection or provisions for chemical injection, shall be protected from backflow by one of the following devices:

1. Atmospheric type vacuum breaker (AVB) - ASSE 1001 (for non-continuous pressure) 2. Pressure vacuum breaker assembly (PVB) - ASSE 1020 3. Spill-resistant Spill resistant vacuum breaker (SVB) - ASSE 1056 4. Reduced pressure principle backflow preventer assembly (RP, RPZ, RPBA) - ASSE 1013

(RP) b. Where lawn sprinkler and irrigation systems have pumps, connections for pumping equipment,

auxiliary air tanks or are otherwise capable of creating back-pressure back pressure, the potable water supply shall be protected by the following type of device if the backflow prevention device is located upstream from the source of back-pressure back pressure: (add colon)

1. Reduced pressure principle backflow preventer assembly (RP, RPZ, RPBA) - ASSE 1013 (RP)

c. Where systems have a backflow prevention device installed downstream from a potable water supply pump or a potable water supply connection, the device shall be one of the following:

1. Atmospheric type vacuum breaker (AVB) - ASSE 1001 (for non-continuous pressure) 2. Pressure vacuum breaker assembly (PVB) - ASSE 1020 3. Spill-resistant Spill resistant vacuum breaker (SVB) - ASSE 1056 4. Reduced pressure principle backflow preventer assembly (RP, RPZ, RPBA) - ASSE 1013

(RP)

Page 235: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Section 10.5.10 page 2 of 2 6-25-2012

d. Where systems include a chemical injector or any provisions for chemical injection, the potable

water supply shall be protected by the following: 1. Reduced pressure principle backflow preventer assembly (RP, RPZ, RPBA) - ASSE 1013

(RP) Basis/Reason for Change: To update Section 10.5.10 with the current titles and designations for ASSE backflow prevention devices. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 236: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 162

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-25-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.12 Protection from Hose Connections A pressure-type or atmospheric-type vacuum breaker or permanently attached hose connection vacuum breaker shall protect hose bibbs, sill-cocks, wall hydrants and other openings with outlets having a hose connection. The backflow preventer shall not be subjected to continuous pressure and shall be limited to low-head backpressure of not more than 10 feet of water from an elevated hose. EXCEPTIONS:

(1) Water heater and boiler drain valves that are provided with hose connection threads and that are intended only for tank or vessel draining shall not be required to be equipped with a backflow preventer.

(2) This section shall not apply to water supply valves intended for connection to clothes washing machines where backflow prevention is otherwise provided or is integral with the machine. Basis/Reason for Change: To clarify the requirements for backflow protection from hose connections. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 237: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 163

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___8-05-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.13.a Chemical Dispensing Systems Chemical dispensing systems with connections to the potable water distribution system shall protect the water distribution systems from backflow in accordance with ASSE 1055, which requires an air gap, atmospheric vacuum breaker, pressure vacuum breaker, spill resistant vacuum breaker, or reduced pressure principle assembly. EXCEPTION: Atmospheric vacuum breakers shall not be used where there are shutoff valves or other shutoff devices downstream or where they are subject to continuous pressure for more than 12 hours at a time. Basis/Reason for Change: To list the backflow prevention devices that are required by ASSE 1055 for chemical dispensing systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 238: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 164

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___6-30-2012 ______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ _ _ Change subsection to read as follows _____ Delete subsection and substitute as follows __ X_ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.13 Protection for from Special Equipment d. Water Powered Back-up Sump Pumps

1. The potable water supply to water powered back-up sump pumps shall be protected against backflow by an ASSE 1013 (RP) reduced pressure principle backflow preventer. Vacuum breakers shall not be permitted. 2. Pump control valves, ejectors, and discharge piping shall be installed in accordance with the manufacturer's instructions.

Basis/Reason for Change: To clarify the backflow prevention requirements for the use of water powered back-up sump pumps. The proper use of vacuum breakers requires that the water supply piping and its vacuum breaker be at an elevation higher than the pump control valve, ejector, and all discharge piping. Some manufacturers do not indicate that the water supply piping and vacuum breaker must be properly elevated. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 239: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 165

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___6-25-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.5.13 Protection for from Special Equipment

e. Laboratory Sink Faucets: Faucets on laboratory sinks shall be protected against backflow from back siphonage and low-head back pressure by the attachment of an ASSE 1035 laboratory faucet backflow preventer. The backflow preventer shall not be subjected to constant supply pressure and there shall be no shutoff devices downstream. The backflow preventer shall be limited to back pressure of not more than 6 inches of water elevation beyond its outlet. Basis/Reason for Change: To include the requirements for protection from backflow through laboratory sink faucets. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 240: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 166

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __8-05-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.9.2 Disinfecting a. Where required by the Authority Having Jurisdiction, the water Water service piping and hot and cold water distribution piping in new or renovated potable water systems shall be disinfected after flushing and prior to use. EXCEPTION: Single dwelling units unless required by the Authority Having Jurisdiction. b. The procedure used shall be as follows or an approved equivalent: Basis/Reason for Change: To clarify the requirements for disinfecting potable water piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 241: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 167

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___4-13-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.11 Allowance for Character of Soil and Water When selecting the material and size for water service supply pipe, tube, or fittings, due consideration shall be given to the action of the water on the interior of the pipe and of the soil, fill, or other material on the exterior of the pipe piping. (Appendix B gives recommendations concerning allowances to be made in sizing water piping because of the properties of the water.) Basis/Reason for Change: Appendix B.2.3 has no specific recommendations for allowances for sizing water piping because of the properties of the water. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 242: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 168

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __3-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 10.14.2B NOTES FOR TABLE 10.14.2B: 4. Refer to Appendix M for WSFU values that are interpolated between the values listed in Table 10.14.2B to the degree that the WSFU increments are close enough that they do not produce GPM differences that would be significant in sizing water supply distribution piping. Basis/Reason for Change: To reference Appendix M in Table 10.14.2B. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 243: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 169

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-24-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.14.6 Excessive Pressures

b. The requirement of Section 10.14.6.a above shall not prohibit supply pressures higher than 80 psi to from water pressure booster systems under Section 10.14.4 or in high pressure distribution systems, provided that the pressure at the fixtures served is subsequently reduced to 80 psi maximum. Where operating water pressures exceed 80 psi, the working pressure rating of materials and equipment shall be suitable for the maximum pressure that may be encountered, including temporary increases or surges.

Basis/Reason for Change: To clarify that high pressure water is supplied from rather than to water pressure booster systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 244: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 170

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___7-28-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.14.6 Excessive Pressures d. When a pressure reducing valve is installed, a gauge port or pressure gauge with pressure range of 0-150 psi shall be installed within 24 inches downstream from the reducing valve. EXCEPTION: In one- and two-family dwelling units, gauge ports or pressure gauges shall not be required if there is a hose bibb or hose-end drain valve to which a pressure test gauge can be connected. Basis/Reason for Change: To delete the requirement for unnecessary gauge ports or water pressure gauges in dwelling units. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 245: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 172

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __4-20-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.15.1 Hot Water Supply System EXCEPTION: In buildings other than dwelling units, tempered water supply systems may be installed in lieu of hot and cold water systems with the approval of the Authority Having Jurisdiction piping shall be permitted to supply fixtures that deliver only tempered water. Basis/Reason for Change: To permit tempered water piping to supply fixtures that handle only tempered water without the need for approval of the Authority Having Jurisdiction. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 246: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 173

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ____Greg Towsley_________________ Date 3 ___22 January 2013_____ Jurisdiction/Company/ Mailing Address _____Grundfos, 17100 W 118th Terrace______________________________________ City/State/Zip ____Olathe, KS 66061_____________________________________________________ Phone __913-227-3414___ Fax _559-346-6414_______ E-mail [email protected]__________ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __x__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ___10.15.2.c________________________ THE FOLLOWING AMENDMENT IS SUBMITTED: NSPC Section 10.15.2.c: c. An on-demand recirculation system, activated by sensors or manually operated buttons, shall be permitted to be used tTo satisfy the requirements of Section 10.15.2a., the controls for the pumps in heated water distribution systems shall start the pump based on the identification of a demand for heated water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. Basis/Reason for Change: The terminology of “on-demand recirculation system” is considered somewhat specific towards one manufacturer’s existing technology. US Patent No. 5829475 is for “On-demand zone valve recirculation system”. In addition, another manufacturer markets and promotes the same licensed solution for “On-Demand” Systems. Finally, Merriam-Webster dictionary does not recognize “on-demand” as a word. The above modified wording provides the same required control sequence with no reference to a manufacturers’ solution which may provide a market advantage. In addition, the proposed wording also opens up opportunities for future technologies to be developed. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 247: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 174

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.15.6 Mixed Water Temperature Control a. Showers and Bath/Shower Combinations: All showers and bath/shower combinations shall be provided with individual balanced pressure, thermostatic, or combination automatic compensating valves that comply with ASSE 1016 or ASME B112.18.1/CSA B125.1. ASME A112.1016/ASSE 1016/CSA B125.16. The automatic compensating valves shall control the water temperature to wall or ceiling-mounted hand-held showers, shower heads, body sprays either in individual shower or tub/shower combination fittings, and tub spouts when part of tub/shower combination fittings. These valves shall include a means to limit the maximum discharge temperature of the water and shall be installed and field-adjusted in accordance with the manufacturer's instructions to a temperature no higher than 120°F. No further mixing of water shall be permitted downstream of the automatic compensating valve. EXCEPTION: (no changes) Table 3.1.3 - Part VI VI-2: ASSE 1016 - 2005 ASME A112.1016/ASSE 1016/CSA B125.16 - 2011 Basis/Reason for Change: To reference new standard ASME A112.1016 / ASSE 1016 / CSA B125.16. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 248: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 175

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __3-04-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.15.6 Mixed Water Temperature Control b. Bathtubs and Whirlpool Baths: The water discharged into bathtubs and whirlpool baths, with or without deck-mounted hand sprays, shall be controlled to a temperature no higher than 120°F by a water temperature limiting device complying with ASSE 1070 or CSA B125.3 or ASSE 1016. Basis/Reason for Change: ASSE 1016 covers automatic compensation valves for individual showers or tub/shower combinations. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 249: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
13 176
Page 250: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
cwhite
Typewritten Text
13 177
Page 251: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 179

10.15.6 page 1 1-11-2013

Contact Information: Person Submitting Change 2 ______NSPC Committee________________ Date 3 ____1-11-2013 Jurisdiction/Company/ Mailing Address _________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip Falls Church, VA 22046___________________________________ Phone_1-800-533-7694____Fax_1-703-237-7442____E-mail [email protected] Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows_____ Delete subsection without substitution Code Section: 10.15.6 Mixed Water Temperature Control l. a. The temperature control devices for water heaters and other hot water supply sources shall not be permitted to be used to meet this Section's requirements for mixed water temperature control. b. Inlet Water Temperatures: The inlet hot and cold water temperatures for temperature actuated mixing valves shall be within their operating ranges and have sufficient differential above and below their discharge set point. f. c. Temperature Actuated Mixing Valves: Where temperature-actuated mixing valves are installed to control the in-line hot water supply temperature in the water distribution system, they shall comply with ASSE 1017. Such devices shall be installed at the hot water source and alone shall not supersede the other requirements of Section 10.15.6 for mixed water temperature control. a. d. Showers and Bath/Shower Combinations: All showers and bath/shower combinations shall be provided with individual balanced pressure, thermostatic, or combination automatic compensating valves that comply with ASSE 1016 or ASME A112.18.1/CSA B125.1. These valves shall include a means to limit the maximum discharge temperature of the water and shall be installed and field-adjusted in accordance with the manufacturer's instructions to a temperature no higher than 120°F. No further mixing of water shall be permitted downstream of the automatic compensating valve. e. EXCEPTION: Gang Showers: Where multiple gang showers are supplied by a one-pipe tempered water distribution system, the tempered water distribution shall be controlled by an automatic temperature control mixing valve complying with ASSE 1069. These valves shall include a means to limit the maximum discharge temperature of the water and shall be installed

Page 252: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

and field-adjusted in accordance with the manufacturer's instructions to a temperature no higher than 105°F. No further mixing of water shall be permitted downstream of the automatic temperature control mixing valve. b. f. Bathtubs and Whirlpool Baths: The water discharged into bathtubs and whirlpool baths, with or without deck-mounted hand sprays, shall be controlled to a temperature no higher than 120°F by a water temperature limiting device complying with ASSE 1070, CSA B125.3, or ASSE 1016. c. g. Bidets: The hot water supply to the faucet on bidet plumbing fixtures shall be limited to 110°F by water temperature limiting device complying with ASSE 1070. Where bidets are incorporated into toilet seats or consist of a heated water tank and nozzle, their controls shall limit the discharge temperature to no more than 110°F. d. h. Public-Use Hand Washing Facilities: Water discharged from public-use hand washing facilities in public toilet rooms, hotel and motel guest rooms, and hospital patient rooms shall be limited to a temperature no higher than 110°F. Water temperature limiting devices serving one or more fixtures and thermostatic faucets shall comply with ASSE 1070. Control valves controlling more than one fixture shall be sized for the required total water flow. e. i. Commercial Hair/Shampoo Sink Sprays: The temperature of water from commercial hair/shampoo sink sprays and pedicure basins shall be limited to a temperature no higher than 110°F by a temperature limiting device complying with ASSE 1070, ASME A112.18.1/CSA B125.1, or CSA B125.3. g. Automatic temperature control mixing valves that supply gang showers shall comply with ASSE 1069. h. j. Water Temperature Limiting Devices: Where ASSE 1070 water temperature limiting devices are required, they shall be point-of-use for a single fixture or used for distribution to multiple fixtures having the same maximum water temperature requirement, depending on the maximum flow rate of the device. EXCEPTION: ASSE 1070 devices shall not be used for gang showers. i. k. Temperature Actuated Flow Reduction (TAFR) Devices: Where temperature actuated flow reduction (TAFR) devices are installed to limit the maximum discharge temperature to 120°F for individual fixture fittings, such devices shall comply with ASSE 1062. These devices shall not supersede the other requirements of Section 10.15.6. j. l. In-Line Pressure Balancing Valves: Where in-line pressure balancing valves are installed to compensate for water pressure fluctuations to stabilize the temperature discharges from their individual faucet or fixture fitting, such devices shall comply with ASSE 1066. These devices shall be installed in an accessible location and alone shall not supersede the other requirements of Section 10.15.6.

Page 253: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

k. m. Where a mixed water temperature control device supplies one or more outlets that can be shutoff downstream from the control device, the control device shall include integral check valves or check valves shall be provided in the hot and cold water supplies to the control device or at its inlets to prevent cross flow through the device.

EXCEPTION: In one- and two-family dwellings, check valves shall not be required for an ASSE 1017 device installed at the water heater and directly connected to its hot and cold water piping.

m. Alternate Methods: The use of combination water temperature control or limiting devices that comply with the standards listed in Table 3.1.3 and satisfy the performance requirements of Section 10.15.6 shall be subject to the approval of the Authority Having Jurisdiction. Basis/Reason for Change: To rearrange the order of the paragraphs, starting with the requirement that the temperature control for water heaters and other hot water supply sources not be used to satisfy this Section's requirements for mixed water temperature control. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled___ Withdrawn___ Other ______________________________________________________________________________

Page 254: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 180

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-07-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.15.9 Drip Pans 10.15.9.1 Where Required (no change) 10.15.9.2 Construction a. Drip pans shall be watertight and constructed of corrosion-resistant materials. Metallic Galvanized steel pans shall be 24 gage gauge (0.0276-inch) minimum thickness. Aluminum pans shall be 20 gauge (0.0320-inch) minimum thickness. Non-metallic pans shall be 0.0625-inch minimum thickness. Pans shall be not less than 1-1/2" deep but shall not be deeper than the bottom of the water heater tank or hot water storage tank. and They shall be of sufficient size to hold the heater or tank without interfering with drain valves, burners, controls, and any required access. b. High impact plastic pans shall be permitted under gas-fired water heaters where the heater is listed to zero clearance to combustible floors and the application is recommended by the pan manufacturer. Basis/Reason for Change: To clarify the minimum thickness for aluminum drip pans. To place a limit on the depth of a pan. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 255: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 181

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___5-10-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.15.9.3 Drainage a. Drip pans shall have drain outlets not less than 3/4" size, with indirect drain pipes extending to an approved point of discharge, a suitably located indirect waste receptor, or floor drain, or extend to within 2 to 6 inches above the adjacent floor. b. Discharge from a relief valve into a water heater drip pan shall be permitted if the drain size for the drip pan is the same diameter or greater than the P&T not less than the relief valve discharge pipe size and the P&T discharge pipe into the drip pan is between 2 inches and 6 inches to extends to within 2 to 6 inches above the bottom of the pan. c. For drip pans installed under water heaters that are located above ceilings, the drain pipe from the drip pan shall extend to a point of disposal or indirect waste that is readily observable in an area below the heater. Basis/Reason for Change: Floor drains can be indirect waste receptors. To clarify the requirements for the installation of relief valve discharge pipes into drip pans. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 256: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 182

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___3-15-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.16.6 Relief Valve Discharge Piping b. a. There shall be no shutoff valve, check valve, or other restricting device between a relief valve and the pressure vessel or piping system being protected. a. b. Piping from the outlet of a relief valve to the point of disposal shall be …(no changes)………… c. The discharge end of the pipe shall be no smaller than the outlet size of its relief valve and shall extend to a point of disposal without valves, traps, or rises that would prevent the discharge piping from draining by gravity. The discharge end of the pipe shall not be threaded. d. An A visible air gap shall be provided where relief valves discharge into an indirect waste pipe, floor drain, trench drain, service, sink, mop basin, laundry sink, standpipe, or other approved receptor. The minimum size of fixture drains or waste pipes that receive the discharge from relief valves shall be as indicated in Table 10.16.6. e. Where relief valves discharge to the floor, the discharge pipe shall terminate not more than 6 inches nor less than 2 inches above the floor. f. If the point of discharge is not within the space or room in which the relief valve is located, an indirect gravity drain shall be provided from the room or space to the point of disposal. Indirect waste pipes shall be sized according to Table 10.16.6 and shall be of a material approved for potable water, sanitary drainage, or storm drainage (see Tables 3.4, 3.5, and 3.7). A visible air gap shall be provided in the room or space in which the relief valve is located.

Page 257: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

EXCEPTION: g. Where water heaters are located above ceilings, the relief valve discharge pipe shall extend to a point of disposal or indirect waste that is readily observable in an area below the heater. g. h. Where two or more relief valves serving independent systems are located in the same area, each shall be discharged separately. Where such relief valves for independent systems are discharged into a common gravity drain or indirect waste pipe, the drain or waste pipe shall be sized according to the largest discharge pipe served. i. For drain and indirect waste piping associated with relief valve discharge piping, refer to Section 9.1.12. Delete Table 10.16.6 SIZE OF DRAINS OR WASTE PIPES RECEIVING RELIF VALVE DISCHARGE Basis/Reason for Change: To edit the title of Section 10.16.6 to indicate that it applies to both the inlet piping and discharge piping of relief valves. To reverse the positions of existing 10.16.6.a and 10.16.6.b, putting the requirements for the inlet pipe before the discharge pipe. To delete the design requirements for indirect waste and drain piping for relief valve discharge piping in Chapter 10, which are located in Chapter 9. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

__________________________________________________________________________________

Page 258: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 187

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __6-05-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.16.7 Vacuum Relief Valves for Water Heaters and Water Storage Pressure Tanks a. Where water distribution piping can siphon water from a water heater and cause dry-firing or cause a water heater or water storage pressure tank to collapse or be damaged by vacuum, a vacuum relief valve shall be installed on the cold water inlet piping to the water heater vacuum relief shall be provided. b. The vacuum relief valve requirements for water heaters shall depend on the type of water heater, the relative elevation of its inlet and outlet piping, the relative elevation of its water supply source, and the relative elevation of the lowest hot and cold water supply outlets connected to the piping associated with the water heater, in accordance with the following:

1. Where the heating element for the water heater is located in or below the lower half of its tank and the water heater has top water pipe connections, vacuum relief shall not be required if the piping associated with the water heater is not connected to any hot and cold water outlets on floor levels below that on which the water heater is installed. If the water heater serves outlets on a floor level below that on which it is installed, a vacuum relief valve shall be installed on either the cold water inlet pipe or the hot water outlet pipe that is above the top of the heater.

2. Where a water heater has a heating element in the upper half of its tank and the piping

associated with the water heater is connected to any hot or cold water outlets on the same floor level on which the water heater is installed or on a lower floor level, its cold water supply and hot water discharge pipes shall be above the top of the water heater and a vacuum relief valve shall be installed on either the cold water inlet pipe or the hot water outlet pipe with its inlet at least 6-inches above the top of the heater.

Page 259: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

3. Where a water heater has a bottom inlet, the cold water supply pipe to the heater shall be above the top of the heater tank before it drops to the bottom inlet and a vacuum relief valve shall be installed on that supply line before it drops with the relief valve inlet at least 6-inches above the top of the heater tank. EXCEPTION: Vacuum relief shall not be required if the elevation of the water supply source for the facility is above the top of the heater tank and there are no cold water outlets in the supply piping from that source that are below the top of the heater tank.

4. Where a water heater has a bottom outlet, the hot water outlet pipe from the heater shall be extended up to above the top of the heater and a vacuum relief valve shall be installed on that outlet pipe above the top of the tank with the relief valve inlet at least 6-inches above the top of the heater tank. EXCEPTION: Vacuum relief shall not be required if there are no outlets in the hot water piping from the water heater that are below the top of the heater tank.

5. Where a water heater is subject to vacuum from its hot water discharge piping, a dip tube

with a vent opening shall not be considered as adequate vacuum relief.

b. c. Vacuum relief valves shall comply with ANSI Z21.22/CSA 4.4 and be rated for not less than 210°F.

c. d. Valves Vacuum relief valves shall be the full size of the water heater inlet pipe connection that it is associated with and shall be installed at an elevation on piping that is above the top of the heater tank. e. Vacuum relief valves shall not be isolated from the water heater by shutoff valves for the water heater. f. Vacuum relief for a water storage pressure tank shall be the same as required for a water heater unless the tank, including any lining, is rated for full vacuum. Basis/Reason for Change: To add specific requirements for installing vacuum relief valves for water heaters and water storage pressure tanks. All water heaters are not subject to damaging siphonage and dry-firing Conventional water heaters with heating elements under or near the bottom of their tank should not require vacuum relief from piping to fixtures on the same floor level. The maximum vacuum siphonage in that case would be only the upper half of the water in the heater tank. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 260: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 188

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.18 Drinking Water Treatment Units 10.18.1 Compliance with Standards Drinking water treatment units shall comply with the appropriate standards listed in Table 3.1.3. a. NSF 42 Drinking Water Treatment Units - Aesthetic Effects b. NSF 44 Water Softeners (cation exchange) c. NSF 53 Drinking Water Treatment Units - Health Effects d. NSF 55 Ultraviolet Microbiological Water Treatment Systems e. NSF 58 Reverse Osmosis Drinking Water Systems f. CSA B483.1 Drinking Water Treatment Systems 10.18.2 Air Gap Discharge Discharge from all drinking water treatment units shall be installed with an air gap. EXCEPTION: Reject water connections from reverse osmosis drinking water treatment units shall be through and air gap or alternate air gap device in accordance with NSF 58. 10.18.3 Connection Tubing The tubing to and from the drinking water treatment unit shall be of a size and material as recommended The tubing shall comply with NSF 14, NSF 58, or NSF 61. Basis/Reason for Change: To update the general requirements for Section 10.18. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 261: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 189

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __4-13-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 10.19 Sizing of Residential Water Softeners NOTES FOR Table 10.19 1. Installation with a kitchen sink and dishwasher, laundry tray and automatic clothes washer. The number of bathroom groups served may include a kitchen sink, dishwasher, laundry sink,

and automatic clothes washer. 2. (No change) 3. (No change) Basis/Reason for Change: To clarify the sizing of residential water softeners based on the number of bathroom groups. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 262: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 190

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___5-07-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.20.2 General f. NFPA 13D multipurpose piping systems shall comply with the "lead-free" requirements of this Code if the piping, including parallel looped branches, supplies one or more end-use devices or equipment that are required to be "lead-free" by Section 3.4.6. The fire sprinklers in such piping shall be "lead-free". EXCEPTIONS: (1) Sprinkler-only branch supply piping to one or more individual sprinklers. (2) Sprinklers supplied by individual sprinkler-only branch piping. (3) Plumbing-only branch supply piping to end-use devices or equipment that are not required to

be "lead-free". Basis/Reason for Change: To clarify the "lead-free" requirements for NFPA 13D multipurpose residential fire sprinkler systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 263: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 191

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-07-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.20.2 General 10.20.2.g. The design of the plumbing portions of NFPA 13D multipurpose piping systems shall comply with the requirements of this Code. 10.20.2.h The design of the fire sprinkler portions of NFPA 13D multipurpose piping systems shall comply with the requirements of NFPA 13D. 10.20.2.i. The installation of the plumbing portions of NFPA 13D multipurpose piping systems, which consist of the water supply to the multipurpose system and the branch piping that supplies cold water to plumbing fixtures and end-use devices, shall be performed under the plumbing permit issued by the Authority Having Jurisdiction for plumbing. 10.20.2.j The installation of the fire sprinkler portions of NFPA 13D multipurpose piping systems, which consist of the fire sprinklers and their supply piping, shall be performed under the fire sprinkler permit issued by the Authority Having Jurisdiction for fire sprinkler systems. Basis/Reason for Change: To establish the design and installation requirements for the plumbing and fire sprinkler portions of NFPA 13D Multipurpose Residential Fire Sprinkler Systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 264: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 192

Contact Information: Person Submitting Change 2 _____Michael Cudahy__________________ Date 3 ___Aug 25 2012____ Jurisdiction/Company/ Mailing Address Plastic Pipe and Fittings Association 800 Roosevelt Rd Bld C Ste 312__________ City/State/Zip __Glen Ellyn / IL / 60137 Phone ___630 363 7933______ Fax __630 858 654___ [email protected]_______ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____10.20.4 Materials for Combined Systems Piping c. Plastic piping shall be CPVC, PP, or PEX in accordance with table 3.4.3 Plastic piping shall be rated for 160 psig at 73 deg F, 130 psig at 120 F, and 100 psig at 180 deg F. Basis/Reason for Change: Polypropylene piping systems designed for combined fire sprinkler / hot and cold water distribution now also exist in the market. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 265: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 193

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __3-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.20.4 Materials for Combined System Piping b. Copper piping shall be ASTM B88 copper water tube, Type L or K. Fittings shall be the solder joint type, ASME B16.22 wrought or ASME B16.18 cast. Solder shall comply with ASTM B32. with not more than 0.2% lead. Flux shall comply with ASTM B813. Solder and flux shall contain no more than 0.2% lead. Soldered joints shall comply with ASTM B828. Basis/Reason for Change: To include the maximum lead content of the flux for solder in NFPA 13D Multipurpose Residential Fire Sprinkler Systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 266: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 194

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___5-07-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 10.20.4 Materials for Combined System Piping d. Piping within combined piping systems that conveys water to outlets for human consumption by drinking or cooking shall be "lead-free" in accordance with Section 3.4.6. Basis/Reason for Change: To coordinate the piping in multipurpose residential fire sprinkler systems with the "lead-free" requirements of Section 3.4 Potable Water. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 267: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 195

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___9-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Section 10.20 NFPA 13D Multipurpose Residential Fire Sprinkler Systems 10.20.8 Installer Qualifications Installers of NFPA 13D multipurpose residential fire sprinkler systems and individuals who provide layouts, details and calculations shall be certified to ASSE 7010. Table 3.1.3 - Part XI XI-9: Reserved Plumbing-Based Residential Fire Protection Systems Installers for One-and Two-Family Dwellings ASSE 7010 - 2008 Basis/Reason for Change: To require NFPA 13D multipurpose installers to be certified to ASSE 7010. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 268: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 195a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___1-25-2013______ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: TABLE 11.4.1 DRAINAGE FIXTURE UNIT (DFU) VALUES Under INDIVIDUAL DWELLING UNITS Shower Stall, 1-1/2" Trap, single 2.5 GPM shower head = 2 DFU Shower Stall, 2" Trap, multiple shower heads up to 5 GPM total = 2 DFU 3 DFU Shower Stall, 3" Trap, multiple shower heads up to 10 GPM total = 5 DFU Shower Stall, 4" Trap, multiple shower heads up to 15 GPM total = 6 DFU Under FOR SERVING 3 OR MORE DWELLING UNITS Shower Stall, 1-1/2" Trap, single 2.5 GPM shower head = 2 DFU Shower Stall, 2" Trap, multiple shower heads up to 5 GPM total = 2 DFU 3 DFU Shower Stall, 3" Trap, multiple shower heads up to 10 GPM total = 5 DFU Shower Stall, 4" Trap, multiple shower heads up to 15 GPM total = 6 DFU Under OTHER THAN DWELLING UNITS Shower Stall, 1-1/2" Trap, single 2.5 GPM shower head = 2 DFU Shower Stall, 2" Trap, multiple shower heads up to 5 GPM total = 2 DFU 3 DFU Shower Stall, 3" Trap, multiple shower heads up to 10 GPM total = 5 DFU Shower Stall, 4" Trap, multiple shower heads up to 15 GPM total = 6 DFU Basis/Reason for Change: To coordinate the listings of DFUs for Shower Stalls in Table 11.4.1 with the proposed changes to GPMs in Section 7.10.4. To coordinate the DFUs with the DFUs for Trap Sizes. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 269: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 196

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___8-05-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 11.4.3 Diversity Factors In certain structures such as hospitals, laboratory buildings, and other special use or special occupancy buildings where the ratio of the number of plumbing fixtures to the number of occupants is proportionally more than required by the building occupancy Table 7.21.2 for Business Occupancy and in excess of 1,000 drainage fixture units, the Authority Having Jurisdiction may permit the use of a diversity factor for sizing drain branches, drain stacks, building drains, and building sewers. Basis/Reason for Change: To clarify the application of diversity factors in sizing drainage piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 270: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 197a

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ____1-31-2013_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Table 11.4.1 Drainage Fixture Unit (DFU) Values Under Individual Fixtures: Wash Sink, Each Set of Faucets 1-1/2" Trap ………………………………..2 DFU Basis/Reason for Change: Wash sinks with up to four faucets have 1-1/2" drains. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 271: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
cwhite
Typewritten Text
13 198
Page 272: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 273: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 199

Contact Information: Person Submitting Change 2: Fritz Reuss_________________ Date 3: January 31, 2013____ Jurisdiction/Company/ Mailing Address: 20 Vail Lane____________________ City/State/Zip: Flemington, NJ 08822______________ Phone: 908-510-0838_______ Fax: N/A___________ E-mail: [email protected]____ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change __X_ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution

Code Section: 11.7.10 High Level Alarm

THE FOLLOWING AMENDMENT IS SUBMITTED: NSPC Section 11.7.10 Sewage pumping units for other than single dwelling units shall include an audible, visual, or combination high liquid level alarm properly located to alert occupants/staff. EXCEPTIONS:

(1) Existing sewage pumping units. (2) Sewage ejectors and sewage pumps serving individual fixtures. (3) Macerating toilet systems.

Basis/Reason for Change: There have been instances whereby a failed sewage ejector within a residential dwelling has caused damage and/or clean-up costs that will potentially be avoided by stipulating that a high level alarm be included for any sewage pumping unit (unless one of the EXCEPTIONS apply); regardless if it is installed within a single family dwelling or a commercial/industrial building. The extending statement “properly located to alert occupants/staff” is added to clarify that the location of the audible/visual alarm device also needs to be considered to ensure timely notification when a high level sewage condition is detected.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 274: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change

2 _John Wyckoff_______________________ Date

1/7/13______

Jurisdiction/Company/

Mailing Address _____Hardyston Twp. Plumbing Inspector, 149 Wheatsworth Rd., Suite A,

City/State/Zip __ Hardyston, NJ 07419

Phone (973)823-7020 X9001 Fax 973-823-7023 E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

__X_ __ Change subsection to read as follows _____ Delete subsection and substitute as follows

_____ Add new subsection to read as follows _____ Delete subsection without substitution

Code Section: 11.7.10 High Water Alarms. Sewage pumping units for other than single dwelling

units shall include on audible, visual, or combination high liquid level alarm.

Basis/Reason for Change: To protect single family houses from damage & costly sewer back-ups

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
13 200
Page 275: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 201

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-04-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows __X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 11.7 Sewage Pumping 11.7.1 General a. Equipment for pumping or lifting sewage shall be in accordance with the following: 11.7.2 Building Subdrains 11.7.3 Sewage Pumps and Ejectors 11.7.4 Pneumatic Sewage Ejectors 11.7.5 Grinder Pumps 11.7.6 Macerating Toilet Systems 11.7.7 Sump Pits, Basins, and Receptors 11.7.8 Discharge Piping 11.7.9 Controls 11.7.10 High Level Alarm 11.7.11 Individual Fixture Pumps and Ejectors 11.7.3 Sewage Pumps and Ejectors a. Sewage pumps and ejectors shall: 1. be installed in a sump pit, basin, or receptor in accordance with Section 11.7.7. 2. in single dwelling units, be capable of passing a solid at least 1-1/2 inches in diameter and

have a 2" minimum discharge pipe size. 3. in other than single dwelling units, be capable of passing a solid at least 2 inches in diameter

and have a 3" minimum discharge pipe size. 4. have a minimum capacity of 20 gallons per minute if they remove drainage from a water

closet or urinal. b. Discharge piping shall comply with Section 11.7.8. EXCEPTION: Individual fixture pumps and ejectors shall comply with Section 11.7.11.

Page 276: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

11.7.11 Individual Fixture Pumps and Ejectors a. Individual fixtures other than water closets, urinals, and similar fixtures may discharge directly into an approved fixture-mounted pump or ejector, or into a receptor having a pump or ejector. b. The discharge piping from a sewage pump or ejector for an individual fixture shall be sized to suit the discharge rate of the fixture and include a backwater valve and full-way shutoff valve. c. Direct-mounted equipment may be manually or automatically controlled. d. The installation of manually or automatically operated equipment shall not be subject to the venting requirements of this Code, but shall be vented only as required for proper operation of the equipment in accordance with the manufacturer's instructions. e. If the equipment provides a proper liquid trap for the fixture, additional traps are not required. f. A vent on the fixture side of a trap may terminate locally in the area served. Basis/Reason for Change: To include the requirements for sewage pumps and ejectors that serve individual fixtures. They were not included in Section 11.7 of the 2012 NSPC. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 277: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 202

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ____12-03-2012____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 11.10 BRANCH CONNECTIONS TO OFFSETS IN STACKS a. Branch drains shall be permitted to connect to a horizontal stack offset, provided that the connection is not less than within 10 pipe diameters downstream from the upper portion of the stack. b. (No change) c. (No change) Basis/Reason for Change: To make 11.10.a consistent with the four sections of 11.9 and 11.10 that use "within" rather than "less than" to define the restrictions on the locations of branch drain connections to stacks and offsets. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 278: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 203

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-10-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 12.4 Vent Terminals 12.4.1 Extension Above Roofs a. Vent pipes shall terminate not less than 6 inches above the roof, measured from the highest point where the vent intercepts the roof. See Figure 12.4.1 EXCEPTION: Where a roof is used for any purpose other than weather protection or maintaining equipment, vents within ten (10) feet of the area being utilized shall extend at least seven (7) feet above the roof, shall be properly supported, and shall also comply with Section 12.4.4 for location. b. Where vent pipes penetrate a flat roof in a location that is subject to ponding of storm water, the vent pipe shall terminate not less than 2 inches above the highest level of ponded storm water. Basis/Reason for Change: To address the elevation of vent terminal pipes where storm water can pond on the roof. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 279: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Section 12.16 page 1 1-24-2013

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

13 - 204

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __1-24-2013_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 12.16 SIZE AND LENGTH OF VENTS 12.16.1 Size of Fixture Vents a. Vents for individual fixtures shall be sized according to Table 12.16. b. Vents for individual fixtures shall be not less than 1-1/4" size nor less than one-half the size of the fixture drain that they serve. c. Where a vent pipe serves two or more fixtures, the size of the combined vent pipe shall be based on the sum of the drainage fixture units (DFU) for all of the drains served. d. Where the fixtures being vented are not connected to the same drain stack, the stack size in Table 12.16 shall be the equivalent stack size for their total combined DFU load, based on Table 11.5.1B. 12.16.2 Size of Circuit or Loop Vents Circuit or loop vents shall not be less than one-half the size of the horizontal drainage branch that they serve.

Page 280: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Section 12.16 page 2 1-24-2013

12.16.3 Size of Relief Vents a.. The size of relief vents for circuit or loop vents of the drainage system shall be not less than one-half the size of the branch drain being served. b. Relief vents, where provided for drain stacks having ten or more branch intervals and relief vents for horizontal offsets in such drain stacks shall be the same size as the vent stack to which they connect. 12.16.4 Size of Stack Vents and Vent Stacks The minimum required size of stack vents and vent stacks shall be in accordance with Table 12.16. For the purpose of sizing, the length of a vent stack or stack vent shall be the developed length from its lowest connection with the drainage system to its termination in the open air, including any vent headers. a. Stack vents shall be the full size of the drain stack that they serve. b. Vent stacks shall be sized based on the total drainage fixture unit load (DFU) at the base of the stack that they serve. Connections of vents to the vent stack on floor levels above the base of the stack shall not increase its size. c. For the purpose of sizing vent stacks, the length of a vent stack in Table 12.16.4 shall be its developed length from its connection to the base of the stack being vented to its connection to its stack vent or, if not connected to its stack vent, its extension to an outdoor vent terminal. 12.16.5 Size of Vent Headers a. Vent headers or and portions thereof shall be sized according to Table 12.16 12.16.6. b. The number of drainage fixture units (DFU) used to size sections of vent headers shall be the sum of all fixture units (DFU) on for all drain stacks served by each that section of the header. c. The total developed length of all sections of vent headers a vent header shall be the longest vent length from the vent stack connection at the base of the most distant drain stack to the outdoor vent terminal in the open air. d. The soil and waste stack size used to size the vent headers shall be the equivalent size capable of handling the fixture unit load (DFU) on the vent header; based on Table 11.5.1B. d. Where two or more vent headers are connected before reaching an outdoor vent terminal, each vent header shall have its own total developed length to the outdoor vent terminal with regard to sizing per Table 12.16.6. 12.16.6 Size of Branch Vents a. Branch vents and portions thereof shall be sized according to Table 12.16.6.

Page 281: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Section 12.16 page 3 1-24-2013

b. The number of drainage fixture units (DFU) used to size sections of branch vents shall be the sum of all drainage fixture units (DFU) for the individual fixture vents or branch vents served by that section of the branch vent. c. The total developed length of all sections of a branch vent shall be the longest length from its connection to the most distant individual fixture vent being vented to its connection to an outdoor vent terminal.

Table 12.16.6 SIZE OF BRANCH VENTS (1) AND VENT HEADERS (2)

DFU Vent Pipe Size (minimum) Vent Pipe Size (minimum) Being For 40 Feet Maximum For Greater than 40 Feet Vented Total Developed Length Total Developed Length

1 1-1/4" 1-1/2" 3 1-1/4" 1-1/2" 6 1-1/4" 1-1/2" 20 1-1/2" 2" 160 2" 3" 360 3" 4" 620 3" 4" 1400 4" 5" 2500 5" 6" 3900 6" 8" 7000 8" 10"

NOTES FOR TABLE 12.16.6 (1) The total developed length of branch vents shall comply with Section 12.16.6.c. (2) The total developed length of vent headers shall comply with Section 12.16.5.c or d.

12.16.7 Underground Vent Piping The minimum size of vent piping installed underground shall be 1-1/2". 12.16.6 12.16.8 Aggregate Size of Vent Terminals a. Each building sewer shall be vented by one or more vents extending from the drainage system, or branches thereof, to the open outside air above the roof. b. Stack vents and vent stacks shall be sized according to Table 12.16. c. b. The aggregate cross-sectional area of all vent terminals serving a sewer shall be not less than the cross-sectional area of the minimum required size of the building drain that they serve, at the point

Page 282: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Section 12.16 page 4 1-24-2013

where it connects to the building sewer. (See Table 12.16.6 12.16.8 for the cross-sectional areas of pipes). EXCEPTION: The aggregate cross-sectional area requirement shall be exclusive of any requirements to increase the size of a vent terminal to prevent frost closure of the vent terminal under Section 12.5. d. c. One or more vent terminals having the aggregate cross-sectional area of a 3" vent terminal shall be permitted to vent a 4" building drain if the drainage fixture unit load (DFU) and number of bathroom groups served by the building drain does not exceed the maximum number allowed on a 3" building drain, as permitted by Section 12.16.6.c 11.5.6.c. CHANGE EXISTING TABLE 12.16.6 TO TABLE 12.16.8.

Table 12.16.6 12.16.8 NOMINAL PIPE CROSS SECTIONAL AREA (Sq. Inches)

Basis/Reason for Change: 1. To coordinate the requirements of Section 12.16 with the necessary changes to the scope of existing Table 12.16 (proposed Table 12.16.4). 2. To add Table 12.16.6 for the sizing of branch vents and vent headers. 3. To change existing Table 12.16.6 to Table 12.16.8. 4. Figure 12.16.1-B in the NSPC Illustrated will have to be revised. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 283: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
cwhite
Typewritten Text
13 205
Page 284: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 285: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 286: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 206

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-07-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 12.18.2 Arrangement of Vent Piping The island vent pipe shall rise vertically under the sink at the end of the fixture trap arm to at least 4 inches above the outlet of the fixture up to the underside of the counter top for the sink. The vent shall then turn down ………… In Figure 12.18 change "4" MIN to UP TO THE UNDERSIDE OF THE COUNTER TOP FOR THE SINK Basis/Reason for Change: Figure 12.18 shows the vent extended up to 4" minimum above the trap arm, which is not the outlet of the fixture. The elevation of the outlet of a fixture is difficult to determine. It would be better to refer to the underside of the sink counter top. Also it is not clear if the 4" refers to the C/L of the vent or its top or bottom. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 287: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 207

Contact Information: Person Submitting Change 2 _____Michael Cudahy__________________ Date 3 ___Aug 25 2012____ Jurisdiction/Company/ Mailing Address Plastic Pipe and Fittings Association 800 Roosevelt Rd Bld C Ste 312__________ City/State/Zip __Glen Ellyn / IL / 60137 Phone ___630 363 7933______ Fax __630 858 654___ [email protected]_______ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____Chapter 13, 13.1.1 Where Required Exception: Where precipitation is collected by a rainwater harvesting system installed according to Appendix G, or storm water from one- and two-family dwellings may be discharged on lawns or streets provided that the storm water flows away from the dwelling and does not otherwise create a nuisance. Basis/Reason for Change: It would seem that some exceptions in the NSPC could be needed if Appendix G is used. A conflict between storm water requirements and rainwater harvesting systems appears to be one of these times. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 288: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 208

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-31-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 13.3.1 General a. Traps shall be installed in a storm drainage system if it connects to a combined sewer conveying both sewage and storm water. EXCEPTION: Traps shall not be required where roof drains, rain leaders, and other storm water inlets are at locations allowed under Section 12.4.4 for outdoor vent terminals. b. Floor drains and other receptors within a building shall be individually trapped and vented if they are connected to a storm drainage system, regardless of whether or not the sewer is combined. c. Traps required under this section shall comply with Section Sections 5.3.1, 5.3.2, 5.3.3, 5.3.5, and 13.3.2. Traps shall have an accessible cleanouts cleanout for their inlet, or other means of clearing the trap. d. Trap seals shall be maintained in accordance with Section 5.3.6. Make the necessary changes to Figure 13.3.2. Basis/Reason for Change: To clarify the requirements for traps in storm drainage piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 289: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 209

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___5-31-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 13.4.3 Combining Storm with Sanitary Drainage a. Storm and sanitary drainage shall not be combined unless connection to a combined sewer is required by the Authority Having Jurisdiction. The sanitary and storm building drains shall be entirely separate, except that where a combined building drain is required for connection to a combined building sewer, the building storm drain storm drains shall connect horizontally to the combined building drain through a single wye fitting that is single wye fittings that are at least 10 feet downstream from any sanitary drain connection the base of any soil or waste stack. b. Horizontal storm drain piping from vertical storm water conductors shall be not less than 10 feet in length and shall be increased one pipe size larger than required for horizontal storm drains in Table 13.6.2 when it is 10 feet from its connection to a combined building drain. Make the necessary changes to Figure 13.3.2. Basis/Reason for Change: To clarify the requirements for Section 13.4.3. The flow capacities of horizontal storm drains in Table 13.6.2 are based on the pipes flowing full. Horizontal combined drain piping is sized to run one-half full under design loads. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 290: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 210

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __11-07-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 14.3 MEDICAL GAS AND VACUUM PIPING SYSTEMS 14.3.1 General The installation of medical gas and vacuum piping systems shall be in accordance with the gas and vacuum system requirements of either NFPA 99 - Standard for Health Care Facilities Health Care Facilities Code or NFPA 99C - Gas and Vacuum Systems. Basis/Reason for Change: To update the requirements for medical gas and vacuum piping systems. NFPA 99 has been changed from a standard to a code. NFPA 99C is no longer active. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 291: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 211

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-10-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 14.12.1 and 14.12.2 14.12.1 General Provisions for drainage from medical, surgical, dental, and similar central vacuum systems shall be as required by either NFPA 99 - Health Care Facilities Code or NFPA 99C - Gas and Vacuum Systems. In addition, drainage from dental and other vacuum systems that collect fluid waste centrally shall comply with Sections 14.12.2 through 14.12.4. 14.12.2 Positive Pressure Drainage from Air/Waste Separators in Dental Vacuum Systems a. The waste outlet ………….as required by NFPA 99 and NFPA 99C. b. (no change) Basis/Reason for Change: NFPA 99 - 2012 is now a Code. NFPA 99C is no longer current with the 2012 Code. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 292: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change

2 __John Heine_____________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address ______________________________________________________________________

City/State/Zip ________________________________________________________________________

Phone ___609-987-0500_______________ Fax _ 609-987-0511 E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

___X__ Change subsection to read as follows _____ Delete subsection and substitute as

follows

_____ Add new subsection to read as follows __X___ Delete subsection without substitution

Code Section: 15.3 Testing of plumbing systems__________________________

15.3.1 New plumbing systems and parts of existing systems that have been altered, extended or repaired

shall be tested as prescribed here in after to disclose leaks and defects only when required by the

authority having jurisdiction.

15.3.2 Exceptions (Delete Section)

Basis/Reason for Change: Clarifies what needs to be tested and method. Wording was repetitive.

This eliminates redundant language.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

NJ PHCC Code Committee, (Chairman) / PO Box 2067

Princeton, NJ 08543

cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
13 212
cwhite
Typewritten Text
Page 293: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 213

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-21-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 15.3 Testing of Plumbing Systems 15.3.1 General New plumbing systems and parts of existing systems that have been altered, extended or repaired shall be tested as prescribed hereinafter to disclose leaks and defects only when required by the Authority Having Jurisdiction. 15.3.2 Exceptions Existing Concealed Sewer and Drain Piping Basis/Reason for Change: To clarify that normally all plumbing piping should be leak tested. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 294: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code

2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC.

2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee.

3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change

2 __John Heine_____________________ Date

3 1/7/13

Jurisdiction/Company/

Mailing Address ______________________________________________________________________

City/State/Zip ________________________________________________________________________

Phone ___609-987-0500_______________ Fax _ 609-987-0511 E-mail [email protected]

IMPORTANT: Please review the attached instruction sheet regarding proposed code changes.

Check All That Apply: _____ Amend section with this editorial change

_____ Change subsection to read as follows _____ Delete subsection and substitute as follows

_____ Add new subsection to read as follows __X___ Delete subsection without substitution

Code Section: 15.3.2 Exceptions __________________________ a. When required by the Authority Having Jursidiction, where an existing concealed sewer or drain

is reused as part of a new or renovated drainage system, the line shall be traced to its point of

termination and shall be tested to determine that:

1. It is connected to the proper drainage system, such as sanitary or storm,

2. It will withstand a leak test, and,

3. It is free flowing and not restricted.

(Delete Section)

Basis/Reason for Change: Clarifies what needs to be tested and method. Wording was repetitive.

This eliminates redundant language.

Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other

____________________________________________________________________________________

NJ PHCC Code Committee, (Chairman) / PO Box 2067

Princeton, NJ 08543

cwhite
Typewritten Text
cwhite
Typewritten Text
13 214
Page 295: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 215

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-21-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 17.9.2 Pitless Adapter 17.9.2.1 Design Pitless adapters designed to replace a section of well casing or for attachment to the exterior of a through the wall of the well casing shall be constructed of materials that provide strength and durability equal to the well casing. 17.9.2.2 Installation Installation shall be by threaded, welded, or compression-gasketed connection to cutoff adapter, or coupling connection to the casing or attachment to the exterior through the wall of the casing and shall be watertight. 17.9.2.3 Adapter Units (no changes) Basis/Reason for Change: To clarify the installation of pitless adapters in well casings Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 296: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 216

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___5-21-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: __X__ Amend section with this editorial change _____ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 17.9.4.2 Location Above Well Any power driven pump located over a well shall be mounted on the well casing, pipe sleeve, pump foundation or pump stand such that a watertight closure is or can be made for with the open end top of the casing or sleeve. Basis/Reason for Change: To clarify the installation of pumps above wells. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 297: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 217

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ____5-21-2012_____ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 17.9.6.3 Protective Pipe When these the minimum distances in Section 16.4.3 cannot be obtained, the suction line shall be enclosed in a protective pipe of standard thickness from the well to the pump. The protective pipe shall be sealed watertight at both ends. This requirement shall be considered satisfied if the suction line lies within a pressure discharge line. Basis/Reason for Change: To clarify the requirements for protective pipes on suction lines from wells. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 298: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 218

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-21-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 17.15 17.15 CROSS CONNECTION SUPPLY CONNECTIONS 17.15.1 Restriction Between Systems There shall be no cross-connection between an An individual potable water supply system shall not be connected to and another individual or public water supply system. 17.15.2 Limitations Between Properties No individual potable water supply system shall serve more than one property unless authorized by the Authority Having Jurisdiction. Basis/Reason for Change: To clarify the requirements for individual potable water supply systems. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 299: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 219

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-08-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Title of Appendix B Sizing the Building Water Supply System and Distribution Piping Systems Basis/Reason for Change: The appendix addresses water supply piping and hot and cold water distribution piping. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 300: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 220

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __4-13-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Appendix B.9.7 Total Equivalent Length of Piping The total equivalent length of piping …………………….See Tables B.9.7.A through B.9.7.E. As a general finding, it has been shown by experience that the equivalent length to be allowed added for pipe fittings and valves as a result of such calculations is approximately fifty percent of the developed length of the BDC in the case of copper water tube and plastic piping systems, and approximately seventy-five percent for standard threaded pipe systems piping. The total equivalent length of copper and plastic piping is approximately 67% pipe and 33% pipe fittings and valves. The total equivalent length of standard threaded piping is approximately 57% pipe and 43% pipe fittings and valves. Basis/Reason for Change: To include the approximate equivalent length of plastic pipe fittings and valves. To indicate the approx-imate percentage of the total equivalent length of piping that is attributable to pipe and the approximate percentage that is attributable to pipe fittings and valves. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 301: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 221

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __4-13-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Appendix C Conversions: Metric to U.S. Customary Units Pipe Sizes: 380 mm = 15 NPS Basis/Reason for Change: To add 15" NPS to the Pipe Size Table. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

Page 302: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

13 - 222

Contact Information: Person Submitting Change 2 ______NSPC Committee__ ______________ Date 3 ___8-05-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808_ ___________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone __1-800-533-7694___ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __ _ Change subsection to read as follows _____ Delete subsection and substitute as follows __ X__ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Appendix F Requirements of the Adopting Agency Add the following to F.2 References: Table 3.5: SDR and PS ratings of PVC building sewers. Table 3.7: SDR and PS ratings of PVC building storm sewers. 5.3.4: Building traps. 6.3.2.e: Waste oil tanks for oil separators. 10.15.1 Tempered water supply systems. 12.5 Frost closure of vent terminals. 14.13 Water-supplied medical aspirators Basis/Reason for Change: To add items in the Code that may be subject to the requirements of the Adopting Agency or Authority Having Jurisdiction. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

Page 303: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code Committee __________________________________________________________

2013 PROPOSED

FIGURES CHANGES

National Standard Plumbing Code (NSPC)

_________________________________________________________________________________________________

180 S. Washington St. Falls Church, VA 22046 1-800-533-7694, Fax: 703-237-7442, e-mail: [email protected], URL: http://www.phccweb.org/nspc

Page 304: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline January 31, 2013

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit, upon committee request, 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than January 31, 2013.

Contact Information: Person Submitting Change 2 ___Dave Bishop___________________ Date 3 _1/31/13____________ Jurisdiction/Company/ Mailing Address _________1001 Parsippany Blvd________________________________ City/State/Zip _______Parsippany New Jersey 07054____________________ Phone __973-229-4735____ Fax _973-263-1488_____ E-mail [email protected]___ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change _X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: ____Figure 1.2.15 and Figure 13.3.2 The minimum distance on the Figures are different. One is from the soil stack and the other is to the branch line of soil stack. Basis/Reason for Change: They are conflicting, they need to be the same. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

cwhite
Typewritten Text
13 F1
Page 305: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

-

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __9-24-2012_______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: 4.3 Types of Joints Between Different Piping Materials Figure 4.3.8-D A Transition Connection Using A Flexible Unshielded Coupling NOTES: 1. Flexible unshielded couplings are limited to underground sewer, drain, and vent piping. Center

stops are required except for repair couplings. The couplings cannot support the pipe. The pipe must be properly backfilled to avoid stresses on the couplings.

Basis/Reason for Change: Flexible transition couplings do not have center stops because of the two different pipe sizes that are being joined. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

cwhite
Typewritten Text
13 F2
Page 306: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

-

1) Proposed Code Changes gaining acceptance will appear in the 2013 Supplement to the NSPC. 2) Proponent must submit 20 copies of Supporting Data for review by the NSPC Committee. 3) Proposed Code Changes must be submitted no later than Thursday, September 27, 2012

Contact Information: Person Submitting Change 2 _____Michael Cudahy__________________ Date 3 ___Aug 25 2012____ Jurisdiction/Company/ Mailing Address Plastic Pipe and Fittings Association 800 Roosevelt Rd Bld C Ste 312__________ City/State/Zip __Glen Ellyn / IL / 60137 Phone ___630 363 7933______ Fax __630 858 654___ [email protected]_______ IMPORTANT: Please review the attached instruction sheet regarding proposed code changes. Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: _____Figure 4.3.9-D__________________ NOTES: 1. Plastic fittings pipes that are lead caulked must be solid plastic. Molten lead will melt cellular pipe fittings. Basis/Reason for Change: In the Illustrated 2012 NSPC, PPFA recommends to delete fittings from this section. There are no cellular fittings, only pipe. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other ____________________________________________________________________________________

cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
13 F3
Page 307: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
13 F4
Page 308: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)
Page 309: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

-

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 ___4-02-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Figure 7.3.2

Figure 7.3.2 MINIMUM FIXTURE CLEARANCES (for other than accessible applications)

Basis/Reason for Change: To clarify the application of the data in Table 7.3.2. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________

cwhite
Typewritten Text
cwhite
Typewritten Text
cwhite
Typewritten Text
13 F5
Page 310: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

National Standard Plumbing Code 2012 Proposed Code Change Form Deadline September 27, 2012

-

Contact Information: Person Submitting Change 2 ______NSPC Committee_________________ Date 3 __5-04-2012______ Jurisdiction/Company/ Mailing Address _______________180 S. Washington Street, P.O. Box 6808 _____________________ City/State/Zip _________________Falls Church, VA 22046___________________________________ Phone _1-800-533-7694____ Fax _1-703-237-7442____ E-mail [email protected]_____________ Check All That Apply: _____ Amend section with this editorial change __X__ Change subsection to read as follows _____ Delete subsection and substitute as follows _____ Add new subsection to read as follows _____ Delete subsection without substitution Code Section: Figure 10.16.6 NOTES 1. Relief valves can discharge to the floor where permitted by the Authority Having Jurisdiction. 2. A shutoff valve in the hot water supply is permitted. 3. Shutoff valves must not isolate relief valves from the tank that they are protecting. 4. Threads are prohibited on the ends of the relief valve discharge pipes to prevent the installation of a

pipe cap if the relief valve begins to leak. 5. Drains or indirect waste pipes Indirect waste receptors that receive the discharge from relief valves

must be sized according to Table 10.16.6, based on the size of the relief valve discharge pipe size. 6. The inlet to indirect waste piping must be elevated to establish sufficient static head above the

horizontal portion of the drain to prevent spillage. The horizontal portion of drain piping from indirect waste receptors must be far enough below the inlet to the receptor to establish sufficient static head to prevent spillage.

7. Where two indirect waste pipes from relief valves are joined, the cross-sectional area of the common

drain must be equal to or larger than the sum of the areas of the individual waste pipes. Where the discharge pipes from separate pressure and temperature relief valves on a water heating or storing pressure vessel terminate at the same indirect waste receptor, it must be sized for the simultaneous discharge of both relief valves according to Section 10.16.6.g.

cwhite
Typewritten Text
13 F6
Page 311: 2013 PROPOSED CHANGES - Cloud Object Storage | Store … ·  · 2015-10-06National Standard Plumbing Code Committee _____ 2013 PROPOSED CHANGES National Standard Plumbing Code (NSPC)

Basis/Reason for Change: To clarify the Notes for Table 10.16.6 with regard to relief valve discharge pipes, indirect waste receptors, and the simultaneous discharge of separate pressure and temperature relief valves on a water heating or storage pressure vessel. Vote: ___ Accept ___ Accept as Amended

___ Accept in Part ___ Accept in Principle ___ Accept in Part and Principle

___ Defeated ___Failed Lack of Second ___ Tabled ___ Withdrawn ___ Other __________________________________________________________________________________