Protecting our environment, Serving our customers, Enhancing our communities
Engineering Intern – Peter WilliamsResponsibilities Maps for New Development GroupMaps for Existing Infrastructure GroupMaps for Business Operations and Planning (BOP)As-Built record keepingGIS Data Maintenance and Creation
Includes feature modification and creation
Maps assisting theNew Development Workgroup
BR31 Study Area
Watershed Boundary
Study Area Boundary (BR31)
Overland Park Boundary
School District Boundary
JCW Service Area
Spr
ing
Hill
Scho
ol D
istr
ict
Purpose: Locates areas upstream from existing sewers that are available for future development based on contours and hydrology
Maps assisting the New Development Workgroup
Area of Proposed BR28
Shows tributary acreage of proposed BR28
Sanitary Sewer Line Rehabilitation: CIPP
Maps Assisting Existing Infrastructure Group
74 PDF maps for 172 sites where sewer lines are to be rehabilitated by CIPP (cast in-place pipe), and indicating the properties affected
Maps assisting the Business
Operations and Planning
WorkgroupKCMO Interconnect Sites
GIS day-to-dayAs-built record keepingMore than 21,000 D size (24”x 36”) drawings scanned to
PDF. These drawings are mainly collection system as-builts and drawings for plants and pump stations.
Hard copies labeled and stored according to districtCombine scanned images for editing to JCW file server.
JCW File Server
Lucity
AIMS
GIS
AIMS Internet Server
Scan Edit
GIS Data Maintenance Steps for new feature creation
1. Scan as-built drawings for particular project i.e. BR15, Lsd 5, Sec 4.
2. Combine scanned images for editing to the JCWfile server.
JCW File Server
LucityAIMS
GIS
AIMS Internet Server
Scan Edit
3. Convert General Layout scan to a TIFF file type and import into GIS map to use as a base map for locating and placing new sewers.
4. Georeference and rectify the image• Place control points to match features between image
and GIS 5.Add new manholes and sewers
• Place sewers upstream to downstream
6. Populate new manhole and sewer attributes using Plan & Profile sheet (PP)
Attribute tables
Plan & Profile sheet
Obtain attributes from here
7. Annotate as-built drawings with project designation, drawing number and manhole numbers
Project Designation
Drawing number
8. Link as-built drawings to associated lines using LUCITYLUCITY Icon
Dialog box to specify document to be attached to a line
Once edits are updated on the AIMS site, the new GIS features, data and documents can be viewed by the public