2013 ITP20 Potential Needs Maps [Draft]
2013 ITP20
October 16, 2012
1
Revision History
2
Date Notes
10-16-2012 Original draft. Posted to SPP.org
2013 ITP20 potential needs maps
• Four futures were evaluated in the 2013 ITP20 for reliability, policy, and economic needs.
• The potential needs highlighted on the following maps were identified in accordance with the 2013 ITP20 scope.
• Maps are draft and will be updated as the assessment progresses
3
BUSINESS AS USUAL FUTURE (F1) Peak hour system flows (230 kV and above)
4
5
Future 1
ADDITIONAL WIND FUTURE (F2) Peak hour system flows (230 kV and above)
6
7
Future 1
ADDITIONAL WIND PLUS EXPORTS FUTURE (F3)
Peak hour system flows (230 kV and above)
8
9
Future 1
COMBINED POLICY FUTURE (F4) Peak hour system flows (230 kV and above)
10
11
Future 1