22
2013 Federal Transportation Improvement Program Ventura County - 100% Prior Local Highway, State Highway, Transit Including Amendments 1-18 (In $000`s) ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment VEN050402 Ventura SCCAB VEN050402 NCRH1 L EXEMPT - 93.127 0 Description: PTC 1,177 Agency CAMARILLO ADOLFO ROAD EASTBOUND AT SANTA ROSA ROAD - ADD DUAL LEFT AND RIGHT TURN LANES (TOLL CREDITS = $135 FOR FY 10/11 CON) Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 Total STP LOCAL - REGIONAL 1,177 1,177 1,177 1,177 VEN050402 Total 1,177 1,177 1,177 1,177 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment VEN050403 Ventura SCCAB VEN050403 NCN26 L EXEMPT - 93.126 0 Description: PTC 2,083 Agency CAMARILLO CALLEGUAS BIKE PATH - CONSTRUCT CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH CONNECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II). (CMAQ INCLUDES $191 IN TOLL CREDITS FOR 11/12 CONSTRUCTION.) Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 Total CMAQ 416 1,667 2,083 2,083 2,083 VEN050403 Total 416 1,667 2,083 2,083 2,083 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment VEN110305 Ventura SCCAB 5O0701 NCN46 L EXEMPT - 93.126 0 Description: PTC 1,174 Agency CAMARILLO PONDEROSA DRIVE FROM ARNEILL TO LAS POSAS REPLACE AND UPGRADE SIDEWALK, CURB AND GUTTER, MEDIAN, LANDSCAPING, TREES AND IRRIGATION (RIP-TE INCLUDES TOLL CREDIT OF $117,000) Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 Total CITY FUNDS 157 157 157 157 STP ENHANCE-RIP TEA 1,017 1,017 1,017 1,017 VEN110305 Total 157 1,017 1,174 1,174 1,174 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment VEN051401 Ventura SCCAB VEN051401 NCN26 L EXEMPT - 93.126 0 Description: PTC 1,395 Agency FILLMORE ROUTE 126 AND SANTA PAULA BRANCH RAILROAD AT POLE CREEK - CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH (CMAQ INCLUDES $8 TOLL CREDITS FOR PE.) Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 Total CMAQ 73 73 73 73 CITY FUNDS 100 1,222 1,322 1,322 1,322 VEN051401 Total 173 1,222 1,395 1,395 1,395 Print Date: 4/30/2014 4:13:14 PM Page: 1 of 22 NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

  • Upload
    hakhanh

  • View
    222

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN050402 Ventura SCCAB VEN050402 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,177 Agency CAMARILLO

ADOLFO ROAD EASTBOUND AT SANTA ROSA ROAD - ADD DUAL LEFT AND RIGHT TURN LANES (TOLL CREDITS = $135 FOR FY 10/11 CON)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSTP LOCAL - REGIONAL 1,177 1,177 1,177 1,177VEN050402 Total 1,177 1,177 1,177 1,177

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN050403 Ventura SCCAB VEN050403 NCN26 L EXEMPT - 93.126 0

Description: PTC 2,083 Agency CAMARILLO

CALLEGUAS BIKE PATH - CONSTRUCT CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH CONNECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II). (CMAQ INCLUDES $191 IN TOLL CREDITS FOR 11/12 CONSTRUCTION.)Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 416 1,667 2,083 2,083 2,083VEN050403 Total 416 1,667 2,083 2,083 2,083

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN110305 Ventura SCCAB 5O0701 NCN46 L EXEMPT - 93.126 0

Description: PTC 1,174 Agency CAMARILLO

PONDEROSA DRIVE FROM ARNEILL TO LAS POSAS REPLACE AND UPGRADE SIDEWALK, CURB AND GUTTER, MEDIAN, LANDSCAPING, TREES AND IRRIGATION (RIP-TE INCLUDES TOLL CREDIT OF $117,000)Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCITY FUNDS 157 157 157 157STP ENHANCE-RIP TEA 1,017 1,017 1,017 1,017VEN110305 Total 157 1,017 1,174 1,174 1,174

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN051401 Ventura SCCAB VEN051401 NCN26 L EXEMPT - 93.126 0

Description: PTC 1,395 Agency FILLMORE

ROUTE 126 AND SANTA PAULA BRANCH RAILROAD AT POLE CREEK - CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH (CMAQ INCLUDES $8 TOLL CREDITS FOR PE.)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 73 73 73 73CITY FUNDS 100 1,222 1,322 1,322 1,322VEN051401 Total 173 1,222 1,395 1,395 1,395

Print Date: 4/30/2014 4:13:14 PM Page: 1 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 2: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN053401 Ventura SCCAB VEN053401 ITS02 L EXEMPT - 93.128 0

Description: PTC 500 Agency OXNARD

INSTALL INTERCONNECT CABLE TO CONNECT SIGNALIZED INTERSECTIONS AT VARIOUS LOCATIONS THROUGHOUT THE CITY

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 399 399 399 399CITY FUNDS 20 81 101 101 101VEN053401 Total 20 480 500 500 500

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN053403 Ventura SCCAB VEN053403 NCN46 L TCM Committed 0

Description: PTC 4,246 Agency OXNARD

EAST VENTURA BOULEVARD FROM NYLAND AVENUE TO EAST OF ALMOND DRIVE - LANDSCAPE ENHANCEMENT, PEDESTRIAN AND BICYCLE FACILITIES, DRAINAGE IMPROVEMENT AND PAVEMENT REHABILITATIONFund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSTP LOCAL - REGIONAL 179 3,528 3,707 3,707 3,707CITY FUNDS 82 457 539 539 539VEN053403 Total 261 3,985 4,246 4,246 4,246

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN090101 Ventura SCCAB REG0703 NCNH2 L EXEMPT - 93.128 0

Description: PTC 740 Agency OXNARD

TRAFFIC SIGNAL IMPROVEMENTS AT VARIOUS LOCATIONS

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM

740 740 740 740

VEN090101 Total 740 740 740 740

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN031229 Ventura SCCAB VEN031229 NCN26 L EXEMPT - 93.126 0

Description: PTC 1,930 Agency SAN BUENAVENTURA

ROUTE 126 BIKE PATH - PHASE II BIKE PATH (CLASS I) CROSSING THE HARMON BARRANCA -(INCLUDES $221 OF CMAQ PROVIDING MATCH THROUGH TOLL CREDITS)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 1,930 1,930 1,930 1,930VEN031229 Total 1,930 1,930 1,930 1,930

Print Date: 4/30/2014 4:13:14 PM Page: 2 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 3: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN090102 Ventura SCCAB REG0703 NCNH2 L EXEMPT - 93.128 0

Description: PTC 500 Agency SAN BUENAVENTURA

NEW SIGNAL AT KIMBALL ROAD AND FOOTHILL ROAD

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM

400 400 400 400

CITY FUNDS 100 100 100 100VEN090102 Total 500 500 500 500

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN111102 Ventura SCCAB 5N011 NCR25 L TCM Committed 0

Description: PTC 1,110 Agency SANTA PAULA

SANTA PAULA BIKE TRAIL IMPROVEMENTS INCLUDING BIKE/PEDESTRIAN IMPROVEMENTS AT 16 ADJACENT INTERSECTIONS AND CONSTRUCTION OF ONE REST AREA SHADE STRUCTUREFund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 1,110 1,110 1,110 1,110VEN111102 Total 1,110 1,110 1,110 1,110

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN54168 Ventura SCCAB VEN54168 NCN25 L TCM 0

Description: PTC 4,094 Agency SANTA PAULA

FACILITY INCL BIKEWAY/WALKWAY FROM SANTA PAULA CREEK TO PECK RD FENCING, LANDSCAPING, BRIDGE & DRAINAGE, PUBLIC ACCESS POINTS/ SAFETY ITEMS

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 201 3,314 3,515 3,515 3,515CITY FUNDS 180 399 579 579 579VEN54168 Total 381 3,713 4,094 4,094 4,094

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN031205 Ventura SCCAB 5TPL04 NCR25 L EXEMPT - 93.126 0

Description: PTC 254 Agency SIMI VALLEY

SIMI VALLEY BIKE PATH CLASS I 1400-FOOT CONNECTION FROM METROLINK STATION TO STEARNS STREET. (CMAQ INCLUDES TOLL CREDITS OF $23 FOR 2010/11 CON.)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 201 201 201 201CITY FUNDS 53 53 53 53VEN031205 Total 53 201 254 254 254

Print Date: 4/30/2014 4:13:14 PM Page: 3 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 4: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN051002 Ventura SCCAB VEN051002 CAR63 L NON-EXEMPT 0

Description: PTC 2,984 Agency SIMI VALLEY

OLSON ROAD WIDENING FROM FOUR TO SIX LANES FROM PRESIDENTIAL DRIVE TO SIMI VALLEY CITY LIMIT, 2700 FEET

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalDEMO-SAFETEA-LU 400 1,280 1,680 1,680 1,680STP LOCAL - REGIONAL 733 733 733 733CITY FUNDS 100 471 571 571 571VEN051002 Total 500 2,484 2,984 2,984 2,984

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN051201 Ventura SCCAB VEN051201 NCN26 L TCM Committed 0

Description: PTC 1,986 Agency SIMI VALLEY

WEST LOS ANGELES AVENUE FROM WEST CITY LIMIT TO EASY STREET 0.4 MILE CLASS II BIKE LANES - CMAQ INCLUDES $228 OF TOLL CREDITS FOR 11/12 CON.

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 1,986 1,986 1,986 1,986VEN051201 Total 1,986 1,986 1,986 1,986

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN031212 Ventura SCCAB VEN031212 ITS02 L TCM Committed 0

Description: PTC 450 Agency THOUSAND OAKS

EXPAND TRAFFIC SIGNAL COORDINATION SYSTEM

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSTP LOCAL - REGIONAL 300 300 300 300CITY FUNDS 150 150 150 150VEN031212 Total 450 450 450 450

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN054605 Ventura SCCAB VEN054605 NCN26 L TCM Committed 0

Description: PTC 1,601 Agency THOUSAND OAKS

CONEJO CREEK PARK BIKE PATH - CLASS I BIKE PATH FOR 1.4 MILES IN CONEJO CREEK PARK FROM ROUTE 23 TO JANSS ROAD AND PAIGE LANE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM

230 230 230 230

ARRA - TRANSPORTATION ENHANCEMENT

1,071 1,071 1,071 1,071

CMAQ 16 134 150 150 150CITY FUNDS 2 148 150 150 150VEN054605 Total 18 1,583 1,601 1,601 1,601

Print Date: 4/30/2014 4:13:14 PM Page: 4 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 5: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN056403 Ventura SCCAB VEN056403 ITS02 L NON-EXEMPT 0

Description: PTC 460 Agency THOUSAND OAKS

LYNN ROAD FROM ROUTE 101 TO AVENIDA DE LAS FLORES SIGNAL SYNCHRONIZATION IMPROVEMENT (PHASE III)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 64 336 400 400 400CITY FUNDS 16 44 60 60 60VEN056403 Total 80 380 460 460 460

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN051004 Ventura SCCAB VEN051004 NCR31 L EXEMPT - 93.126 0

Description: PTC 6,000 Agency VENTURA COUNTY

RECONSTRUCT AND DEEP LIFT ASPHALT ON VARIOUS ROADS IN VENTURA COUNTY WITHIN CONGRESSIONAL DISTRICT 24

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalDEMO-SAFETEA-LU 4,800 4,800 4,800 4,800COUNTY 1,200 1,200 1,200 1,200VEN051004 Total 6,000 6,000 6,000 6,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN090504 Ventura SCCAB 5O0703 L EXEMPT - 93.126 0

Description: PTC 1,018 Agency VENTURA COUNTY

1000' E. OF ROUTE 126/CTR ST TO 0.75 MILE WEST OF RANCHO CAMULOS CONSTRUCT BIKE/PED PATH FOR 1.2 MILES IN SANTA PAULA BRANCH ROW (PHASE III OF PIRU/CAMULUS PROJECT, SPLIT FROM VEN990310)Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 539 539 539 539STP ENHANCE-RIP TEA 479 479 479 479VEN090504 Total 1,018 1,018 1,018 1,018

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN110104 Ventura SCCAB 5O0703 NCR25 L EXEMPT - 93.126 0

Description: PTC 1,820 Agency VENTURA COUNTY

OJAI VALLEY BIKE TRAIL NEAR CASITAS SPRINGS - REPLACE DRY-WEATHER CROSSING WITH 790-FOOT BRIDGE OVER SAN ANTONIO CREEK

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 190 190 190 190COUNTY 150 1,480 1,630 1,630 1,630VEN110104 Total 150 1,670 1,820 1,820 1,820

Print Date: 4/30/2014 4:13:14 PM Page: 5 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 6: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN54122 Ventura SCCAB VEN54122 CAXT2 L NON-EXEMPT 0

Description: PTC 3,362 Agency VENTURA COUNTY

NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS - PE AND ROW PHASES (CON IN 07-VEN040501) -- PHASE IFund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 331 350 681 681 681STP LOCAL - REGIONAL 2,603 2,603 2,603 2,603COUNTY 43 35 78 78 78VEN54122 Total 374 2,988 3,362 3,362 3,362

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN990310 Ventura SCCAB VEN990310 NCN25 L TCM 0

Description: PTC 6,000 Agency VENTURA COUNTY

PIRU CRK BRIDGE (PHASE I) BIKE PATH (BIKE/PED PATH ALSO IN VEN090504.)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 265 797 1,062 1,062 1,062COUNTY 35 90 1,933 2,058 2,058 2,058PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.

1,100 1,100 1,100 1,100

STP ENHANCE-RIP TEA 1,780 1,780 1,780 1,780VEN990310 Total 300 90 5,610 6,000 6,000 6,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN040501 Ventura SCCAB VEN040501 CAXT2 L TCM Committed 0

Description: PTC 50,265 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)

NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS - CON PHASE (PE & ROW IN 07-VEN54122) - INCL FINANCE COSTFund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 7,764 7,764 7,764 7,764STP LOCAL - REGIONAL 14,258 14,258 14,258 14,258BONDS - LOCAL 23,000 23,000 23,000 23,000STATE UNIVERSITY 5,243 5,243 5,243 5,243VEN040501 Total 50,265 50,265 50,265 50,265

Print Date: 4/30/2014 4:13:14 PM Page: 6 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 7: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN071105 Ventura SCCAB 4PD04 CAXT2 L EXEMPT - 93.126 0

Description: PTC 23,000 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)

REIMBURSEMENT OF LEWIS ROAD WIDENING ADVANCE CONSTRUCTION FUNDS PAID WITH LOCAL BONDS (PROJECT 07-VEN040501)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSTATE CASH - RIP 23,000 23,000 23,000 23,000VEN071105 Total 23,000 23,000 23,000 23,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN056406 Ventura SCCAB VEN056406 CARH3 101 7.9 7.9 S NON-EXEMPT 0

Description: PTC 6,271 Agency THOUSAND OAKS

ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PHASE I INCLUDING WENDY DRIV BRIDGE NB WIDENING ACROSS ROUTE 101; NB RAMP IMPROVEMENTS; INTERSECTION IMPROVEMENTS; SIGNAL MOD (OTHER PHASES SPLIT TO VEN110301 & VEN110302.) TOLL CREDIT = $77 FOR CONFund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSTP LOCAL - REGIONAL 550 5,079 5,629 5,629 5,629PRIVATE FUNDS 71 571 642 642 642VEN056406 Total 621 5,650 6,271 6,271 6,271

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN110301 Ventura SCCAB VEN056406 CARH3 101 7.9 7.9 S NON-EXEMPT 0

Description: PTC 6,300 Agency THOUSAND OAKS

ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 2 INCLUDING WENDY DRIVE BRIDGE SOUTHBOUND WIDENING ACROSS ROUTE 101; SB OFF-RAMP IMPROVEMENT TO WIDEN FROM 1 TO 2 LANES AT WENDY DRIVE INTERSECTION TO PROVIDE TURN LANE (RAMP TO REMAIN 1 LANE EXITING FREEWAY) TOLL CREDIT = $88 FOR CON SPLIT FROM VEN056406Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSTP LOCAL - REGIONAL 5,665 5,665 5,665 5,665PRIVATE FUNDS 635 635 635 635VEN110301 Total 6,300 6,300 6,300 6,300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN110302 Ventura SCCAB VEN056406 CARH3 101 7.9 7.9 S NON-EXEMPT 0

Description: PTC 3,587 Agency THOUSAND OAKS

ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 3 IMPROVE SB ONRAMP (SPLIT FROM VEN056406)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalPRIVATE FUNDS 3,587 3,587 3,587 3,587VEN110302 Total 3,587 3,587 3,587 3,587

Print Date: 4/30/2014 4:13:14 PM Page: 7 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 8: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN54020 Ventura SCCAB VEN54020 CAX70 101 16.6 17 S NON-EXEMPT 0

Description: PTC 40,000 Agency CAMARILLO

IN CAMARILLO CONSTRUCT AIRPORT NORTH (SPRINGVILLE) INTERCHANGE (CONNECTING FUTURE EXTENSIONS OF VERDULERA ST & PONDEROSA DR) INTERSECTING US 101

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalPRIVATE FUNDS 2,275 4,700 33,025 40,000 40,000 40,000VEN54020 Total 2,275 4,700 33,025 40,000 40,000 40,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment343 Ventura SCCAB 343 NCRH3 101 20.1 20.1 S NON-EXEMPT 0

Description: PTC 83,977 Agency OXNARD

IN OXNARD AT RICE AVE (SANTA CLARA) RECONSTRUCT INTERCHANGE (T21-#664) (SAFETEA-LU #1565) (SAFETEA-LU #2639 AND 'TIP') (TCSP - 2010 APPROP EARMARK)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM

5,000 5,000 5,000 5,000

DEMO-SAFETEA-LU 616 5,140 5,756 5,756 5,756DEMO - TEA 21 179 7,460 8,122 15,761 15,761 15,761SURFACE TRANS PROG 490 490 490 490STP LOCAL 94 94 94 94STP LOCAL - REGIONAL 354 354 354 354TRANS AND COMM AND SYS PRESRV PILOT PROG

660 660 660 660

BENEFIT ASSESS DIST 8,993 8,993 8,993 8,993CITY FUNDS 43 10,492 5,885 16,420 16,420 16,420TRADE CORRIDOR PROGRAM 30,449 30,449 30,449 30,449343 Total 316 19,582 64,079 83,977 83,977 83,977

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN070201 Ventura SCCAB VEN070201 CAX62 101 39.8 43.6 S NON-EXEMPT 0

Description: PTC 87,760 Agency CALTRANS

NEAR MUSSEL SHOALS ADD 1 HOV LANE EACH DIR FROM MOBIL PIER ROAD UC TO S/O CASITAS PASS RD IN SANTA BARBARA CO. (PM R 39.8 TO 2.2). HOV LANES ARE PROPOSED TO BE PART-TIME (AM & PM PEAK PERIODS) ONLY. EXTEND ON/OFF-LANES AT MUSSEL SHOALS & LA CONCHITA FOR BETTER ACCEL AND DECEL; KEEP AS SINGLE LANES. CLOSE EXISTING 3 MEDIAN OPENINGS LOCATED NEAR LA CONCHITA AND MUSSEL SHOALS AND TANK FARM.Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCORRIDOR MOBILITY PROGRAM 76,900 76,900 76,900 76,900STATE CASH - IPP PRIOR 260 260 260 260STATE CASH - IIP 10,600 10,600 10,600 10,600VEN070201 Total 10,600 260 76,900 87,760 87,760 87,760

Print Date: 4/30/2014 4:13:14 PM Page: 8 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 9: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN080401 Ventura SCCAB REG0701 PLN40 118 .5 17.9 S EXEMPT - 93.126 0

Description: PTC 271 Agency CALTRANS

ROUTE 118 FROM ROUTE 126 IN VENTURA TO ROUTE 23 IN MOORPARK - PLANNING/FEASIBILITY STUDY OF POTENTIAL IMPROVEMENTS. TCSP EARMARK 08CA005 EA 28750 PPNO 4407

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalNATIONAL PARK SERVICE FUNDS

45 45 45 45

TRANS AND COMM AND SYS PRESRV PILOT PROG

226 226 226 226

VEN080401 Total 271 271 271 271

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment12020 Ventura SCCAB 12020 CAX63 118 16.9 17.3 S NON-FEDERAL/NON-

REGIONAL0

Description: PTC 950 Agency MOORPARK

IN MOORPARK LOS ANGELES AVE WIDEN FROM 4 TO 6 LANES BETWEEN MAUREEN AND LETA YANCY

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCITY FUNDS 950 950 950 95012020 Total 950 950 950 950

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN071106 Ventura SCCAB VEN071106 CAX63 118 27.3 32.6 S NON-EXEMPT 0

Description: PTC 29,717 Agency CALTRANS

IN SIM VLY WIDEN RTE 118 WB LA CONTY LN TO TAPO CYN FR 3 TO 4 LANES (TAPO CYN TO KUEHNER) AND FR 4 TO 5 LANES (KUEHNER TO COUNTY LN); WIDEN EB TAPO CYN TO TAPO FR 3 TO 4 LANES; WIDEN EB KUEHNER TO LA CNTY LINE FR 4 TO 5 LANFund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - REGIONAL SURFACE TRANSPORTATION PROGRAM

6,507 6,507 6,507 6,507

STATE CASH - RIP 1,206 22,004 23,210 23,210 23,210VEN071106 Total 1,206 28,511 29,717 29,717 29,717

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVENLS06 Ventura SCCAB REG0701 SHP01 999 S EXEMPT - 93.126 0

Description: PTC 3,341 Agency CALTRANS

GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - CALTRANS MINOR PROGRAM Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Pavement resurfacing and/or rehabilitationFund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSHOPP ADVANCE CONSTRUCTION (AC) - CT MINOR

3,341 3,341 3,341 3,341

VENLS06 Total 3,341 3,341 3,341 3,341

Print Date: 4/30/2014 4:13:14 PM Page: 9 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 10: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090202 Ventura SCCAB REG0702 PAR04 T EXEMPT - 93.126 0

Description: PTC 180 Agency CALTRANS

FOUR (4) REPLACEMENT MINIVANS FOR ARC VENTURA COUNTY

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5310 ELD AND DISABI 160 160 160 160PRIVATE FUNDS 20 20 20 20VEN090202 Total 180 180 180 180

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN081004 Ventura SCCAB 5TL0703 BUN93 T EXEMPT - 93.126 0

Description: PTC 100 Agency CAMARILLO

PURCHASE ONE (1) EXPANSION DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 80 80 80 80CITY FUNDS 20 20 20 20VEN081004 Total 100 100 100 100

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN081005 Ventura SCCAB 5TL0703 BUR04 T EXEMPT - 93.126 0

Description: PTC 100 Agency CAMARILLO

PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 80 80 80 80CITY FUNDS 20 20 20 20VEN081005 Total 100 100 100 100

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090701 Ventura SCCAB 5TL0703 PAN93 T EXEMPT - 93.126 0

Description: PTC 100 Agency CAMARILLO

PURCHASE ONE (1) EXPANSION DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE.

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 80 80 80 80CITY FUNDS 20 20 20 20VEN090701 Total 100 100 100 100

Print Date: 4/30/2014 4:13:14 PM Page: 10 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 11: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090702 Ventura SCCAB 5TL0703 PAR16 T EXEMPT - 93.126 0

Description: PTC 100 Agency CAMARILLO

PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 80 80 80 80CITY FUNDS 20 20 20 20VEN090702 Total 100 100 100 100

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090705 Ventura SCCAB 5TL0707 TRNH6 T EXEMPT - 93.126 0

Description: PTC 24 Agency CAMARILLO

BUS SHELTER AT CENTRAL AVENUE AND DEL NORTE TRANSFER LOCATION

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 24 24 24 24VEN090705 Total 24 24 24 24

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN101103 Ventura SCCAB 5TL0703 PAN93 T EXEMPT - 93.126 0

Description: PTC 150 Agency CAMARILLO

THREE (3) MINIVANS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE SYSTEM EXPANSION

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 120 120 120 120CITY FUNDS 30 30 30 30VEN101103 Total 150 150 150 150

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN057416 Ventura SCCAB REG0702 BUO00 T EXEMPT - 93.126 0

Description: PTC 150 Agency GOLD COAST TRANSIT

SCHEDULING / RUN CUTTING SYSTEM

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 120 120 120 120LOCAL TRANS FUNDS 30 30 30 30VEN057416 Total 150 150 150 150

Print Date: 4/30/2014 4:13:15 PM Page: 11 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 12: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090106 Ventura SCCAB REG0702 VEN03 T EXEMPT - 93.126 0

Description: PTC 185 Agency GOLD COAST TRANSIT

FOUR (4) TRANSIT SUPERVISORY VEHICLES AND RELATED EQUIPMENT FOR REPLACEMENT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 185 185 185 185VEN090106 Total 185 185 185 185

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090107 Ventura SCCAB VEN090107 BUN94 T TCM Committed 0

Description: PTC 3,608 Agency GOLD COAST TRANSIT

EIGHT (8) CNG-FUELED 25-FOOT TO 40-FOOT BUSES FOR EXPANSION. BUSES WILL BE USED ON ALL GOLD COAST LINES TO REDUCE SPARE RATIO AND INCREASE FREQUENCY WHERE WARRANTED BY DEMAND.Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 3,608 3,608 3,608 3,608VEN090107 Total 3,608 3,608 3,608 3,608

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090108 Ventura SCCAB REG0702 TRN08 T EXEMPT - 93.126 0

Description: PTC 600 Agency GOLD COAST TRANSIT

FAREBOX SYSTEM UPGRADE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 600 600 600 600VEN090108 Total 600 600 600 600

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090109 Ventura SCCAB REG0702 TRN06 T EXEMPT - 93.126 0

Description: PTC 30 Agency GOLD COAST TRANSIT

CAMERA SYSTEM FOR SUPERVISORY AND SUPPORT VEHICLES

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalPUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.

30 30 30 30

VEN090109 Total 30 30 30 30

Print Date: 4/30/2014 4:13:15 PM Page: 12 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 13: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090201 Ventura SCCAB VEN090201 SHP01 T TCM 0

Description: PTC 866 Agency GOLD COAST TRANSIT

MARKET/VALENTINE INDUSTRIAL PARK SHUTTLE SERVICE ON MARKET STREET, VALENTINE ROAD, AND TELEPHONE ROAD

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 866 866 866 866VEN090201 Total 866 866 866 866

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090708 Ventura SCCAB REG0702 ADR55 T EXEMPT - 93.126 0

Description: PTC 2,091 Agency GOLD COAST TRANSIT

MODERNIZE TRANSIT OPERATIONS FACILITY

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 2,091 2,091 2,091 2,091VEN090708 Total 2,091 2,091 2,091 2,091

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110108 Ventura SCCAB 5TL04 BUO00 T TCM Committed 0

Description: PTC 1,701 Agency GOLD COAST TRANSIT

OPERATING ASSISTANCE - VINEYARD AVENUE LINE THREE YEAR DEMONSTRATION (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDIT OF $195.). Service ends 2014/15.

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 1,701 1,701 1,701 1,701VEN110108 Total 1,701 1,701 1,701 1,701

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN54149 Ventura SCCAB VEN54149 BUN07 T EXEMPT - 93.126 0

Description: PTC 125 Agency GOLD COAST TRANSIT

TWO-WAY RADIO SYSTEM REPLACEMENT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 100 100 100 100LOCAL TRANS FUNDS 25 25 25 25VEN54149 Total 125 125 125 125

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN991203 Ventura SCCAB VEN991203 BUN07 T EXEMPT - 93.126 0

Description: PTC 175 Agency GOLD COAST TRANSIT

INSTALLATION OF ABOVE GROUND HOIST SYSTEM

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 140 140 140 140

Print Date: 4/30/2014 4:13:15 PM Page: 13 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 14: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

LOCAL TRANS FUNDS 35 35 35 35VEN991203 Total 175 175 175 175

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN030609 Ventura SCCAB VEN030609 TRRH6 T EXEMPT - 93.126 0

Description: PTC 13 Agency MOORPARK

METROLINK STATION SECURITY WALL (TRANSIT ENHANCEMENT)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 10 10 10 10CITY FUNDS 3 3 3 3VEN030609 Total 13 13 13 13

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN081003 Ventura SCCAB REG0702 T EXEMPT - 93.126 0

Description: PTC 112 Agency MOORPARK

ONE (1) FIXED-ROUTE BUS FOR REPLACEMENT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 90 90 90 90LOCAL TRANS FUNDS 22 22 22 22VEN081003 Total 112 112 112 112

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090104 Ventura SCCAB RRC0702 BUR17 T EXEMPT - 93.126 0

Description: PTC 1,260 Agency MOORPARK

Purchase 3 replacement buses.

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 1,260 1,260 1,260 1,260VEN090104 Total 1,260 1,260 1,260 1,260

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090703 Ventura SCCAB REG0702 PAO00 T EXEMPT - 93.126 0

Description: PTC 52 Agency MOORPARK

ADA PARATRANSIT SERVICE- OPERATING ASSISTANCE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 52 52 52 52VEN090703 Total 52 52 52 52

Print Date: 4/30/2014 4:13:15 PM Page: 14 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 15: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110605 Ventura SCCAB REG0702 TRRH6 T EXEMPT - 93.126 0

Description: PTC 59 Agency MOORPARK

MOORPARK RAIL STATION UPGRADES INCLUDING PLANTING/IRRIGATION UPGRADE, TICKET MACHINES RELOCATION, STRIPING AND PAINTING, LIGHTING IMPROVEMENTS

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 47 47 47 47CITY FUNDS 12 12 12 12VEN110605 Total 59 59 59 59

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN051202 Ventura SCCAB 5TL0701 NCN86 T EXEMPT - 93.126 0

Description: PTC 312 Agency OJAI

MULTI-AGENCY TRANSPORTATION / VEHICLE FACILITY (INCLUDING OJAI TROLLEY MAINTENANCE FACILITY)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5309(c) BUS 250 250 250 250CITY FUNDS 62 62 62 62VEN051202 Total 312 312 312 312

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090116 Ventura SCCAB REG0702 BUR17 T EXEMPT - 93.126 0

Description: PTC 466 Agency OJAI

THREE FIXED-ROUTE BUSES FOR REPLACEMENT - OJAI TROLLEY

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5311 466 466 466 466VEN090116 Total 466 466 466 466

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN030610 Ventura SCCAB 5TL0707 NCR90 T NON-EXEMPT 0

Description: PTC 450 Agency SAN BUENAVENTURA

MILLS RD AT TELEGRAPH RD - TRANSFER CENTER BUS SHELTERS, BIKE RACKS, BENCHES, & OTHER BUS STOP AMENITIES

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 88 310 398 398 398CITY FUNDS 12 40 52 52 52VEN030610 Total 100 350 450 450 450

Print Date: 4/30/2014 4:13:15 PM Page: 15 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 16: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN061007 Ventura SCCAB VEN061007 TRRH6 T TCM Committed 0

Description: PTC 359 Agency SAN BUENAVENTURA

MILLS ROAD AT TELEGRAPH ADJACENT TO PACIFIC VIEW MALL - BUS TURNOUTS WITH BUS SHELTERS, AND OTHER BUS STOP AMENITIES, PLUS STANDARD BUS SHELTERS CITYWIDE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 310 310 310 310CITY FUNDS 49 49 49 49VEN061007 Total 359 359 359 359

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN011219 Ventura SCCAB VEN011219 TRN07 T EXEMPT - 93.126 0

Description: PTC 484 Agency SIMI VALLEY

BUS WASHER REPLACEMENT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 387 387 387 387CITY FUNDS 97 97 97 97VEN011219 Total 484 484 484 484

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN020901 Ventura SCCAB VEN020901 BUN07 T EXEMPT - 93.126 0

Description: PTC 96 Agency SIMI VALLEY

FUEL TANK REMEDIATION - MTBE PROJECT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 76 76 76 76CITY FUNDS 20 20 20 20VEN020901 Total 96 96 96 96

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN031241 Ventura SCCAB VEN031241 BUO00 T EXEMPT - 93.126 0

Description: PTC 10 Agency SIMI VALLEY

SAFETY AND SECURITY PLANNING AND TRAINING

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 8 8 8 8CITY FUNDS 2 2 2 2VEN031241 Total 10 10 10 10

Print Date: 4/30/2014 4:13:15 PM Page: 16 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 17: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN055406 Ventura SCCAB REG0702 PAR17 T EXEMPT - 93.126 0

Description: PTC 523 Agency SIMI VALLEY

FIVE REPLACEMENT PARATRANSIT VANS

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 195 195 195 195CITY FUNDS 328 328 328 328VEN055406 Total 523 523 523 523

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN055409 Ventura SCCAB VEN055409 PAR17 T EXEMPT - 93.126 0

Description: PTC 302 Agency SIMI VALLEY

THREE REPLACEMENT PARATRANSIT VANS - CARRYOVER FROM PRIOR YEAR

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 (FHWA TRANSFER FUNDS)

202 202 202 202

CITY FUNDS 100 100 100 100VEN055409 Total 302 302 302 302

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN055412 Ventura SCCAB VEN055412 PAR17 T EXEMPT - 93.126 0

Description: PTC 317 Agency SIMI VALLEY

THREE (3) REPLACEMENT PARATRANSIT VANS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDIT OF $36 IN FY 10/11.)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 317 317 317 317VEN055412 Total 317 317 317 317

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090110 Ventura SCCAB REG0702 TRRH6 T EXEMPT - 93.126 0

Description: PTC 484 Agency SIMI VALLEY

REPLACE/UPGRADE TRANSIT SHELTERS AND ADD NEW SHELTERS

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 484 484 484 484VEN090110 Total 484 484 484 484

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN091202 Ventura SCCAB REG0702 TRN06 T EXEMPT - 93.126 0

Description: PTC 4 Agency SIMI VALLEY

ONE (1) REPLACEMENT COLOR LASER JET PRINTER

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 3 3 3 3

Print Date: 4/30/2014 4:13:15 PM Page: 17 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 18: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

CITY FUNDS 1 1 1 1VEN091202 Total 4 4 4 4

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090117 Ventura SCCAB REG0702 TRN09 T EXEMPT - 93.126 0

Description: PTC 2,480 Agency SOUTHERN CALIF REGIONAL RAIL AUTHORITY

POSITIVE TRAIN CONTROL SYSTEM - VENTURA COUNTY FUNDING SHARE OF FIVE-COUNTY PROJECT ALSO IN L.A., ORANGE, RIVERSIDE AND SAN BERNARDINO COUNTIES

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 2,480 2,480 2,480 2,480VEN090117 Total 2,480 2,480 2,480 2,480

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090709 Ventura SCCAB REG0702 COO00 T EXEMPT - 93.126 0

Description: PTC 582 Agency SOUTHERN CALIF REGIONAL RAIL AUTHORITY

OPERATING ASSISTANCE - METROLINK

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 582 582 582 582VEN090709 Total 582 582 582 582

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN091118 Ventura SCCAB 5TL0706 NCR86 T EXEMPT - 93.126 0

Description: PTC 960 Agency SOUTHERN CALIF REGIONAL RAIL AUTHORITY

GROUPED PROJECTS FOR RECON/RENOV O TRANSIT BUILDINGS & STRUCT - CENTRAL MAINTENANCE FACILITY & KELLER STREET YARD Scope: Projects consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Recon/renov of transit buildings and structures (e.g., rail or bus buildings, storage and maintenance facilities, stations, terminals, and ancillary structures).(non-capacity Increasing)Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 960 960 960 960VEN091118 Total 960 960 960 960

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN056402 Ventura SCCAB REG0702 BUN07 T EXEMPT - 93.126 0

Description: PTC 253 Agency THOUSAND OAKS

EXPANSION OF CNG TIME FILL AND GAS STORAGE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 73 149 222 222 222CITY FUNDS 10 21 31 31 31VEN056402 Total 83 170 253 253 253

Print Date: 4/30/2014 4:13:15 PM Page: 18 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 19: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090105 Ventura SCCAB REG0702 PAR17 T EXEMPT - 93.126 0

Description: PTC 425 Agency THOUSAND OAKS

FIVE LARGE 12 PASSENGER CUTAWAY VEHICLES FOR PARATRANSIT FOR REPLACEMENT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 425 425 425 425VEN090105 Total 425 425 425 425

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN101102 Ventura SCCAB 5TL0702 PLN40 T EXEMPT - 93.126 0

Description: PTC 50 Agency THOUSAND OAKS

TRANSIT MARKETING

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 40 40 40 40CITY FUNDS 10 10 10 10VEN101102 Total 50 50 50 50

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110110 Ventura SCCAB REG0702 BUR17 T EXEMPT - 93.126 0

Description: PTC 1,261 Agency THOUSAND OAKS

PURCHASE TWO CNG TRANSIT BUSES FOR REPLACEMENT AND TWO TRANSIT SERVICE VEHICLES FOR EXPANSION PLUS ADDITIONAL FARE EQUIPMENT (CMAQ INCLUDES TRANSIT DEVELOPMENT CREDITS OF $53 IN FY 2011/12)Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 788 788 788 788CITY FUNDS 50 50 50 50PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.

423 423 423 423

VEN110110 Total 1,261 1,261 1,261 1,261

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110111 Ventura SCCAB 5TL04 BUO00 T TCM Committed 0

Description: PTC 568 Agency THOUSAND OAKS

EXTEND OPERATING HOURS FOR THOUSAND OAKS FIXED ROUTE AND DIAL A RIDE SYSTEMS. Service ends 7/1/2014.

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalCMAQ 480 480 480 480CITY FUNDS 88 88 88 88VEN110111 Total 568 568 568 568

Print Date: 4/30/2014 4:13:15 PM Page: 19 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 20: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110603 Ventura SCCAB REG0702 TRR06 T EXEMPT - 93.126 0

Description: PTC 69 Agency THOUSAND OAKS

REPLACE PHONE SYSTEM FOR DIAL-A-RIDE CALL-IN CENTER

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 55 55 55 55CITY FUNDS 14 14 14 14VEN110603 Total 69 69 69 69

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110604 Ventura SCCAB 5TL0707 TRN08 T EXEMPT - 93.126 0

Description: PTC 127 Agency THOUSAND OAKS

REPLACE FAREBOXES AND INSTALL AUTOMATIC STOP ANNUNCIATORS

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 102 102 102 102CITY FUNDS 25 25 25 25VEN110604 Total 127 127 127 127

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110901 Ventura SCCAB 5TL0703 PAN93 T EXEMPT - 93.126 0

Description: PTC 44 Agency VARIOUS AGENCIES

ONE EXPANSION MINIVAN IN FISCAL YEAR 10/11 FOR HELP OF OJAI (5310 INCLUDES $5,047 OF TOLL CREDITS)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5310 ELD AND DISABI 44 44 44 44VEN110901 Total 44 44 44 44

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN110902 Ventura SCCAB 5TL0707 PAN07 T EXEMPT - 93.126 0

Description: PTC 3 Agency VARIOUS AGENCIES

GPS UNITS FOR CAMARILLO HEALTH CARE DISTRICT PARATRANSIT VEHICLES IN FISCAL YEAR 2010/11 (5310 INCLUDES $321 TOLL CREDITS)

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5310 ELD AND DISABI 3 3 3 3VEN110902 Total 3 3 3 3

Print Date: 4/30/2014 4:13:15 PM Page: 20 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 21: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN050301 Ventura SCCAB REG0703 NCN31 T EXEMPT - 93.126 0

Description: PTC 500 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)

FARM RAILROAD CROSSING IMPROVEMENTS IN VENTURA COUNTY

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSECTION 115 50 450 500 500 500VEN050301 Total 50 450 500 500 500

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN070204 Ventura SCCAB 5TL0707 ITS03 T TCM Committed 0

Description: PTC 420 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)

SMARTCARD UPGRADE

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalSTP LOCAL - REGIONAL 381 381 381 381LOCAL TRANS FUNDS 39 39 39 39VEN070204 Total 420 420 420 420

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090115 Ventura SCCAB REG0702 PAR16 T EXEMPT - 93.126 0

Description: PTC 259 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)

FIVE REPLACEMENT PARATRANSIT VEHICLES FOR CAMARILLO HEALTH CARE DISTRICT

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 259 259 259 259VEN090115 Total 259 259 259 259

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090502 Ventura SCCAB 5TL0707 LUM04 T EXEMPT - 93.126 0

Description: PTC 151 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)

TRANSIT ENHANCEMENTS

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalFTA 5307 UZA FORMULAR 40 40 40 40ARRA - FTA 5307 101 101 101 101CITY FUNDS 10 10 10 10VEN090502 Total 151 151 151 151

Print Date: 4/30/2014 4:13:15 PM Page: 21 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose

Page 22: 2013 Federal Transportation Improvement Program - …ftip.scag.ca.gov/Documents/13FTIP_Prior_Amend13_0118VEN.pdf · 2013 Federal Transportation Improvement Program ... 2013 Federal

2013 Federal Transportation Improvement Program

Ventura County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1-18(In $000`s)

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN090707 Ventura SCCAB REG0702 TRN06 T EXEMPT - 93.126 0

Description: PTC 10 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)

PURCHASE TWO (2) WHEELCHAIR-SIZE SCALES FOR USE IN ADA CERTIFICATION

Fund ENG R/W CON Total Prior 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 TotalARRA - FTA 5307 10 10 10 10VEN090707 Total 10 10 10 10

Grand Total 20,785 27,720 355,568 404,073 404,073 404,073

Print Date: 4/30/2014 4:13:15 PM Page: 22 of 22

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2013 FTIP for this purpose