2013 CREA Energy Innovation Summit 2 MW Solar Project. Location of Project. Hwy 7 & Colo Blvd in Adams County. Electricity Production. Hangar 160 Solar Field Commissioned Dec 2012 Maximum Output – 2 MW Energy Output 3,400 MWh / yr 0.25% of United Powers annual energy needs - PowerPoint PPT Presentation
Citation preview
2013 CREAEnergy
Innovation Summit
2 MW Solar Project
1
Location of Project
• Hwy 7 & Colo Blvd in Adams County
2
Electricity ProductionHangar 160 Solar Field
• Commissioned Dec 2012• Maximum Output – 2 MW• Energy Output• 3,400 MWh /yr• 0.25% of United Powers
annual energy needs• Supply 300 -350 homes/yr
3
Generation Overview
4
7,600 solar panels 300 watts (DC) / panel 25 yr warranty
Racking System Wind tested – 120 mph All Steel
RPS Station (2) Inverters – 1,000 V UL 1.85 MVA Transformer
Combiner Box 19 panel strings 400 panels / string
Monitoring Real-time @ Individual string level
Solar Overview
Capacity Factors
• Solar 18 to 20 %• Wind 35 to 45 %• Baseload 85 to 95 %
5
12:00:00 AM
01:00:00 AM
02:00:00 AM
03:00:00 AM
04:00:00 AM
05:00:00 AM
06:00:00 AM
07:00:00 AM
08:00:00 AM
09:00:00 AM
10:00:00 AM
11:00:00 AM
12:00:00 PM
01:00:00 PM
02:00:00 PM
03:00:00 PM
04:00:00 PM
05:00:00 PM
06:00:00 PM
07:00:00 PM
08:00:00 PM
09:00:00 PM
10:00:00 PM
11:00:00 PM
12:00:00 AM0
500
1000
1500
2000
2500
BaseloadSolarWind
Business Case
6
Renewable Resource 3 to 1 multiplier 0.73 % of RPS
Local Contractors Samuel Engineering HT Solar - Mechanical E Light - Electric Atlas Landscaping
Construction
3 Months / Oct - Dec Primary Metered Realtime data –
connected to SCADA
Hangar 160 Solar Field
United Power
Tri-State Policy 115Bill Credit Option
kwh
$$
$$
kwh
Community
7
• Good for the Environment• Reduces CO2 Emissions by 5,000 metric tons• Equivalent to planting 750 trees or taking 750 cars off the road
• Good for the Economy• Local generation creates local construction jobs
• Good for United Power• Cost of Energy is predictable and stable• Helps meet RPS requirements• Net benefit to all co-op members
Renewable Generation & RPS
• Continue to develop projects that benefit overall membership
• Enhances community presence and co-op reputation
• Provides hedge against rising energy prices
• Needed to meet higher RPS requirements
• Working with Tri-State to develop these small DG projects
8