2013 - 2015 Electric and Natural Gas Conservation and
Load Management Plan
Submitted by:
The Connecticut Light and Power Company
The United Illuminating Company
Yankee Gas Services Company
Connecticut Natural Gas Corporation and
Southern Connecticut Gas Company
Docket No. 12-11-XX
November 1, 2012
Table of Contents
CHAPTER ONE: OVERVIEW (Electric and Natural Gas).................................................................................. 1
Historical & Three Year Plan Highlights .................................................................................................... 6
2013-2015 Priorities ................................................................................................................................ 10
Current Funding Sources ......................................................................................................................... 14
Future and Potential Funding Sources and Challenges .......................................................................... 17
Codes, Standards and Changes in the Market Process ........................................................................... 17
Energy Efficiency Board ........................................................................................................................... 18
Performance Contracting ........................................................................................................................ 18
Long Term Program Planning ................................................................................................................. 19
CHAPTER TWO: INCREASED SAVINGS BUDGET TABLES/EXCEL FILES (EDCs and LDCs) .............................. 21
Electric Distribution Company (EDC) Combined Tables – The Connecticut Light and Power Company
and the United Illuminating Company .................................................................................................... 23
Table A1 – Combined CL&P and UI Increased Savings Budgets .......................................................... 24
Table A2- CL&P and UI Increased Savings Funding Sources ............................................................... 25
A1 Pie 2013 ......................................................................................................................................... 26
A1 Pie 2014 ......................................................................................................................................... 27
A1 Pie 2015 ......................................................................................................................................... 28
Table B2 – 2013 – Statewide Total Resource Costs and Benefits ....................................................... 29
Table B2 – 2014 - Statewide Total Resource Costs and Benefits ........................................................ 30
Table B2 – 2015 - Statewide Total Resource Costs and Benefits ........................................................ 31
The Connecticut Light & Power Company 2013-2015 Increased Savings Budget Tables ....................... 33
Table A – CL&P 2013-2015-Increased Savings Budget........................................................................ 34
Table A Pie 2013 .................................................................................................................................. 35
Table A Pie 2014 .................................................................................................................................. 36
Table A Pie 2015 .................................................................................................................................. 37
Table B 2013 – CL&P Comparison of Conservation Programs - Increased Savings Budget ................ 38
Table B 2014 – CL&P Comparison of Conservation Programs - Increased Savings Budget ................ 39
Table B 2015 – CL&P Comparison of Conservation Programs - Increased Savings Budget ................ 40
Table B1 2013 – CL&P Comparison of Program Benefits - Increased Savings Budget ....................... 41
Table B1 2014 – CL&P Comparison of Program Benefits - Increased Savings Budget ....................... 42
Table B1 2015 – CL&P Comparison of Program Benefits - Increased Savings Budget ....................... 43
Table C 2013 – CL&P Increased Savings Budget ................................................................................. 44
Table C Pie 2013 .................................................................................................................................. 45
Table C 2014 - CL&P Increased Savings Budget .................................................................................. 46
Table C Pie 2014 .................................................................................................................................. 47
Table C 2015 - CL&P Increased Savings Budget .................................................................................. 48
Table C Pie 2015 .................................................................................................................................. 49
Table D – CL&P Historical and Projected Program Expenditures ....................................................... 50
Table D1 – C&LP Historical and Projected Annual kW ........................................................................ 51
Table D2 – CL&P Historical and Projected Annual kWh ...................................................................... 52
Table D3 – CL&P Historical and Projected Lifetime kWh .................................................................... 53
Table D4 – CL&P Historical and Projected Units ................................................................................. 54
CL&P Performance Incentive 2013 ..................................................................................................... 55
CL&P Performance Incentive 2013 (Cont.) ......................................................................................... 56
CL&P Performance Incentive 2014 ..................................................................................................... 57
Performance Incentive 2014 (Cont.) ................................................................................................... 58
CL&P Performance Incentive 2015 ..................................................................................................... 59
Performance Incentive 2015 (Cont) .................................................................................................... 60
The United Illuminating Company 2013-2014 Increased Savings Budget Tables ................................... 61
Table A - UI 2013-2015 Increased Savings Budget ............................................................................. 62
Table A Pie 2013 .................................................................................................................................. 63
Table A Pie 2014 .................................................................................................................................. 64
Table A Pie 2015 .................................................................................................................................. 65
Table B 2013 – UI Comparison of Conservation Programs ................................................................. 66
Table B 2014 – UI Comparison of Conservation Programs ................................................................. 67
Table B 2015 - UI Comparison of Conservation Programs .................................................................. 68
Table B1 2013 – UI Comparison of Program Benefits Increased Savings ........................................... 69
Table B1 2014 – UI Comparison of Program Benefits Increased Savings ........................................... 70
Table B1 2015 – UI Comparison of Program Benefits Increased Savings ........................................... 71
Table C 2013 – UI Increased Savings Budget ...................................................................................... 72
Table C Pie 2013 .................................................................................................................................. 73
Table C 2014 – UI Increased Savings Budget ...................................................................................... 74
Table C Pie 2014 .................................................................................................................................. 75
Table C 2015 – Increased Savings Budget ........................................................................................... 76
Table C Pie 2015 .................................................................................................................................. 77
Table D – UI Historical and Projected Program Expenditures ............................................................ 78
Table D1 – UI Historical and Projected Annual kW ............................................................................. 79
Table D2 – UI Historical and Projected Annual kWh and Lifetime kWh ............................................. 80
UI Performance Incentive 2013 .......................................................................................................... 81
UI Performance Incentive 2014 .......................................................................................................... 84
UI Performance Incentive 2015 .......................................................................................................... 87
Combined Natural Gas Companies 2013-2015 - Increased Savings Budget Tables ............................... 91
Table A1 – 2012-2013 Combined Natural Gas Companies Increased Savings Plan ............................ 92
Table A1 – 2013-2015 Combined Natural Gas Companies Increased Savings Plan ............................ 93
Table A2 – 2013-2015 Combined Natural Gas Companies Increased Savings Funding Sources ........ 94
A1 Pie 2013 ......................................................................................................................................... 95
A1 Pie 2014 ......................................................................................................................................... 96
A1 Pie 2015 ......................................................................................................................................... 97
Table B – 2013 Comparison of Natural Gas Conservation Programs – Increased Savings Budget ..... 98
Table B – 2014 Comparison of Natural Gas Conservation Programs – Increased Savings Budget ..... 99
Table B – 2015 Comparison of Natural Gas Conservation Programs – Increased Savings Budget ... 100
Tables – The Yankee Gas Services Company 2013-2015 Increased Savings Budget Tables ................. 101
Table A .............................................................................................................................................. 102
Table A Pie 2013 ................................................................................................................................ 103
Table A Pie 2014 ................................................................................................................................ 104
Table A Pie 2015 ................................................................................................................................ 105
Table C - Yankee Gas 2013 Increased Savings Program Budget by Category ................................... 106
Table C Pie 2013 ................................................................................................................................ 107
Table C - Yankee Gas 2014 Increased Savings Program Budget by Category ................................... 108
Table C Pie 2014 ................................................................................................................................ 109
Table C - Yankee Gas 2015 Increased Savings Program Budget by Category ................................... 110
Table C Pie 2015 ................................................................................................................................ 111
Table D1 – YGS Historical and Projected Program Expenditures ...................................................... 112
Table D2 – YGS Historical and Projected Program Units .................................................................. 113
Table D3 – YGS Historical and Projected Annual CCF and Lifetime CCF ........................................... 114
YGS Performance Incentive 2013 ..................................................................................................... 115
YGS Performance Incentive 2014 ..................................................................................................... 116
YGS Performance Incentive 2015 ..................................................................................................... 117
The Connecticut Natural Gas Corporation 2013-2015 Increased Savings Budget Tables .................... 119
Table A .............................................................................................................................................. 120
Table A Pie 2013 ................................................................................................................................ 121
Table A Pie 2014 ................................................................................................................................ 122
Table A Pie 2015 ................................................................................................................................ 123
Table C 2013 CNG Increased Savings Program Expenditures by Category ....................................... 124
Table C Pie 2013 ................................................................................................................................ 125
Table C 2014 CNG Increased Savings Program Expenditures by Category ....................................... 126
Table C Pie 2014 ................................................................................................................................ 127
Table C 2015 CNG Increased Savings Program Expenditures by Category ....................................... 128
Table C Pie 2015 ................................................................................................................................ 129
Table D – CNG Historical and Projected Program Expenditures and Units ...................................... 130
Table D1 – CNG Historical and Projected Lifetime CCF and Annual CCF .......................................... 131
CNG 2013 Performance Incentive ..................................................................................................... 132
CNG 2014 Performance Incentive ..................................................................................................... 133
CNG 2015 Performance Incentive ..................................................................................................... 134
The Southern Connecticut Gas Company 2013-2015 Increased Savings Budget Tables ...................... 135
Table A .............................................................................................................................................. 136
Table A Pie 2013 ................................................................................................................................ 137
Table A Pie 2014 ................................................................................................................................ 138
Table A Pie 2015 ................................................................................................................................ 139
Table C 2013 SCG Increased Savings Program Expenditures by Category ........................................ 140
Table C Pie 2013 ................................................................................................................................ 141
Table C 2014 SCG Increased Savings Program Expenditures by Category ........................................ 142
Table C Pie 2014 ................................................................................................................................ 143
Table C 2015 SCG Increased Savings Program Expenditures by Category ........................................ 144
Table C Pie 2015 ................................................................................................................................ 145
Table D SCG Historical and Projected Program Spending and Units ................................................ 146
Table D1 – SCG Historical and Projected Annual CCF and Lifetime CCF ........................................... 147
SCG 2013 Performance Incentive ..................................................................................................... 148
SCG 2014 Performance Incentive ..................................................................................................... 149
SCG 2015 Performance Incentive ..................................................................................................... 150
CHAPTER THREE: RESIDENTIAL PROGRAMS (Electric and Natural Gas) .................................................. 151
Overview ............................................................................................................................................... 151
Residential Retail Products (Electric) .................................................................................................... 156
Residential New Construction (Electric and Natural Gas) .................................................................... 164
Home Energy Solutions (Electric and Natural Gas) ............................................................................... 180
Residential Water Heating Program (Electric and Natural Gas) ........................................................... 196
Residential Behavior/Engagement Program (Electric and Natural Gas) ............................................... 200
CHAPTER FOUR: COMMERCIAL AND INDUSTRIAL PROGRAMS (Electric and Natural Gas) ..................... 208
Overview ............................................................................................................................................... 209
C&I NEW CONSTRUCTION ..................................................................................................................... 222
Energy Conscious Blueprint (Electric and Natural Gas) ........................................................................ 222
C&I RETROFIT ........................................................................................................................................ 227
Energy Opportunities: (Electric and Natural Gas) ............................................................................. 227
Small Business Energy Advantage (Electric and Natural Gas) ........................................................... 232
Business and Energy Sustainability Program .................................................................................... 237
Retro-Commissioning (RCx) (Electric and Natural Gas) ........................................................................ 239
PRIME (Process Re-engineering for Increased Manufacturing Efficiency) (Electric and Natural Gas) . 243
O&M Services (Electric and Natural Gas).............................................................................................. 245
Business Sustainability Challenge (Electric and Natural Gas) ............................................................... 247
CHAPTER FIVE: EDUCATION and OUTREACH ........................................................................................... 253
Overview ............................................................................................................................................... 253
Clean Energy Communities Program (Electric and Natural Gas) .......................................................... 255
EnergizeCT and Museum Partnerships (Electric) .................................................................................. 263
eesmarts™ (Electric) .............................................................................................................................. 268
CHAPTER SIX: ISO-NE LOAD RESPONSE, RESEARCH, DEVELOPMENT & DEMONSTRATION ..................... 272
ISO-NE Demand Response and Price Responsive Demand (CL&P Only) .............................................. 273
Overview ............................................................................................................................................... 273
Research, Development and Demonstration (Electric and Natural Gas) ............................................. 277
CHAPTER SEVEN: MARKETING .................................................................................................................. 279
Overview ............................................................................................................................................... 279
CHAPTER EIGHT: FINANCING PROGRAMS ................................................................................................ 285
Overview ............................................................................................................................................... 285
SBEA/Municipal Loan Program ............................................................................................................. 289
C&I Energy Efficiency Financing Program (Electric & Gas) ................................................................... 292
C&I Energy Efficiency Financing Program (PURA program) - Docket No. 05-07-21............................. 294
Residential Energy Efficiency Financing (Electric and Natural Gas) ...................................................... 296
CHAPTER NINE: BENEFIT/COST ANALYSIS ................................................................................................. 299
Overview ............................................................................................................................................... 299
CHAPTER TEN: BASE PLAN SCENARIO ....................................................................................................... 313
OVERVIEW ............................................................................................................................................. 313
Combined Connecticut Light and Power Company and The United Illuminating Company 2013-2015
Base Budgets Tables.............................................................................................................................. 319
Table A1 – 2013-2015 Combined Electric Companies Base Budget ................................................. 320
Table A2 – 2013-2015 Combined Electric Companies Funding Sources Base Budget ...................... 321
A1 Pie 2013 ....................................................................................................................................... 322
A1 Pie 2014 ....................................................................................................................................... 323
A1 Pie 2015 ....................................................................................................................................... 324
Table B2 – 2013 Statewide Total Resource Costs and Benefits ........................................................ 325
Table B2 – 2014 Statewide Total Resource Costs and Benefits ........................................................ 326
Table B2 – 2015 Statewide Total Resource Costs and Benefits ........................................................ 327
Connecticut Light & Power – 2013-2015 Base Budget Tables .............................................................. 330
Table A – CL&P 2013-2015 Base Budget ........................................................................................... 332
Table A Pie 2013 ................................................................................................................................ 333
Table A Pie 2014 ................................................................................................................................ 334
Table A Pie 2015 ................................................................................................................................ 335
Table B 2013 – CL&P Comparison of Programs Base Budget ........................................................... 336
Table B 2014– CL&P Comparison of Programs Base Budget ............................................................ 337
Table B 2015– CL&P Comparison of Programs Base Budget ............................................................ 338
Table B1 2013 CL&P Comparison of Program Benefits..................................................................... 339
Table B1 2014 CL&P Comparison of Program Benefits..................................................................... 340
Table B1 2015 CL&P Comparison of Program Benefits..................................................................... 341
Table C 2013 – CL&P Program Expenditures by Category Base Budget ........................................... 342
Table C Pie 2013 ................................................................................................................................ 343
Table C 2014 - CL&P Program Expenditures by Category Base Budget ............................................ 344
Table C Pie 2014 ................................................................................................................................ 345
Table C 2015 - CL&P Program Expenditures by Category Base Budget ............................................ 346
Table C Pie 2015 ................................................................................................................................ 347
Table D – CL&P Historical and Projected Program Expenditures Base Plan ..................................... 348
Table D1 – CL&P Historical and Projected Annual kW Savings Base Plan ........................................ 349
Table D2 – CL&P Historical and Projected Annual kWh – Base Plan ................................................ 350
Table D3 – CL&P Historical and Projected Lifetime kWh – Base Plan............................................... 351
Table D4 – CL&P Historical and Projected Units – Base Plan ............................................................ 352
CL&P Performance Incentive 2013 ................................................................................................... 353
CL&P Performance Incentive 2014 ................................................................................................... 355
CL&P Performance Incentive 2015 ................................................................................................... 357
United Illuminating 2013-2015 Budget Tables - Base Plan ................................................................... 359
Table A .............................................................................................................................................. 360
Table A Pie 2013 ................................................................................................................................ 361
Table A Pie 2014 ................................................................................................................................ 362
Table A Pie 2015 ................................................................................................................................ 363
Table B 2013 UI Comparison of Conservation Programs Base Plan ................................................. 364
Table B 2014 UI Comparison of Conservation Programs Base Plan ................................................. 365
Table B1 2013 UI Comparison of Conservation Programs Base Plan ............................................... 367
Table B1 2014 UI Comparison of Conservation Programs Base Plan ............................................... 368
Table B1 2015 UI Comparison of Conservation Programs Base Plan ............................................... 369
Table C 2013 – UI Program Expenditures by Category ..................................................................... 370
Table C Pie 2013 ................................................................................................................................ 371
Table C 2014 - UI Program Expenditures by Category ...................................................................... 372
Table C Pie 2014 ................................................................................................................................ 373
Table C 2015 UI Program Expenditures by Category ........................................................................ 374
Table C Pie 2015 ................................................................................................................................ 375
Table D – UI Historical and Projected Expenditures - Base Plan ....................................................... 376
Table D – UI Historical and Projected Annual kW Savings – Base Plan ............................................. 377
Table D1 – UI Historical and Projected Annual kWh and Lifetime kWh – Base Plan ........................ 378
UI Performance Incentive 2013 – Base Plan ..................................................................................... 379
UI Performance Incentive 2014 – Base Plan ..................................................................................... 384
UI Performance Incentive 2015 – Base Plan ..................................................................................... 389
The Combined Natural Gas Companies – 2013-2015 Base Budget ...................................................... 394
Table A1 – 2012-2013 Combined Natural Gas - Base Budget ........................................................... 396
Table A1 – 2013-2015 Combined Natural Gas – Base Budget .......................................................... 397
Table A2 – Combined Natural Gas Funding Sources – Base Budget ................................................. 398
A1 Pie 2013 ....................................................................................................................................... 399
A1 Pie 2014 ....................................................................................................................................... 400
A1 Pie 2015 ....................................................................................................................................... 401
Table B – 2013 Comparison of Conservation Programs – Base Budget ............................................ 402
Table B – 2014 Comparison of Conservation Programs – Base Budget ............................................ 403
Table B – 2015 Comparison of Conservation Programs – Base Budget ............................................ 404
The Yankee Gas Services Company – 2013-2015 Base Budget Tables ................................................. 405
Table A .............................................................................................................................................. 406
Table A Pie 2013 ................................................................................................................................ 407
Table A Pie 2014 ................................................................................................................................ 408
Table A Pie 2015 ................................................................................................................................ 409
Table C 2013 – YGS Program Expenditures by Category – Base Budget........................................... 410
Table C Pie 2013 ................................................................................................................................ 411
Table C 2014 – YGS Program Expenditures by Category – Base Budget........................................... 412
Table C Pie 2014 ................................................................................................................................ 413
Table C 2015 – YGS Program Expenditures by Category – Base Budget........................................... 414
Table C Pie 2015 ................................................................................................................................ 415
Table D – YGS Historical and Projected Expenditures and Units – Base Budget .............................. 416
Table D1 – YGS Historical and Projected Annual CCF and Lifetime CCF – Base Plan ........................ 417
Yankee Gas Services 2013 Performance Incentive – Base Plan ........................................................ 419
Yankee Gas Services 2014 Performance Incentive – Base Plan ........................................................ 420
Yankee Gas Services 2015 Performance Incentive – Base Plan ........................................................ 421
The Connecticut Natural Gas Corporation 2013-2015 Base Budget Tables ......................................... 422
Table A .............................................................................................................................................. 424
Table A Pie 2013 ................................................................................................................................ 425
Table A Pie 2014 ................................................................................................................................ 426
Table A Pie 2015 ................................................................................................................................ 427
Table C 2013 – CNG Program Expenditures by Category – Base Plan .............................................. 428
Table C Pie 2013 ................................................................................................................................ 429
Table C 2014 – CNG Program Expenditures by Category – Base Plan .............................................. 430
Table C Pie 2014 ................................................................................................................................ 431
Table C 2015 – CNG Program Expenditures by Category – Base Plan .............................................. 432
Table C Pie 2015 ................................................................................................................................ 433
Table D – 2013-2015 CNG Historical and Projected Expenditures and Units – Base Plan ................ 434
Table D1 – 2013-2015 CNG Historical and Projected Annual CCF and Lifetime CCF – Base Plan ..... 435
CNG – 2013 Performance Incentives – Base Plan ............................................................................. 436
CNG – 2014 Performance Incentives – Base Plan ............................................................................. 437
CNG – 2015 Performance Incentives – Base Plan ............................................................................. 438
The Southern Connecticut Gas Company 2013-2015 Base Budget Tables ........................................... 439
Table A .............................................................................................................................................. 440
Table A Pie 2013 ................................................................................................................................ 441
Table A Pie 2014 ................................................................................................................................ 442
Table A Pie 2015 ................................................................................................................................ 443
Table C 2013 – SCG Program Expenditures by Category – Base Budget .......................................... 444
Table C Pie 2013 ................................................................................................................................ 445
Table C 2014 - SCG Program Expenditures by Category – Base Budget ........................................... 446
Table C Pie 2014 ................................................................................................................................ 447
Table C 2015 - SCG Program Expenditures by Category – Base Budget ........................................... 448
Table C Pie 2015 ................................................................................................................................ 449
Table D – SCG Historical and Projected Expenditures and Units – Base Budget .............................. 450
Table D1 – SCG Historical and Projected Annual CCF and Lifetime CCF – Base Budget ................... 451
SCG – 2013 Performance Incentives – Base Plan .............................................................................. 452
SCG – 2014 Performance Incentives – Base Plan .............................................................................. 453
SCG – 2015Performance Incentives – Base Plan .............................................................................. 454
EXHIBITS .................................................................................................................................................... 455
EXHIBIT I: 2012 PUBLIC COMMENT MATRIX ........................................................................................ 457
EXHIBIT II: ENERGY EFFICIENCY BOARD RESOLUTIONS ....................................................................... 496
EXHIBIT III: PURA COMPLIANCE ORDERS ............................................................................................. 499
UI filed the following in their response to DN 12-02-01 RA-50 on April 30, 2012. ............................ 520
Appendix ................................................................................................................................................... 522
EDC’s Increased Savings Plan ELs and LFs ................................................................................................. 525
Connecticut Light and Power Increased Savings Plan – ELs and LFs ..................................................... 527
CL&P Residential Retail Products (Lighting and Appliances) – Increased Savings Plan .................... 528
CL&P Residential Retail Lighting – Increased Savings Plan ............................................................... 529
CL&P Residential Retail Lighting – Increased Savings Plan ............................................................... 530
CL&P Residential Retail Lighting – Increased Savings Plan ............................................................... 531
CL&P Retail Appliances – Increased Savings Plan ............................................................................. 532
CL&P Appliance Rebate – Increased Savings Plan ............................................................................ 533
CL&P Appliance Rebate – Increased Savings Plan ............................................................................ 534
CL&P Residential New Construction – Increased Savings Plan ......................................................... 535
CL&P – Residential New Construction – Increased Savings Plan ...................................................... 536
CL&P - Residential New Construction – Increased Savings Plan ....................................................... 537
CL&P – Home Energy Solutions – Increased Savings Plan ................................................................ 538
CL&P – Home Energy Solutions – Increased Savings Plan ................................................................ 539
CL&P – Home Energy Solutions – Increased Savings Plan ................................................................ 540
CL&P – Home Energy Solutions – Income Eligible Increased Savings Plan ....................................... 541
CL&P – Home Energy Solutions - Income Eligible – Increased Savings Plan .................................... 543
CL&P Residential Home Energy Reports / Engagement – Increased Savings Plan ........................... 544
CL&P Residential Home Energy Reports / Engagement – Increased Savings Plan ........................... 545
CL&P - ECB – Increased Savings Plan ................................................................................................ 546
CL&P – ECB – Increased Savings Plan ................................................................................................ 547
CL&P – ECB – Increased Savings Plan ................................................................................................ 548
CL&P – Energy Opportunities – Increased Savings Plan ................................................................... 549
CL&P – Energy Opportunities – Increased Savings Plan ................................................................... 550
CL&P – Energy Opportunities – Increased Savings Plan ................................................................... 551
CL&P – O&M Increased Savings Plan ................................................................................................ 552
CL&P – O&M Services - Increased Savings Plan ................................................................................ 553
CL&P – O&M Services – Increased Savings Plan ............................................................................... 554
CL&P – O&M Services – Increased Savings Plan ............................................................................... 555
CL&P – O&M Retro – Increased Savings Plan ................................................................................... 556
CL&P Prime – Increased Savings Plan ............................................................................................... 559
CL&P – SBEA – Increased Savings Plan .............................................................................................. 560
CL&P – Clean Energy Communities - Increased Savings Plan ........................................................... 563
CL&P – Smart Living Center – Increased Savings Plan ...................................................................... 564
CL&P – Science Center – Increased Savings ...................................................................................... 565
CL&P – eeSmarts – Increased Savings Plan ....................................................................................... 566
CL&P Residential Loan Fund – Increased Savings Plan ..................................................................... 568
CL&P - Load Management – Increased Savings Plan ........................................................................ 569
CL&P – RD&D – Increased Savings Plan ............................................................................................ 572
CL&P Administration – Increased Savings Plan ................................................................................. 573
CL&P Planning– Increased Savings Plan ............................................................................................ 573
CL&P Evaluation– Increased Savings Plan ......................................................................................... 574
CL&P Information Technology– Increased Savings Plan ................................................................... 574
UI – Increased Savings Plan – ELs and LFs ................................................................................................. 575
UI - Retail Products – Increased Savings Plan ................................................................................... 576
UI - Retail Products – Increased Savings Plan ................................................................................... 577
UI - Retail Products – Increased Savings Plan ................................................................................... 578
UI – Residential New Construction – Increased Savings Plan ........................................................... 580
UI – Home Energy Solutions - Increased Savings Plan ...................................................................... 584
UI - HES Income Eligible - Increased Savings Plan ............................................................................. 588
UI - Energy Conscious Blueprint– Increased Savings Plan ................................................................ 592
UI - Energy Opportunities– Increased Savings Plan .......................................................................... 596
UI – Small Business– Increased Savings Plan .................................................................................... 600
UI - O&M Services– Increased Savings Plan ...................................................................................... 604
UI – EE Communities / Behavioral Pilot– Increased Savings Plan ..................................................... 608
UI – SmartLiving Center ®– Increased Savings Plan .......................................................................... 609
UI – Science Center– Increased Savings Plan .................................................................................... 612
UI- eeSmarts– Increased Savings Plan .............................................................................................. 613
UI – Residential Loan Fund– Increased Savings Plan ........................................................................ 616
UI – Research, Development & Demonstration– Increased Savings Plan ........................................ 617
UI - Administration– Increased Savings Plan .................................................................................... 618
UI – Planning and Evaluation– Increased Savings Plan ..................................................................... 618
UI – Information Technology– Increased Savings Plan ..................................................................... 619
Yankee Gas Services – Increased Savings Plan – Els and LFs ................................................................ 621
YGS Residential New Construction - 2013-2015 Increased Savings Plan .......................................... 622
YGS Residential New Construction - 2013-2015 Increased Savings Plan .......................................... 623
YGS HES – 2013-2015 Increased Savings Plan .................................................................................. 624
YGS HES – 2013-2015 Increased Savings Plan .................................................................................. 625
YGS HES Income Eligible 2013-2015 Increased Savings .................................................................... 626
YGS Water Heating - 2013-2015 Increased Savings Plan .................................................................. 628
YGS Water Heating - 2013-2015 Increased Savings Plan .................................................................. 629
YGS Energy Conscious Blueprint - 2013-2015 Increased Savings Plan ............................................. 630
YGS Energy Conscious Blueprint - 2013-2015 Increased Savings Plan ............................................. 631
YGS Energy Opportunities - 2013-2015 Increased Savings Plan ....................................................... 632
YGS Energy Opportunities - 2013-2015 Increased Savings Plan ....................................................... 633
YGS O&M - 2013-2015 Increased Savings Plan ................................................................................. 634
YGS O&M - 2013-2015 Increased Savings Plan ................................................................................. 635
YGS SBEA- 2013-2015 Increased Savings Plan .................................................................................. 636
YGS SBEA- 2013-2015 Increased Savings Plan .................................................................................. 637
YGS Smart Living Center & Clean Energy Communities - 2013-2015 Increased Savings Plan .......... 638
Connecticut Natural Gas – Increased Savings Plan – ELs and LFs ......................................................... 639
CNG Residential New Construction - 2013-2015 Increased Savings Plan ........................................ 640
CNG HES - 2013-2015 Increased Savings Plan .................................................................................. 642
CNG Income Eligible - 2013-2015 Increased Savings Plan ................................................................ 644
CNG Water Heating - 2013-2015 Increased Savings Plan ................................................................. 646
CNG Energy Conscious Blueprint - 2013-2015 Increased Savings Plan ............................................ 648
CNG Energy Opportunities - 2013-2015 Increased Savings Plan ...................................................... 650
CNG SBEA - 2013-2015 Increased Savings Plan ................................................................................ 652
CNG O&M Services- 2013-2015 Increased Savings Plan ................................................................... 654
CNG Smart Living Center & Clean Energy Communities - 2013-2015 Increased Savings Plan ......... 656
Southern Connecticut Gas – Increased Savings Plan – Els and LFs ....................................................... 657
SCG Residential New Construction - Increased Savings Plan ............................................................ 658
SCG HES - Increased Savings Plan ..................................................................................................... 660
SCG Income Eligible - Increased Savings Plan ................................................................................... 662
SCG Water Heating - Increased Savings Plan .................................................................................... 664
SCG ECB - Increased Savings Plan ..................................................................................................... 666
SCG ENOPP - Increased Savings Plan ................................................................................................ 668
SCG SBEA - Increased Savings Plan ................................................................................................... 670
SCG O&M - Increased Savings Plan ................................................................................................... 671
SCG CEC and Smart Living - Increased Savings Plan .......................................................................... 674
EDC’s Base Plan ELs and LFs .................................................................................................................. 675
CL&P Base Plan ELs and LFs .................................................................................................................. 677
CL&P Retail Products EL25 – Base Plan ............................................................................................. 678
CL&P Retail Lighting EL25 – Base Plan ............................................................................................. 679
CL&P Retail Lighting LF26 – Base Plan .............................................................................................. 680
CL&P Energy Star Appliances – EL25 – Base Plan ............................................................................. 682
CL&P Energy Star Appliance LF26 – Base Plan .................................................................................. 683
CL&P New Residential Construction EL25 – Base Plan ..................................................................... 685
CL&P New Residential Construction LF26 – Base Plan ..................................................................... 686
CL&P Home Energy Solutions EL25 – Base Plan................................................................................ 689
CL&P Home Energy Solutions FL26 – Base Plan ................................................................................ 690
CL&P Limited Income EL25 – Base Plan ........................................................................................... 693
CL&P Limited Income LF26 – Base Plan ............................................................................................ 694
CL&P Energy Conscience Blueprint EL25 – Base Plan ...................................................................... 696
CL&P Energy Conscience Blueprint LF26 – Base Plan ....................................................................... 697
CL&P Energy Opportunities EL25 – Base Plan ................................................................................... 700
CL&P Energy Opportunities LF26 – Base Plan ................................................................................... 701
CL&P Small Business Energy Advantage EL25 – Base Plan ............................................................... 703
CL&P Small Business Energy Advantage LF26 – Base Plan ............................................................... 704
CL&P O&M Rollup – Base Plan .......................................................................................................... 707
CL&P O&M Services – Base Plan ....................................................................................................... 708
CL&P O&M Services Only – Base Plan ............................................................................................... 709
CL&P O&M Retro Commissioning EL25 – Base Plan ......................................................................... 711
CL&P O&M Retro Commissioning LF26 – Base Plan ......................................................................... 712
CL&P Prime EL25 – Base Plan ............................................................................................................ 714
CL&P Prime LF26 – Base Plan ............................................................................................................ 715
CL&P Clean Energy Communities EL25 – Base Plan .......................................................................... 716
CL&P SmartLiving Center and Museum Partnerships EL25 & LF26 – Base Plan ............................... 717
CL&P eeSmarts EL25 – Base Plan ...................................................................................................... 719
CL&P eeSmarts LF26 – Base Plan ...................................................................................................... 720
CL&P Science Center EL25 – Base Plan ............................................................................................. 723
CL&P Residential Loan Fund (Includes ECLP) – Base Plan ................................................................. 724
CL&P Research, Development and Demonstration EL25 – Base Plan .............................................. 725
CL&P Research, Development and Demonstration LF26 – Base Plan .............................................. 726
CL&P Load Management EL25 – Base Plan ....................................................................................... 727
CL&P Load Management LF26 – Base Plan ....................................................................................... 728
CL&P Administration – Base Plan ...................................................................................................... 730
CL&P Planning EL25 – Base Plan ....................................................................................................... 731
CL&P Evaluation EL25 – Base Plan .................................................................................................... 732
CL&P Information Technology EL25 – Base Plan ............................................................................. 733
UI – Base Plan ELs and LFs..................................................................................................................... 735
UI – Retail Products – Base Plan ....................................................................................................... 736
UI - Residential Retail Lighting – Base Plan ....................................................................................... 738
UI – Residential New Construction – Base Plan ............................................................................... 739
UI – Home Energy Solutions – Base Plan .......................................................................................... 742
UI – HES Income Eligible – Base Plan ................................................................................................ 745
UI - Energy Conscious Blueprint – Base Plan .................................................................................... 748
UI – Energy Opportunities – Base Plan ............................................................................................. 751
UI – Small Business – Base Plan ........................................................................................................ 754
UI – O&M Services – Base Plan ......................................................................................................... 757
UI – Clean Energy Communities / Behavoir Pilot – Base Plan........................................................... 760
UI – SmartLiving Center – Base Plan .............................................................................................. 761
UI - Science Center – Base Plan ....................................................................................................... 764
UI – eeSmarts – Base Plan ............................................................................................................... 765
UI - Residential Loan Fund – Base Plan ............................................................................................. 768
UI – Research, Development and Demonstartion – Base Plan ......................................................... 768
YGS – Base Plan ELs and LFs ...................................................................................................................... 771
YGS Residential New Construction Base Plan ................................................................................... 772
YGS HES Base Plan ............................................................................................................................. 774
YGS HES Base Plan ............................................................................................................................. 775
YGS HES - Income Eligible Base Plan ................................................................................................. 776
YGS HES - Income Eligible ................................................................................................................. 777
YGS Water Heating – Base Plan ........................................................................................................ 778
YGS Water Heating – Base Plan ........................................................................................................ 779
YGS Energy Conscious Blueprint – Base Plan .................................................................................... 780
YGS Energy Conscious Blueprint – Base Plan .................................................................................... 781
YGS Energy Opportunities – Base Plan ............................................................................................. 782
YGS Energy Opportunities – Base Plan ............................................................................................. 783
YGS Small Business Base Plan ........................................................................................................... 784
YGS Small Business Base Plan ........................................................................................................... 785
YGS O&M Base Plan .......................................................................................................................... 786
YGS O&M Base Plan .......................................................................................................................... 787
YGS Clean Energy Communities Base Plan ....................................................................................... 788
YGS Smart Living Center - Base Plan ................................................................................................. 789
CNG – Base Plan ELs and LFs ..................................................................................................................... 791
CNG Residential New Construction – Base Plan ............................................................................... 792
CNG Residential New Construction – Base Plan ............................................................................... 793
CNG HES – Base Plan ......................................................................................................................... 794
CNG HES – Base Plan ......................................................................................................................... 795
CNG HES Income Eligible – Base Plan ............................................................................................... 796
CNG HES Income Eligible – Base Plan ............................................................................................... 797
CNG Water Heating – Base Plan ....................................................................................................... 798
CNG Water Heating – Base Plan ....................................................................................................... 799
CNG Energy Conscious Blueprint Base Plan ...................................................................................... 800
CNG Energy Conscious Blueprint Base Plan ...................................................................................... 801
CNG Energy Opportunities – Base Plan............................................................................................. 802
CNG Energy Opportunities – Base Plan............................................................................................. 803
CNG Small Business – Base Plan........................................................................................................ 804
CNG Small Business – Base Plan........................................................................................................ 805
CNG O&M – Base Plan ...................................................................................................................... 806
CNG O&M – Base Plan ...................................................................................................................... 807
CNG Clean Energy Communities ....................................................................................................... 808
CNG Smart Living Center – Base Plan ............................................................................................... 809
SCG – Base Plan – ELs and LFs ................................................................................................................... 811
SCG Residential New Construction – Base Plan ................................................................................ 812
SCG Residential New Construction – Base Plan ................................................................................ 813
SCG HES – Base Plan .......................................................................................................................... 814
SCG HES – Base Plan .......................................................................................................................... 815
SCG HES Income Eligible – Base Plan ................................................................................................ 816
SCG HES Income Eligible – Base Plan ................................................................................................ 817
SCG Water Heating – Base Plan ........................................................................................................ 818
SCG Water Heating – Base Plan ........................................................................................................ 819
SCG Energy Conscious Blueprint – Base Plan .................................................................................... 821
SCG Energy Conscious Blueprint – Base Plan .................................................................................... 822
SCG Energy Opportunities – Base Plan ............................................................................................. 823
SCG Energy Opportunities – Base Plan ............................................................................................. 824
SCG Small Business – Base Plan ........................................................................................................ 825
SCG Small Business – Base Plan ........................................................................................................ 826
SCG O&M – Base Plan ....................................................................................................................... 827
SCG O&M – Base Plan ....................................................................................................................... 828
SCG Clean Energy Communities – Base Plan .................................................................................... 829
SCG Smart Living Center – Base Plan ................................................................................................ 830
1
CHAPTER ONE: OVERVIEW (Electric and Natural Gas)
In accordance with Connecticut General Statutes § 16-245m and § 16-32f, The Connecticut Light and Power Company (“CL&P”), The United Illuminating Company (“UI”) (collectively, the “Electric Companies”) and The Connecticut Natural Gas Corporation (“CNG”), The Southern Connecticut Gas Company (“SCG”), and Yankee Gas Services Company (“Yankee Gas”) (collectively the “Natural Gas Companies”) hereby submit this multi-year comprehensive Conservation & Load Management (“C&LM”) Plan (“2013-2015 Conservation &Load Management Plan”, or the “Plan”) for the implementation of cost-effective electric and natural gas energy efficiency programs and market transformation initiatives.
This is the fourteenth C&LM Plan prepared by the Electric Companies since passage of the State’s restructuring legislation (Public Act 98-28) and the seventh plan filed by the Natural Gas Companies since passage of the State’s energy independence legislation (Public Act 05-01). In conjunction with the Energy Efficiency Board (“EEB”) (formerly the Energy Conservation Management Board) and the EEB consultants, the Companies have developed and deployed cost-effective, integrated electric and gas efficiency and conservation programs to all classes of energy consumers throughout the state. On June 14, 2012 the Department of Energy and Environmental Protection (“DEEP”) released the 2012 Integrated Resource Plan (IRP). In that plan, DEEP concluded that the analytical calculations they performed provided strong support, in terms of widespread economic and environmental benefits, for achieving all cost-effective energy efficiency. To capture this opportunity, DEEP concluded that the state can cost-effectively achieve approximately 2% annual electric energy savings by increasing the offerings from and budget for Conservation and Load Management (C&LM) programs.
The attached Plan comports with the DEEP findings in the IRP and is projected to deliver electric savings of approximately 2.1 percent of sales per year on average over the three-year period. Recommendations from the state’s recently drafted Comprehensive Energy Plan (CES) are also integrated into this 3-year Plan. The 2013-2015 C&LM Plan represents a continuation of integrating the C&LM plans for both the Electric Distribution Companies (“EDCs”) and Natural Gas Local Distribution Companies (“LDCs”), to benefit electric and gas customers and to reduce duplicative efforts. Historically, the natural gas programs have delivered savings of 0.3 percent of sales, on average, over the past three years, and are projected to deliver gas savings of 0.5% of sales on average in 2013-2015. The EDCs and LDCs will continue to monitor overall market response and program effectiveness and will maintain the flexibility to reallocate unspent program dollars within program sectors to in-demand programs. This flexibility will allow the EDCs and LDCs to react to market conditions, enhance their capacity to achieve cost-effective savings, and will minimize undue interruptions in program offerings in the marketplace.
The plan also takes a “fuel blind” approach to energy efficiency in the residential sector. Public Act 12-1 deferred the limitations on spending Energy Efficiency Fund money on homes heated by fuel oil that had been imposed by PA 11-80 until August 1, 2013. Since the plan presented here is a three-year plan, it assumes the oil funding issue will be addressed at a minimum level through the use of Regional Greenhouse Gas Initiative (RGGI) dollars; adjustments will be made to the subsequent years if the limitation remains in effect or if additional program funding is provided by the fuel oil industry.
The three-year Plan contains two related yet distinct plans comprised of two different levels of energy savings and funding. First, the Expanded Plan describes the programs, strategies, budgets and increased funding levels necessary to achieve the State’s increased savings goals. Additionally, a Base Plan chapter is included which reflects the standard three-year budgets and savings associated with the traditional
2
funding sources (mill rate, etc.) for a C&LM base three-year plan in the event funding for the increased savings in the Expanded Plan is not available.
Please find the attached table which reflects the savings by year (2013 to 2015) for the Electric Companies (CL&P, UI and Combined) in MWHs and its respective savings percentage of the MWH usage. Additionally, the second table reflects the savings by year (2013 to 2015) for the Natural Gas Companies (YGS, SCG and CNG and Combined) in MMCF and their respective savings percentage of the MMCF usage.
Electric Companies – Summary of Annual Savings and % of Sales
2013 2014 2015 2013-2015
GWh % of
Sales
GWh % of
Sales
GWh % of
Sales
GWh % of
Sales
CL&P 331.7 1.5% 454.3 2.1% 555.6 2.5% 1,341.7 2.0%
UI 87.6 1.6% 117.5 2.1% 118.0 2.1% 323.0 1.9%
Total 419.3 1.5% 571.8 2.1% 673.6 2.4% 1,664.7 2.0%
Gas Companies – Summary of Annual Savings and % of Sales
2013 2014 2015 2013-2015
MMCF % of
Sales
MMCF % of
Sales
MMCF % of
Sales
MMCF % of
Sales
YGS 193.1 0.43% 216.9 0.47% 246.4 0.53% 656.5 0.48%
SCG 142.7 0.54% 168.8 0.63% 181.7 0.67% 493.2 0.62%
CNG 166.2 0.55% 185.8 0.60% 199.0 0.63% 551.0 0.59%
Total 502.1 0.49% 571.4 0.55% 627.2 0.60% 1,700.7 0.55%
3
Due to the time it takes to accelerate program implementation, any delay in approving Expanded Plan
program funding results in a significant loss of savings, even when spending is concentrated in latter
months. The Companies are not able to ramp up marketing activities and the delivery infrastructure to
the higher levels of program implementation in the Expanded Plan unless and until the funding for the
Expanded Plan is approved. Additional issues are listed below:
Contractors will not invest in their infrastructure (labor, equipment etc.) without an increased funding level commitment.
Large C&I customers are unwilling to invest in the upfront engineering time and expanse unless there is a commitment that commensurate funding for the energy efficiency measures is available.
The lead time on ordering and installing large C&I projects can take approximately 12 to 18 months.
The level of activity (marketing, vendor networks, increased sales forces, etc.) that Connecticut will need to accomplish to achieve these aggressive goals will take several months to ramp up to an effective level.
The graph below shows how projected savings revert quickly toward the Base Plan level of energy
savings if the approved funding for the Expanded Plan is delayed, because the program administrators
must allow for uncertainty.
4
The Companies are pleased to submit their first multi-year Plan. A three-year plan provides the budget flexibility needed to take advantages of market opportunities as they arise and enables the Companies to sustain a commitment to energy efficiency on behalf of the customers we serve. The three-year plan
0.0%
0.4%
0.8%
1.2%
1.6%
DayOne
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2013 Savings By Approval Month
Base
Expanded
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
Jan
-13
Mar
-13
May
-13
Jul-
13
Sep
-13
No
v-1
3
Jan
-14
Mar
-14
May
-14
Jul-
14
Sep
-14
No
v-1
4
Jan
-15
Mar
-15
May
-15
Jul-
15
Sep
-15
No
v-1
5
2013-2015 Cumulative Savings By Approval Month
Day One
Jun-13
Dec-13
5
also demonstrates program stability to the “green industry” that delivers products and services through the C&LM programs. The three-year planning horizon also provides the multi-year framework and perspective to develop and implement some innovative and effective program strategies that take more than one year to develop and realize their benefits.
Connecticut’s Energy Efficiency program administrators have worked diligently throughout the year with the EEB consultants, regulators, trade allies, consumer and business organizations, advocacy groups and other stakeholders to solicit input that has shaped this plan. This collaboration, coupled with periodic program adjustments facilitated by a multi-year plan, is an industry best practice and a key part of our continuous improvement process that will keep us a national leader in energy efficiency and help Connecticut reclaim the top spot.
New for this Plan is a separate Marketing Chapter (Chapter 7). This chapter describes a strategy of marketing by customer segments, rather than by specific programs. Specific marketing initiatives and action items are included with the program pages when appropriate. The Marketing Chapter also includes a description of the statewide marketing initiative, Energize Connecticut, which was created in 2012 and will be fully integrated into the marketing messaging in 2013 and beyond.
In addition, this is the first Plan that integrates performance matrix for the natural gas companies.
In order to ramp up and achieve the increasing savings levels over the three-year period (while improving cost effectiveness), the Companies plan to make the following investments in time and program design:
Program Delivery: The delivery mechanisms of the vendor-based direct install programs including Home Energy Solutions (HES), Home Energy Solutions-Income Eligible (HES-IE) and Small Business Energy Advantage (SBEA) will be reevaluated and reengineered as appropriate to incorporate best practices. Additionally, program delivery will utilize technology including, but not limited to, the mobile applications to perform HES assessments and customer proposals and a web based customer engagement software platform to facilitate deeper, add-on measures.
Marketing & Customer Segmentation: The Companies will continue to invest in marketing methods to identify the needs of various customer segments and design offerings specifically targeted to these segments.
Sales & Consultative Selling: The Companies will develop an Energy Efficiency sales staff that is experienced in energy efficiency sales and are trained to deal with company executives such as Chief Executive Officers, Chief Financial Officers, Presidents, and General Managers to increase the traditional energy efficiency project channels that primarily relied upon the technical sales from the Companies’ Account Executives, third party contractors and Energy Service Companies who sell projects primarily though Facility Managers.
Grass Roots / Community Initiatives: The Companies plan to continue to ramp up efforts of the Clean Energy Communities program which is a joint effort between the Connecticut Energy Efficiency Fund and the Connecticut Energy Financing Investment Authority (CEFIA). These efforts are proving successful in generating energy efficiency and renewable energy awareness as well as increasing customer engagement and program participation.
6
Residential Home Energy Reporting. The three year plan will include the incorporation of a Residential Behavior program.
Industrial Sector Emphasis: As recognized by the Comprehensive Energy Strategy (CES), the Companies will be investing in industrial energy efficiency at a more aggressive rate in an effort to minimize the negative impact on energy costs in this sector. According to the CES assessment, $1.1 billion is currently being spent on energy by industry today and is expected to rise to $1.6 billion by 2050 under a “business as usual” scenario. The CES vision is that continued long-term investment in energy efficiency reduces industrial energy use by approximately 40% and that investing $1.2 billion through 2050 could create $2.1 billion in net savings. Near-term CES proposed actions under consideration: tailor energy efficiency program delivery to the needs of industry; focus programs for specific industry sub-sectors; increase the availability of technical assistance; provide best-in-class financing options; improve program accessibility for small and medium-sized industrial businesses. This ramp up will be accomplished through the use of increased customer segment analysis of the industrial market and alignment with key industrial vendors and trade allies.
Historical & Three Year Plan Highlights
Historical spending and savings achievements, as well as customer participation associated with the implemented C&LM Plans from 2006 to 2015 are highlighted in the following tables. 2012 to 2015 are plan budgets. 2006 to 2011 are actual results.
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
2006 2007 2008 2009 2010 2011 2012Budget
2013Expanded
Budget
2014Expanded
Budget
2015Expanded
Budget
MW
H
Years
2006 to 2015 Annual Energy Savings MWH (CL&P and UI)
Annual Energy Savings Cumulative Annual Energy Savings
7
010,000,00020,000,00030,000,00040,000,00050,000,000
2006 2007 2008 2009 2010 2011 2012Budget
2013Expanded
Budget
2014Expanded
Budget
2015Expanded
Budget
MW
H
2006 to 2015 Lifetime Energy Savings MWH (CL&P and UI)
Lifetime Energy Savigns Cumulative Lifetime Energy Savings
050,000
100,000150,000200,000250,000300,000350,000400,000450,000500,000550,000600,000
2006 2007 2008 2009 2010 2011 2012Budget
2013Expanded
Budget
2014Expanded
Budget
2015Expanded
Budget
KW
2006 to 2015 Energy Efficiency Demand Savings (KW) (CL&P and UI)
Annual Demand Savings Cumulative Demand Savings
05,000
10,00015,00020,00025,00030,00035,00040,000
2006 2007 2008 2009 2010 2011 2012Budget
2013Expanded
Budget
2014Expanded
Budget
2015Expanded
Budget
CC
F (
000
's)
Years
2006 to 2015 Annual Energy Savings CCF (YGS, CNG and SCG)
Annual Energy Savings Cumulative Annual Energy Savings
8
0
100,000
200,000
300,000
400,000
500,000
600,000
2006 2007 2008 2009 2010 2011 2012Budget
2013Expanded
Budget
2014Expanded
Budget
2015Expanded
Budget
CC
F (
000's
)
Years
2006 to 2015 Lifetime Energy Savings CCF (YGS, CNG and SCG)
Lifetime Energy Savings Cumulative Lifetime Energy Savings
$0$200$400$600$800
$1,000$1,200$1,400$1,600$1,800
2006 2007 2008 2009 2010 2011 2012 Budget 2013Expanded
Budget
2014Expanded
Budget
2015Expanded
Budget
$ M
Years
2006 to 2015 Spending (Electric and Gas)
Annual Spending" Cumulative Energy Spending
9
0
100
200
300
400
500
600
700
2006 2007 2008 2009 2010 2011 2012Budget
2013Expanded
Budget
2014Expanded
Budget
2015Expanded
Budget
$ M
Years
2006 to 2015 Customer $$ Savings (Electric and Gas)
Customer Savings Annualy Customer Savings Cumulative
10
2013-2015 Priorities
In order to achieve the Plan’s aggressive savings goals, while, while recognizing our business customers’ perception of the long-standing economic malaise addressed in Chapter 4, the Companies have identified the following key priorities for 2013-2015, as reflected in this Plan.
Market Transformation & Program Delivery
Over the years, the Electric and Natural Gas Companies have worked closely with the EEB to successfully influence and effect change in building design, renovations, maintenance practices and equipment performance. Often these improvements come through changes to the State Building Code and Appliance Standards, or as a result of collaboration with trade and business associations. While the Companies will continue have a critical role in these changes, we are also playing a part in the transformation of energy efficiency from an institutionally-supported paradigm to a market-based practice that will be become the “new normal”.
Increasingly, the business community is embracing energy efficiency and strategic energy management as a standard business practice, and, in the residential sector, as a necessity. An objective of the C&LM programs is to help facilitate that shift. The challenge will be to maintain the deeper savings per customer that the Companies have been able to accomplish over the past few years and prevent the market from migrating back to the few cost-effective measures that yield the majority of the higher paybacks. Efforts in 2013-2015 will include an emphasis on programs and initiatives that promote sustainable energy management as a core consumer and business value. Ultimately, as the green market continues to grow, programs should move from a primary dependency on public benefit charges to a more self-sustaining industry that can be supplemented, or leveraged, though Energy Efficiency Fund resources.
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Totals
Quantity of Home Energy Solutions Participants
Weatherization only 4,280 5,924 8,970 10,702 27,352 20,915 24,755