25
UFGS TABLE OF CONTENTS - Interim Update - Dec 2012 DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 1. LIST OF DRAWINGS 2. SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 3. METRIC MEASUREMENTS 4. BID SCHEDULES 5. SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY PROJECTS 6. SUPPLEMENTARY CONDITIONS FOR AZORES PROJECTS 7. SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA DIVISION 01 - GENERAL REQUIREMENTS 1. SUMMARY OF WORK 2. WORK RESTRICTIONS 3. PRICE AND PAYMENT PROCEDURES 4. COST AND PERFORMANCE REPORT 5. MEASUREMENT AND PAYMENT 6. ADMINISTRATIVE REQUIREMENTS 7. PROJECT SCHEDULE 8. CONSTRUCTION PROGRESS DOCUMENTATION 9. NETWORK ANALYSIS SCHEDULES (NAS) 10. SUBMITTAL PROCEDURES 11. AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS 12. LEED(TM) DOCUMENTATION 13. SPECIAL PROJECT PROCEDURES 14. GOVERNMENTAL SAFETY REQUIREMENTS 15. HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES 16. ENVIRONMENTAL MANAGEMENT 17. CHEMICAL DATA QUALITY CONTROL 18. SOURCES FOR REFERENCE PUBLICATIONS 19. QUALITY CONTROL 20. QUALITY CONTROL 21. QUALITY CONTROL 22. QUALITY CONTROL SYSTEM (QCS) 23. QUALITY CONTROL FOR MINOR CONSTRUCTION 24. SPECIAL INSPECTIONS 25. TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 26. TEMPORARY PEST CONTROL 27. TEMPORARY ENVIRONMENTAL CONTROLS

2013 02 15_sow Ufgs Table of Contents_002

Embed Size (px)

Citation preview

Page 1: 2013 02 15_sow Ufgs Table of Contents_002

UFGS TABLE OF CONTENTS - Interim Update - Dec 2012

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS1. LIST OF DRAWINGS2. SUPPLEMENTARY INSTRUCTIONS TO BIDDERS3. METRIC MEASUREMENTS4. BID SCHEDULES5. SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY PROJECTS6. SUPPLEMENTARY CONDITIONS FOR AZORES PROJECTS7. SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN

AREA

DIVISION 01 - GENERAL REQUIREMENTS1. SUMMARY OF WORK2. WORK RESTRICTIONS3. PRICE AND PAYMENT PROCEDURES4. COST AND PERFORMANCE REPORT5. MEASUREMENT AND PAYMENT6. ADMINISTRATIVE REQUIREMENTS7. PROJECT SCHEDULE8. CONSTRUCTION PROGRESS DOCUMENTATION9. NETWORK ANALYSIS SCHEDULES (NAS)10. SUBMITTAL PROCEDURES11. AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS12. LEED(TM) DOCUMENTATION13. SPECIAL PROJECT PROCEDURES14. GOVERNMENTAL SAFETY REQUIREMENTS15. HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES16. ENVIRONMENTAL MANAGEMENT17. CHEMICAL DATA QUALITY CONTROL18. SOURCES FOR REFERENCE PUBLICATIONS19. QUALITY CONTROL20. QUALITY CONTROL21. QUALITY CONTROL22. QUALITY CONTROL SYSTEM (QCS)23. QUALITY CONTROL FOR MINOR CONSTRUCTION24. SPECIAL INSPECTIONS25. TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS26. TEMPORARY PEST CONTROL27. TEMPORARY ENVIRONMENTAL CONTROLS28. SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS29. TEMPORARY ENVIRONMENTAL CONTROLS (GTMO)30. ENVIRONMENTAL PROTECTION31. TEMPORARY STORM WATER POLLUTION CONTROL32. PROJECT IDENTIFICATION33. RECYCLED / RECOVERED MATERIALS34. INSTALLATION OF GOVERNMENT-FURNISHED MEDICAL

EQUIPMENT35. CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

Page 2: 2013 02 15_sow Ufgs Table of Contents_002

36. STARTING AND ADJUSTING37. CLOSEOUT SUBMITTALS38. OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL

SYSTEMS39. OPERATION AND MAINTENANCE DATA40. FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)41. RELIABILITY CENTERED ACCEPTANCE FOR FACILITY SHELLS42. RELIABILITY CENTERED ACCEPTANCE FOR SUPERSTRUCTURE

PERFORMANCE REQUIREMENTS43. RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS44. RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS45. COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS1. OPERATION, MAINTENANCE, AND PROCESS MONITORING FOR SOIL

VAPOR EXTRACTION (SVE) SYSTEMS2. SUBSURFACE DRILLING, SAMPLING, AND TESTING3. SOIL-BENTONITE (S-B) SLURRY TRENCH4. [DEMOLITION][ AND ][DECONSTRUCTION]5. CARPET REMOVAL AND RECLAMATION6. REMOVAL AND SALVAGE OF HISTORIC BUILDING MATERIALS7. PRECIPITATION/COAGULATION/FLOCCULATION WATER

TREATMENT8. REMEDIATION OF CONTAMINATED SOILS AND SLUDGES BY

INCINERATION9. REMEDIATION OF CONTAMINATED SOILS BY THERMAL

DESORPTION10. BIOREMEDIATION OF SOILS USING LANDFARMING SYSTEMS11. BIOREMEDIATION OF SOILS USING WINDROW COMPOSTING12. SOIL WASHING THROUGH SEPARATION/SOLUBILIZATION13. SOLIDIFICATION/STABILIZATION (S/S) OF CONTAMINATED

MATERIAL14. WASTE CONTAINMENT GEOMEMBRANE15. CLAY BARRIER LAYER16. GEOSYNTHETIC CLAY LINER (GCL)17. EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL18. REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILS19. COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR

EXTRACTION (SVE) SYSTEMS20. UNDERGROUND STORAGE TANK REMOVAL21. SELECT FILL AND TOPSOIL FOR LANDFILL COVER22. TEST FILL23. TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS24. ASBESTOS HAZARD CONTROL ACTIVITIES25. ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS26. REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD27. LEAD IN CONSTRUCTION28. LEAD BASED PAINT HAZARD ABATEMENT, TARGET HOUSING &

CHILD OCCUPIED FACILITIES

Page 3: 2013 02 15_sow Ufgs Table of Contents_002

29. HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND MERCURY

30. REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

31. MOLD REMEDIATION

DIVISION 03 - CONCRETE1. CONCRETE REHABILITATION2. RESTORATION OF CONCRETE IN HISTORIC STRUCTURES3. CONCRETE REHABILITATION FOR CIVIL WORKS4. STRUCTURAL CAST-IN-PLACE CONCRETE FORMING5. INSULATING CONCRETE FORMING6. CONCRETE ACCESSORIES7. CONCRETE REINFORCING8. STEEL STRESSING TENDONS AND ACCESSORIES FOR PRESTRESSED

CONCRETE9. CAST-IN-PLACE CONCRETE10. CAST-IN-PLACE CONCRETE11. MISCELLANEOUS CAST-IN-PLACE CONCRETE12. CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS13. MARINE CONCRETE14. CAST-IN-PLACE ARCHITECTURAL CONCRETE15. CONCRETE FINISHING16. PREPLACED-AGGREGATE CONCRETE17. SHOTCRETE18. ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE

CONSTRUCTION19. CONCRETE FOR CONCRETE CUTOFF WALLS20. CONCRETE CURING21. PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION22. PRECAST CONCRETE SLABS (MAX. SPAN 8'- 0" O.C.)23. PRECAST STRUCTURAL PRETENSIONED CONCRETE24. PRECAST ARCHITECTURAL CONCRETE25. PRECAST [PRESTRESSED] STRUCTURAL CONCRETE26. TILT-UP CONCRETE27. PRECAST ROOF DECKS28. LIGHTWEIGHT CONCRETE ROOF INSULATION29. LIGHTWEIGHT INSULATING CONCRETE OVERLAY30. LIGHTWEIGHT INSULATING CONCRETE31. LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR

SYSTEM32. GYPSUM CONCRETE FLOOR PLANKS33. METALLIC NON-SHRINK GROUTING34. MASS CONCRETE

DIVISION 04 - MASONRY1. RESTORATION AND CLEANING OF MASONRY IN HISTORIC

STRUCTURES

Page 4: 2013 02 15_sow Ufgs Table of Contents_002

2. REHABILITATION OF REINFORCED AND UNREINFORCED MASONRY WALLS USING FRP COMPOSITE STRUCTURAL REPOINTING

3. REHABILITATION OF REINFORCED AND UNREINFORCED MASONRY WALLS USING SURFACE APPLIED FRP COMPOSITES

4. MASONRY5. NONBEARING MASONRY VENEER/STEEL STUD WALLS6. GLAZED STRUCTURAL CLAY TILE AND PREFACED CONCRETE

MASONRY UNITS7. GLASS MASONRY UNITS

DIVISION 05 - METALS1. ULTRASONIC INSPECTION OF WELDMENTS2. WELDING, STRUCTURAL3. STRUCTURAL STEEL4. WELDING STRUCTURAL ALUMINUM FRAMING5. DEEP LONGSPAN STEEL JOIST FRAMING6. LONGSPAN STEEL JOIST FRAMING7. OPEN WEB STEEL JOIST FRAMING8. STEEL JOIST GIRDER FRAMING9. STEEL DECKS10. COLD-FORMED METAL FRAMING11. MISCELLANEOUS METAL FABRICATIONS12. STRUCTURAL METAL FABRICATIONS13. CIVIL WORKS FABRICATIONS14. METAL STAIRS15. METAL LADDERS16. METAL RAILINGS17. ROLLING COVER FOR AVIATION REFUELING VAULTS18. FABRICATION OF HYDRAULIC STEEL STRUCTURES19. DECORATIVE METAL SPECIALTIES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES1. ROUGH CARPENTRY2. PIER TIMBERWORK3. GLUED-LAMINATED CONSTRUCTION4. FINISH CARPENTRY5. LAMINATE CLAD ARCHITECTURAL CASEWORK6. SOLID POLYMER (SOLID SURFACING) FABRICATIONS7. FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS8. FIBERGLASS REINFORCED PLASTIC (FRP) GRATING9. FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION1. BITUMINOUS DAMPPROOFING2. BUILT-UP BITUMINOUS WATERPROOFING3. ELASTOMERIC SHEET WATERPROOFING4. FLUID-APPLIED WATERPROOFING5. METALLIC OXIDE WATERPROOFING6. BENTONITE WATERPROOFING7. WATER REPELLENTS

Page 5: 2013 02 15_sow Ufgs Table of Contents_002

8. BOARD AND BLOCK INSULATION9. MINERAL FIBER BLANKET INSULATION10. LOOSE FILL THERMAL INSULATION11. ROOF AND DECK INSULATION12. EXTERIOR INSULATION AND FINISH SYSTEMS13. BUILDING AIR BARRIER SYSTEM14. ASPHALT SHINGLES15. SLATE ROOFING16. ROOF TILES17. CLAY TILE ROOFING REPLACEMENT OR REPAIR18. METAL ROOF PANELS19. FABRICATED ROOF PANEL ASSEMBLIES20. METAL WALL PANELS21. FABRICATED WALL PANEL ASSEMBLIES22. BUILT-UP ASPHALT ROOFING23. MODIFIED BITUMINOUS MEMBRANE ROOFING24. ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING25. POLYVINYL-CHLORIDE (PVC) ROOFING26. PROTECTED MEMBRANE ROOFING (PMR)27. SPRAYED POLYURETHANE FOAM (SPF) ROOFING28. FLASHING AND SHEET METAL29. COPPER ROOF SYSTEM30. STEEL STANDING SEAM ROOFING31. ALUMINUM STANDING SEAM ROOFING32. COPPER SHEET METAL FLASHING33. ROOF VENTILATORS, GRAVITY-TYPE34. SPRAY-APPLIED FIREPROOFING35. FIRESTOPPING36. JOINT SEALANTS

DIVISION 08 - OPENINGS1. STEEL DOORS AND FRAMES2. ALUMINUM DOORS AND FRAMES3. METAL STORM DOORS4. SLIDING FIRE DOORS5. SLIDING METAL DOORS6. WOOD DOORS7. FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES8. ALUMINUM SLIDING GLASS DOORS9. METAL ROLLING COUNTER DOORS10. OVERHEAD COILING DOORS11. FORCED ENTRY RESISTANT COMPONENTS12. BULLET-RESISTANT COMPONENTS13. STEEL SLIDING HANGAR DOORS14. VERTICAL LIFT FABRIC DOORS15. CORROSION CONTROL HANGAR DOORS16. ROLLING SERVICE [AND FIRE] DOORS17. HEMP SHIELDED DOOR18. SECURITY DOORS AND FRAMES19. VAULT DOORS AND DAY GATES

Page 6: 2013 02 15_sow Ufgs Table of Contents_002

20. DETENTION HOLLOW METAL FRAMES, DOORS, AND DOOR FRAMES21. SOUND CONTROL DOOR ASSEMBLIES22. SECTIONAL OVERHEAD DOORS23. VERTICAL LIFT DOORS24. BLAST RESISTANT DOORS (OVAL ARCH MAGAZINES)25. BLAST RESISTANT DOORS26. ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS27. CURTAIN WALL AND GLAZED ASSEMBLIES28. ALUMINUM WINDOWS29. STEEL WINDOWS30. ALUMINUM STORM WINDOWS31. WOOD WINDOWS32. WOOD WINDOWS - REPAIR AND REHABILITATION33. PLASTIC WINDOWS34. RADIO FREQUENCY SHIELDED ENCLOSURES, DEMOUNTABLE TYPE35. RADIO FREQUENCY SHIELDED ENCLOSURES, WELDED TYPE36. BLAST RESISTANT TEMPERED GLASS WINDOWS37. DETENTION AND SECURITY WINDOWS38. [SKYLIGHTS][ AND ][TRANSLUCENT PANELS]39. DOOR HARDWARE40. ELECTRICAL LOCKING CONTROL FOR BRIGS41. DETENTION HARDWARE42. GLAZING43. FRAGMENT RETENTION FILM FOR GLASS44. DETENTION AND SECURITY GLAZING45. METAL [WALL] [AND] [DOOR] LOUVERS

DIVISION 09 - FINISHES1. COLOR SCHEDULE2. SUPPORTS FOR PLASTER AND GYPSUM BOARD3. LATH4. GYPSUM PLASTERING5. FIREPROOF GYPSUM PLASTERING6. STUCCO7. VENEER PLASTER8. GYPSUM BOARD9. CERAMIC TILE, QUARRY TILE, AND PAVER TILE10. CHEMICAL-RESISTANT QUARRY TILE11. ACOUSTICAL CEILINGS12. STATIC-CONTROL FLOORING13. PORTABLE (DEMOUNTABLE) WOOD FLOORING14. WOOD PARQUET FLOORING15. WOOD STRIP FLOORING16. WOOD ATHLETIC FLOORING17. RESILIENT FLOORING18. RESILIENT ATHLETIC FLOORING19. PORTLAND CEMENT TERRAZZO20. TERRAZZO TILE21. RESINOUS TERRAZZO FLOORING22. STANDARD RESINOUS FLOORING

Page 7: 2013 02 15_sow Ufgs Table of Contents_002

23. CHEMICAL RESISTIVE RESINOUS FLOORING24. FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM25. FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM26. CARPET27. RIGID GRID ACCESS FLOORING28. STRINGERLESS ACCESS FLOORING29. WALLCOVERINGS30. ACOUSTICAL WALL TREATMENT31. PAINTS AND COATINGS32. HIGH-PERFORMANCE COATINGS33. HIGH-BUILD GLAZE COATINGS34. METALLIZING: HYDRAULIC STRUCTURES35. PAINTING: HYDRAULIC STRUCTURES36. STEEL COATINGS37. EPOXY/FLUOROPOLYURETHANE INTERIOR COATING OF WELDED

STEEL PETROLEUM FUEL TANKS38. INTERIOR COATING OF WELDED STEEL WATER TANKS39. THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL

PETROLEUM FUEL TANKS40. MAINTENANCE, REPAIR, AND COATING OF TALL ANTENNA

TOWERS41. COATING OF STEEL WATERFRONT STRUCTURES42. EXTERIOR COATING OF STEEL STRUCTURES43. PROTECTION OF BURIED STEEL PIPING AND STEEL BULKHEAD TIE

RODS44. INTERIOR LINING FOR CONCRETE STORAGE TANKS (FOR

PETROLEUM FUELS)45. LINSEED OIL PROTECTION OF CONCRETE SURFACES46. METALLIC TYPE CONDUCTIVE/SPARK RESISTANT CONCRETE

FLOOR FINISH47. PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR

PAINTING

DIVISION 10 - SPECIALTIES1. VISUAL COMMUNICATIONS SPECIALTIES2. INTERIOR SIGNAGE3. EXTERIOR SIGNAGE4. TOILET COMPARTMENTS5. CUBICLE TRACK AND HARDWARE6. WIRE MESH PARTITIONS7. DEMOUNTABLE MOVABLE PARTITIONS8. ACCORDION FOLDING PARTITIONS9. COILING PARTITIONS10. FOLDING PANEL PARTITIONS11. SLIDING PARTITIONS12. WALL AND CORNER GUARDS13. TOILET ACCESSORIES14. FIRE EXTINGUISHERS15. METAL LOCKERS16. STEEL SHELVING

Page 8: 2013 02 15_sow Ufgs Table of Contents_002

17. STORM SHUTTERS

DIVISION 11 - EQUIPMENT1. COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT2. FOODSERVICE EQUIPMENT SCHEDULE3. DOCK LEVELERS4. AIR STRIPPER5. RADIOGRAPHIC DARKROOM EQUIPMENT6. ELECTRIC KITCHEN EQUIPMENT7. REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT8. FOOD PREPARATION EQUIPMENT9. FOOD COOKING EQUIPMENT10. FOOD DISPENSING EQUIPMENT11. ICE MACHINES12. CLEANING AND DISPOSAL EQUIPMENT13. LABORATORY EQUIPMENT AND FUMEHOODS14. PLAYGROUND EQUIPMENT15. GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT16. WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT17. MEDICAL EQUIPMENT, MISCELLANEOUS18. DENTAL EQUIPMENT19. INCINERATORS, GENERAL PURPOSE

DIVISION 12 - FURNISHINGS1. WINDOW BLINDS2. CURTAINS AND DRAPES3. ROLLER WINDOW SHADES4. MANUFACTURED METAL CASEWORK5. MANUFACTURED WOOD CASEWORK6. MANUFACTURED PLASTIC CASEWORK7. FOODSERVICE CASEWORK, COUNTERTOPS, AND ACCESSORIES8. MEDICAL AND DENTAL CASEWORK9. MANUFACTURED VANITIES10. COUNTERTOPS11. ENTRANCE FLOOR MATS12. FURNITURE SYSTEMS13. DETENTION FURNITURE AND ACCESSORIES14. FIXED SEATING15. SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION1. HYDROTHERAPY EQUIPMENT2. COLD-STORAGE ROOMS (PREFABRICATED PANEL TYPE)3. PREFABRICATED AUDIOMETRIC ROOMS4. ELECTROMAGNETIC (EM) SHIELDING5. METAL BUILDING SYSTEMS6. SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT7. SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT8. X-RAY SHIELDING

Page 9: 2013 02 15_sow Ufgs Table of Contents_002

DIVISION 14 - CONVEYING EQUIPMENT1. ELECTRIC TRACTION ELEVATORS2. ELECTRIC TRACTION FREIGHT ELEVATORS3. ELECTRIC TRACTION PASSENGER ELEVATORS4. HYDRAULIC ELEVATORS5. PNEUMATIC-TUBE SYSTEM

DIVISION 21 - FIRE SUPPRESSION1. STANDPIPE SYSTEMS2. FIRE-SUPPRESSION SPRINKLER SYSTEMS3. WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION4. WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION5. DRY-PIPE FIRE SPRINKLER SYSTEMS6. DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION7. PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION8. [DELUGE] [PREACTION] FIRE SPRINKLER SYSTEMS9. FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS10. FOAM FIRE EXTINGUISHING FOR FUEL TANK PROTECTION11. FOAM FIRE EXTINGUISHING FOR HAZ/FLAM MATERIAL FACILITY12. AQUEOUS FILM-FORMING FOAM (AFFF) FIRE PROTECTION SYSTEM13. DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS14. CARBON-DIOXIDE FIRE-EXTINGUISHING SYSTEMS15. FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)16. CARBON DIOXIDE FIRE EXTINGUISHING (HIGH PRESSURE)17. CARBON DIOXIDE FIRE EXTINGUISHING (LOW PRESSURE)18. WET CHEMICAL FIRE EXTINGUISHING SYSTEM19. HALON 1301 FIRE EXTINGUISHING20. CLEAN AGENT FIRE EXTINGUISHING SYSTEMS21. WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET22. FIRE PUMPS

DIVISION 22 - PLUMBING1. PLUMBING, GENERAL PURPOSE2. PLUMBING, HEALTHCARE FACILITIES3. MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL4. CURED-IN-PLACE PIPE (CIPP) LINING5. PLUMBING PIPING INSULATION6. VERTICAL PUMPS, AXIAL-FLOW AND MIXED-FLOW IMPELLER-TYPE7. SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPE8. SANITARY SEWERAGE PUMPS9. PNEUMATIC SEWAGE EJECTORS10. SUMP PUMPS11. GENERAL SERVICE COMPRESSED-AIR SYSTEMS CLEANING

PROCEDURES12. HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,

AND VALVES, STAINLESS13. GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE14. LARGE NONLUBRICATED RECIPROCATING AIR COMPRESSORS

(OVER 300 HP)

Page 10: 2013 02 15_sow Ufgs Table of Contents_002

15. NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (100 HP AND LARGER)

16. HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING17. LARGE CENTRIFUGAL AIR COMPRESSORS (OVER 200 HP)18. WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)19. SOLAR WATER HEATING EQUIPMENT20. GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES21. LABORATORY CHEMICAL-WASTE AND VENT PIPING

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING1. AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS2. HVAC SYSTEM CLEANING3. BASIC MECHANICAL MATERIALS AND METHODS4. COMMON PIPING FOR HVAC5. VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT6. TESTING, ADJUSTING, AND BALANCING FOR HVAC7. THERMAL INSULATION FOR MECHANICAL SYSTEMS8. COMMISSIONING OF HVAC SYSTEMS9. TESTING INDUSTRIAL VENTILATION SYSTEMS10. CONTROL VALVES, SELF-CONTAINED11. BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC12. LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS13. ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC14. SPACE TEMPERATURE CONTROL SYSTEMS15. FACILITY GAS PIPING16. LOW TEMPERATURE WATER (LTW) HEATING SYSTEM17. [HIGH][MEDIUM] TEMPERATURE WATER SYSTEM WITHIN

BUILDINGS18. STEAM TRAPS19. STEAM CONDENSATE PUMPS20. STEAM VALVES21. STEAM SYSTEM AND TERMINAL UNITS22. REFRIGERANT PIPING23. CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS24. METAL DUCTS25. SELF-ACTING BLAST VALVES26. HVAC POWER VENTILATORS27. OVERHEAD VEHICLE TAILPIPE [AND WELDING FUME] EXHAUST

REMOVAL SYSTEM(S)28. INDUSTRIAL VENTILATION AND EXHAUST29. AIR TERMINAL UNITS30. DIFFUSERS, REGISTERS, AND GRILLS31. CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR) AIR

FILTRATION SYSTEM32. PANEL FILTERS33. DUST AND GAS COLLECTOR, DRY SCRUBBER AND FABRIC FILTER

TYPE

Page 11: 2013 02 15_sow Ufgs Table of Contents_002

34. MECHANICAL CYCLONE DUST COLLECTOR OF FLUE GAS PARTICULATES

35. ELECTROSTATIC DUST COLLECTOR OF FLUE GAS PARTICULATES36. FABRIC FILTER DUST COLLECTOR OF FLY ASH PARTICLES IN FLUE

GAS37. HEATING BOILERS38. STEAM HEATING PLANT WATERTUBE (SHOP ASSEMBLED)

COAL/OIL OR COAL39. STEAM HEATING PLANT WATERTUBE (FIELD ERECTED) COAL/OIL

OR COAL40. WATER-TUBE BOILERS, OIL/GAS OR OIL41. HEAT RECOVERY BOILERS42. LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR

OUTPUT)43. LOW PRESSURE WATER HEATING BOILERS (OVER 800,000 BTU/HR

OUTPUT)44. STEAM BOILERS AND EQUIPMENT (500,000 - 18,000,000 BTU/HR)45. STEAM BOILERS AND EQUIPMENT (18,000,000 - 60,000,000 BTU/HR)46. HEATING SYSTEM; GAS-FIRED HEATERS47. BUILDING HEATING SYSTEMS, WARM AIR48. FORCED HOT WATER HEATING SYSTEMS USING WATER AND

STEAM HEAT EXCHANGERS49. COLD STORAGE REFRIGERATION SYSTEMS50. PACKAGED WATER CHILLERS, ABSORPTION TYPE51. WATER CHILLERS, VAPOR COMPRESSION TYPE52. CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS53. COOLING TOWERS54. REFRIGERATION EQUIPMENT FOR COLD STORAGE55. CENTRAL STEAM-GENERATING SYSTEM, COAL-FIRED56. CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND

OIL FIRED57. HEATING AND UTILITIES SYSTEMS, CENTRAL STEA58. THERMAL ENERGY STORAGE SYSTEM: ICE-ON-COIL59. ENERGY RECOVERY SYSTEMS60. DESICCANT COOLING SYSTEMS61. MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS62. PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR-

CONDITIONERS63. EVAPORATIVE COOLING SYSTEMS64. EVAPORATIVE COOLING SYSTEM65. UNITARY AIR CONDITIONING EQUIPMENT66. COMPUTER ROOM AIR CONDITIONING UNITS67. WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS68. TERMINAL HEATING AND COOLING UNITS69. WARM AIR HEATING SYSTEMS70. UNITARY HEATING AND COOLING EQUIPMENT71. AIR COILS72. FAN COIL UNITS73. UNIT VENTILATORS74. ELECTRIC DUCT HEATERS

Page 12: 2013 02 15_sow Ufgs Table of Contents_002

75. ELECTRIC UNIT HEATERS76. ELECTRIC SPACE HEATING EQUIPMENT77. DESICCANT DEHUMIDIFICATION EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION1. UTILITY MONITORING AND CONTROL SYSTEM TESTING2. UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL1. BASIC ELECTRICAL MATERIALS AND METHODS2. COMMON WORK RESULTS FOR ELECTRICAL3. MEDIUM-VOLTAGE CABLES4. INSULATED WIRE AND CABLE5. DOCKSIDE POWER CONNECTION STATIONS6. SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT7. HIGH VOLTAGE OVERCURRENT PROTECTIVE DEVICES8. LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES9. APPARATUS INSPECTION AND TESTING10. POWER MONITORING SYSTEM11. LIGHTING CONTROL DEVICES12. PRIMARY UNIT SUBSTATION13. MAIN ELECTRIC SUPPLY STATION AND SUBSTATION14. SECONDARY UNIT SUBSTATIONS15. PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE

TRANSFORMERS16. THREE-PHASE PAD-MOUNTED TRANSFORMERS17. SINGLE-PHASE PAD-MOUNTED TRANSFORMERS18. SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED

SWITCHGEAR19. MEDIUM-VOLTAGE SURGE ARRESTERS20. INTERIOR DISTRIBUTION SYSTEM21. 480-VOLT STATION SERVICE SWITCHGEAR AND TRANSFORMERS22. SWITCHBOARDS AND SWITCHGEAR23. SWITCHBOARDS AND SWITCHGEAR24. PANELBOARDS25. MOTOR CONTROL CENTERS26. ELECTRIC METERS27. ELECTRICITY METERING28. MARINA ELECTRICAL WORK29. MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS30. COORDINATED POWER SYSTEM PROTECTION31. AUTOMATIC TRANSFER SWITCHES32. ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE33. ELECTRIC MOTORS, 3-PHASE VERTICAL SYNCHRONOUS TYPE34. VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS35. SINGLE OPERATION GENERATOR SETS36. DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

Page 13: 2013 02 15_sow Ufgs Table of Contents_002

37. DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH AUXILIARIES

38. MOTOR-GENERATOR SETS, 400 HERTZ (HZ)39. UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA

CAPACITY40. UNINTERRUPTIBLE POWER SUPPLY (UPS)41. POWER FACTOR CORRECTION EQUIPMENT42. 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER43. RADIO FREQUENCY INTERFERENCE POWER LINE FILTERS44. AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH45. AUTOMATIC TRANSFER SWITCHES46. LIGHTNING PROTECTION SYSTEM47. LIGHTNING PROTECTION SYSTEM48. LIGHTNING PROTECTION SYSTEM49. CATHODIC PROTECTION BY GALVANIC ANODES50. CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)51. CATHODIC PROTECTION SYSTEM (STEEL WATER TANKS)52. CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)53. CATHODIC PROTECTION BY IMPRESSED CURRENT54. CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT) FOR

LOCK MITER GATES55. CATHODIC PROTECTION SYSTEM FOR STEEL WATER TANKS56. INTERIOR LIGHTING57. INTERIOR LIGHTING58. EMERGENCY LIGHTING59. EXIT SIGNS60. HELIPAD LIGHTING AND VISUAL NAVIGATION AIDS61. EXTERIOR LIGHTING INCLUDING SECURITY AND CCTV

APPLICATIONS62. SECURITY LIGHTING63. SURGICAL LIGHTING FIXTURES64. EXTERIOR LIGHTING65. EXTERIOR LIGHTING66. LIGHTING POLES AND STANDARDS67. ROADWAY LIGHTING68. AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION

AIDS69. AREA LIGHTING70. FLOOD LIGHTING71. LOW-VOLTAGE MOTORS

DIVISION 27 - COMMUNICATIONS1. TWO-WAY RADIO DATA ETHERNET TRANSMISSION SYSTEM2. CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM3. CABLE TRAYS FOR COMMUNICATIONS SYSTEMS4. PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET

COMMUNICATION SYSTEMS5. BUILDING TELECOMMUNICATIONS CABLING SYSTEM6. COMMUNICATIONS OPTICAL BACKBONE CABLING7. WIRE LINE DATA TRANSMISSION SYSTEM

Page 14: 2013 02 15_sow Ufgs Table of Contents_002

8. INTERCOMMUNICATION SYSTEM9. INTERCOMMUNICATION SYSTEM10. FIBER OPTIC DATA TRANSMISSION SYSTEM11. FIBER OPTIC DATA TRANSMISSION SYSTEM12. STAND-ALONE ONE-WAY RADIO CONTROL SYSTEM13. ONE-WAY FM RADIO DATA CONTROL SYSTEM14. NURSE CALL AUDIO-VISUAL (NCAV) SYSTEM15. TELEVISION SIGNAL RECEPTION SYSTEM16. RADIO PAGING SYSTEM17. RADIO AND PUBLIC ADDRESS SYSTEMS18. INTERCOMMUNICATION SYSTEM19. NURSE CALL SYSTEM20. NURSE CALL TONE-VISUAL (NCTV) SYSTEM21. COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY1. GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND

SECURITY2. BASIC INTRUSION DETECTION SYSTEMS (IDS)3. SMALL INTRUSION DETECTION SYSTEM4. ELECTRONIC SECURITY SYSTEMS (ESS), COMMERCIAL5. ELECTRONIC SECURITY SYSTEM6. CENTRAL MONITORING SERVICES FOR ELECTRONIC SECURITY

SYSTEMS7. CLOSED CIRCUIT TELEVISION SYSTEMS8. DURESS SIGNAL SYSTEM [FOR BRIG FACILITIES]9. FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP10. FIRE ALARM REPORTING SYSTEMS - DIGITAL COMMUNICATORS11. FIRE DETECTION AND ALARM CONTROL, GUI, AND LOGIC SYSTEMS12. FIRE ALARM REPORTING SYSTEM, RADIO TYPE13. EXTERIOR FIRE REPORTING SYSTEM, RADIO TYPE14. CARBON MONOXIDE DETECTORS15. ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM16. FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE17. EXTERIOR FIRE ALARM SYSTEM, CLOSED CIRCUIT TELEGRAPHIC

TYPE18. INTERIOR FIRE DETECTION AND ALARM SYSTEM19. CENTRAL FIRE ALARM SYSTEM, DIGITAL ALARM COMMUNICATOR

TYPE20. INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM21. FUEL-GAS DETECTION AND ALARM22. WATCHTOUR SYSTEM [FOR BRIG FACILITIES]

DIVISION 31 - EARTHWORK1. EARTHWORK2. GEOTEXTILE3. GEOSYNTHETIC DRAINAGE LAYER4. GEOGRID SOIL REINFORCEMENT5. GEOTEXTILES USED AS FILTERS6. CLEARING FOR CIVIL WORKS

Page 15: 2013 02 15_sow Ufgs Table of Contents_002

7. CLEARING AND GRUBBING8. PIPING; OFF-GAS9. RADON MITIGATION10. EXCAVATION AND FILL11. TERMITE CONTROL BARRIER SYSTEM12. BASALTIC TERMITE BARRIER13. MESH TERMITE BARRIER14. SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL15. SOIL SURFACE EROSION CONTROL16. FOUNDATION DRILLING AND GROUTING17. BIOENGINEERING PRACTICES FOR STREAM BANK AND SHORELINE

STABILIZATION18. WIRE MESH GABIONS [AND MATTRESSES]19. METAL SHEET PILING20. FOUNDATION PREPARATION21. CAST-IN-PLACE CONCRETE PILES22. PRECAST/PRESTRESSED CONCRETE PILES23. CONCRETE CYLINDER PILES24. PRESSURE-INJECTED FOOTINGS25. STEEL H-PILES26. WOOD MARINE PILES27. TIMBER PILES28. PILING: COMPOSITE, WOOD AND CAST IN-PLACE CONCRETE29. CAST-IN-PLACE CONCRETE PILES, STEEL CASING30. AUGER CAST GROUT PILES31. DRILLED CAISSONS32. DRILLED CONCRETE PIERS AND SHAFTS33. SOIL AND ROCK ANCHORS34. TUNNEL AND SHAFT GROUTING

DIVISION 32 - EXTERIOR IMPROVEMENTS1. RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS2. RUNWAY RUBBER REMOVAL3. EMULSIFIED ASPHALT SEAL COATS [WITH] [WITHOUT]

AGGREGATE4. BITUMINOUS SEAL AND FOG COATS5. COLD MILLING OF BITUMINOUS PAVEMENTS6. SEALING OF CRACKS IN BITUMINOUS PAVEMENTS7. STRESS-ABSORBING MEMBRANE INTERLAYER8. COLD-MIX RECYCLING9. RESEALING OF JOINTS IN RIGID PAVEMENT10. FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS11. BITUMINOUS REJUVENATION12. HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS13. HEATER SCARIFYING OF BITUMINOUS PAVEMENTS14. GROOVING FOR AIRFIELD PAVEMENTS15. PARTIAL DEPTH PATCHING OF RIGID PAVING16. SLABJACKING RIGID PAVEMENTS17. LANDSCAPE ESTABLISHMENT

Page 16: 2013 02 15_sow Ufgs Table of Contents_002

18. [PERVIOUS] BITUMINOUS CONCRETE PAVEMENT19. DRAINAGE LAYER20. SAND-CLAY [BASE] [SUBBASE] COURSE21. [BASE COURSE FOR RIGID] [AND SUBBASE COURSE FOR FLEXIBLE]

[SUBBASE COURSE FOR PERVIOUS] PAVING22. [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE]

PAVING23. AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE

COURSE24. GRADED CRUSHED AGGREGATE BASE COURSE FOR [PERVIOUS]

[FLEXIBLE] PAVEMENT25. BITUMINOUS CONCRETE BASE COURSE26. BITUMINOUS BASE COURSE27. BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE28. LIME-[STABILIZED][MODIFIED] SUBGRADE29. LIME TREATED SUBGRADE [LIME MODIFIED SOILS]30. CEMENT STABILIZED [BASE] [SUBBASE] COURSE AT AIRFIELDS

AND ROADS31. PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE32. LEAN CONCRETE BASE COURSE33. BITUMINOUS TACK AND PRIME COATS34. BITUMINOUS SURFACE TREATMENT35. HOT-MIX ASPHALT AIRFIELD PAVING36. WARM-MIX ASPHALT AIRFIELD PAVING37. HOT-MIX ASPHALT (HMA) FOR ROADS38. HOT MIX BITUMINOUS PAVEMENT39. RESIN MODIFIED PAVEMENT SURFACING MATERIAL40. BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT

COLD-MIX)41. BITUMINOUS ROAD-MIX SURFACE COURSE42. POLYMER CONCRETE- MICRO-OVERLAY (PCMO) FOR FUEL AND

ABRASION RESISTANT WEARING SURFACES43. COAL TAR SEAL COAT WITH UNVULCANIZED RUBBER44. FUEL-RESISTANT (COAL TAR) SEALER45. POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS46. CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY

PAVEMENTS47. PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES48. CONCRETE PAVEMENT FOR CONTAINMENT DIKES49. ROLLER COMPACTED CONCRETE (RCC) PAVEMENT50. STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVEMENTS51. PERVIOUS CONCRETE PAVING52. COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS53. AGGREGATE SURFACE COURSE54. CONCRETE SIDEWALKS AND CURBS AND GUTTERS55. CONCRETE BLOCK PAVEMENTS56. PAVEMENT MARKINGS57. PAVEMENT MARKINGS58. PLAYGROUND PROTECTIVE SURFACING

Page 17: 2013 02 15_sow Ufgs Table of Contents_002

59. HIGH-SECURITY CHAIN LINK FENCES AND GATES60. CHAIN LINK FENCES AND GATES61. WIRE FENCES AND GATES62. SEGMENTAL CONCRETE BLOCK RETAINING WALL63. UNDERGROUND SPRINKLER SYSTEMS64. IRRIGATION SPRINKLER SYSTEMS65. SEEDING66. SODDING67. SPRIGGING68. EXTERIOR PLANTS69. TRANSPLANTING EXTERIOR PLANTS

DIVISION 33 - UTILITIES1. CLEANING FUEL STORAGE TANKS2. SLIP LINING OF EXISTING PIPING3. CONCRETE POLES4. UTILITY HORIZONTAL DIRECTIONAL DRILLING5. TRENCHLESS EXCAVATION USING MICROTUNNELING6. AVIATION FUEL DISTRIBUTION SYSTEM START-UP7. COMMISSIONING OF FUEL FACILITY SYSTEMS8. AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM9. AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM

(TYPE [IV][V])10. AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM

(CUT-N-COVER TANKS)11. WATER DISTRIBUTION12. NATURAL GAS AND LIQUID PETROLEUM PIPING13. WATER UTILITY METERING14. WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER TANK15. WATER STORAGE STEEL TANKS16. WATER WELLS17. [EXTRACTION] [MONITORING] WELLS18. GROUNDWATER MONITORING WELLS19. RELIEF WELLS20. SANITARY SEWERS21. PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE22. PACKAGED SEWAGE LIFT STATIONS, GRINDER PUMP TYPE23. FORCE MAINS AND INVERTED SIPHONS; SEWER24. SIPHONS, DOSING25. STORM DRAINAGE UTILITIES26. SPEED REDUCERS FOR STORM WATER PUMPS27. FOUNDATION DRAINAGE SYSTEM28. SUBDRAINAGE SYSTEM29. POND AND RESERVOIR LINERS30. NATURAL-GAS METERING31. NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION32. SERVICE PIPING, FUEL SYSTEMS33. AVIATION FUEL MECHANICAL EQUIPMENT34. AVIATION FUEL PANTOGRAPHS35. AVIATION FUEL PIPING

Page 18: 2013 02 15_sow Ufgs Table of Contents_002

36. AVIATION FUEL CONTROL VALVES37. AVIATION FUEL PUMPS38. FILTER SEPARATOR, AVIATION FUELING SYSTEM39. AVIATION FUEL DISTRIBUTION (NON-HYDRANT)40. LIQUID FUELS PIPELINE COATING SYSTEMS41. WELDING FOR POL SERVICE PIPING42. FACTORY-FABRICATED FUEL STORAGE TANKS43. STEEL TANKS WITH FIXED ROOFS44. UNDERTANK INTERSTITIAL SPACE45. PRESSURE VESSELS FOR STORAGE OF COMPRESSED GASES46. FUEL IMPERMEABLE LINER SYSTEM47. BULK FUEL RECEIVING/DISPENSING EQUIPMENT48. LEAK DETECTION FOR FUELING SYSTEMS49. TIGHTNESS TESTING OF EXISTING UNDERGROUND FUEL SYSTEMS50. CENTRAL HIGH TEMPERATURE WATER (HTW) GENERATING PLANT

AND AUXILIARIES51. VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES52. ABOVEGROUND HEAT DISTRIBUTION SYSTEM53. PREFABRICATED UNDERGROUND HEATING/COOLING

DISTRIBUTION SYSTEM54. PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION SYSTEM55. EXTERIOR BURIED PREINSULATED WATER PIPING56. HEAT DISTRIBUTION SYSTEMS IN CONCRETE TRENCHES57. EXTERIOR UNDERGROUND STEAM DISTRIBUTION SYSTEM58. EXTERIOR BURIED PUMPED CONDENSATE RETURN59. EXTERIOR SHALLOW TRENCH STEAM DISTRIBUTION60. EXTERIOR ABOVEGROUND STEAM DISTRIBUTION61. CLEANING PETROLEUM STORAGE TANKS62. ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND63. OVERHEAD TRANSMISSION AND DISTRIBUTION64. OVERHEAD TRANSMISSION AND DISTRIBUTION65. UNDERGROUND ELECTRICAL DISTRIBUTION66. UTILITY TRANSFORMERS67. SWITCHGEAR AND PROTECTION DEVICES68. MEDIUM-VOLTAGE GAS SWITCH69. MEDIUM-VOLTAGE UTILITY FUSES70. PIER TELEPHONE DISTRIBUTION SYSTEMS71. TELECOMMUNICATIONS OUTSIDE PLANT (OSP)72. COAXIAL CABLE DATA TRANSMISSION SYSTEM

DIVISION 34 - TRANSPORTATION1. RAILROAD TRACK AND ACCESSORIES2. WELDING CRANE AND RAILROAD RAIL - THERMITE METHOD3. ACCESS CONTROL POINT CONTROL SYSTEM4. AIRFIELD LIGHTING5. ACTIVE VEHICLE BARRIERS6. MOORING AND GROUNDING POINTS FOR AIRCRAFT

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION1. ELECTROMECHANICAL OPERATING MACHINERY FOR LOCKS

Page 19: 2013 02 15_sow Ufgs Table of Contents_002

2. VERTICAL GATE LIFT SYSTEMS3. WIRE ROPE FOR GATE OPERATING DEVICES4. STOPLOGS5. MITER GATES6. SECTOR GATES7. TAINTER GATES AND ANCHORAGES8. VERTICAL LIFT GATES9. CLOSURE GATES10. ELECTRICAL EQUIPMENT FOR GATE HOIST11. DREDGING12. ARTICULATING CONCRETE BLOCK REVETMENTS13. STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR

STRUCTURES14. LEVEE CONSTRUCTION15. REINFORCED SOIL SLOPE16. CONCRETE FLOATING PIER FOR SMALL CRAFT17. PRESTRESSED CONCRETE FENDER PILING18. POLYMERIC FENDER PILES19. MARINE FENDERS20. ARCH-TYPE RUBBER MARINE FENDERS21. EMBANKMENT FOR EARTH DAMS

DIVISION 40 - PROCESS INTEGRATION1. WELDING PROCESS PIPING2. PIPELINES, LIQUID PROCESS PIPING3. WELDING PRESSURE PIPING4. WELDING GENERAL PIPING5. VACUUM SYSTEMS PROCESS PIPING6. PROCESS CONTROL7. FIBER OPTIC (FO) OUTSIDE PLANT (OSP) MEDIA

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT1. BRIDGE CRANES2. BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING3. BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING4. GANTRY CRANES5. PORTAL CRANE TRACK INSTALLATION6. MONORAIL HOISTS7. HYDRAULIC FLUID POWER SYSTEMS8. HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES9. ULTRASONIC INSPECTION OF PLATES10. [DIESEL][NATURAL GAS] FUELED ENGINE PUMP DRIVES

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT1. PROCESS CHILLERS AND COOLERS2. CENTRIFUGAL PROCESS CHILLERS AND COOLERS3. RECIPROCATING PROCESS CHILLERS AND COOLERS4. PROCESS CONDENSERS

Page 20: 2013 02 15_sow Ufgs Table of Contents_002

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT

1. FANS/BLOWERS/PUMPS; OFF-GAS2. VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS3. LOW PRESSURE COMPRESSED AIR PIPING (NON-BREATHING AIR

TYPE)4. PUMPS: WATER, CENTRIFUGAL5. FLOW MEASURING EQUIPMENT [POTABLE WATER] [SEWAGE

TREATMENT PLANT]6. PUMPS: WATER, VERTICAL TURBINE7. DOWNFLOW LIQUID ACTIVATED CARBON ADSORPTION UNITS8. TRICKLING FILTER9. CHEMICAL FEED SYSTEMS10. CHLORINE-FEEDING MACHINES (AUTOMATIC, SEMIAUTOMATIC

AND MANUAL)11. VERTICAL ATMOSPHERIC TANKS AND VESSELS

DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT1. AIR POLLUTION CONTROL2. THERMAL (CATALYTIC) OXIDATION SYSTEMS

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT1. PACKAGED WASTEWATER TREATMENT EQUIPMENT, AERATION2. PACKAGED WASTEWATER TREATMENT EQUIPMENT,

BIOCHEMICAL3. COMPOSTING TOILET4. SEWAGE BAR SCREEN AND MECHANICAL SHREDDER5. GRIT REMOVAL AND HANDLING EQUIPMENT6. COMMINUTORS7. COALESCING [OR VERTICAL TUBE] OIL-WATER SEPARATORS8. ADVANCED OXIDATION PROCESSES (AOP)9. CIRCULAR CLARIFIER EQUIPMENT10. AIR AND GAS DIFFUSION EQUIPMENT11. CONTINUOUS LOOP REACTOR WASTEWATER TREATMENT SYSTEM12. FILTRATION EQUIPMENT13. OPEN-CHANNEL DISINFECTION EQUIPMENT14. GRAVITY BELT THICKENERS15. SLUDGE-DIGESTER GAS, HEATING, AND MIXING SYSTEM16. FLOATING COVER FOR SLUDGE-DIGESTION TANKS17. RECESSED CHAMBER FILTER PRESSES

DIVISION 48 - ELECTRICAL POWER GENERATION1. TURBINE OIL2. SOLAR LIQUID FLAT PLATE COLLECTORS

-- End of Master Table of Contents --