2012E01 Thermal Power

Embed Size (px)

Citation preview

  • 7/29/2019 2012E01 Thermal Power

    1/15

    PPP Status: THERMAL POWER

    By- Abhishek Agarwal (2012E01)

    Objective: To Study the Current Status of PPP in

    Thermal Power Sector and Identify the Challenges

    involved.

  • 7/29/2019 2012E01 Thermal Power

    2/15

    Contents

    Key Statistics

    Why Privatization

    Current Scenario

    Legal & Regulatory Environment

    Government Initiatives

    Challenges

    Project Experiences

    Conclusion and Way Forward

  • 7/29/2019 2012E01 Thermal Power

    3/15

    Key Statistics

    Fifth Largest Generation capacity

    Generation as on Aug. 12- 207,006 MW

    Thermal Power Contribution- 66 %

    44% of 11th Plan Generation by Pvt.

    Sector

    In 12th Plan: 80% of addition to be

    done by Thermal Power and 58% by

    Pvt. Sector

    Funds Allocated: Rs. 6386 billion

    Lowest per Capita Consumption- 600

  • 7/29/2019 2012E01 Thermal Power

    4/15

    Why Privatization

    High Cost of Electricity Services

    Unreliable Supply

    Poor Maintenance

    Lack of Investment and Inadequate

    Expansion

    Poor Technological Advancements

    Rising Subsidy Burdens

    Budgetary Constraints

  • 7/29/2019 2012E01 Thermal Power

    5/15

    Current Scenario

    Generation Transmission Distribution

    Private Participation

    Allowed (1991)

    Privatization

    Allowed Recently

    Private Participation

    Allowed (2003)

    Single Buyer

    Model

    Wholesale

    Competition

    Captive

    Generation

    No Model Available.

    Usually PPP model

    through Concession

    Agreement is used

    License Required

    Players:

    Reliance Power ,

    Tata Power,

    Lanco Power,

    GVK Power

    Players:

    Torrent Power,

    Tata Power

    Players:

    Torrent Power,

    Tata Power,

    Reliance Power

  • 7/29/2019 2012E01 Thermal Power

    6/15

    Legal & Regulatory Environment

    (I) Power Sector is in Concurrent List.

    Electricity Act Amendments,1991- to

    attract IPPs to produce and sell only to

    SEBs. Electricity Regulatory Commission

    Act, 1998- setup regulatory

    commissions for fair & just tariff setting

    transparent policy formulations

  • 7/29/2019 2012E01 Thermal Power

    7/15

    Legal & Regulatory Environment

    (II)

    Electricity Act, 2003

    De-licensing of Generation

    Open Access

    Captive Power Generation

    Bulk Purchasing

  • 7/29/2019 2012E01 Thermal Power

    8/15

    Legal & Regulatory Environment

    (III)

    Electricity Act, 2003.contd

    Distribution licenses

    Power Trading

    Formation of SERC mandatory

    Theft Minimization, Tariff

  • 7/29/2019 2012E01 Thermal Power

    9/15

    Government Initiatives

    100% FDI Allowed

    Customs & CVD Exemptions

    Tax Holidays for 10 years

    FSAs and PPAs

    APDRP & National Electric Policy for

    increased attractiveness

    UMPPs

  • 7/29/2019 2012E01 Thermal Power

    10/15

    Challenges

    Empowerment of Regulators

    Obtaining Clearances

    Overlapping Central & State

    Responsibilities

    Reduction of Subsidy

    Fuel Supply & Transportation

    Poor FSAs and PPAs

    T&D Losses

  • 7/29/2019 2012E01 Thermal Power

    11/15

    Project Experiences (I)

    GVK Plant at Jegurupadu, AP, 1992, 235MW

    Owned by GVK

    Constructed by ABB, Germany & India

    O&M by Jegurupadu O&M Co.

    FSA signed with GAIL

    PPA signed with AP Transco for 28

    years

    Financing: D/E Ratio: 2.33:1

    E uit : GVK CMS Asian Infrastructure

  • 7/29/2019 2012E01 Thermal Power

    12/15

    Project Experiences (II)

    Dabhol Power Plant

  • 7/29/2019 2012E01 Thermal Power

    13/15

    Project Experiences (III)

    UMPP by Tata Power, Mundra, 2006, 800x5MW

    SPV: Coastal Gujarat Power Ltd. (CGPL)

    Tariff: Rs. 2.26/KW Estimated Investments: 16000-20000 Cr.

    Govt. Role: Provide Land, Water, FSA,

    PPA, Clearances TP Role: Funds, Technology, Equipments,

    Execution & Operations

    FSA with Indonesian Government

  • 7/29/2019 2012E01 Thermal Power

    14/15

    Conclusion & Way Forward

    Overcoming Challenges

    Increased Competition

    Open Access for consumers

    PPP in Transmission

    Reduce Demand-Supply Gap

  • 7/29/2019 2012E01 Thermal Power

    15/15

    Thank You