PPP Status: THERMAL POWER
By- Abhishek Agarwal (2012E01)
Objective: To Study the Current Status of PPP in
Thermal Power Sector and Identify the Challenges
involved.
7/29/2019 2012E01 Thermal Power
2/15
Contents
Key Statistics
Why Privatization
Current Scenario
Legal & Regulatory Environment
Government Initiatives
Challenges
Project Experiences
Conclusion and Way Forward
7/29/2019 2012E01 Thermal Power
3/15
Key Statistics
Fifth Largest Generation capacity
Generation as on Aug. 12- 207,006 MW
Thermal Power Contribution- 66 %
44% of 11th Plan Generation by Pvt.
Sector
In 12th Plan: 80% of addition to be
done by Thermal Power and 58% by
Pvt. Sector
Funds Allocated: Rs. 6386 billion
Lowest per Capita Consumption- 600
7/29/2019 2012E01 Thermal Power
4/15
Why Privatization
High Cost of Electricity Services
Unreliable Supply
Poor Maintenance
Lack of Investment and Inadequate
Expansion
Poor Technological Advancements
Rising Subsidy Burdens
Budgetary Constraints
7/29/2019 2012E01 Thermal Power
5/15
Current Scenario
Generation Transmission Distribution
Private Participation
Allowed (1991)
Privatization
Allowed Recently
Private Participation
Allowed (2003)
Single Buyer
Model
Wholesale
Competition
Captive
Generation
No Model Available.
Usually PPP model
through Concession
Agreement is used
License Required
Players:
Reliance Power ,
Tata Power,
Lanco Power,
GVK Power
Players:
Torrent Power,
Tata Power
Players:
Torrent Power,
Tata Power,
Reliance Power
7/29/2019 2012E01 Thermal Power
6/15
Legal & Regulatory Environment
(I) Power Sector is in Concurrent List.
Electricity Act Amendments,1991- to
attract IPPs to produce and sell only to
SEBs. Electricity Regulatory Commission
Act, 1998- setup regulatory
commissions for fair & just tariff setting
transparent policy formulations
7/29/2019 2012E01 Thermal Power
7/15
Legal & Regulatory Environment
(II)
Electricity Act, 2003
De-licensing of Generation
Open Access
Captive Power Generation
Bulk Purchasing
7/29/2019 2012E01 Thermal Power
8/15
Legal & Regulatory Environment
(III)
Electricity Act, 2003.contd
Distribution licenses
Power Trading
Formation of SERC mandatory
Theft Minimization, Tariff
7/29/2019 2012E01 Thermal Power
9/15
Government Initiatives
100% FDI Allowed
Customs & CVD Exemptions
Tax Holidays for 10 years
FSAs and PPAs
APDRP & National Electric Policy for
increased attractiveness
UMPPs
7/29/2019 2012E01 Thermal Power
10/15
Challenges
Empowerment of Regulators
Obtaining Clearances
Overlapping Central & State
Responsibilities
Reduction of Subsidy
Fuel Supply & Transportation
Poor FSAs and PPAs
T&D Losses
7/29/2019 2012E01 Thermal Power
11/15
Project Experiences (I)
GVK Plant at Jegurupadu, AP, 1992, 235MW
Owned by GVK
Constructed by ABB, Germany & India
O&M by Jegurupadu O&M Co.
FSA signed with GAIL
PPA signed with AP Transco for 28
years
Financing: D/E Ratio: 2.33:1
E uit : GVK CMS Asian Infrastructure
7/29/2019 2012E01 Thermal Power
12/15
Project Experiences (II)
Dabhol Power Plant
7/29/2019 2012E01 Thermal Power
13/15
Project Experiences (III)
UMPP by Tata Power, Mundra, 2006, 800x5MW
SPV: Coastal Gujarat Power Ltd. (CGPL)
Tariff: Rs. 2.26/KW Estimated Investments: 16000-20000 Cr.
Govt. Role: Provide Land, Water, FSA,
PPA, Clearances TP Role: Funds, Technology, Equipments,
Execution & Operations
FSA with Indonesian Government
7/29/2019 2012E01 Thermal Power
14/15
Conclusion & Way Forward
Overcoming Challenges
Increased Competition
Open Access for consumers
PPP in Transmission
Reduce Demand-Supply Gap