4
10/4/2012 1 TRAFFIC ENGINEERING DIVISION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT JON CHENEY, TRAFFIC ENGINEER Traffic Engineering Organizational Chart Traffic Engineer Jon Cheney, P.E. Traffic Studies Traffic Signals Administration Transportation Planning Traffic Counts & Studies Development Review Crash Data Mgmt System Computerized Signal Systems Isolated Signals School Flashers Employees: 21 (4 currently vacant) Holly Hill TMC What do we do?? Traffic signals and systems design, construction and O&M Development, Rezoning, Land Use Amendments, & Use Permits Engineering studies to justify signs & markings Short & Long range planning of key countywide roads & Level- of-Service of roads Provides for the safe and efficient movement of both vehicular and pedestrian traffic throughout the County. 533 traffic signals and flashers Traffic Management Traffic Engineering Division Traffic Management 24 coordinated traffic signal systems 21 local & 100 traffic monitoring cameras Reduced Speed School Zone signals Consolidated Services Countywide; except Daytona Beach

2012 Traffic Engineering.ppt - Volusia County, FloridaEngineering studies to justify signs & markings Short & Long range planning of key countywide roads & Level-of-Service of roads

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2012 Traffic Engineering.ppt - Volusia County, FloridaEngineering studies to justify signs & markings Short & Long range planning of key countywide roads & Level-of-Service of roads

10/4/2012

1

TRAFFIC ENGINEERING DIVISION

VOLUSIA COUNTY

PUBLIC WORKS DEPARTMENT

JON CHENEY, TRAFFIC ENGINEER

Traffic Engineering Organizational Chart

Traffic EngineerJon Cheney, P.E.

Traffic Studies Traffic Signals AdministrationTransportation

Planning

Traffic Counts& Studies

Development Review

Crash DataMgmt System

Computerized SignalSystems

Isolated Signals

School Flashers

Employees: 21 (4 currently vacant)Holly Hill TMC

What do we do??Traffic signals and

systems design, construction and O&M

Development, Rezoning, Land Use Amendments,

& Use Permits

Engineering studies to justify signs & markings

Short & Long range planning of key

countywide roads & Level-of-Service of roads

Provides for the safe and efficient movement of both vehicular and pedestrian traffic throughout the County.

• 533 traffic signals and flashers• Traffic Management

Traffic Engineering Division

• Traffic Management• 24 coordinated traffic

signal systems• 21 local & 100 traffic

monitoring cameras• Reduced Speed School Zone

signals

Consolidated Services Countywide; except Daytona Beach

Page 2: 2012 Traffic Engineering.ppt - Volusia County, FloridaEngineering studies to justify signs & markings Short & Long range planning of key countywide roads & Level-of-Service of roads

10/4/2012

2

Challenges

Special Events

Disasters & Evacuations

Photos provide by Daytona News-Journal

4%

5%

6%

Volusia County Population Growth Rate

4%• New Economy• New Issues• New Strategies

• New Economy• New Issues• New Strategies

Challenges Challenges -- GrowthGrowth

Source: Bureau of Business and Economic Research

0%

1%

2%

3%

1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040

Gro

wth

Rat

e

Growth Rate

0.6%

1%

• New Strategies• New Strategies

A variety of sources used to develop system, mainly consisting A variety of sources used to develop system, mainly consisting of: of:

2025 Volusia County MPO’s LRTP2025 Volusia County MPO’s LRTP2035 LRTP: E+C Model Runs, 2035 LRTP: E+C Model Runs, SubcommSubcomm. Input & Make Your Mark . Input & Make Your Mark WorkshopWorkshop2007 C t N d Pl & E i D l t2007 C t N d Pl & E i D l t

Challenges: Challenges: Transportation System Needs Transportation System Needs

2007 County Needs Plan & Economic Development2007 County Needs Plan & Economic DevelopmentmyRegion.org & East Central Florida RPC effortmyRegion.org & East Central Florida RPC effort2050 FDOT Max # of Lanes analysis2050 FDOT Max # of Lanes analysisSE Volusia Regional Transportation StudySE Volusia Regional Transportation StudySW Volusia Regional Transportation StudySW Volusia Regional Transportation StudyVolusia County 5Volusia County 5--Year Road Program: City Year Road Program: City MtgsMtgs, Zone , Zone MtgsMtgs, , Council Workshop, Annual County BudgetCouncil Workshop, Annual County BudgetAnnual County CIE Report to DEOAnnual County CIE Report to DEO

A variety of sources used to develop system, mainly consisting A variety of sources used to develop system, mainly consisting of: of:

2025 Volusia County MPO’s LRTP2025 Volusia County MPO’s LRTP2035 LRTP: E+C Model Runs, 2035 LRTP: E+C Model Runs, SubcommSubcomm. Input & Make Your Mark . Input & Make Your Mark WorkshopWorkshop2007 C t N d Pl & E i D l t2007 C t N d Pl & E i D l t

Challenges: Challenges: Transportation System Needs Transportation System Needs

2007 County Needs Plan & Economic Development2007 County Needs Plan & Economic DevelopmentmyRegion.org & East Central Florida RPC effortmyRegion.org & East Central Florida RPC effort2050 FDOT Max # of Lanes analysis2050 FDOT Max # of Lanes analysisSE Volusia Regional Transportation StudySE Volusia Regional Transportation StudySW Volusia Regional Transportation StudySW Volusia Regional Transportation StudyVolusia County 5Volusia County 5--Year Road Program: City Year Road Program: City MtgsMtgs, Zone , Zone MtgsMtgs, , Council Workshop, Annual County BudgetCouncil Workshop, Annual County BudgetAnnual County CIE Report to DCAAnnual County CIE Report to DCA

Page 3: 2012 Traffic Engineering.ppt - Volusia County, FloridaEngineering studies to justify signs & markings Short & Long range planning of key countywide roads & Level-of-Service of roads

10/4/2012

3

20252025

Challenges: Challenges: Transportation Transportation

Needs Needs -- CongestionCongestion

20252025Roadway DeficienciesRoadway DeficienciesFuture Conditions

• The transportation network and the traffic volumes are based on 2025 Central Florida Regional Planning Model (CFRPM)

• The population and employment data is based on the CFRPM

• Model generated V/C ratios are used to determine network deficiencies

20502050

Challenges: Challenges: Transportation Transportation

Needs Needs -- CongestionCongestion

20502050Roadway DeficienciesRoadway DeficienciesFuture Conditions

• The transportation network and the traffic volumes are based on 2050 Central Florida Regional Planning Model (CFRPM)

• The population and employment data is based on the CFRPM

• Model generated V/C ratios are used to determine network deficiencies

NOT Funded System Needs NOT Funded System Needs –– highlighted in yellowhighlighted in yellow

Challenges: Challenges: Transportation System Needs Transportation System Needs

Needs Plan migrating to Needs Plan migrating to STRATEGIC PLAN due STRATEGIC PLAN due to fiscal constraintsto fiscal constraints

Current Issues

• Update to 20 Year MPO Long Range Transportation Plan & new Federal MAP-21 Transportation Bill

• 6 of 7 Council members on MPO Board

• Comprehensive Plan Amendments (additions/deletions to County Thoroughfare System)

Traffic Engineering Division

Thoroughfare System)

• Growth Management Legislation vs Economic Development

• Cost Saving & Greenhouse Gas Reduction Programs:

• Signal power – County LED’s replacement completeCity LED replacement underway

• Next Step in traffic technology - Adaptive Signal Control

• Signal Retiming (system & isolated)

• Sunrail – VOTRANs customer delivery to station on-time

• Variable work load in cities

135 watts vs 10 watts

Page 4: 2012 Traffic Engineering.ppt - Volusia County, FloridaEngineering studies to justify signs & markings Short & Long range planning of key countywide roads & Level-of-Service of roads

10/4/2012

4

QUESTIONS?