2012 Section Engineer Meeting Wednesday October 3, 2012
Presented by Steve Applegate Project Consultant Tom Nein - Plate
Production & Plant Manager
Slide 2
ABC Concepts ALSP & ALBC Shapes Manufacturing Location KYTC
Local Projects & History Kentucky Support Team Questions
Agenda
Slide 3
Accelerated Bridge Program
Slide 4
Accelerated Bridge Construction (ABC): ABC is bridge
construction that uses innovative planning, design, materials, and
construction methods in a safe and cost-effective manner to reduce
the onsite construction time that occurs when building new bridges
or replacing and rehabilitating existing bridges Prefabricated
Bridge Elements and Systems PBES are structural components of a
bridge that are built offsite, or near- site of a bridge and
include features that reduce the onsite construction time and the
mobility impact time that occurs when building new bridges or
rehabilitating or replacing existing bridges relative to
conventional construction methods. Accelerated Bridge Program
Slide 5
+ = ABC Many of our bridge products can be combined with
Express Foundations to help you meet the goal of Accelerated Bridge
Construction.
Slide 6
Structural Plate Shapes 6
Slide 7
Aluminum Structural Plate - Design & Loading Aluminum
Structural Plate in AASHTO Material AASHTO M219 Design AASHTO
Section 12 Installation AASHTO Section 26 Loading HS-25 and LRFD
Highway Loading
Slide 8
Aluminum Structural Plate - Shapes Several Shapes allowed in
AASHTO Section 12; Round Pipe Arch True Arch on Footings Ellipse
Box Shape
Slide 9
Structural Plate Pipe Arch
Slide 10
Aluminum Structural Plate Aluminum Structural Plate Advantages
Easy to Design Quick to Install Cost Savings over Concrete
Structures Industry Competition Durability History % Recycled
Material Made in Kentucky Twin Aluminum Plate installed 1968 No
corrosion
Slide 11
Aluminum Box Culvert Slip Line of Failing Concrete Box road
traffic maintained during construction
Slide 12
17 Span Aluminum Arch on Footings with Slope Collar
Slide 13
10 Span ALBC on Precast Footings
Slide 14
Benefits to You: Provides ease and speed of installation
Alleviates hazardous working conditions Trapezoidal foundation
reduces wing wall concrete quantities Minimal reinforcement to be
placed on site Pick weights and sizes customized to your equipment
Use with Aluminum Plate or CON/SPAN Structures Blends the speed of
precast with the economy of cast-in-place EXPRESS Concrete Footings
Speed and Ease
Slide 15
Construction Process: Excavate and prepare foundation subgrade
Unload and set precast channels Place minimal reinforcing at joints
to provide foundation continuity Set precast bridge units,
headwalls and wing walls Pour cast-in-place concrete Seal joints,
grout wing walls and backfill. Helping Accelerate Bridge
Construction
Slide 16
+ = ABC Many of our bridge products can be combined with
Express Foundations to help you meet the goal of Accelerated Bridge
Construction.
Slide 17
Accelerated Bridge Construction (ABC): ABC is bridge
construction that uses innovative planning, design, materials, and
construction methods in a safe and cost-effective manner to reduce
the onsite construction time that occurs when building new bridges
or replacing and rehabilitating existing bridges Prefabricated
Bridge Elements and Systems PBES are structural components of a
bridge that are built offsite, or near- site of a bridge and
include features that reduce the onsite construction time and the
mobility impact time that occurs when building new bridges or
rehabilitating or replacing existing bridges relative to
conventional construction methods. Accelerated Bridge Program
Slide 18
Winchester Plant 18
Slide 19
Manufactured in Winchester KY Established 1985 Acres 19 180,000
SF Mfg Operation Plant Capabilities Galvanizing Tank On-site water
treatment facility 2 roll forming lines 19 overhead cranes 12
presses 4 press brakes Various sheers, band saws and curving rolls
Machine shop Capacity Running at 35% potential capacity
Little Bennett Regional Park, Clarksburg, MD 10-6 ft. span x
5-7 40.5 lf ALBC Loading: HS25 Engineer: Tim Sharp Dist 3
Installed: Nov 2010 Location: Richardsville Kentucky 263 4 Day Road
Closure Accelerated Construction 4 Day Road Closure
Slide 27
Little Bennett Regional Park, Clarksburg, MD 253 ft. span x
10-2 66 lf ALBC Loading: HS25 Engineer: Paul Sanders Dist 4
Installed: June 2010 Location: Caneyville Kentucky 2766 Emergency
Replacement
Slide 28
Little Bennett Regional Park, Clarksburg, MD 254 ft. span x 8-7
24 lf ALBC Loading: HS25 Owner: Webster County Road Rob Mooney
Installed: Oct 2011 Location: Clay KY Williams Clay Road Webster
County County Road Department ALBC
Slide 29
Bid as an alternate (221span X 66 rise Aluminum Box Culvert) to
Concrete Bridge on piles in 1995 Saved $310,000 versus concrete
bridge Improved Road close time from 3 months to 1 week Increased
road width to allow for wider entrance for Pikeville Elementary
School Chloe Creek US 223 and Hwy 1460 KYTC DIST 12 22 Span ALBC
Before and After
Slide 30
KYTC DIST 12 Chloe Creek Remove Old Bridge
Slide 31
KYTC DIST 12 Prepare 4,000 PSF foundation
Slide 32
KYTC DIST 12 Assemble Box in Parking Lot while old bridge is
taken out and foundation prepared
Slide 33
KYTC DIST 12 ALBC ready for backfill
Slide 34
After 17 years of HS-25 Coal Haul Traffic
Slide 35
Kentucky Support Team 35
Slide 36
Questions? 36
Slide 37
Kentucky Support Team
Slide 38
Summary & Overview Bridge Portfolio Innovative Bridge
Developments Engineering Support & Design Tools CONTECHs
Consultative Approach Building Blocks to a successful Project
Planning & Solution Development Project Design Worksheet
Structure Selection Site & Layout DYOB Engineer Estimate Site
Simulation Proposal Preparation Design Build Support Design Support
Specifications Contract Drawings Permitting Structural/Fabrication
Drawings Approval Assistance Custom Shape Development
Horizontal/Vertical Alignment Hydraulics & Scour Support
Foundations Installation Support Preconstruction Meeting On-Site
Installation Assistance Logistics Coordination Contech. Your
project partner.