  • Slide 1
  • 2012 Section Engineer Meeting Wednesday October 3, 2012 Presented by Steve Applegate Project Consultant Tom Nein - Plate Production & Plant Manager
  • Slide 2
  • ABC Concepts ALSP & ALBC Shapes Manufacturing Location KYTC Local Projects & History Kentucky Support Team Questions Agenda
  • Slide 3
  • Accelerated Bridge Program
  • Slide 4
  • Accelerated Bridge Construction (ABC): ABC is bridge construction that uses innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the onsite construction time that occurs when building new bridges or replacing and rehabilitating existing bridges Prefabricated Bridge Elements and Systems PBES are structural components of a bridge that are built offsite, or near- site of a bridge and include features that reduce the onsite construction time and the mobility impact time that occurs when building new bridges or rehabilitating or replacing existing bridges relative to conventional construction methods. Accelerated Bridge Program
  • Slide 5
  • + = ABC Many of our bridge products can be combined with Express Foundations to help you meet the goal of Accelerated Bridge Construction.
  • Slide 6
  • Structural Plate Shapes 6
  • Slide 7
  • Aluminum Structural Plate - Design & Loading Aluminum Structural Plate in AASHTO Material AASHTO M219 Design AASHTO Section 12 Installation AASHTO Section 26 Loading HS-25 and LRFD Highway Loading
  • Slide 8
  • Aluminum Structural Plate - Shapes Several Shapes allowed in AASHTO Section 12; Round Pipe Arch True Arch on Footings Ellipse Box Shape
  • Slide 9
  • Structural Plate Pipe Arch
  • Slide 10
  • Aluminum Structural Plate Aluminum Structural Plate Advantages Easy to Design Quick to Install Cost Savings over Concrete Structures Industry Competition Durability History % Recycled Material Made in Kentucky Twin Aluminum Plate installed 1968 No corrosion
  • Slide 11
  • Aluminum Box Culvert Slip Line of Failing Concrete Box road traffic maintained during construction
  • Slide 12
  • 17 Span Aluminum Arch on Footings with Slope Collar
  • Slide 13
  • 10 Span ALBC on Precast Footings
  • Slide 14
  • Benefits to You: Provides ease and speed of installation Alleviates hazardous working conditions Trapezoidal foundation reduces wing wall concrete quantities Minimal reinforcement to be placed on site Pick weights and sizes customized to your equipment Use with Aluminum Plate or CON/SPAN Structures Blends the speed of precast with the economy of cast-in-place EXPRESS Concrete Footings Speed and Ease
  • Slide 15
  • Construction Process: Excavate and prepare foundation subgrade Unload and set precast channels Place minimal reinforcing at joints to provide foundation continuity Set precast bridge units, headwalls and wing walls Pour cast-in-place concrete Seal joints, grout wing walls and backfill. Helping Accelerate Bridge Construction
  • Slide 16
  • + = ABC Many of our bridge products can be combined with Express Foundations to help you meet the goal of Accelerated Bridge Construction.
  • Slide 17
  • Accelerated Bridge Construction (ABC): ABC is bridge construction that uses innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the onsite construction time that occurs when building new bridges or replacing and rehabilitating existing bridges Prefabricated Bridge Elements and Systems PBES are structural components of a bridge that are built offsite, or near- site of a bridge and include features that reduce the onsite construction time and the mobility impact time that occurs when building new bridges or rehabilitating or replacing existing bridges relative to conventional construction methods. Accelerated Bridge Program
  • Slide 18
  • Winchester Plant 18
  • Slide 19
  • Manufactured in Winchester KY Established 1985 Acres 19 180,000 SF Mfg Operation Plant Capabilities Galvanizing Tank On-site water treatment facility 2 roll forming lines 19 overhead cranes 12 presses 4 press brakes Various sheers, band saws and curving rolls Machine shop Capacity Running at 35% potential capacity
  • Slide 20
  • Galvanizing TankStructural Plate Presses Winchester Plant 20
  • Slide 21
  • ALSP Press AreaInventory Area Winchester Plant 21
  • Slide 22
  • Winchester Plant Products Multi-Plate Super-Span AL Structural Plate AL Box Culvert
  • Slide 23
  • Winchester Plant Products Collector Pans Bin Wall Metric Sheeting Tunnel Liner
  • Slide 24
  • Kentucky Applications
  • Slide 25
  • 37 Maintenance Projects 10 Monthly Letting Projects KYTC ALBC Installation / Utilization
  • Slide 26
  • Little Bennett Regional Park, Clarksburg, MD 10-6 ft. span x 5-7 40.5 lf ALBC Loading: HS25 Engineer: Tim Sharp Dist 3 Installed: Nov 2010 Location: Richardsville Kentucky 263 4 Day Road Closure Accelerated Construction 4 Day Road Closure
  • Slide 27
  • Little Bennett Regional Park, Clarksburg, MD 253 ft. span x 10-2 66 lf ALBC Loading: HS25 Engineer: Paul Sanders Dist 4 Installed: June 2010 Location: Caneyville Kentucky 2766 Emergency Replacement
  • Slide 28
  • Little Bennett Regional Park, Clarksburg, MD 254 ft. span x 8-7 24 lf ALBC Loading: HS25 Owner: Webster County Road Rob Mooney Installed: Oct 2011 Location: Clay KY Williams Clay Road Webster County County Road Department ALBC
  • Slide 29
  • Bid as an alternate (221span X 66 rise Aluminum Box Culvert) to Concrete Bridge on piles in 1995 Saved $310,000 versus concrete bridge Improved Road close time from 3 months to 1 week Increased road width to allow for wider entrance for Pikeville Elementary School Chloe Creek US 223 and Hwy 1460 KYTC DIST 12 22 Span ALBC Before and After
  • Slide 30
  • KYTC DIST 12 Chloe Creek Remove Old Bridge
  • Slide 31
  • KYTC DIST 12 Prepare 4,000 PSF foundation
  • Slide 32
  • KYTC DIST 12 Assemble Box in Parking Lot while old bridge is taken out and foundation prepared
  • Slide 33
  • KYTC DIST 12 ALBC ready for backfill
  • Slide 34
  • After 17 years of HS-25 Coal Haul Traffic
  • Slide 35
  • Kentucky Support Team 35
  • Slide 36
  • Questions? 36
  • Slide 37
  • Kentucky Support Team
  • Slide 38
  • Summary & Overview Bridge Portfolio Innovative Bridge Developments Engineering Support & Design Tools CONTECHs Consultative Approach Building Blocks to a successful Project Planning & Solution Development Project Design Worksheet Structure Selection Site & Layout DYOB Engineer Estimate Site Simulation Proposal Preparation Design Build Support Design Support Specifications Contract Drawings Permitting Structural/Fabrication Drawings Approval Assistance Custom Shape Development Horizontal/Vertical Alignment Hydraulics & Scour Support Foundations Installation Support Preconstruction Meeting On-Site Installation Assistance Logistics Coordination Contech. Your project partner.
  • Slide 39
  • Sales Team Territory Map 39
  • Slide 40
  • Field Marketing Territory Map 40
  • Slide 41
  • Questions? 41