19
S STUDY TUDY of of SPAC SPACE E a collection of works a collection of works by by Darren Graves Darren Graves Designer in Motion Designer in Motion

2012 Portfolio C

Embed Size (px)

Citation preview

Page 1: 2012 Portfolio C

SSTUDYTUDYofof

SPACSPACEEa c o l l e c t i o n o f w o r k s a c o l l e c t i o n o f w o r k s b y b y

D a r r e n G r a v e s D a r r e n G r a v e s D e s i g n e r i n M o t i o nD e s i g n e r i n M o t i o n

Page 2: 2012 Portfolio C

11 L A C O U N T Y H I G H D E S E RT M A C CL A C O U N T Y H I G H D E S E RT M A C C L B L - 2 0 1 0 - 1 1L B L - 2 0 1 0 - 1 1

Page 3: 2012 Portfolio C

Los Angeles County High Desert Multi-Ambulatory Care Center

Lancaster requires a new ambulatory care center to service the Antelope Valley, and the MACC will serve as a replacement hospital for the current care facility on 60th Avenue in Lancaster. The new location is 4th and I Streets in Lancaster, in the middle of a residential neighbor-hood.

The center will serve to reinvigorate the suburban landscape and be open to the public for any Emergency, surgical and outpatient procedures.

Lee, Burkhart, Liu was commissioned to carry this project from Schecmatic Design to Construction Documents, and guide a Design Buld fi rm in the Construction Documentation in order to retain the integrity of the User Group Agreements.

As a public project, we were concerned with address-ing public issues such as landscaping, environmental awareness, and of course, health. The building is a model of sustainability and will achieve LEED Silver when it is completed in Summer 2014.

I was responsible for drawing the Building Information Model in Revit under the project management of ar-chitects and planners. As a designer, I presented the project in the majority of User Group meetings and coordinated the Revit effort with engineers, architec-tural draftsman, and client interpretation.

Page 4: 2012 Portfolio C

The Revit Model was a deliverable, along with paper documentation, to the County of Los Angeles in January of 2011. LBL was awarded a Commendation from the County for its efforts on this project, and the Revit model was used for animations to the residents of the City of Lan-caster, where it was lauded and served to excite the residents about the prospect of renewal in their desert landscape.

OPTION ONEOPTION ONE

OPTION TWOOPTION TWO

Process....Process....

Views of Atrium

Page 5: 2012 Portfolio C

22 B U I L D I N G 2 2 C AT U N I V E R S I T Y O F C A L I F O R N I A , I RV I N EB U I L D I N G 2 2 C AT U N I V E R S I T Y O F C A L I F O R N I A , I RV I N E L B L - 2 0 1 1L B L - 2 0 1 1

Page 6: 2012 Portfolio C

Building 22C UC Irvine Medical Center

The CDDC (Comprehensive Digestive Disease Center) is a tenant on UC Irvine’s Medical Campus and as a highly regarded practice tied to the newly renovated Douglas Hospital, the UC Regents and the client agreed to upgrade the facilities and upgrade new corridor along the campus in the City of Orange.

The existing facility is sandwiched between Building 23 and Building 22A; the 24,600 SF building steps back to the south from the main drive. As the building sits on a North-South axis and looks clear across a plaza to Douglas Hospital, we took pains to maintain its status as a campus thoroughfare while upgrading the ground-fl oor corridors. The fi nished design adds a third fl oor and provides six new operating rooms for the practice in a 34,921 SF envelope.

Due to funding concerns, LBL was asked to design two options for the renovation, seen above. The third fl oor was optioned in the Bid Docu-ments as either a shell or a full build out. A creative use of phasing in Revit allowed us to build one Revit model with three options all the way through to 100% CD Submittal.

My responsibilities for the project at LBL were to build and maintain the Building Information Model through the medical planning, and Schemat-ic Design to Construction Documentation phases.

In addition to planning and architectural services, LBL was asked to present our design to potential donors for the project; my renderings - seen to the left and right - were used in conjuction with NavisWorks animations and impressed the donors enough to provide full funding for the project with a sizable grant. We completed 100% CD documents in October of 2011. Construction is scheduled for 2015.

existing demolition 2-story design 3-story design

Page 7: 2012 Portfolio C

33 T E L E M E D I C I N E L A B - U N I V E R S I T Y O F C A L I F R N I A AT L O S A N G E L E ST E L E M E D I C I N E L A B - U N I V E R S I T Y O F C A L I F R N I A AT L O S A N G E L E S L B L - 2 0 1 0 - 1 1L B L - 2 0 1 0 - 1 1

Page 8: 2012 Portfolio C

LEVEL 10' - 0"

LEVEL 2406' - 6"

LEVEL A376' - 0"

LEVEL 3420' - 0"

DEF

LEVEL B362' - 6"

ROOF433' - 6"

G

1A3.22

13' -

6"

13' -

6"

16' -

0"

14' -

6"

13' -

6"

17' - 9" 10' - 4" 17' - 9"

CONSULT27-061C3

OPEN WORKAREA

27-061C

CONSULT27-061C7

LAB SPACEA7-073

LEVEL 10' - 0"

LEVEL 2406' - 6"

LEVEL A376' - 0"

LEVEL 3420' - 0"

D E F

ROOF433' - 6"

G

1A3.22

13' -

6"

13' -

6"

16' -

0"

14' -

6"

17' - 9" 10' - 4" 17' - 9"

CONSULT27-061C8

OPEN WORKAREA

27-061C

CONSULT27-061C2

OFFICE 317-064B

OFFICE 217-064A

LAB SPACEA7-073

UP

33 34 35 36 37 3831

D

E

F

G

1A3.21

2' - 2" 24' - 0" 24' - 0" 24' - 0" 13' - 3" 10' - 7"

17' -

9"

10' -

4"

MECHANICALEQUIPMENT

ROOMA7-073D

OFFICEA7-073C

BREAK ROOMA7-073B

LAB SPACEA7-073

CORRIDORA7-000CO

ELEV.CL.

A7-034A

SCI-ADA344X4 LKRSLC36

TC4822 TC4822 TC4822 TC4822 TC4822

EEW/SS

FILLER PANEL

17' -

9"

STAN03C

STAN02

REFR01

STAN02

STAN01C

STAN01

STAN01

STAN01

STAN01

STAN01

STAN01

STAN01

STAN01C

REFR01

REFR01

CART01

CRYS01 CRYS02

STAN03CART01

STAN03

OVMC01

MICR02

COMP01

COMP01

COMP01

COMP01COMP01

COMP01

COMP01

COMP01

COMP01

COMP01

COMP01COMP01COMP01

COMP01

COPY03

PRLA01

OVEN01

PRLA01

PRLA01

PRLA01

PRLA01

FRZR01

PRLA01 CENT02

MICT01

MICT01

MICT01

MICT01

REFR05

MICT01

WABA03

COMP01

CART02 CART02

CART02

OVEN01

COSL01

STAN04

CART01

WABA03 WABA03

WABA03 WABA03

STAN02D

STAN03C

COMP01

WABA02

MIXR01 HTPL01

MICR01

STSL01

STSL01

COPY02

FRZR05

FRZR06

FRZR02

COMP01

SCSL01-AT

SCSL01-FL

MICR02

BSCA01

HOFU03

REFR03

C7230-2DC-TB-KT C7230-1DC C7230-3DC-KT C6030-1DC-TB-KTC4830-TB-KT TC36-22-GF T7236-MCB TC48-22-GF C7230-2DC-TB-KT C7230-3DC-TB-LFC

SW

4830-24-D-T

BS

W4830-24-1D

C

C72

30C

7230

C72

30C

7230

T3630-24-1DC

TC3630-24-1DCTC3630-24-1DC

TC3630-24-1DC

C48

30-T

B

P-3.25 P-3.25 P-3.25 P-3.25

P-3.25 P-3.25

P-6

P-6

P-3.25 P-3.25 P-3.25 P-3.25P-3

.25

P-3

.25

P-3.25 P-3.25 P-3.25 P-3.25

P-6

C72

36-2

DC

T36

36-3

0-1D

C

C7230-2D

C-T

B-K

TC

7230-2DC

-TB

-KT

-MM

C72

36-2

DC

-TB

C72

36-2

DC

-TB

C7236-2D

C-T

BC

7236-2DC

-TB

P-6C P-6CP-6C

P-6CP-6C-SSP-6CP-6CP-6CP-6C

C4830-1D

C-W

MB

C4830-W

MBC6030-1DC

C60

30-1

DC

-WM

B-

C72

30-1

DC

-WM

B-

UCFM

T9036-1DC T7236-31-SB T7236-31-SB T4836-2DC T4836-2DC

C60

36-1

DC

TC36-16-GL

FH-1A

DA

FH-2

BSC-1

P-3.25

P-6

C

UCFM

P-6

P-6

C60

30-T

B

UCFM

T7236 T6036

SC5-36-PSS-2DC SC4-36-PSS

SC2-36-PSS

SC3-36-DC-(2)PSSTC36-16 TC30

MM

C72

36-(

2)FS

C

TRIPLE CHANNELWIREMOLD ONWALL

TRIPLE CHANNELVERTICALRACEWAY FROMCEILING TO TOPOF WIREMOLD

TRIPLE CHANNELWIREMOLD ONWALL

TRIPLE CHANNELVERTICALRACEWAY FROMCEILING TO TOPOF WIREMOLD

TRIPLE CHANNELVERTICALRACEWAY FROMCEILING TO TOPOF WIREMOLD

TRIPLE CHANNELWIREMOLD ONWALL

TRIPLE CHANNELWIREMOLD ONWALL

TRIPLE CHANNELWIREMOLD ONWALL TRIPLE CHANNEL

VERTICALRACEWAY FROMCEILING TO TOPOF WIREMOLD

TRIPLE CHANNELVERTICALRACEWAY FROMCEILING TO TOPOF WIREMOLD

TRIPLE CHANNELVERTICALRACEWAY FROMCEILING TO TOPOF WIREMOLD

LAB COATS (36")W/SHELF ABOVEWASTE BELOW

BIOWASTE

BULLETIN BOARD

FLAT PANELTV

PRLA01

PRIN05

COMP01

PRLA01

LS3MG7 MT9

MT8 MT7 LS6 IF3IF2

IF1

IF5

LS7LS5

MT4MT1

MT2

MG6

MT6

MG4MG3

MG1

MG2

SS1 LS4

SP5SP2

SP6SP4

SP3

SP1

AI6AI5

AI3AI2

AI1

MT5

AI4

MT3

SS2

LA1

IF4

AI7

MT10

MT11

AI3A

AI1A

FRZR07

CODR01

2A3.21

WACL01

SHLV02

SHLV02

P-3

.25

P-3

.25

P-3

.25

1A3.22

WABA01

STPL01

PRCK01

STEE01STEE01

CAST01

CAAC01

CAFL02

HOFU02

PHME01

WAPR02

STAN02C

STAN02A

STAN01B

STAN03A

REFR04

COMP01

FAXM01

COPY01

COMP01

WAPR02 STER01

REFR04

STAN01A

STAN01B

LEVEL 10' - 0"

LEVEL 2406' - 6"

LEVEL A376' - 0"

LEVEL 3420' - 0"

33 34 35 36 37 3831

LEVEL B362' - 6"

ROOF433' - 6"

MACHINE ROOM FLOOR443' - 5 5/8"

1A3.21

2A3.21

2' - 2" 24' - 0" 24' - 0" 24' - 0" 13' - 3" 10' - 7"

9' -

11 5

/8"

13' -

6"

13' -

6"

16' -

0"

14' -

6"

13' -

6"

LAB SPACEA7-073

ACCESSIONINGDESK

63CORRIDOR27-000CO

CORRIDORA7-000CO

UCLA PRIME Renovation

To accommodate growing demand for diag-nosis and testing through telemedicine, UC campuses are upgrading and expanding laboratory space. LBL was asked to improve the lab and sub-specialty clinic in the UCLA Center for Health Sciences, adjacent to the School of Dentistry.

The basement level laboratory will be de-molished and refi nished as an open plan lab with specialty casework, as seen to the left. The second fl oor and a portion of the fi rst fl oor will be redesigned as new offi ces for the pathologists on staff, while most of the Scope lies in reconfi guring the HVAC to exhaust air from the basement to the roof through the thin existing framework.

This project is in Construction Documen-tation and my responsibilities lie primarily with Revit coordination, implementation and drafting, as this is mostly engineering work. I lead the LBL BIM and drafting on the proj-ect, working direclty with the Project Archi-tect and the users to present a fi nal design solution in the coming months

.

Page 9: 2012 Portfolio C

44 P H A R M A C Y R E M O D E L - C E D A R S S I N A I / T H O P H A R M A C Y R E M O D E L - C E D A R S S I N A I / T H O L B L - 2 0 1 1 - 1 2L B L - 2 0 1 1 - 1 2

Page 10: 2012 Portfolio C

Cedars Sinai/THO Infusion Pharmacy

Although this project is minimal in total area (~2100 SF), it is a very complex equipment and engineering solution that we employed for this renovation and refurbishment in Beverly Hills, CA. The client was very specifi c about limiting cost and visual pollution on the roof, so we explored various HVAC solutions in order to exceed USB 797 requirements while mitigating construction invasiveness.

The practice will remain open during costruction, which will start in the second week of March 2012.

Page 11: 2012 Portfolio C

Cedars Sinai/THO Infusion Pharmacy

My responsibilities for the project ranged from project management to Revit coordination, implementation and drafting. After measuring the site conditions, I drafted the Building Information Model and we used it to medi-cally plan and design the new space. I also generated a series of pamphlets, InDesign presentations, and render-ings for User Group meetings and presentations to the Board and the City of Beverly Hills.

Relocating the existing pharmacy and designing the new reception area was much easier due to coordination with MEP and structural engineers through Revit. The client and users also benefi ted from the model, as we repeat-edly used it in meetings as an illustrative element for both medical planning and aesthetic design decisions.

We plan on using the BIM with the contractor in order to insure a rapid pace and a detailed account of materials and equipment for the construction period. LBL plans on obtaining a Certifi cate of Occupancy for the client by the beginning of Summer 2012.

Page 12: 2012 Portfolio C

55 M U S E U M O F A RT - H O P E C O L L E G E , M I C H I G A NM U S E U M O F A RT - H O P E C O L L E G E , M I C H I G A N C C O N C E P T D E S I G N - 2 0 0 9C C O N C E P T D E S I G N - 2 0 0 9

Hope College Museum of Art

Through a series of design meetings and after many iterative processes, the Principal of C Concept Designand I delivered a Design Package to the Trustees in October of 2009. The purpose of our explorations was to delineate a program and Schematic Design for a new exhibition hall in the center of Hope College, in Holland, Michigan, USA.

A 10,000 SF, two-story structure will be under construc-tion shortly, and the curvilinear glass facade will illumi-nate the talented artists of this community.

Page 13: 2012 Portfolio C

66 S A G H A R B O R H O U S ES A G H A R B O R H O U S E C C O N C E P T D E S I G N - 2 0 0 9C C O N C E P T D E S I G N - 2 0 0 9

Sag Harbor House

When a friend of the Principal arrived one day, I was intro-duced to an opera singer who wanted a relaxed, modern house in which to retire.

The Long Island house had been purchased years earlier, after the fi rst owners of the prefabricated dwelling moved on. By incorporating Dutch and Californian elements into an East Coast beach house, we were able to double the livable space of her property.

Construction has been completed and the new pool, kitchen and living spaces provide much requiescence for the happy contralto.

existing 2-story design

Page 14: 2012 Portfolio C

77Collins Residence

Growing up in Los Angeles has left me enamored with the beach and the culture that embodies a surfl ing life. When my colleague at Ryder Design was approached to fi nish a half-built house in on Balboa in New-port Beach, we were elated to bring a lost project back to life.

The house needed to be redesigned in order to save its soul, and our work lasted about over a year, detailing, designing and managing the 20 million dollar

My responsibilities included as-built documentation after on-site mea-surement. The project was drafted and coordinated through AutoCAD drawings and sketches with the client in meetings.

This work is published in House/Beautiful, January 2012. Ryder Design was the architect and Maine Design did interiors.

C O L L I N S R E S I D E N C E - N E W P O RT B E A C H , C AC O L L I N S R E S I D E N C E - N E W P O RT B E A C H , C A RY D E R D E S I G N - 2 0 0 8RY D E R D E S I G N - 2 0 0 8

Page 15: 2012 Portfolio C

Las Pulgas Residence

California ranch houses are scattered among the hills of southern California - this 1960s house was hiding in the foothills overlooking the Santa Monica Basin and only needed to be reshaped in order to take advantage of its airy surroundings and spacious views.

The client contracted Ryder Design to renovated the property as in investment project, and with a budget of 500,000 USD, we gutted the house and opened up the south and eastern walls to the Pacifi c Ocean. The addition of a garage allowed for expansion of the living room into a roof (of garage) garden and an expansive space to play and enjoy the Palisades life.

My responsibilities included drafting, design (SD to CD) and assisting the Principal with any client or coordination needs during Construction Administration.

88 L A S P U L G A S R E S I D E N C E - PA C I F I C PA L I S A D E S , C AL A S P U L G A S R E S I D E N C E - PA C I F I C PA L I S A D E S , C A RY D E R D E S I G N - 2 0 0 7RY D E R D E S I G N - 2 0 0 7

Page 16: 2012 Portfolio C

99

USC STUDENT HEALTH CENTER

S T U D E N T H E A LT H C E N T E R - U N I V E R S I T Y O F S O U T H E R N C A L I F O R N I AS T U D E N T H E A LT H C E N T E R - U N I V E R S I T Y O F S O U T H E R N C A L I F O R N I A W W C O T - 2 0 0 7W W C O T - 2 0 0 7

Page 17: 2012 Portfolio C

Housing GridWest Hollywood, California

99H O U S I N G T H E S I S - W E S T H O L LY W O O D , C AH O U S I N G T H E S I S - W E S T H O L LY W O O D , C A U N I V E R S I T Y O F S O U T H E R N C A L I F O R N I A - 2 0 0 6U N I V E R S I T Y O F S O U T H E R N C A L I F O R N I A - 2 0 0 6

Page 18: 2012 Portfolio C

Desert Interpretive CenterVazquez Rocks, California

Black Box TheaterLos Angeles, California

VA R I O U S S T U D E N T W O R KVA R I O U S S T U D E N T W O R K U N I V E R S I T Y O F S O U T H E R N C A L I F O R N I A - 2 0 0 2 , 2 0 0 3 , 2 0 0 5U N I V E R S I T Y O F S O U T H E R N C A L I F O R N I A - 2 0 0 2 , 2 0 0 3 , 2 0 0 5

Page 19: 2012 Portfolio C

SSTUDY TUDYof ofSPAC SPACEE

a collection of works a collection of works by by

Darren Graves Darren Graves Designer in Motion Designer in Motion