    PRODUCT INSTALLATION GUIDERev: 01, Issue Date 04.01.2012

    GREEN TERRAMESH

    Material DeliveryGreen Terramesh units are supplied pre-assembled at the

    production facility. They are supplied in a collapsed form, foldedand bundled. The bundles are compressed and strapped together

    at the factory for easy shipping and handling. Each bundle islabeled with a tag reporting the sizes of the units contained.

    Lacing wire is supplied in coils, ring fasteners are shipped in

    boxes, erosion control blankets are shipped in rolls and pre-formed steel brackets are shipped in a box.

    AssemblyThe folded units shall be taken out from the bundle and placedon a hard at surface. Green Terramesh units shall be opened,

    unfolded and pressed out to their original shape. When the units

    are unfolded for assembly, they will have one or two shippingfolds. They can be removed by placing the fold over a board and

    walking along the sides.

    Fastening ProcedureWhen using lacing wire, cut off a piece of wire approximately 1.5

    times the length of the edge to be tied. Longer edges shall bejoined by several lengths of wire. Lacing wires shall be secured

    around the selvedge wire or heavier edge wire, where present,

    by looping and twisting the lacing wire around itself. Proceedtying with alternate double and single loops. Double loops shall

    be made at intervals not greater than 6 in. (150 mm). The unitsshould be pulled tightly together during the tying operation. Pliers

    may be used to create tight joints. The other end of the tie wire

    shall be secured by again looping and twisting the wire arounditself. Care should be taken to avoid damaging the wire coating.

    When steel ring fasteners are used, the use of either amechanical or a pneumatic fastening tool is required. Spacing of

    the rings shall be in accordance with ASTM A975 Table 2, Panel

    to Panel connection, Pull-Apart Resistance. In any case, ringfasteners spacing shall not exceed 6 in. (150 mm). Rings shall be

    installed at the top and the bottom connections of the side andalong all edges.

    The average maximum resistance of the fasteners from the eld

    shall not be lower than 90% of the resistance provided in the

    certication.

    Foundation PreparationThe foundation on which the Green Terramesh units are to beplaced shall be cut or lled and graded to the lines and grades

    shown on the construction drawings. Surface irregularities, loosematerial, and vegetation shall be removed during the preparation

    of the foundation.

    Installation and Soil CompactionAfter the foundation has been prepared, the pre-assembled GreenTerramesh units are placed in position empty, and shall be tied

    or fastened to adjacent units along all edges in order to form acontinuously connected, monolithic structural unit.

    Units shall be placed in position according to the required slope

    angle. Factory attached triangles insures correct facia angle andspeed up the construction. Pre-form steel brackets shall be placed

    and securely attached to the reinforcing steel wire in the anchor

    panel and at the top of the welded panel. (Make a small cut to the

    ECB if necessary). The erosion control blanket of each unit shall

    overlap for 4 in. (100 mm) with the adjacent units blanket on theside in a manner to ensure that the vegetative soil behind will not

    be exposed at any time.

    Figure 1

    G H

    B

    H

    G

    60

    3.00

    m

    A

    C

    VARIABLE

    VARIABLE0.65m

    B

    E

    Place unfolded Green Terrameshunit (A) on level ground.

    Lift the facial and rotate triangularsteel brackets (F) to pre form the unitto required slope angle. Attach steelbrackets (E).

    Place top soil (H) and backfill soilmaterial (G) simultaneously in 8"(200mm) compacted lift thickness.

    Place stepped or stacked successiveunit and repeat the steps.

    D

    C = Erosion Control Blanket D = Welded Black Steel GridE = Steel Bracket F = Factory Attached Triangular Steel BracketG = Soil / Backfill H = Top Soil

    A = Green Terramesh unit in ZN/PVC coated double twist wire mesh type 8x10,

    wire 2.70 / 3.70mm or 2.20 / 3.20mmB = ZN/PVC coated metallic reinforcing wires 3.40 / 4.40mm, inserted into thedouble twist mesh at positions corresponding to the folds.

  • 7/28/2019 2012 PIG Green Terramesh

    2/2

    Maccaferri reserves the right to amend product specications without notice and speciers

    are requested to check as to the validity of the specications they are using

    www.maccaferri-usa.com

    Headquarters:

    10303 Governor Lane BoulevardWilliamsport, MD 21795-3116Tel: 301-223-6910Fax: 301-223-6134email: [email protected]

    Area Ofces:

    AZ, Phoenix MD, Williamsport OH, WestervilleCA, Sacramento MO, St. Louis PR, CaguasFL, Coral Gables NJ, IselinNM, Albuquerque TX, Lewisville

    2012 Maccaferri, Inc. Printed in USA

    Figure 2

    Open

    1.75 in.(44 mm)

    0.7

    5in.

    (19mm)

    Nominal overlap of 1 in.(25 mm) after closure

    Figure 3

    B CPneumatic

    Spenax ToolManual Tool

    Care shall be taken when placing the soil to ensure that the PVCcoating is not damaged. After a layer of soil has been placed,

    sufcient hand shovelling shall be performed to achieve a level

    top surface before soil compaction is performed.Top soil is placed behind the facing about 18-24 in. (0.5-0.6 m)

    thick. Soil compaction within 3 ft (1 m) of the face should be

    carefully performed with a walk-behind compactor to prevent anyslope distortion or bulging of the facing unit.Place soil ll in approximately 8 in. (200 mm) lifts and compact

    it to the required level. Mechanically stabilized earth structures

    shall be made of a good quality, free draining, granular and/or selected ll. The recommended ll gradation is in the range

    of 0.001-0.75 in. (0.02 mm to 19 mm), or as indicated in theproject specications. Soils outside of this range may be suitable,

    providing they have been approved by a geotechnical engineer.

    Compaction shall be performed to 95% of Standard Proctor, byuse of conventional compaction equipment.

    The number of compaction and vegetative soil layers will beas such to achieve the required vertical spacing between the

    Green Terramesh units, according to the project specications.

    Once the compacted layers have achieved the top of the GreenTerramesh unit, the top end is folded and securely stapled to the

    soil.Care shall be taken to ensure that all adjacent units (above,

    underneath and sideways) will be connected along the face at the

    contact edges.The top return portion of the last unit on top of the structure shall

    be buried approximately 12 in. (300 mm) beneath the soil surface.Hydroseed or plant if needed; using a native species increases

    the chance of survival. Irrigation may be necessary in drierclimates/seasons.

    Figure 4

    ASteel Bracket

    Successive backfill layer compaction

    Folding top end of the unit

    Next Unit

    Folding of the top unit