2012-2017 Proposed Highway Improvement Program. Public Works and Transportation Committee April 25, 2012. 2012-2017 Five Year Highway Improvement Program. Management philosophy sets system priorities : Preservation Modernization Expansion. Priority One: Preservation. - PowerPoint PPT Presentation
Citation preview
1
2012-2017Proposed Highway Improvement Program
Public Works and Transportation Committee
April 25, 2012
2
2012-2017 Five Year Highway Improvement Program
Management philosophy sets system priorities:
1. Preservation
2. Modernization
3. Expansion
3
Priority One: PreservationDeveloping a set of projects
ARGUS Pavement Management Software
Keeping tabs on the system
Asset Inventories
$1.6 billion to build
4
Developing the Project SetARGUS Pavement Management System……
……Today is an introduction to ARGUS
5
Pavement Management Goal
Make cost effective decisions
For given 5 year budget levels:
Where repairs are needed
What repair strategies to use
When the repairs should be done
6
Pavement ManagementSystem Components:
County highway database
Automated pavement testing
Repair strategies with costs
Pavement aging prediction
Optimization program
7
County Highway DatabaseContains information on…
Surface type
Surface width
Section area
Traffic volumes
Percentage of trucks
8
Automated Pavement Testing
About 855 lane miles in system
County is divided into quadrants
One quadrant is tested each year
Entire county is covered in four years
9
Automated Pavement Testing
First: Laser Road Surface Tester (RST) measures…
Cracking
Rutting
Ride quality
10
Automated Pavement Testing
Second: Dynaflect deflection tester measures strength and
condition of …
Pavement
Subgrade
11
Repair Strategies and CostsTwo Groups of Roadway Priorities:
(starting with 2010-2014 program analysis)
Four lane roads - 53 miles
Two lane roads - 244 miles
12
Repair Strategies and Costs
Four resurfacing strategies
Three “3R” strategies
Three reconstruction strategies
Associated per-square-yard costs
13
Pavement Aging Prediction Costs
14
ARGUS SummaryPavement Management System does…
Assess the present condition of the system
Estimate future road conditions
Identify and rank road projects
Maximize the condition of the system within the given budget
15
ARGUS Summary …Pavement Management System does not…
Replace professional judgment
Provide certain detailed project-specific
information
16
LCDOT ARGUS results
Started in 1986
System condition has improved from a rating of
68 to 79 (on 100 scale)
Area of backlog and failing pavement has been
reduced from 55% to 9%
17
2012 – 2017Proposed Highway Improvement Program
The following charts to appear in
Section 2 Preservation Projects
18
2012 Traffic Volumes
19
Definitions of Pavement ConditionGood (80 – 100)
Sections may require crack sealing or a thin overlay. These sections do not require immediate attention. Pavement in this category is generally less than 12 years old.
Satisfactory (70-79)Sections may require resurfacing or other rehabilitation in the near future. Pavement is generally 12-14 years old.
Failing (60-69)Will require some type of improvement in the near future to preserve the usability of the surface and avoid the need for reconstruction. This is pavement that is approaching the end of its useable life.
Backlog (10-59)May require surface and base course reconstruction to restore roadway serviceability. Some may require total reconstruction, including reconstruction of the subgrade. Pavement in this category is generally more than 15 years old.
20
Current Pavement Condition = 79Failing
6% Backlog3%
Satisfactory29%
Good62%
21
2012 Pavement Conditions
22
ARGUS optimizes improvements
23
Multiple treatments evaluated
24
System Recommendations2013 - 2017
25
System Preservation Projects 2013-2017
26
2013 ProjectsStreet Name From To Project Type
Darrell Road IL Route 176 Riverwalk Lane Resurfacing
Delany Road 21st Street Wadsworth Road Resurfacing
Dilleys Road Wadsworth Road Stearns School Road Resurfacing
Dilleys Road Stearns School Road IL Route 132 Resurfacing
Hart Road IL Route 14 Lake Cook Road Resurfacing
Kilbourne Road State Line Road Russell Road Resurfacing
Monaville Road Cedar Lake Road IL Route 83 Resurfacing
Wadsworth Road Dilleys Road CP Railroad Tracks Resurfacing
Sunset Avenue IL Route 131 Golf Road Resurfacing
Golf Road Sunset Avenue Greenwood Avenue Resurfacing
Greenwood Avenue Golf Road Sheridan Road Resurfacing
27
2014 ProjectsStreet Name From To Project Type
Fairfield Road Petite Lake Road IL Route 132 Reconstruction
Grass Lake Road 2025' E of Bridge IL Route 59 Resurfacing
Long Grove Road Ela Road Quentin Road Resurfacing
Midlothian Road Winchester Road IL Route 176 Resurfacing
Washington Street UP Railroad Bridge IL Route 131 Resurfacing
Lewis Avenue Glen Flora Avenue IL Route 132 Reconstruction
28
2015 Projects
Street Name From To Project Type
21st Street IL Route 131 Kenosha Road Resurfacing
9th Street Kenosha Road Lewis Avenue Resurfacing
9th Street Lewis Avenue IL Route 137 Resurfacing
Cedar Lake Road IL Route 134 IL Route 120 Reconstruction
Ela Road IL Route 22 IL Route 12 Resurfacing
Ela Road IL Route 12 Cuba Road Resurfacing
Petite Lake Road IL Route 59 Fairfield Road Reconstruction
Quentin Road Long Grove Road Lake Cook Road Resurfacing
Rollins Road Wilson Road Fairfield Road Resurfacing
29
2016 Projects
Street Name From To Project Type
Aptakisic Road Buffalo Grove Road Prairie Road Resurfacing
Aptakisic Road Prairie Road Weiland Road Resurfacing
Aptakisic Road Weiland Road IL Route 21 Resurfacing
Center Street IL Route 83 US Route 45 Resurfacing
Grass Lake Road IL Route 83 Deep Lake Road Resurfacing
Hunt Club Road IL Route 173 Wadsworth Road Resurfacing
Lewis Avenue Dugdale Road IL Route 137 Resurfacing
30
2017 ProjectsStreet Name From To Project Type
Deep Lake Road Grass Lake Road Gelden Road Resurfacing
Hunt Club Road IL Route 132 Dada Drive Resurfacing
Hunt Club Road Dada Drive Washington Street Resurfacing
Hunt Club Road Washington Street Gages Lake Road Resurfacing
Hunt Club Road Gages Lake Road IL Route 120 Resurfacing
Prairie Road IL Route 22 Aptakisic Road Resurfacing
Russell Road Kenosha Road Lewis Avenue Resurfacing
Wilson Road IL Route 120 IL Route 60 Reconstruction
31
Keeping Tabs on the System:Asset Inventories
Pavement and bike facilities, guardrail
Bridges and railroad crossings
Signals and signs
Drainage and stormwater facilities
More…
32
Program resurfaces about12 miles per year
33
Many roads initially built in the 1950s
Inventory: Lane Miles
34
Inventory: Culverts
35
36
Age of Highway Bridges
37
Age of Bridge Deck Surface
38
Age of Bike and Pedestrian Bridges
39
Bridges: Sufficiency Ratings
40
Stormwater Management Facilities
41
By the NumbersInventory: Non-Pavement Assets
14,468 Storm sewer structures
648 Culverts
197 Miles of storm sewer pipe
23,503 Feet of fencing
8,965 Feet of retaining wall
52 Miles of 4’ paved shoulder
18 Miles of guardrail
26 Landscape areas (48 acres)
April 2012
42
Inventory: Signs
43
Inventory: Railroad Crossings
44
Inventory: Signal Controllers
45
Priority One: Preservation
Developing a set of projects
ARGUS Pavement Management Software
Keeping tabs on the system
Asset Inventories
Next Program Presentation:
Priority Two – System Modernization
Priority Three – System Expansion