Reference is made to Article 13 of the Statutes of Det Norske Veritas relating to limitations of liability which will apply for this document. DET NORSKE VERITAS AS, Head Office: Veritasveien 1, N-1322 HØVIK, Norway Org. No. MVA Third Party Verification of DNV 2.7-1 Offshore Containers for MML Suzhou Co. Ltd. Suzhou PR China REPORT No.: SH/80548205/20110803 From: DNV Energy Shanghai DAILY VISIT REPORT WEEK NO. 2011/31 DATE: 8 th August 2011. Prep. by: Charlie Chong To: Bob Zhu Copy: DNV Charlie Cai Xiu Liang NO. OF PAGES (incl. this): Subject: Container Fabrication and Testing Inspection. MML Suzhou Co. Ltd. At the request of MML Suzhou Co. Ltd. Container, load testing and fabrication inspections were carried out at MML Suzhou yard of containers. Client : MML Suzhou Co. Ltd. Suzhou PR China. Date of inspection : 29 th July 2011. Inspection activities : Prototype Testing of 53/11. DVR/Type Approval : S-5280 Description : 32’ Container/32’m001 Container ID : 49/11, 50/11, 51/11, 52/11, 53/11 and 54/11. DNV Project No. : PP019240/80526825 Inspection activities & Items inspected. Following inspections/witnessing activity was attended by undersigned during this visit; - Prototype test for offshore container Serial: 53/11. References. Followings were inspection references; - DNV 2.7-1-2006 Offshore Container. - AWS D1.1-2008 Structural welding code. Documentation. Following documents were reviewed and commented as follow; - Dimensional reports. - Material certificates. - NDT reports. - Material traceability and material certificates. - FAT testing procedures. The documents were found to be generally satisfactory.

20110803 Prototype Testing

  • View
    58

  • Download
    1

Embed Size (px)

DESCRIPTION

DNV 2.7-1 Prototype Testing

Citation preview

Page 1: 20110803 Prototype Testing

Reference is made to Article 13 of the Statutes of Det Norske Veritas relating to limitations of liability which will apply for this document.

DET NORSKE VERITAS AS, Head Office: Veritasveien 1, N-1322 HØVIK, Norway Org. No. MVA

Third Party Verification of DNV 2.7-1 Offshore Containers for MML Suzhou Co. Ltd. Suzhou PR China

REPORT No.: SH/80548205/20110803 From: DNV Energy Shanghai

DAILY VISIT REPORT WEEK NO. 2011/31 DATE: 8th August 2011. Prep. by: Charlie Chong To: Bob Zhu

Copy:

DNV Charlie Cai Xiu Liang

NO. OF PAGES (incl. this):

Subject: Container Fabrication and Testing Inspection.

MML Suzhou Co. Ltd.

At the request of MML Suzhou Co. Ltd. Container, load testing and fabrication inspections were carried out at MML Suzhou yard of containers. Client : MML Suzhou Co. Ltd. Suzhou PR China. Date of inspection : 29th July 2011. Inspection activities : Prototype Testing of 53/11. DVR/Type Approval : S-5280 Description : 32’ Container/32’m001 Container ID : 49/11, 50/11, 51/11, 52/11, 53/11 and 54/11. DNV Project No. : PP019240/80526825 Inspection activities & Items inspected. Following inspections/witnessing activity was attended by undersigned during this visit; - Prototype test for offshore container Serial: 53/11. References. Followings were inspection references; - DNV 2.7-1-2006 Offshore Container. - AWS D1.1-2008 Structural welding code. Documentation. Following documents were reviewed and commented as follow; - Dimensional reports. - Material certificates. - NDT reports. - Material traceability and material certificates. - FAT testing procedures. The documents were found to be generally satisfactory.

Page 2: 20110803 Prototype Testing

Det Norske Veritas Page 2 of 7

Pre-Test Structural Inspection. Pre-test structural inspection on container 53/11 was witnessed by undersigned. Following were witnessed; - Dimensional checks. - Welding inspections. - Padeye skew angles and CG checks. The above mentioned were found to be satisfactory and acceptable. Prototype Testing. Prototype testing of Container 53/11 was witnessed by DNV. Following tests were carried out at the rated load and deformations were checked and were found to be within tolerances; - Four points load testing. - Two point diagonal load testing on all padeye. - Drop testing. Post testing inspection was carried out on the padeye and container general conditions. The Padeye was visually inspected; No deformation and visually detectable crack was observed. Post testing MPI test on the padeye was carried out and witnessed by undersigned. The reports shall be submitted for DNV review. Additional testing; water hose spray test was witnessed by DNV. Visual inspection for water leakage visually inspected on container internal wall was performed, no leakage was detected. Summary and Conclusion. Prototype testing on container 53/11 in accordance with DNV 2.7-1-2006 was witnessed by DNV. The testing was witnessed and the container was found to be acceptable. With best regards

Charlie Chong DNV Energy Surveyor Shanghai Office

Page 3: 20110803 Prototype Testing

Det Norske Veritas Page 3 of 7

Prototype testing: 53/11

Prototype testing in progress: 4 points test.

Page 4: 20110803 Prototype Testing

Det Norske Veritas Page 4 of 7

Prototype testing in progress: Test Parameters Prototype testing in progress: 4 points test

Prototype testing in progress: 4 points test

Page 5: 20110803 Prototype Testing

Det Norske Veritas Page 5 of 7

Prototype testing in progress: Deflection measurements

Prototype testing in progress: Deflection measurements

Prototype testing in progress: 2 points test

Page 6: 20110803 Prototype Testing

Det Norske Veritas Page 6 of 7

Prototype testing in progress: Drop test.

Padeye skewness check.

Page 7: 20110803 Prototype Testing

Det Norske Veritas Page 7 of 7

Padeye skewness check.

Post drop test MPI on 4 corners and padeyes.