36
2011 Summer Capacity Presentation May 23, 2011

2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

2011 Summer Capacity

PresentationMay 23, 2011

Page 2: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

2

Presentation Team

• Ken Zagzebski, President and CEO• Dwayne Burke, Director, Environmental Affairs• Mike Holtsclaw, Director, Power Delivery Operations• Ron Talbot, Sr. VP, Power Supply• Jim Sadtler, VP, Supply and Technology • Joe Bentley, VP, Power Delivery• William Henley, VP, Corporate Affairs• Ken Flora, Director, Regulatory Affairs• Herman Schkabla, Director, Markets & Risks• Jake Allen, Team Leader, Mkting

and Program Mgmt

• Joan Soller, Manager, Corporate Planning

Page 3: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

3

Overview

• Safety• Environmental Rules• Summer Preparedness• Generation• Transmission & Distribution• Technologies & Renewables

Summer 2011 Preparation:

Pete Unit 1 Major Outage--Spring 2011 Turbine Overhaul

Page 4: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

4

Safety OSHA Total Recordable Injury & Illness Case Rate (TRII)

IPL vs

EEI Average Peer Group

Safety

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

2006 2007 2008 2009 2010

Tota

l Rec

orda

ble

Inju

ry a

nd Il

lnes

s C

ase

Rat

e

IPL

EEI Pe

ers

IPL

IPL

IPL

IPL

EEI Pe

ers

EEI Pe

ers

EEI Pe

ers

EEI

Peers

-No

t Y

et

Avail

ab

le

Page 5: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

5

Potential Impact of Federal Environmental Rules

Rule State of RulemakingExpected

Compliance Date

Key Issues

GHG• indefinite delay of "cap and trade" legislation• new source performance standard

TBD• Potential tax discussion to address deficit• Carbon capture and sequestration• NSPS - efficiency driven

HAPS/MACT • Proposed rule issued on 3/16/11• Final Rule by 11/2011

1/2015

• EPA limited flexibility in rule timing and est of standards • Short compliance timeline (3 years) • 1 yr possible extension by IDEM • Availability of contractors/outage schedules

Ash • EPA Proposed Rule: 6/2010• Final Rule: likely after 2012 election

12/2017 • Possible hazardous waste designation; close ponds • Limited beneficial use allowed

NSR Ongoing settlement discussions with EPA

Varies • Unit controls and limits

CAIR/CATR Final rule 7/2011 2012 / 2014 •Trading allowed; allocation process

PCB• EPA Notice of Rulemaking: 2010• Proposed Rule: 2012• Final Rule: 2013

Test: 2014Replace: 2020

Test equipment and replace in 2015, 2020, and 2025 depending on PCB

316(b) • Proposed Rule Issued 3/28/2011 • Final Rule by 7/2012 2015

• Allow site specific cost benefit vs. mandated "one-size-fits-all" • Cooling towers could still be required

Effluent Rule • EPA Proposed Rule: 7/2012 • Final Rule: 1/2014 2017 Treat water effluent prior to ponds

Environmental Rules

Page 6: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

6

Summer Preparedness

Page 7: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

7

IPL Summer Peaks and Demand Response

3116 3139

2888

84 89

75

76

68

22

2500

2600

2700

2800

2900

3000

3100

3200

3300

7/31/2006 8/8/2007 9/2/2008 6/25/2009 8/24/2010 2011Peak Demand Date

MW

Net Demand Demand Response Available Demand Response Available (but not utilized)

Projected

3200 3228

2844 2843

3013 2963

3 pm

94 F

3 pm

91 F

4 pm

91 F

4 pm

95 F

4 pm

93 F

Summer Preparedness

Page 8: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

8

Demand Response Options Summer Demand Impacts (MW)

Rider 2010 201114 Real Time Interrupt ible 0 1215 Customer-owned generat ion 36 32.317 Curtailment with not ice 3.4 2.2

ACLM ACLM Demand Response 24.4 28.2Total 63.8 74.7

Summer Preparedness

Page 9: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

9

Planning Reserve Requirements

(MW)

Jun Jul Aug Sept

UCAP Planning Requirement 2,972 2,998 2,998 2,718

IPL Resources (MISO UCAP Ratings)

2,959 2,959 2,959 2,959

IPL Position Prior to Accounting for

Capacity Sales & Purchases

-13 -41 -41 +241

IPL Net Sales (-) & Purchases (+)

+50 +50 +50 0

Current IPL Position 37 9 9 241

Summer Preparedness

Page 10: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

10

Generation

Petersburg

Harding Street Eagle Valley

Georgetown

Page 11: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

11

IPL Generation Nameplate Ratings

Generation

Coal

2,651 MW

Wind

100 MW

Diesel

14 MW

Dual (oil/gas)

164 MW

Gas

316 MW

Oil

208 MW

Page 12: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

12

Equivalent Forced Outage Rate (EFOR)—Coal Fired

EFOR is an industry measure that represents the effect on unit reliability due to unit forced outages and/or unplanned derates.

Latest available NERC 5 yr average EFOR of 7.46% is used

0

2

4

6

8

10

12

2006 2007 2008 2009 2010Perc

enta

ge (%

) EFO

R -

Bas

eloa

d U

nits

Generation

IPL

IPL

IPL

IPL

IPL

NER

C A

vg

NER

C A

vg

NER

C A

vg

NER

C A

vg

NER

C A

vg

Page 13: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

13

Maintenance

Plan Large Coal-Fired Units

• 10-year incremental plan for the 5 Large Coal Units

• Addresses major components that are approaching normal design life

• Correct emerging reliability issues

• Increases predictive and proactive maintenance

Pete Unit 1 Spring 2011 Major Outage--Removal of Turbine Shell

Generation

Page 14: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

14

Transmission & Distribution

Page 15: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

15

Power Delivery Major Projects

• Transmission– Petersburg to

Thompson—upgrade and rerate

– Petersburg—upgrade auto transformers

– Wheatland –

Breed--

upgrade

– I-69 Line Relocations

• Central Business District– Georgia Street– Cultural Trail

Transmission Tower—I-69 Project

Transmission & Distribution

Page 16: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

16

Downtown Network System

• Preventative Maintenance Measures– Inspect nearly 300 manholes per year (5

year cycle)

– Preventative maintenance testing on 100 Network Protectors annually

– Transformer oil dissolved gas analysis

Transmission & Distribution

Page 17: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

17

Transmission & Distribution

Historical Manhole Pressurization Events Past 5 Years

Downtown Network System

• Massachusetts Ave, Primary Splice Failure on UG Network Cable– One Manhole Cover Dislodged

• E Michigan St & New Jersey, Secondary Cable Failure– Three Manhole Covers Dislodged over a matter of minutes– IPL Cable Damage in only one manhole– IFD Dispatched on report of gas odor prior to the event

• 20 W Court, Customer Service Cable Failure– One Manhole Cover Dislodged– Customer Owned Service Wire Initially Short Circuited

Page 18: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

18

Transmission & Distribution

Junction BoxCustomer’s

Switchgear

Manhole #2

Cable Raceway

Manhole #1

Customer

IPL

20 W Court Street

April 27, 2011

Pre-Event

120/208 Volt

Downtown Network System

Page 19: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

19

Transmission & Distribution

Junction BoxCustomer’s

Switchgear

Manhole #2

Cable Raceway

Manhole #1

Customer

IPL

20 W Court Street

April 27, 2011X

Short Circuit

In Customer’s

Equipment

Initial Event

120/208 Volt

Downtown Network System

Page 20: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

20

Transmission & Distribution

Junction BoxCustomer’s

Switchgear

Manhole #2

Cable Raceway

Manhole #1

Customer

IPL

20 W Court Street

April 27, 2011

Short Circuit

In Customer’s

Equipment

During the Event

X

Downtown Network System

Page 21: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

21

Transmission & Distribution

Junction BoxCustomer’s

Switchgear

Manhole #2

Cable Raceway

Manhole #1

Customer

IPL

20 W Court Street

April 27, 2011

Short Circuit

In Customer’s

Equipment X

Secondary Event

X

Short Circuit In Manhole #2

Caused by Customer Short Circuit

Downtown Network System

Page 22: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

22

Transmission & Distribution

Junction BoxCustomer’s

Switchgear

Manhole #2

Cable Raceway

Manhole #1

Customer

IPL

20 W Court Street

April 27, 2011

Short Circuit

In Customer’s

Equipment X

Short Circuit In Manhole #2

Caused by Customer Short Circuit

Combustible Gases Reach LEL and Cover on Manhole #2 is Dislodged

Over Pressurization Event

XX

Downtown Network System

Page 23: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

23

Transmission & Distribution

Junction BoxCustomer’s

Switchgear

Manhole #2

Cable Raceway

Manhole #1

Customer

IPL

20 W Court Street

April 27, 2011

Short Circuit

In Customer’s

Equipment

Secondary Cable Burns in Two as designed, Event Stops

Event Ends

X

120/208 Volt

Downtown Network System

Page 24: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

24

Transmission & Distribution

Junction BoxCustomer’s

Switchgear

Manhole #2

Manhole #1

Customer

IPL

20 W Court Street

April 27, 2011

300 Circuit Feet of

Secondary Cable

Is Replaced

L

LInstalled Cable

Limiters on the

New Cables

Post Event

Downtown Network System

Page 25: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

25

Transmission & Distribution

Downtown Network System

• New Initiatives– Network SCADA (DOE Project)– Primary Cable fault detectors (DOE Project)– Install cable limiters at select locations– Evaluate Thermal Imaging for elevated

temperatures on components– Combination Locking & Pressure relieving

manhole covers

Page 26: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

26

Technologies and Renewables

Page 27: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

27

Distribution Equipment

• Distribution Automation– Installation of 318 network protector

relays

– Installation of 250 feeder relays and approximately 90 LTC control

– Installation of 178 new reclosers

– Replacement of 1,350 one-way capacitor controls with two-way controls

27

Technologies and Renewables

Page 28: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

28

Advanced

Metering

• Advanced Metering Infrastructure (AMI)– New 2-way RF

communication system installed

– All demand meters are being replaced (~6,400)

– 4,000 energy-only meters will be installed

28

Technologies and Renewables

IPL Metering installs new AMI demand meter at an IPS school.

Page 29: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

29

Electric

Vehicles

Project

• Deploying Electric Vehicle Supply Equipment (EVSE)

• EV Time of Use charging rates available

• Will measure grid impacts from EV charging

Technologies and Renewables

Page 30: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

30

Cyber Security

• Critical Infrastructure Program (CIP)– Implemented Compliant Critical Infrastructure

Protection (CIP) Program– Cyber Security Monitoring

• Smart Grid Security– Implementing a DOE approved Cyber Security Plan

(CSP)– Implementing risk management program

Technologies and Renewables

Page 31: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

31

Customer-Sited Renewable Resources

• Renewable Incentives for small-scale projects

• Net Metering expanded in 2010

• Feed-In Tariff for larger- scale renewables at

customer locations

Technologies and Renewables

Page 32: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

32

Summary

• IPL is well positioned to serve our customers this summer and be in compliance with MISO’s planning reserve margin

• We are also taking steps to be prepared for summers to come

Summary

Page 33: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

33

APPENDIX

Page 34: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

34

IPL Generating Stations—Coal Fired DetailsUnit # Fuel

Commercial DateAge

MW NOx Controls SO2 Controls

Petersburg

1 CoalJun-67

44232

LNB/OFA NN (2004) FGD

2Coal

Dec-6942 435

LNB/OFASCR (2004) FGD

3 CoalNov-77

34540

SCR (2004) FGD (upgraded 2006)

4 CoalApr-86

25545

Improved LNB (2001)NN (2001) FGD (upgrade under

construction)

Harding Street

5 CoalJun-58

53106

LNB/OFASNCR (2004)

NN (2004)—

6 CoalMay-61

50106

LNB/OFA NN (2004)

SNCR (2004)—

7 CoalJul-73

38427

SCR (2005)LNB/OFANN (2000)

FGD (2007)

Eagle Valley

3 CoalDec-51

6043 — —

4 CoalJan-53

5856

OFA (2004)LNB (2004) —

5 CoalDec-53

5762

OFA (2004)LNB (2004) —

6 CoalOct-56

5599

LNB/OFANN (2004) —

Appendix

Page 35: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

35

IPL Generating Stations—Other Fuel DetailsUnit # Fuel

Commercial DateAge

MW

Petersburg DG DieselAug-67

448

Harding Street

3 OilSep-41

7035

4 OilJun-47

6435

CT-1 OilMay-73

3820

CT-2 OilMay-73

3820

CT-3 OilMay-73

3820

CT-4 Oil/GasApr-94

1782

CT-5 Oil/GasJan-95

1682

CT-6 GasMay-02

9158

DG DieselApr-67

443

Eagle ValleyUnit 1 Oil

Mar-4962

39

Unit 2 OilMay-50

6139

DG DieselApr-67

443

Appendix

Page 36: 2011 Summer Capacity - in€¦ · Presentation Team • Ken Zagzebski, President and CEO • Dwayne Burke, Director, ... • Proposed rule issued on 3/16/11 • Final Rule by 11/2011

36

IPL Generating Stations—Other Fuel Details

Unit # FuelCommercial Date

AgeMW

Georgetown

GT-1 Gas May-0011

79

GT-4 Gas Feb-029

79

Hoosier Wind Park Wind

Nov-091 100

Lakefield Wind Park Wind Under Construction—

Planned COD Sep-11 201

Appendix