2011 put it all

Embed Size (px)

Citation preview

  • 8/6/2019 2011 put it all

    1/15

    SHANNON MILLIKEN

    Network

    Proposal

    June 13

    2011CCNA Discovery Networking for Home and Small Businesses: Capstone

    Project Putting it All Together

  • 8/6/2019 2011 put it all

    2/15

    2

    Dear, Susan Roberts

    Enclosed in this packet is a network proposal for the Anycompany Corperation. This

    packet contains the hardware specifics for the computers that will be used by the

    administrative manager, film and graphics editor, and the mobile film crew. This packet also

    contains the cost of those specific computers along with the cost of the server wireless router

    and DSl Modem. The physical layout of the network and the Adressing Scheme for the Server

    and other user computers. After assessing your Building and Budget in this packet I have given

    you my best recommendations of what you need to start your business over.

    Your IT advisor ,

    Shannon Milliken

  • 8/6/2019 2011 put it all

    3/15

    3

    Computer System Planning For

    Job Role: Administrative manager

    Component Recommendation

    Processor:

    (Manufacture/model/speed)AMD Pheonix X6 10907/3.2Ghz

    Memory:

    (typem, amount)Kingston ram/ 4GB

    Hard Drive:

    (type, capacity)SEAGATE /2TB

    CD-ROM/DVD:

    (R,R/W,speed)

    HP/ 130ms

    USB Ports:

    (number, location)4 integrated on the front

    Video Card:

    (manufacturer, model, video RAM)MSI / 768MB

    Sound Card:

    (Manufacture, model)Aseus Xonar DS Audiocard

    Modem:

    (Internal/external, speed, standard)Integrated

    Network Card(s):

    (Ethernet: speed, wireless, standard)Rosewill 100/1000 Mbps/ 802.3

    standard

    Operating System:(manufacturer, version, compatibility)

    Windows XP

    Monitor:

    (size, resolution, refresh)17x10 inch lcd

    Printer:

    (manufacturer, model, type, speed)Hp laser All in one

    Speakers:

    (manufacturer, model, type)N/A

    Internet Connection:

    (USB/Ethernet/wireless)

  • 8/6/2019 2011 put it all

    4/15

    4

    Computer System Planning Form

    Job Role: Film and Graphics Editor

    Component Recommendation

    Processor:

    (Manufacture/model/speed)AMD Pheonix X6 10907/3.2Ghz

    Memory:

    (typem, amount)Kingston ram/ 4GB

    Hard Drive:

    (type, capacity)SEAGATE /2TB

    CD-ROM/DVD:(R,R/W,speed) HP/ 130msUSB Ports:

    (number, location)4 integrated on the front

    Video Card:

    (manufacturer, model, video RAM)MSI / 768MB

    Sound Card:

    (Manufacture, model)Aseus Xonar DS Audiocard

    Modem:

    (Internal/external, speed, standard)Integrated

    Network Card(s):

    (Ethernet: speed, wireless, standard)Rosewill 100/1000 Mbps/ 802.3

    standardOperating System:

    (manufacturer, version, compatibility)Windows XP

    Monitor:

    (size, resolution, refresh)17x10 inch lcd

    Printer:

    (manufacturer, model, type, speed)Hp laser All in one

    Speakers:

    (manufacturer, model, type)N/A

    Internet Connection:

    (USB/Ethernet/wireless)

  • 8/6/2019 2011 put it all

    5/15

    5

    Computer System Planning Form

    Job Role: Mobile Worker * 6

    *Shared Printer:

    Component Recommendation

    Processor:

    (Manufacture/model/speed)Intel Dual core/ 2.6 GHz/3mb

    Memory:

    (typem, amount)2GB DDr3

    Hard Drive:

    (type, capacity)Seagate 320GB

    CD-ROM/DVD:

    (R,R/W,speed) Sony optime Black 18x Dvd/Cdrom

    USB Ports:

    (number, location)4 integrated left side

    Video Card:

    (manufacturer, model, video RAM)1024 Ati HD SSOU

    Sound Card:

    (Manufacture, model)Integrated

    Modem:

    (Internal/external, speed, standard)None

    Network Card(s):

    (Ethernet: speed, wireless, standard) IntegratedOperating System:

    (manufacturer, version, compatibility)Windows XP

    Monitor:

    (size, resolution, refresh)Given

    Printer:

    (manufacturer, model, type, speed)Shared

    Speakers:

    (manufacturer, model, type)Integrated

    Internet Connection:

    (USB/Ethernet/wireless)Wireless

  • 8/6/2019 2011 put it all

    6/15

    6

    The Following Printer will be installed and shared to all workers.

    Brother MFC Series MFC-7840W MFC Monochrome Laser Printer

    ISP

    y Verizon : Small Business Quick Plan with Static IPy Speed: 3MBPS/768KBPSy Services:

    o Emailo Static Public Ipo DNSo Internet Connectivityo 74.99 per month

    Internal Services:

    y FTP/File Servery Mail Servery DHCPy DNSy Network Connectivity

    Devices providing these services:

    y Windows 2003 Server ( FTP/File Server and Email Server )y Linksys ISR ( DHCP, DNS, Firewall, and Network Connectivity )

    Equipment is to be installed after hours when possible.

    y Wireless SecurityWPA2 Key : K!@#112345

    SSID : Main Office

    ESSID-Broadcast: disabled

    y Windows Server 2003Static IP : 182.18.1.167Host Name: Company server

    Server Services: Mail, FTP, File sharing

    y Linksys ISRLinksys Wireless-G Broadband Router WRT54GL

  • 8/6/2019 2011 put it all

    7/15

    7

    Are Wired connections required? Number: 4

    Are Wireless connections required? Number: 6

    Wireless standard Standard N

    Firewall required? Yes

    ISP connectivity required? Yes

    Type of ISP connectivity DSLInternal or external modem required? Yes External DSL

    Cables required? Yes Straight Threw

    Battery backup required? Yes

  • 8/6/2019 2011 put it all

    8/15

    8

    Logical Topology

  • 8/6/2019 2011 put it all

    9/15

    9

    Physical Topology

  • 8/6/2019 2011 put it all

    10/15

    10

    Budget for Computers

    Employee Computers

    Administrative Manager $1,096.67Film and Graphics editor $857.82

    Mobile Worker # 1-6 $469.99 per computer totaling $2819.94

    Network Hardware

    Linksys Wireless Router $59.99

    Ethernet Cable $20.99

    SDR-S1346-T04 $1199.00

    Printers

    HP all in one 149.99

    SAMSUNG ML Series ML-2851ND 279.99

    Total $6475.39

  • 8/6/2019 2011 put it all

    11/15

    11

    Budget Specifics

    Administrative manager

    Processor $229.00

    RAM $44.99

    Hard Drive $79.99

    CD-RW/DVD $59.99

    Video Card $159.99

    Monitor $49.99

    Speakers $49.99

    Total $673.94

    Film and Graphics Editor

    Processor $240.00

    RAM $44.99

    Hard Drive $79.99

    CD-RW/DVD $59.99

    Video Card $159.99

    Monitor $49.99

    Speakers $49.99

    Total $ 673.94

    Mobile Worker

    Bundle of laptops $2819.99

  • 8/6/2019 2011 put it all

    12/15

    12

    Checklist for installation of Computers at the customer site.

    Film and Graphics Editor

    Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check Video Card Install and Check The Operating System Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network.

    Administrative Manager Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check The Operating System Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network.

    Mobile Workers

    Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check Video Card Install and Check The Operating System

  • 8/6/2019 2011 put it all

    13/15

    13

    Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network.

    Checklist for the configuration and installation of the network equipment at the customer site.

    Connect and verify power to the Linksys ISR Change IP of Router to 172.16.1.1 Set DHCP Range and settings on the ISR Set Authentication to TSK and Encryption to WPA2 On the ISR Change ISR ESSID to accompany Disable ISR Broadcast ESSID Set Username and Password on the ISR

    Checklist for overall Security at A Company

    6 Key pass code on all doors Password Policies that require a password change every 60 Days Installation of ADT Small Business Security Systems Site Survey Penetration test for the networks security and wireless security

    Router Configuration:

  • 8/6/2019 2011 put it all

    14/15

    14

    Installation Documentation

    1/14/11 Started at 1:00 P.M.

    -Dcomputer1 Set to DHCP Successfully

    -Dcomputer2 Set to DHCP Successfully

    -ISR IP set to 172.16.1.1

    -ISR DHCP Enabled

    -ISR DHCP Range set to 182.16.1.150-250

    -Server IP Set to 182.16.1.151

  • 8/6/2019 2011 put it all

    15/15

    15

    -Server Subnet Set to 255.255.255.0

    -Printer IP Set to 182.16.1.162

    -Printer Subnet Set to 255.255.255.0

    -1:03 P.M. Ran Simulation of packet from Server to WComputer 1

    Result : Unsuccessful

    -1:07 P.M. Ran Simulation of packet from Server to WComputer 2

    Result : successful

    -1:09 P.M. Checked WComputer 1 & 2 IP settings and found DHCP Failed then set the IPs Statically but

    within the DHCP Range.

    Set WComputer 1 ip to 182.16.1.54

    Set WComputer 2 ip to 182.16.1.102

    -1:12 P.M. Ran Simulation of packet from Server to DComputer 1

    Result : Successful

    -1:17 P.M. Ran Simulation of packet from Server to DComputer 2

    Result P: Successful

    -1:20 P.M. Tested DComputer 1 and DComputer 2 connectivity to the printer

    Result : Successful

    -1:26 PM Tested Wireless Connectivity with the ISR to all Mobile Workers Computers

    Result : Successful

    -1:30 PM There was an average 1.5 Second Time Delay for the transportation of Wired Packets, and 2.3

    Second Time Delay for all Wireless Packets.