29
ALBERTA TRANSPORTATION 2011-14 Tentative Major Construction Projects 2011/12 – 2013/14 Provincial Highway Projects Provincial Highway Construction & Rehabilitation North/South Trade Corridor Ring Roads in Edmonton and Calgary Northeast Alberta Transportation Corridor Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2011/12 and 2013/14. Projects that are under contract or tendered are identified stating the year of construction. Other projects are being designed, rights of way being negotiated and the acquisition of permits underway. These projects will commence as planned in the 3 year program dependant upon the timely completion of the design, and availability of budget. Minor changes to the program may be required as newer information becomes available, In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year. Not identified in the program are some of the bridge rehabilitation projects and localized improvements such as minor slide repairs and intersection upgrades; small carry-over projects from 2010/11; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects.

2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

ALBERTA TRANSPORTATION

2011-14 Tentative Major Construction Projects 2011/12 – 2013/14

Provincial Highway Projects Provincial Highway Construction & Rehabilitation North/South Trade Corridor Ring Roads in Edmonton and Calgary Northeast Alberta Transportation Corridor

Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2011/12 and 2013/14.

• Projects that are under contract or tendered are identified stating the year of construction.

• Other projects are being designed, rights of way being negotiated and the acquisition of permits underway. These projects will commence as planned in the 3 year program dependant upon the timely completion of the design, and availability of budget.

• Minor changes to the program may be required as newer information becomes available, In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year.

Not identified in the program are some of the bridge rehabilitation projects and localized improvements such as minor slide repairs and intersection upgrades; small carry-over projects from 2010/11; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects.

Page 2: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

GLOSSARYThis is a listing of abbreviations used in the following document

@ AtAve AvenueBdy or Bdry BoundaryBF 74817 or (74817-02) Bridge File NumberBvd BoulevardCNR Canadian National RailwayCr CreekCty County(E) East JunctionE EastEB or EBL East Bound LaneECL East Corporate (or City) LimitEID Eastern Irrigation DistrictG/S Grade Separation StructureHwy HighwayIncl IncludesImp ImprovementInt IntersectionIntch InterchangeIR Indian ReserveLk LakeJct JunctionLR Local RoadMtn Mountain(N) North JunctionN NorthNB or NBL North Bound LaneNCL North Corporate (or City) LimitNWRR North West Ring RoadR or Riv RiverRge RangeRd or Rds Road or Roads(S) South JunctionS SouthSB or SBL South Bound LaneSCL South Corporate (or City) Limitsel selectiveSRA Safety Rest AreaSt StreetSV Summer VillageTr TrailTwp TownshipUAR Urban Approach RoadVIS Vehicle Inspection Station(W) West JunctionW WestWB or WBL West Bound LaneWCL West Corporate (or City) LimitWID Western Irrigation District

Page 3: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

1 W of Bassano - E of Hwy 550 (WBL & EBL) Preservation/Overlay 34Contract for 2011 Construction

1 W of Hwy 873 - W of Hwy 884 (selective, EB & WB) Preservation/Overlay 50Contract for 2011 Construction

1 South Saskatchewan River Bridge on Highway 1, at Medicine Hat (73802-1)

Structure Replacement

1A E of Hwy 22 to W of Hwy 766 Twinning - Grade, Base, Stage Paving 6Contract for 2010 & 2011 Construction

1A Major Intersection Improvement @ Jct Hwy 1A & 22 Intersection Improvement

1A Bighill Creek Bridge on Highway 1A, at N Boundary of Cochrane (521-1)

Structure Replacement

1A Hwy 22 - E of Hwy 22 Twinning - Grade, Base, Stage Paving 4

1A Crowchild Trail Interchange (Phase 2) (Roadwork) Interchange - Grade, Base, PavingContract for 2009, 2010, & 2011 Construction

2 Nanton CPR Overpass Abandonment and Realignment, NBL & SBL (includes removal of bridge structure 75051)

Reconstruct/Re-Alignment 5

2 N of Hwy 547 - N of Hwy 2A (S) Preservation/Overlay 11

2 Structure: 196 Ave Br Twinning Deerfoot Trail (82011E-01)

Interchange - Bridge StructureContract for 2009, 2010, & 2011 Construction

2 Bow River Calf Robe Bridge on Highway 2/Deerfoot Trail, at Calgary (78880-1)

Bridge Rehabilitation

2 CPR and CNR Overpass on Deerfoot Trail, at Calgary (NBL)

Bridge Rehabilitation

2 32nd Avenue Improvement(EBL) (Within Deerfoot Right of Way)

Intersection Improvement

2 96th Avenue/Airport Trail Interchange Interchange Upgrading

Tuesday, February 22, 2011 Page 1 of 27

Page 4: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

2 Balzac Interchange Replacement Interchange Upgrading

2 Hwy 567 (Airdrie) - N of Hwy 2A (Crossfield) 6 Laning - Grade, Base, Pave 13

2 N of Hwy 2A (Crossfield) - S of Hwy 581 (S of Carstairs)

6 Laning - Base, Pave 11

2 Bergthall Road Interchange Interchange - Grade, Base, Paving

2 Structure: Interchange @ Bergthall Road Interchange - Bridge Structure

2 4 km N of Hwy 581- S of Hwy 27 Preservation/Overlay 40

2 Olds Interchange (median widening & diamond conversion)

4 - Lane Median Widening 5

2 Hwy 2 & Hwy 587 Interchange Upgrade Interchange Upgrading

2 Safety Rest Area near Hwy 27 (Olds Interchange) Safety Rest Area

2 Local Road Over Highway 2 Interchange, at S Boundary of Red Deer (75331-1) (Replacement)

Interchange - Bridge Structure

2 Highway 2 Over Highway 2A Interchange, 1 km S of Red Deer (75332-3) (New Structure)

Interchange - Bridge Structure

2 Highway 2 Over Highway 2A Interchange, 1 km S of Red Deer (75332-4) (New Structure)

Interchange - Bridge Structure

2 Waskasoo Creek Culvert on Highway 2, at SW Boundary of Red Deer (75333-1) (Extension)

Structure Replacement

2 Hwy 2 Interchange Upgrades: Gaetz Avenue/Taylor Drive (Roadwork)

Interchange Upgrading

2 1 km N of Hwy 590 - City of Red Deer (NBL & SBL) Preservation/Overlay 47

Tuesday, February 22, 2011 Page 2 of 27

Page 5: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

2 Major Access Closure in Red Deer County, Rear Service Road Construction required at:Twp Rd 360, Twp Rd 392

Access Control

2 Old Pole Road Flyover Interchange - Bridge Structure

2 Old Pole Road Flyover Interchange - Grade, Base, Paving

2 Roadside Turnout: SRA C-009A(SBL), S of Ponoka near Wolf Creek

Safety Rest Area

2 Major Access Closure, Lacombe County Access Control

2 Access Closure, City of Lacombe Access Control

2 Access Closure, Town of Blackfalds Access Control

2 Hwy 2 & Hwy 53 Interchange Upgrade Interchange Upgrading

2 Hwy 2 & Hwy 13 Interchange Upgrade Interchange Upgrading

2 Intersection Improvements at Hwy 2 & Cardiff Road (Morinville)

Intersection Improvement

2 4 km N of Hwy 37 - Town of Morinville Preservation/Overlay 8

2 Watercourse Culvert on Provincial Highway 2 near Athabasca (71616-1)

Structure Replacement

2 Watercourse Culvert on Provincial Highway 2 near Hondo (76191-1)

Structure Replacement

2 Hwy 2 & Main Street, Slave Lake Intersection Improvement

2 Sucker Creek (Arcadia Creek Bridge ) on Highway 2, 12 km E of Enilda (76478-1)

Structure Replacement

Tuesday, February 22, 2011 Page 3 of 27

Page 6: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

2 Highway 2 and 49 (NE Corner Turning Lane/Taper) Intersection ImprovementContract for 2011 Construction

2 Watercourse Bridge on Provincial Highway 2 near Donnelly (72315-1)

Structure ReplacementContract for 2011 Construction

2 CNR Overpass on Highway 2, 10 km W of Peace River (76161-1)

Miscellaneous

2 Hwy 49 - 12 km N of Town of Sexsmith Preservation/Overlay 33

2 2 km N of Hwy 43 - Hwy 43 Preservation/Overlay 2

2 Bad Heart River Culvert on Provincial Highway 2 near Sexsmith (75063-1)

Structure Replacement

2A High River, High Country Drive, Intersection Improvement

Intersection Improvement

2A Innisfail - S of Hwy 42(Penhold) 2nd Stage Paving 15

2A Town of Lacombe: 46th Ave - North of Airport Road Twinning - Grade, Base, Stage Paving 4

2A Structure: CNR Underpass(73548-01) Hwy 2A 4-Lane Twinning - Structure

2A Roundabout at 2A/597 Intersection Improvement

2A N of Central Park Road - Town of Blackfalds Twinning - Grade, Base, Stage Paving 3

2A Structure: Blindman River(73496-03) Hwy 2A 4-Lane NBL

Twinning - Structure

2A Red Deer - N of Central Park Road Twinning - Grade, Base, Stage Paving 4

2A Intersection Treatment @ Jct Spruce Road (Twp Rd 422) N of Morningside

Intersection Improvement

Tuesday, February 22, 2011 Page 4 of 27

Page 7: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

2A Hwy 2(E) - Grimshaw Widen And Overlay 11Contract for 2011 Construction

2A Watercourse Culvert on Hwy 2A:36 SW of Peace River (9874-1)

Widen BridgeContract for 2011 Construction

2A 2nd Order Tributary to Strong Creek Culvert on Highway 2A, 3 km NE of Grimshaw (13779-1)

Widen BridgeContract for 2011 Construction

2A Tributary to Strong Creek Culvert on Highway 2A, 5.6 km NE of Grimshaw (75262-1)

Widen BridgeContract for 2011 Construction

3 Intersection and Safety Improvements @ Hwy 3/61 Street and Hwy 3/Frank Industrial Park in Crowsness Pass

Intersection Improvement

3 Hwy 4 - Hwy 845 (EBL & WBL) Preservation/Overlay 22

4 Village of Coutts - S of Hwy 501 Preservation/Overlay 13

4 Village of Coutts Preservation/Overlay 1

4 Hwy 501(W) - N of Milk River Twinning - 2nd Stage Paving 19

6 Pincher Creek - N of Hwy 507 Preservation/Overlay 12

6 Drywood Creek Bridge on Highway 6, 26 km NW of Hill Spring (904-1...Curb Repairs)

Miscellaneous

6 Yarrow Creek Bridge on Highway 6, 29 km W of Hill Spring (903-1...Curb Repairs)

Miscellaneous

6 Roundabout Construction in the Town of Pincher Creek, Jct Hwy 6, Hwy 507, and Hewetson Ave

Intersection Improvement

6 Kettles Creek Culvert on Highway 6, at E Boundary of Pincher Creek (73638-1)

Structure Replacement

Tuesday, February 22, 2011 Page 5 of 27

Page 8: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

9 N of Hwy 1 - N of Hwy 566 Widen And Overlay 21Contract for 2010 & 2011 Construction

9 W of Hwy 21 - E of Hwy 836 Widen And Overlay 15Contract for 2009, 2010, & 2011 Construction

9 E of Hwy 836 - E of Hwy 840 2nd Stage Paving 14Contract for 2009, 2010, & 2011 Construction

9 W of Hwy 884(S) - E of Hwy 884(S) (selective) Preservation/Overlay 13

10 2 km E of Hwy 849 - Hwy 569 Preservation/Overlay 10

10 E of Hwy 9 - E of Hwy 849 (Drumheller) Preservation/Overlay 12

11A Intersection Treatment, Jct of Poplar Ridge Road, West of Red Deer

Intersection Improvement

12 Bentley - W of Hwy 792 Reconstruct/Re-Alignment 9

13 Intersection Upgrading at Jct of RR 10 (Hamlet of Westerose)

Intersection Improvement

13 Hwy 881 (Town of Hardisty) - Hwy 884 Preservation/Overlay 21

13 Jct Hwy 36 to Jct Hwy 881 Preservation/Overlay 39Contract for 2010 & 2011 Construction

14 W of Hwy 216 - Hwy 216 (includes interchange ramps)

Preservation/Overlay 2

14 Hwy 824 - 5 km E of Hwy 824 Preservation/Overlay 5

14 Town of Tofield - Village of Ryley Preservation/Overlay 16

14 E of Hwy 857 - Hwy 36 Preservation/Overlay 17

14 Hwy 36 - 9 km E of Hwy 870 Preservation/Overlay 31

Tuesday, February 22, 2011 Page 6 of 27

Page 9: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

14 Intersection/Safety Improvements, Town of Wainwright - West Town Limits to Main Street

Intersection Improvement 2

15 City of Edmonton - City of Ft Saskatchewan Preservation/Overlay 5

16 Watercourse Culvert on Provincial Highway 16 near Marlboro (72236-1)

Structure ReplacementContract for 2011 Construction

16 Little Brule Culvert on Provincial Highway 16 near Chip Lake (13654-1)

Structure Replacement

16 W of Jct Rge Rd 31 (West Meso Road) to E of Jct Hwy 16A, W of Jct Rge Rd 261(231St) to E of Jct Hwy 216

Preservation/Overlay 15Contract for 2011 Construction

16 1 km W of Village of Wabamun - 6 km W of Hwy 770 (EBL)

Preservation/Overlay 13

16 6 km W of Hwy 770 - Hwy 60 (EBL selective) Preservation/Overlay 35

16 Hwy 43 - 1 km E of Hwy 43 (WBL) Preservation/Overlay 1

16 2 km W of Winterburn Road - Hwy 216 (WBL) Preservation/Overlay 4

16 Hwy 60 - City of Edmonton (EBL) Preservation/Overlay 3

16 Hwy 60 - City of Edmonton (WBL) Preservation/Overlay 3

16 E of Hwy 834 - Hwy 15 (WBL) Preservation/Overlay 17Contract for 2011 Construction

16 Hwy 15 - Town of Vegreville (WBL) and Flyover ramp (EBL)

Preservation/Overlay 17Contract for 2011 Construction

16 Minburn Approach Road - Hwy 41 (WBL) Preservation/Overlay 35

16 Hwy 41 - W of Hwy 893 (WBL) Preservation/Overlay 14

Tuesday, February 22, 2011 Page 7 of 27

Page 10: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

16A 2 km W of Hwy 60 - 1 km W of City of Edmonton (EBL & WBL)

Preservation/Overlay 7

16A Hwy 16 Interchange (Stony Plain Road) Anthony Henday Road

Interchange - Grade, Base, PavingContract for 2009, 2010, & 2011 Construction

16A Hwy 16 - Town of Vegreville (ECL) Preservation/Overlay 8

17 Bridge Over Watercourse on Provincial Hwy 17 on Alberta Sask Border (83156-1)

Structure ReplacementCost Shared with Sask. Govt.

17 12 km S of Hwy 619 - 10 km N of Hwy 619 Widen And Overlay 22Cost Shared with Sask. Govt.

18 W of Hwy 2 - Hwy 2 Preservation/Overlay 1

19 Structure: Whitemud Creek Devon (85036-01) Twinning - Structure

19 Hwy 60 - Hwy 2 Twinning - Grade, Base, Stage Paving 12

19 Structure: Watercourse (8958) Devon Twinning - Structure

19 Hwy 60 - Hwy 625 selective Preservation/Overlay 13

21 Hwy 582 - N of Hwy 583 Preservation/Overlay 6

21 Hwy 623 - Fort Saskatchewan (selective) Preservation/Overlay 40

21 CPR Overpass on Highway 21, at Akenside (79441-2 SBL)

Bridge Rehabilitation

21 CPR Overpass on Highway 21, at Akenside (79441-1 NBL)

Bridge Rehabilitation

22 Highwood River Bridge on Highway 22, 1 km S of Longview (1741-1)

Bridge Rehabilitation

Tuesday, February 22, 2011 Page 8 of 27

Page 11: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

22 Town of Black Diamond Preservation/Overlay 2

22 W of Hwy 22X to E of Hwy 762 Preservation/Overlay 15

22 S of Cremona to N of CremonaClimbing Lanes (SBL) 2 sections

Passing/Climbing Lane 8

22 CPR Overpass on Highway 22, at W Boundary of Cochrane (77466-1)

Twinning - Structure

22 James River Bridge on Highway 22, 13 km N of Sundre (79262-1)

Bridge Rehabilitation

22 Climbing Lane Construction, N of Hwy 621 to S of Hwy 16 (1 NB, 2 SB)

Passing/Climbing Lane 7Contract for 2011 Construction

22 North Saskatchewan River Bridge E of Drayton Valley (74381-1) (Phase 2, bridge)

Structure Replacement

22 North Saskatchewan River Bridge, E of Drayton Valley (74381-1) (Phase 2, road realignment for new bridge)

Reconstruct/Re-Alignment 7

22 S of Paddle River - Hwy 43 Widen And Overlay 11

23 Hwy 542 - E of Hwy 2 Preservation/Overlay 42Contract for 2011 Construction

24 Hwy 23 - Bow River Preservation/Overlay 23Contract for 2011 Construction

26 Hwy 834 - W of Hwy 855 Preservation/Overlay 18

27 Red Deer River Bridge on Highway 27, at Sundre (1980-1)

Bridge Rehabilitation

27 12 km W of Hwy 21 - 1 km W of Hwy 21 (selective) Preservation/Overlay 3

28 N of Hwy 28A - Hwy 651 Widen And Overlay 11

Tuesday, February 22, 2011 Page 9 of 27

Page 12: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

28 Hwy 651 - W of Hwy 827 Preservation/Overlay 14

28 Various Curve Revisions (3) W of Redwater, Hwy 38, N of Redwater

Reconstruct/Re-Alignment 3

28 1 km W of Hwy 827 - Hwy 829 Preservation/Overlay 7

28 2 km E of Village of Waskatenau - UAR 104 Preservation/Overlay 8

28 Cache Creek Bridge on Highway 28, 3 km W of Spedden (72816-1)

Structure Replacement

28 Muriel Creek Bridge on Provincial Highway 28 near Ardmore (73665-1)

Bridge Rehabilitation

29 Hwy 36 - Duvernay Widen And Overlay 2

32 Groat Creek Culvert near Mcleod Valle (13836-1) Widen Bridge

32 S of Mahaska - Groat Creek Widen And Overlay 21

32 Tributary to Mcleod River Culvert, 33 km SW of Whitecourt (9540-1)

Widen Bridge

32 Safety Rest Area, SW of Whitecourt, SRA NC-011, SB Safety Rest Area 0.30

32 Watercourse Culvert near Mcleod Valle (1674-1) Widen Bridge

32 Repairs to Rainbow Creek Culvert near Haddocreek (73676-1)

Widen Bridge

35 Watercourse Culvert on Provincial Highway 35 near Chinook Vall (76055-1)

Structure Replacement

35 Stowe Creek Culvert on Provincial Highway 35 near Notikewin (71814-1)

Structure Replacement

Tuesday, February 22, 2011 Page 10 of 27

Page 13: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

35 Safety Rest Area, N of Manning, SRA P-076, SB Safety Rest Area 0.30

36 N of Hwy 561 - S of Hwy 570 Preservation/Overlay 4

36 S of Hwy 577 - Hwy 9 Preservation/Overlay 21

36 S of Hwy 570 - S of Hwy 577 Preservation/Overlay 36

36 Sullivan Lake - S of Hwy 12 Preservation/Overlay 13

36 Hwy 45 - Hwy 29 Widen And Overlay 6

37 4 km E of Hwy 2 - Hwy 28 Preservation/Overlay 6

37 Hwy 2 - 1 km E of Hwy 2 Preservation/Overlay 1

39 Eight Mile C Culvert on Provincial Highway 39 near Leduc (402-1)

Structure Replacement

40 Winter Creek Bridge on Provincial Highway 40 near Entrance (77015-1)

Structure Replacement

40 North of Hwy 16 to South of Berland River (4 locations)

Passing/Climbing Lane 6Contract for 2010 & 2011 Construction

40 N of Berland R - S of Muskeg River Widen And Overlay 11Contract for 2011 Construction

40 Malcolm Creek Culvert on Highway 40, 2 km N of Grande Cache (76995-1)

Structure Replacement

40 Big Mountain Creek Culvert on Highway 40, 35 km S of Grande Prairie (79474-1)

Bridge Structure

41 N of Hwy 545 - S of Hwy 570 Preservation/Overlay 70

Tuesday, February 22, 2011 Page 11 of 27

Page 14: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

41 Buffalo Creek Bridge on Provincial Highway 41 near Wainwright (72699-1)

Structure Replacement

43 2 km E of Hwy 671 - Hwy 723 (Beaverlodge Bypass) Twinning - Grade, Base, Stage Paving 10

43 W of Grande Prairie - City of Grande Prairie Preservation/Overlay 5

43 Hwy 723 - Hwy 724 Twinning - 2nd Stage Paving 14

43 City of Grande Prairie - Hwy 2 (SBL) Preservation/Overlay 2

43 City of Grande Prairie - Hwy 2 (NBL) Preservation/Overlay 3

43 Roadside Turnout: SRA P-027 A (EBL) E of Debolt Safety Rest Area 0.20

43 Pelican Ck Culvert Located on South (Local) SErvice Road near Calais (86200-1)

Bridge Structure

43 Goose Creek Culvert on Local Road 14 km W of Valleyview (86207-1)

Bridge Structure

43 Woodpecker Creek Culvert Located on North (Local) Service Road near Sturgeon Lake Settlement (86205-1)

Bridge Structure

43 Pelican Creek Culvert on North (Local) Service Road near Calais (86201-1)

Bridge Structure

43 Woodpecker Creek Culvert Located on South (Local) Service Road near Sturgeon Lake Settlement (86206-1)

Bridge Structure

43 Deep Creek Culvert on Hwy 43 near Crooked Creek (71295-1)

Structure ReplacementContract for 2011 & 2012 Construction

43 Harrington Creek (Tributary to Sturgeon Creek ) Culvert, Sturgeon Heights (Replace Existing and Construct New Pipe For Twinning)

Structure ReplacementContract for 2011 & 2012 Construction

Tuesday, February 22, 2011 Page 12 of 27

Page 15: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

43 E of Crooked Creek - W of Sturgeon Lake IR 154 Twinning - Grade, Base, Stage Paving 17Contract for 2011 & 2012 Construction

43 Clarkson Creek Culvert on Provincial Highway 43 near Crooked Creek (71319-3)

Twinning - StructureContract for 2011 & 2012 Construction

43 Clarkson Creek Culvert on Provincial Highway 43 near Crooked Creek (71319-1)

Twinning - StructureContract for 2011 & 2012 Construction

43 Watercourse Structure (Gonika), Hwy 43 near Crooked Creek (86036-1)

Structure ReplacementContract for 2011 & 2012 Construction

43 Clarkson Creek Culvert Over Service Road near Crooked Creek (86261)

Twinning - StructureContract for 2011 & 2012 Construction

43 Goose Creek Bridge, W of Valleyview (74307-1), mods for pedestrian traffic

Bridge Structure

43 Woodpecker Creek Culvert, near Valleyview (71631-2)

Twinning - Structure

43 Goose Creek Bridge on Highway 43, 14 km W of Valleyview (74307-2)

Twinning - Structure

43 Pelican Creek Culvert on Provincial Highway 43 near Calais (74308-2)

Twinning - Structure

43 Pedestrian Underpass on Provincial Hwy 43 near Sturgeon Lake Settlement (86204-1)

Twinning - Structure

43 Sturgeon Lake IR (W of W Bdry - E Bdry) Twinning - Grade, Base, Stage Paving 19

43 Goose Creek Bridge on Pedestrian Trail near Calais (86202-1)

Bridge Structure

43 Pedestrian Underpass on Provincial Hwy 43 near Calais (86203-1)

Twinning - Structure

Tuesday, February 22, 2011 Page 13 of 27

Page 16: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

43 Tributary to Goose Creek, South Service Road, BF86267

Bridge Structure

43 Service Roads, Both Sides, N & S, Sturgeon Lake IR Access Control 15

43 1 km W of Hwy 33 - Hwy 33 (WBL) Preservation/Overlay 1

43 S of Onoway - Hwy 16 (NBL) Widen And Overlay 12

43X W of 116 Street (RR63) - E of Hwy 2 and 43 interchange, N of Grande Prairie

2nd Stage Paving

44 Hwy 16 - 1 km N of Hwy 16 Preservation/Overlay 2

44 Watercourse Culvert on Provincial Highway 44 near Jarvie (73293-1)

Structure Replacement

47 Sundance Creek Culvert on Provincial Highway 47 near Edson (8814-1)

Structure ReplacementContract for 2011 Construction

49 E of Village of Rycroft - E of Hwy 733 Preservation/Overlay 33

49 W of Hwy 744 - Hwy 2 Preservation/Overlay 22

53 2 km W of Hwy 761 - 1 km E of Hwy 766 Preservation/Overlay 20

53 Hwy 20 - W of Hwy 792 Preservation/Overlay 22Contract for 2011 Construction

55 Structure: Hwy 813 (GS) (75118-03) Athabasca (Bridge Removal)

Bridge Structure

55 Access Control/Int Relocation @ Hwy 813/widen (Hwy 2 - W of Hwy 827)

Reconstruct/Re-Alignment 3

55 Structure: Tawatinaw R (01517-01) Athabasca Structure Replacement

Tuesday, February 22, 2011 Page 14 of 27

Page 17: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

55 W of Iron River - Jct Hwy 41 Widen And Overlay 12

55 Roundabout Intersection Construction @ Hwy 55 & 892

Intersection Improvement

56 Hwy 1 - S of Hwy 561 Preservation/Overlay 22Contract for 2011 Construction

56 Redwillow Creek Culvert on Provincial Highway 56 near Stettler (74362-1)

Structure Replacement

56 2 km S of Hwy 609 - Hwy 13 Preservation/Overlay 24

58 Safety Rest Area, W of High Level, SRA P-004 A, (WBL)

Safety Rest AreaContract for 2010 & 2011 Construction

58 Sixth Meridian - S of Negus River Widen And Overlay 16Contract for 2010 & 2011 Construction

58 E of Chinchaga River - Sixth Meridian Widen And Overlay 14Contract for 2009, 2010, & 2011 Construction

58 Tributary to Bushe River Culvert on Highway 58, 20 km W of High Level (80541-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Watercourse Culvert on Provincial Highway 58 near High Level (86101-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Tributary to Bushe River Culvert on Highway 58, 15 km W of High Level (80672-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Watercourse Culvert on Provincial Highway 58 near High Level (86098-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Watercourse Culvert on Provincial Highway 58 near High Level (86102-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Watercourse Culvert on Provincial Highway 58 near High Level (86095-1)

Widen BridgeContract for 2011 & 2012 Construction

Tuesday, February 22, 2011 Page 15 of 27

Page 18: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

58 Watercourse Culvert on Provincial Highway 58 near High Level (86100-1)

Widen BridgeContract for 2011 & 2012 Construction

58 S of Negus River - Jct Hwy 35 (High Level) Widen And Overlay 31Contract for 2011 & 2012 Construction

58 Watercourse Culvert on Provincial Highway 58 near High Level (86099-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Watercourse Culvert on Provincial Highway 58 near High Level (86096-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Watercourse Culvert on Provincial Highway 58 near High Level (86097-1)

Widen BridgeContract for 2011 & 2012 Construction

58 Safety Rest Area, E of High Level, SRA P-005/E-043, WBL (upgrade)

Safety Rest Area 0.30

61 N of Hwy 879 - W of Etzikom Widen And Overlay 14Contract for 2011 Construction

63 Hwy 28 - Hwy 661 Preservation/Overlay 34

63 13 km S of Hwy 663 - 1 km S of Hwy 663 Preservation/Overlay 12

63 Twinning on Highway 63 from Hwy 55 to Wandering River (delivery of various segments dependant on right of way acquisition)

Twinning - Grade, Base, Stage Paving 61

63 Wandering River - S of May Tower Twinning - Grading 17Contract for 2009, 2010, & 2011 Construction

63 Rest Area, N of Wandering River (NBL) (Grading) Safety Rest Area 0.10Contract for 2009, 2010, & 2011 Construction

63 Safety Rest Area, N of Wandering River (SBL) (Grading)

Safety Rest Area 0.10Contract for 2010 & 2011 Construction

63 S of May Tower - S of House River Twinning - Grading 19Contract for 2010 & 2011 Construction

63 Wandering River - S of House River Twinning - Base, Stage Paving 36

Tuesday, February 22, 2011 Page 16 of 27

Page 19: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

63 Safety Rest Area, N of Wandering River (SBL, Base Pave)

Safety Rest Area 0.10

63 N of Lyle Creek - N of House River Preservation/Overlay 40

63 Safety Rest Area, N of Wandering River (NBL) (Base Pave)

Safety Rest Area 0.10

63 S of Marianna Lake to N of Marianna Lake Preservation/Overlay 17

63 N of Marianna Lake to N of Algar Tower Preservation/Overlay 25

63 S of Hwy 881 - S of Hwy 69 Twinning - 2nd Stage Paving 19Contract for 2011 Construction

63 Pinchpoint Tangent Pile Wall (N of Athabasca R.) Miscellaneous 1Contract for 2010 & 2011 Construction

63 Athabasca River - S of Thickwood Boulevard Interchange (stage 2)

Grading, Base, Full Paving 2Contract for 2010 & 2011 Construction

63 Structure: Interchange @ Thickwood Boulevard Interchange - Bridge StructureContract for 2010 & 2011 Construction

63 Structure: Interchange @ Confederation Way Interchange - Bridge StructureContract for 2010 & 2011 Construction

63 Conn Creek Culvert on Highway 63, 4 km N of Fort Mcmurray (78995-1)

Structure ReplacementContract for 2010 & 2011 Construction

63 Confederation Way Interchange Stage 2 (Roadwork) Interchange - Grade, Base, Paving 6Contract for 2010 & 2011 Construction

63 Thickwood Blvd Interchange Stage 2 (Roadwork) Interchange - Grade, Base, Paving 3Contract for 2010 & 2011 Construction

63 Athabasca River Bridge on Highway 63, Fort Mcmurray (Replace Superstructure & Lowering of Grant Macewan)

Structure Replacement

63 Structure: Franklin Tunnel Phase 2 Fort Mcmurray (75217SE2)

Bridge Structure

Tuesday, February 22, 2011 Page 17 of 27

Page 20: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

63 Roadwork - New bridge/Steinhauer & widening from Morrison to Bridge.

Widen And Overlay 1

63 Structure: Athabasca River - NB Fort McMurray Steinhauer (78041N)

Widen Bridge

63 Parsons Creek Interchange Interchange - Grade, Base, Paving

64 Tributary to Peace River Culvert on Highway 64, 22 km SW of Worsley (79554-1) (Inlet Repairs)

Miscellaneous

88 Safety Rest Area, N of Hwy 754, SRA P-018, NB Safety Rest Area 0.30

88 S of Jct Hwy 686 to N of the 23rd Baseline Base, Stage Paving 20Contract for 2010 & 2011 Construction

88 Safety Rest Area, S of Hwy 986, SRA P-017, NB Safety Rest Area 0.30

88 Watercourse Culvert on Provincial Hwy 88 near Red Earth (86234-1)

Structure Replacement

88 N of Jct Hwy 686 - Willow Creek Base, Stage Paving 24Contract for 2010 & 2011 Construction

201 CALGARY SOUTH EAST RING ROAD (17th Ave SE to E of Macleod Trail Interchange) (P3 Initiative)

Grading, Base, Full Paving 24

201 Provincial Highway 201 (Stoney Trail) Over Nose Hill Dr at Calgary (82402-1)

Interchange - Bridge Structure

201 Provincial Highway 201 (Stoney Trail) Over CPR at Calgary (79097-2)

Interchange - Bridge Structure

201 Nose Hill Drive Interchange Stony Trail NW (Roadworks)

Interchange - Grade, Base, Paving

201 Calgary North West Ring Road, Hwy 1 - Hwy 2 2nd Stage Paving 23

Tuesday, February 22, 2011 Page 18 of 27

Page 21: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

216 EDMONTON NORTH EAST RING ROAD (Manning Drive - S of Whitemud Drive Interchange) (includes various interchange upgrades on Hwy 16) (P3 Initiative)

Grading, Base, Full Paving 27

216 EDMONTON NORTH WEST RING ROAD (Hwy 16 West to Manning Drive) (P3 Initiative)

Grading, Base, Full Paving 22

216 Cameron Heights Drive Over Provincial Highway 216 (Anthony Henday Drive) at Edmonton (85013-1)

Interchange - Bridge StructureContract for 2010 & 2011 Construction

216 Cameron Heights Interchange Anthony Henday (Roadwork)

Interchange - Grade, Base, PavingContract for 2010 & 2011 Construction

216 Callingwood Road (62 Ave) Over Provincial Highway 216 (Anthony Henday Drive) at Edmonton (85010-1)

Interchange - Bridge StructureContract for 2009, 2010, & 2011 Construction

216 Lessard Drive Over Provincial Highway 216 (Anthony Henday Drive) at Edmonton (85011-1)

Interchange - Bridge StructureContract for 2009, 2010, & 2011 Construction

216 62 Ave Interchange (Callingwood Rd) Anthony Henday (Roadwork)

Interchange - Grade, Base, PavingContract for 2009, 2010, & 2011 Construction

216 Lessard Road Interchange Anthony Henday (Roadwork)

Interchange - Grade, Base, PavingContract for 2009, 2010, & 2011 Construction

216 142 Street (Rabbit Hill Road) Over Anthony Henday Interchange - Bridge StructureContract for 2010 & 2011 Construction

216 Rabbit Hill Road (142 Street) Interchange, Anthony Henday

Interchange - Grade, Base, PavingContract for 2010 & 2011 Construction

504 Hwy 36 - W of Hwy 877 Preservation/Overlay 16Contract for 2011 Construction

507 W of Hwy 775 - Pincher Creek (selective) Preservation/Overlay 16

510 Hwy 3 - Hwy 785 Preservation/Overlay 24

529 Hwy 23 - Little Bow Park Access Road Preservation/Overlay 16Contract for 2011 Construction

Tuesday, February 22, 2011 Page 19 of 27

Page 22: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

540 Stimson Creek Bridge on Provincial Highway 540 near Pekisko (1308-1)

Structure Replacement

540 W of Hwy 2 - Hwy 2 Base, Paving 19

542 W of Milo - Milo Widen And Overlay 9Contract for 2010 & 2011 Construction

542 EID Irrigation Canal Culvert on Provincial Highway 542 near Brooks (75923-1)

Structure Replacement

543 Tongue Creek Bridge on Provincial Highway 543 near Hartell (913-1)

Structure Replacement

544 EID Irrigation Canal Culvert on Provincial Highway 544 near Duchess (76799-1)

Structure Replacement

544 EID Irrigation Canal Bridge on Provincial Highway 544 near Duchess (72059-1)

Structure Replacement

550 EID Irrigation Canal Bridge on Provincial Highway 550 near Duchess (76338-1)

Structure Replacement

579 E of Hwy 40 - E of Harold Creek (Selective) Grading 5

579 Hwy 40 - E of Hwy 40 Grading 3

579 W of Water Valley to Water Valley Preservation/Overlay 5Contract for 2011 Construction

580 Sucker Creek Bridge on Provincial Highway 580 near Carstairs (798-1)

Structure Replacement

582 3 km W of Hwy 2A - 1 km E of Hwy 2 Preservation/Overlay 9

583 Hwy 805 - Hwy 806 Preservation/Overlay 6

585 Hwy 21 - E of Hwy 836 Preservation/Overlay 14

Tuesday, February 22, 2011 Page 20 of 27

Page 23: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

587 Hwy 22 - W of Hwy 766 Preservation/Overlay 13Contract for 2011 Construction

587 9 km W of Hwy 766 - 7 km E of Hwy 766 Preservation/Overlay 16

587 W of Hwy 805 - E of Hwy 805 Preservation/Overlay 5

590 Hwy 2 - Hwy 791 Widen And Overlay 8

590 Threehills Creek Bridge on Provincial Highway 590 near Innisfail (116-1)

Structure Replacement

604 W of RR 272 - Hwy 2A Grading, Base, Full Paving 11

604 Wolf Creek Culvert on Highway 604 near Morningside (1043-1)

Bridge Structure

604 Whelp Brook Culvert on Provincial Highway 604 near Morningside (1201-1)

Bridge Structure

609 Village of Edberg - Hwy 56 Preservation/Overlay 6

609 Hwy 56 - Hwy 854 Preservation/Overlay 21Contract for 2011 Construction

617 Hwy 623 - Hwy 834 Preservation/Overlay 18

619 Hwy 36 - E of Hwy 36(Town of Viking)

Preservation/Overlay 1

625 W of Sparrow Drive - E of 9th Street (Nisku) Reconstruct/Re-Alignment 4Contract for 2010 & 2011 Construction

626 Hwy 855 - Hwy 857 Preservation/Overlay 14

627 Hwy 770 - Hwy 779 Preservation/Overlay 15

627 Hwy 779 - City of Edmonton Preservation/Overlay 21Contract for 2011 Construction

Tuesday, February 22, 2011 Page 21 of 27

Page 24: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

628 E of Hwy 779 - E of Hwy 60 Grading, Base, Stage Paving 16

628 Hwy 14 - Hwy 14 selective Preservation/Overlay 1

630 E of Hwy 21 - Hwy 824 (EBL) Preservation/Overlay 6

630 2 Km E of Hwy 21 - 3 Km E of Hwy 824 (WBL) Preservation/Overlay 1

646 Hwy 881 - Hwy 41 Preservation/Overlay 25Contract for 2011 Construction

646 Hwy 29 - 6 km E of Hwy 29 Preservation/Overlay 6Contract for 2011 Construction

651 Hwy 2 - 10 km E of Hwy 803 (selective) Preservation/Overlay 9

660 Hwy 882 - Hwy 41 Preservation/Overlay 27

660 Hwy 41 - Hwy 28 Preservation/Overlay 5

661 E of Ft Assiniboine - W of the Vega Ferry Base, Stage Paving 1

663 W of Hwy 855 - E of Hwy 855 Preservation/Overlay 21Contract for 2011 Construction

667 Hwy 722 - Hwy 43 Preservation/Overlay 7

670 Watercourse Bridge on Provincial Highway 670 near Grande Prair (13767-1)

Structure Replacement

672 Beavertail Creek Bridge on Provincial Highway 672 near Hythe (8963-1)

Structure Replacement

672 Beaverlodge River Bridge on Highway 672, 2 km S of Hythe (8781-1)

Bridge Rehabilitation

672 Watercourse Culvert on Provincial Highway 672 near Grande Prair (13765-1)

Structure ReplacementContract for 2011 Construction

Tuesday, February 22, 2011 Page 22 of 27

Page 25: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

676 Watercourse Culvert on Provincial Highway 676 near Whitemud Creek (77308-1)

Structure ReplacementContract for 2011 Construction

681 Watercourse Bridge on Provincial Highway 681 near Blueberry Mountain (76439-1)

Structure Replacement

684 Strong Creek Bridge on Provincial Highway 684 near Peace River (7979-1)

Structure Replacement

686 Watercourse Culvert on Hwy 686 near Trout Lake (86210-1)

Structure Replacement

688 Bridge File 86256 (Pat's Creek) Construction of New Culvert on New Alignment

Bridge Structure

688 Bridge File 86255 Construction of New Culvert on New Road Alignment

Bridge Structure

688 Realignment and Reconstruction of Existing Intersection of Hwy 2 (1.3 km S of current location and approx 2.7 km of new roadway)

Reconstruct/Re-Alignment 3

690 Watercourse Culvert on Provincial Highway 690 near Dixonville (73271-1)

Structure Replacement

726 Watercourse Bridge on Provincial Highway 726 near Worsley (73353-1)

Structure ReplacementContract for 2011 Construction

727 Hwy 49 - Hwy 680 Base, Staged Paving 20Contract for 2011 Construction

727 Structure: Ksituan River (72963-02) NW of Spirit River (Bridge Removal)

Bridge Structure

727 Structure: Howard Creek (72964-02) Spirit River (Bridge Removal)

Bridge Structure

727 3 intersection treatments and shoulder pulling, Hwy 49 to N of Hwy 49 (on existing 727)

Intersection Improvement 3

Tuesday, February 22, 2011 Page 23 of 27

Page 26: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

730 Montagneuse River Bridge on Highway 730, 17 km N of Hines Creek (70050-1)

Structure ReplacementContract for 2011 Construction

734 Wigwam Creek Bridge on Provincial Highway 734 near Sundre (77571-1)

Structure Replacement

734 Bread Creek Culvert on Provincial Highway 734 near Bearberry (72008-1)

Structure Replacement

734 Yara Creek Bridge on Provincial Highway 734 near Sundre (73159-1)

Structure Replacement

734 Tepee Pole C Bridge on Provincial Highway 734 near Bearberry (72564-1)

Structure Replacement

742 Bow River Bridge, on Highway 742 at Canmore (167-1)

Bridge Rehabilitation

743 N of Hwy 986 - S of Whitemud River, Reconstruction of gravelled highway and drainage improvements

Grading 11

743 Whitemud River Bridge on Highway 743, 27 km SE of Deadwood (76026-1)

Structure ReplacementContract for 2010 & 2011 Construction

743 Watercourse Culvert on Provincial Highway 743 near Peace River (77271-1)

Structure ReplacementContract for 2010 & 2011 Construction

762 Hwy 549 - Hwy 22 Preservation/Overlay 22

763 Hwy 18 - Hwy 33 Preservation/Overlay 26

766 N of Jct Hwy 580 to Jct Hwy 582 Sealed Base 15Contract for 2010 & 2011 Construction

766 Hwy 582 - Twp Rd 324 Sealed Base 11Contract for 2011 Construction

770 Hwy 39 - 2 km N of Hwy 622 Preservation/Overlay 11

Tuesday, February 22, 2011 Page 24 of 27

Page 27: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

771 Jct of Sunnyside Drive, S of SV of Parkland Beach Intersection Improvement

771 S of Hwy 611 - Hwy 611 Grading 6Contract for 2010 & 2011 Construction

772 Watercourse Culvert on Provincial Highway 772 near Balzac (1094-1)

Structure Replacement

774 E of Westcastle Ski Hill to W of Beaver Mines Lake Access

Base, Stage Paving 11

778 Hwy 616 - 2 km S of Hwy 39 Preservation/Overlay 16

779 N of 44th Ave - S of Hwy 16A (Town of Stony Plain) Preservation/Overlay 1Contract for 2010 & 2011 Construction

779 47th Ave - N of 44th Ave (Town of Stony Plain) Widen And Overlay 1Contract for 2010 & 2011 Construction

779 Hwy 628 - 47th Ave (Town of Stony Plain) Reconstruct/Re-Alignment 2

779 Hwy 16 - 1 km N of Hwy 16 selective Preservation/Overlay 1

779 Hwy 16A - Hwy 16 selective Preservation/Overlay 3

785 Town of Pincher Creek Preservation/Overlay 1

785 Watercourse Culvert on Hwy 785 near Pincher Creek (1745-1)

Structure Replacement

791 Hwy 72 - 5 km S of Hwy 575 Preservation/Overlay 8

791 Hwy 590 - Hwy 42 Grading, Base, Stage Paving 15

813 Intersection Relocation: Hwy 55 - N of Hwy 55 Reconstruct/Re-Alignment 1

817 Hwy 901 - S of Strathmore Preservation/Overlay 9Contract for 2011 Construction

Tuesday, February 22, 2011 Page 25 of 27

Page 28: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

827 Hwy 661 - 16 km N of Hwy 661 Grading, Base, Stage Paving 16

831 Hwy 45 - S of Hwy 28 Preservation/Overlay 16Contract for 2011 Construction

831 North Saskatchewan River Bridge on Highway 831, 4 km S of Waskatenau (13742-1)

Bridge Painting

833 City of Camrose - Hwy 617 Preservation/Overlay 17

834 Hwy 26 - Hwy 14 Preservation/Overlay 39

840 Watercourse Bridge on Provincial Highway 840 near Standard (6673-1)

Structure Replacement

845 Coaldale to S of Oldman River Preservation/Overlay 13Contract for 2011 Construction

853 Hwy 589 - N of Hwy 589 Preservation/Overlay 2

857 Hwy 16A - Town of Vegreville (NCL) Preservation/Overlay 1

858 4 km N of Hwy 55 - 22 km N of Hwy 55 Preservation/Overlay 18Contract for 2011 Construction

862 Watercourse Culvert on Provincial Highway 862 near Gem (72079-1)

Bridge Structure

862 Hwy 561 - 5 km E of Hwy 561 Base, Stage Paving 5

867 N of Beaver River - Hwy 55 Base, Stage Paving 11

870 Iron Creek Bridge on Provincial Highway 870 near Hardisty (7721-1)

Structure Replacement

872 N of Hwy 586 - S of Hwy 12 Preservation/Overlay 15

875 EID Irrigation Canal Bridge on Provincial Highway 875 near Rolling Hill (72029-1)

Structure Replacement

Tuesday, February 22, 2011 Page 26 of 27

Page 29: 2011-14 Tentative Major Construction Projects …...Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects

Highway Location Type of WorkEstimatedLength (km)

Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

in 2011-2014MAJOR PROVINCIAL HIGHWAY PROJECTS

(Major Construction and Rehabilitation)

877 N of Hwy 61 - Hwy 513 Base, Paving 17Contract for 2011 Construction

887 Canal Creek Bridge on Provincial Highway 887 near Orion (7097-1)

Structure Replacement

892 Hwy 659 - Hwy 28 Preservation/Overlay 7

892 Hwy 28 - Hwy 55 selective Preservation/Overlay 5

892 9 km N of Hwy 55 - 10 km N of Hwy 55 Preservation/Overlay 2

897 North Saskatchewan River Bridge on Highway 897, 16 km N of Marwayne (71145-1)

Bridge Rehabilitation

947 Athabasca River - Hwy 43 2nd Stage Paving 20

986 Culvert on Tributary to Cadotte River on Highway 986 NE of Peace River (86227-1)

Structure Replacement

986 Watercourse Culvert on Provincial Highway 986 near Three Creeks (81288-1)

Structure Replacement

BOW RIVER WEIR

Calgary Bow River Weir Modifications: W17236-03 Miscellaneous

UAR 104 1 km S of Hwy 28 - Hwy 28 Preservation/Overlay 1

UAR 172 Hwy 21 - Village of New Sarepta Preservation/Overlay 4

Tuesday, February 22, 2011 Page 27 of 27