32
Chim Sáo wellhead platform topsides installation, July 2010 Chim Sáo wellhead platform topsides installation, July 2010 2010 Half-year Results 26 August 2010

2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Chim Sáo wellhead platform topsides installation, July 2010Chim Sáo wellhead platform topsides installation, July 2010

2010 Half-year Results

26 August 2010

Page 2: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Disclaimer & Important Notice

This presentation contains forward looking statements that are subject to risk factors associated with the oil and gas industry It is believed that therisk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a range of variables which could cause actual results or trends to differ materially including but not limited to: price fluctuationstrends to differ materially, including but not limited to: price fluctuations, actual demand, currency fluctuations, geotechnical factors, drilling and production results, gas commercialisation, development progress, operating results, engineering estimates, reserve estimates, loss of market, p g , g g , , ,industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial markets conditions in various countries, approvals and cost estimates.

All references to dollars, cents or $ in this document are to Australian currency, unless otherwise stated.

2

Page 3: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

2010 Half-year Results Da id KnoDavid Knox

Managing Director & CEO

Page 4: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Sound Operating Performance

Change on 2009

2010 Half-year Result

Production 24.2 mmboe (9%)

Sales Revenue $1,091 million 7%Sales Revenue $1,091 million 7%

EBITDAX $655 million 1%

Net Profit After Tax $198 million 94%

Underlying Net Profit $210 million 121%

Operating Cash Flow $537 million 8%

Inte im Di idend 22 cents pe sha e nchanged

4

Interim Dividend 22 cents per share unchanged

Page 5: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

The Santos Strategy

Base business

Using quality assets, Santos will safely deliver:

Eastern Australia: Margin growth and resource conversion Indonesia: Established business with incremental growth WA: Growing a material domestic gas business

LNG growth GLNG: A leading CSG to LNG project, FID 2010

PNG LNG FID D 09 fi t LNG d ti id 2014 PNG LNG: FID Dec-09, first LNG production mid-2014 Darwin LNG: Mature brownfield LNG growth Bonaparte LNG: Innovative floating LNG project

Focused growth in Asia Vietnam: Deliver Chim Sáo and exploration-led growth India/Bangladesh: Bay of Bengal exploration led growth

5

India/Bangladesh: Bay of Bengal exploration-led growth

Page 6: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Reserves and Resources for Growth

4000

mmboeReserves & resources/

production*3,937

CAGR 14%

3 862

3000

4000 ,

2,7453,067

3,474

3,862

2000

2,497 72 years

2,086

1 971

,

2,2482,595

2,849

1000 793

12

26 years

295

1,443

360

1,971

378 394 495

0

2004 2005 2006 2007 2008 2009P d R P b bl R 2C R

647 12 years348295

414 441 485 518

6

Proved Reserves Probable Reserves 2C Resources

* Based on 2009 production of 54.4 mmboe and cumulative reserves/resources

Excludes exploration

Page 7: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

2010 Half-year Results Pete WasoPeter Wasow

Executive Vice President & CFO

Page 8: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Reported & underlying profits

1st Half Reported NPAT

Underlying NPAT$

120 (5) 210

300

NPAT$m

198120 (5) 210

200

102 95100

01st Half 2009

1st Half 2009

1st Half 2010

1st Half 2010

OtherPrices & foreign

8

exchange

Page 9: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Production impacted by flooding

26.7 (0.2) (0.7) (2.0) (1.9) 2.3 24.2mmboe 2010 full year guidance

f 49 52 b

25

3026.7 (0.2) (0.7) (2.0) (1.9) 2.3 24.2mmboeof 49 to 52 mmboe

unchanged

Wet weather and flood

15

20impact on Cooper Basin production in first half was 2 mmboe

5

10 Stronger gas

production in WA and Indonesia

0

1st Half 2009

1st Half 2010

Asset Sales

Contract Expiry

Flooding Naturaldecline

Newprod’n

9

0 0

Page 10: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Sales Volumes and Revenue

2 8 3 530

40

Purchased

mmboe

Higher realised prices for ll d

29.0 28.5

26.2 25.0

2.8 3.5

10

20

ProducedReserves

Purchased Gasall products

Cooper gas sales volumes met by production and gas

0

1st Half 2009 1st Half 2010

Reservesfrom storage

Higher volumes of third party gas offset lower own

1000

15001,024 327 (171) (89) 1,091$m

p y gproduct volumes

Third party gas revenue $90 million

0

500

$

10

1st Half 2010

1st Half 2009

Prices FX Volume Mix

Page 11: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Production Cost and Cost of Sales

Total Cost of SalesProduction Cost $m $m

650Gas

purchases

300$24.70 per boe

$23.82 per boe

$266m $276m

650 p

Cost of

200

450Cost of

produced hydrocarbons1100

250

1st Half 2009 1st Half 20100

1st Half 2009 1st Half 2010

11

1 Includes production costs, tariffs, tolls and pipeline costs, royalties, inventory and DD&A

Page 12: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Segment EBITDAX Summary

Segment Half Year Half Year Change

Eastern Australia 278 303 (8)WA&NT 312 285 9

Seg e t$m 2010 2009 %

& 3 85 9GLNG 15 5 200Asia Pacific 65 54 20Gain on sale of assets (3) 22

Corporate and unallocated items (12) (22) 45

TOTAL EBITDAX 655 647 1

Eastern Australia |Higher prices offset by lower liquid sales volumes due to floodingWA&NT |Higher liquids and LNG revenue GLNG |Additional field capacity at Fairview

12

Asia Pacific |Higher prices and lower operating costs

Page 13: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

DD&A Declines by $37 million

Rate Volume

300

350314 (24) (13) 277

$m

Lower Cooper volumes drive lower depletion rate

200

250

300

2010 full year guidance of $11.70/boe

50

100

150maintained

0

50

1st Half 2009 1st Half 2010$11.76/boe $11.45/boe

13

$ / $ /

Page 14: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Funding Growth

Committed to maintaining current investment grade credit rating- Maintain strong liquidity profile to provide financial flexibility- Prudent management of capital through the cycle

Strong liquidity with A$6.4 billion of cash and facilities Other funding options

- Sell down GLNG project equity- Export Credit Agency financingp g y g- Hybrid securities if appropriate- Asset leasing and 3rd party infrastructure ownership- Sell assets not adding to free cash flow, debt capacity or strategyg , p y gy

If required, new equity to support the credit rating in a manner that rewards existing shareholders

14

Page 15: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

2010 Half-year Results Da id KnoDavid Knox

Managing Director & CEO

Page 16: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Moomba Plant, February 2010

16

Page 17: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Reindeer gas plant, July 2010

17

Page 18: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Chim Sao, July 2010

18

Chim Sáo wellhead platform topsides installation, July 2010Chim Sáo wellhead platform topsides installation, July 2010

Page 19: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

LNG is a key component of Santos’ Growth Strategy

Strategy Bonaparte LNGStrategy Components PNG LNG

Sanctioned Dec 2009 6.6 mtpa two trains

Fi t LNG 2014Deliver the

Bonaparte LNG 2 mtpa FLNG Santos 40% with carry to FID

Darwin LNG Production since 2006 3.6 mtpa single train Santos 11 5%

First LNG 2014 Santos 13.5%

Deliver the Base Business

LNG G th Santos 11.5%

GLNG Leading CSG to LNG

LNG Growth

Focused 7.2 mtpa two trains FID 2010 Santos 60%

Focused growth in Asia

19

Page 20: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Strategy Delivers Material LNG Growth

6mtpaGLNG T1

Santos equity LNG productionfrom existing discovered resources

5BLNG

3

4GLNG T2

1

2GLNG T1

0

1

Darwin LNG

PNG LNGExcludes PNG LNG expansion

2010 2020

20

Assumes Santos equity of 45% in GLNG

2010 2020

Page 21: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

GLNG Milestones Achieved

Two trains, five train site

GLNG is progressing key milestones

Project fully staffed

GLNG Operations Pty Ltd, owned by the project shareholders, operates the pipeline and LNG plantpipeline and LNG plant

FEED complete for upstream, pipeline and two trains on Curtis Island

Long lead engineering orders placed

Binding off-take agreement

Queensland Government environmental Qapproval for 10mtpa capacity (3 trains)

42 signed agreements with Indigenous groups

21

Water solution - 1.3 million trees planted

Page 22: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

GLNG Path to FID

Federal environmental decision

FID in 2010 and first cargo in 2014

Federal environmental decision expected in October

Complete further binding offtakeand equity sell down to underpin a q y ptwo train project

Santos maximum equity at FID expected to be 45%

Final EPC costs 4Q 2010

FID 1st train 4Q 2010

22

Page 23: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

GLNG Upstream Update

Wells- 59 CSG wells were drilled for GLNG in

1H10- Key successes with pad drilling and

directional drilling in coals (24 wells)11 d illi d l ti i d t d t- 11 drilling and completion rigs devoted to CSG program

Water1 3 million trees planted- 1.3 million trees planted

Upstream FEED- Dual competitive FEED studies completed

Fl l t d f d EPC- Fluor selected as preferred EPC contractor

- Early works and detailed design progressing

23

p g g- Final EPC costs 4Q10

Page 24: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Papua New Guinea LNG

FID approved Dec 2009

PNG LNG Project construction commences

pp 6.6 mtpa two trains Santos 13.5% Four Asian buyersFour Asian buyers Financial Close achieved

March 2010 Early works construction, y

facilities detailed design and procurement activities underway

First LNG 2014 First LNG 2014 Plateau production of ~9

mmboe pa net to Santos LNG plant site schematic

Page 25: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Summary

Continued delivery of Santos’ growth strategy

Sound operating performance despite Central Australia flooding

GLNG progressing to FID by year end

PNG LNG construction underway

Strong financial position to fund growth

25

Page 26: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Reference slides

Page 27: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

2010 Guidance

Item 2010G idGuidance

Production (mmboe) 49 – 52

Production costs ($m) 560 – 580Production costs ($m) 560 – 580

DD&A expense ($/boe) 11.70

Royalty related taxation expense1 ($m after tax) 70 – 90Royalty related taxation expense ($m after tax) 70 90

Capital expenditure (including exploration & evaluation)2 ($m)

2,300

1 Royalty related taxation expense guidance assumes an oil price of A$90 per barrel.

2 Capital expenditure guidance includes $150 million for conventional exploration.

27

Page 28: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

$6.4 billion of Funding Capacity

30 June 201030 June 2010

Cash & term deposits 2 405

$m

Cash & term deposits 2,405Undrawn, committed corporate lines** 2,038Undrawn, committed project line* 1,947C h & itt d d bt li 6 390Cash & committed debt lines 6,390

* Converted at 30 June 2010 exchange rate* *Commences on 1 October 2010 the same date the existing $700m loan facility expires

28

* *Commences on 1 October 2010, the same date the existing $700m loan facility expires

Page 29: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

EBITDAX

PricesVolume and

MixOperating

CostsGas

Purchases Other

1,000647

Prices

156

Mix

(89)

Costs

(24)

Purchases

(14)

Other

(21) 655$m

600

800

200

400

01st Half 2009

1st Half 2010

29

Page 30: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Significant items (after tax)

1st Half 1st Half2010 2009$m

Underlying profit 210 95Significant items (12) 7

2010 2009$m

g ( )Net profit after tax 198 102

Significant items included:Significant items included:Net (losses)/gains on sales and impairment losses (27) 16Foreign currency gains/(losses) 3 (15)Fair value adjustment on embedded derivatives and hedges (9) 6Remediation costs and contract losses* 4 (10)Investment Allowance 17 10

Total (12) 7

30

* Net of related insurance recoveries

Page 31: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Second Half 2010 Sensitivities

Sensitivity Change* NPAT Impact A$mA$m

US dollar oil price US$1/bbl 5

Gas price 10 cent/GJ 9Gas price 10 cent/GJ 9

A$/US$ exchange rate 1 cent 4

Inte est ates 1% 1Interest rates 1% 1

* Change from average YTD price/rate

31

* Change from average YTD price/rate

Page 32: 2010 Half-year Results - Santos€¦ · PdR PbblR 2C R 647 years 348 414 441 485 518 6 Proved Reserves Probable Reserves 2C Resources * Based on 2009 production of 54.4 mmboe and

Contact Information

Head officeAdelaideGround Floor Santos Centre

Andrew NairnGroup Executive Investor RelationsLevel 10 Santos CentreGround Floor, Santos Centre

60 Flinders StreetAdelaide, South Australia 5000GPO Box 2455Ad l id S th A t li 5001

Level 10, Santos CentreDirect: + 61 8 8116 5314Facsimile: +61 8 8116 5131Email: [email protected]

Adelaide, South Australia 5001Telephone: +61 8 8116 5000Facsimile: +61 8 8116 5050

U f l il

Brooke HannInvestor Relations AnalystLevel 10, Santos CentreDi 61 8 8116 7227Useful email contacts

Share register enquiries:[email protected]

Direct: + 61 8 8116 7227Facsimile: +61 8 8116 5131Email: [email protected]

Investor enquiries:[email protected]

Website:www.santos.com