14
EESSI - Electronic Exchange of Social Security Information RO perspective Bianca Culea - CNPAS

2010 - EESSI - Electronic Exchange of Social Security Information

Embed Size (px)

Citation preview

Page 1: 2010 - EESSI - Electronic Exchange of Social Security Information

EESSI - Electronic Exchange of Social Security Information

RO perspective

Bianca Culea - CNPAS

Page 2: 2010 - EESSI - Electronic Exchange of Social Security Information

EESSI Architecture:

Source: European Commission

MemberState 1

MemberState 2

CI

CI

MemberState 4

CI

CI

CI

CI

CI CICI CICI

CI

CI

Member State 3

CI

CI

CI

MemberState “n”

CI

CI

CI

CoordinationNode CI Competent

InstitutionAccessPoint

NationalNetwork

NationalNetwork

NationalNetwork

NationalNetwork

sTESTA

EESSIInternational Network

NationalNetwork

NationalNetwork

Page 3: 2010 - EESSI - Electronic Exchange of Social Security Information

RO – 4 Access Points:

Access Point Covered areas

ApRO04Pension, Legislation Applicable and Work

Accidents and Occupational Diseases

ApRO03 Sickness

ApRO02 Family Benefits

ApRO01Unemployment

Page 4: 2010 - EESSI - Electronic Exchange of Social Security Information

MemberState 1

CICI

Access Point

EESSIInternational Network

NationalNetwork

Electronic contact point

Nationaltraffic

Internationaltraffic

CI

Network for Social Security

National part of Access Point

Source: European Commission

CI CompetentInstitution

AccessPoint

International Part of Access Point

National Part ofAccess Point

International part of Access Point

International EESSI Protocol

NationalEESSI Protocol

Internal “Bridging” Protocol

MemberState 2

`

WEBIC

Page 5: 2010 - EESSI - Electronic Exchange of Social Security Information

Page 5

5

Routing Architecture:

MS CI 1

AP-RI

NPAPIPAP

CN

EMS EMD

ICD2ICD1

CI1-D1 WEBICAdapter

Original message sent to CI 1 (found in DS)

CI2NA

Adapter

CI1-D2XML

Adapter

D 1 (SP A)

D 2 (SP B)

WEBIC

DB

NA

DB

CI 2

NA

DB Messages in DB and seen by user:

CI2

Messages in DBand seen by user:

CI1 (SP A)

Messages in DBand seen by user:

CI1 (SP B)

CustomRouting

Depending on a parameter in the body of the SED

(SP=SED Parameter)

DB

CI1 (SP A)

CI2

CI1 (SP B)

Messages in DB:

Page 6: 2010 - EESSI - Electronic Exchange of Social Security Information

General schedule – Master Directory data upload:

Page 7: 2010 - EESSI - Electronic Exchange of Social Security Information

EESSI - April 2010 - RO Status: 4 APs established AP’s Administrators and Managers established CN/Master Directory content for all 4 APs uploaded S - testa connected for all 4 APs Training on PAI and MMI for all 4 APs staff PAI and MMI RO related information checked

(minor modification still needed) PAI translation (RO) done.

Page 8: 2010 - EESSI - Electronic Exchange of Social Security Information

RO target: January 2011 - ???Integration of EESSI into national environment, reengineering national application

Mid October 2010

↓31 November

2010

Six Testing Member States to test ALL the components of the EESSI system

End User and national administrator training for all

1 December 2010

↓28 February

2011

Installation, configuration of various EESSI components for all and testing.

1 March 2011

↓1 Mai 2011

A testing campaign of exchanges with the WEBIC will be organises for the non testing Member States will be organised with

Page 9: 2010 - EESSI - Electronic Exchange of Social Security Information

Trainings:

September 2010 until the end of November, trainings for national users and administrator will take place.

The purpose of the training is to prepare the Member States for the installation, configuration, administration and the use of the Reference Implementation and the WEBIC.

Page 10: 2010 - EESSI - Electronic Exchange of Social Security Information

General schedule: Bid preparation conditionality:

Documentation – final versions:June 2010 - ICD2 and Protocol Design Document middle of August : Coordination Node, Reference Implementation, WEBIC

So,………………….Bid preparation can start……!

Page 11: 2010 - EESSI - Electronic Exchange of Social Security Information

RO & EESSI:

• from January 2011, once the local EESSI components are installed, Member States will be in a position to start establishing the connexion of EESSI to their national environment through the ICD2 interface by adapting/configuring national connectors and developing or reengineering national applications.

Page 12: 2010 - EESSI - Electronic Exchange of Social Security Information

RO: Bid scope:Required hardware for 4 APs

• NPAPs development• National Applications reengineering and APs

integration• Technical support• Trainings

Page 13: 2010 - EESSI - Electronic Exchange of Social Security Information

Ro – “EESSI enabled” scenario:

• June – October 2010 – Bid preparation and launch• November – December 2010 – Bid evaluation• January - February 2011 – IPAPs installations and

tests• May 2011 – NPAPs & National Applications first

release• June 2011-October 2011 – NPAPs & National

Applications and EESSI integration tests

• December 2011 – RO EESSI “enabled”

Page 14: 2010 - EESSI - Electronic Exchange of Social Security Information

Thank you!