History of Project

•Board saw a need, and formed a vision for a larger library

•Mill levy for construction passed by community

•Property purchased from Empire Electric

•All wanted a resource & energy efficient library building

Page 3: 2009.02 Library Reception

Green Building

•USGBC Leadership in Energy and Environmental Design (LEED) Certified

•Construction through Library Use

•Green Features

•Building that Teaches

Page 4: 2009.02 Library Reception

Features

•New Building over 3 X size of current location

•Programs, collection & other services

•Meeting Room will seat over 5 X current space

•Location, Location, Location!

Page 5: 2009.02 Library Reception

Floorplan

Page 6: 2009.02 Library Reception

Building Updates

Page 7: 2009.02 Library Reception

Roofing Panel

Page 8: 2009.02 Library Reception

NW Corner

Page 9: 2009.02 Library Reception

Reading Deck

Page 10: 2009.02 Library Reception

East Side

Page 11: 2009.02 Library Reception

Ready to Roof!

Page 12: 2009.02 Library Reception

Flooring Panels

Page 13: 2009.02 Library Reception

Raised Flooring

Page 14: 2009.02 Library Reception

NE View

Page 15: 2009.02 Library Reception

Timelines•March

Raised Floor, Ductwork, Interior walls

•AprilWindows, Drywall, Plumbing, Electrical

•MayInterior Detailing, Building Air Flush

•June – Move In!!

Page 16: 2009.02 Library Reception

How to DonateOnlineIn PersonBy Mail