ALBERTA TRANSPORTATION 2009-12 Tentative Major Construction Projects 2009/10 – 2011/12 Provincial Highway Projects Provincial Highway Construction & Rehabilitation North/South Trade Corridor Ring Roads in Edmonton and Calgary Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2009/10 and 2011/12. Projects that are under contract or tendered are identified stating the year of construction. Other projects are being designed, rights of way being negotiated and the acquisition of permits underway. These projects will commence as planned in the 3 year program dependant upon the timely completion of the design, and availability of budget. Minor changes to the program may be required as newer information becomes available, In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year. Not identified in the program are some of the bridge rehabilitation projects and localized improvements such as minor slide repairs and intersection upgrades; small carry-over projects from 2008/09; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects.

2009-12 Tentative Major Construction Projects 2009/10 ......The attached tentative three-year construction and rehabilitation program lists the major projects where substantive work

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • ALBERTA TRANSPORTATION

    2009-12 Tentative Major Construction Projects 2009/10 – 2011/12

    Provincial Highway Projects Provincial Highway Construction & Rehabilitation North/South Trade Corridor Ring Roads in Edmonton and Calgary

    Provincial Water Management Projects The attached tentative three-year construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2009/10 and 2011/12.

    • Projects that are under contract or tendered are identified stating the year of construction.

    • Other projects are being designed, rights of way being negotiated and the acquisition of permits underway. These projects will commence as planned in the 3 year program dependant upon the timely completion of the design, and availability of budget.

    • Minor changes to the program may be required as newer information becomes available, In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year.

    Not identified in the program are some of the bridge rehabilitation projects and localized improvements such as minor slide repairs and intersection upgrades; small carry-over projects from 2008/09; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects.

  • GLOSSARYThis is a listing of abbreviations used in the following document

    @ At2nd SecondAve AvenueBdy or Bdry BoundaryBF 74817 or (74817-02) Bridge File NumberBvd BoulevardCr CreekCty County(E) East JunctionE EastEB or EBL East Bound LaneECL East Corporate (or City) LimitG/S Grade Separation StructureHwy HighwayIncl IncludesImp ImprovementInt IntersectionIntch InterchangeIR Indian ReserveJct JunctionLR Local RoadMS Metis SettlementMtn Mountain(N) North JunctionN NorthNB or NBL North Bound LaneNCL North Corporate (or City) LimitR or Riv RiverRge RangeRd or Rds Road or RoadsRsrve Reserve(S) South JunctionS SouthSB or SBL South Bound LaneSCL South Corporate (or City) Limitsel selectiveSRA Safety Rest AreaSt StreetTr TrailTwp TownshipVIS Vehicle Inspection Station(W) West JunctionW WestWB or WBL West Bound LaneWCL West Corporate (or City) Limit

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    1 E of Banff Park Boundary - Kananaskis River (selective EBL & WBL)

    Preservation/Overlay 16

    1 Banff Park Boundary - Hwy 742 Preservation/Overlay 11

    1 Highway 1 Over Highway 1A Interchange, 10 km E of Calgary (WBL, abutment repairs & other rehabilitation work)

    Bridge Rehabilitation .

    1 Highway 1 Over Highway 1A Interchange, 10 km E of Calgary (77091-1)

    Bridge Rehabilitation .

    1 E of Hwy 842 - E of Hwy 56 (WBL) Preservation/Overlay 16Contract for 2009 Construction.

    1 W of Bassano - E of Hwy 550 (WBL & EBL) Preservation/Overlay 27

    1 Highway 1 Over Gershaw Drive Interchange, at Medicine Hat (73897-2) (WBL)

    Bridge Rehabilitation .

    1 Highway 1 Over Gershaw Drive Interchange, at Medicine Hat (73897-1) (EBL)

    Bridge Rehabilitation .

    1 CPR Overpass On Highway 1, 1 km SE Of Medicine Hat Boundary (71340-2) (WBL)

    Bridge Rehabilitation .

    1 CPR Overpass On Highway 1, 1 km SE Of Medicine Hat Boundary (71340-1) (EBL)

    Bridge Rehabilitation .

    1A Hwy 1 - E of Canmore Preservation/Overlay 15

    1A E of Hwy 22 - E of Town of Cochrane ECL Preservation/Overlay 6

    1A Calgary ECL - Hwy 1 Preservation/Overlay 5

    2 S of Hwy 511 - Fort Macleod SCL Preservation/Overlay 11Contract for 2009 Construction.

    2 S of Hwy 519 - Claresholm SCL (NBL) Preservation/Overlay 17Contract for 2009 Construction.

    Tuesday, March 31, 2009 Page 1 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    2 Nanton NCL - N of Cayley (NBL & SBL) Preservation/Overlay 18Contract for 2009 Construction.

    2 Roadside Turnout: SRA S-010 A (SBL) S of High River

    Rest Area / Truck Turnout .

    2 Roadside Turnout: SRA S-011 A (NBL) S of High River

    Rest Area / Truck Turnout .

    2 N of Stavely - Nanton NCL (SBL) Preservation/Overlay 25Contract for 2009 Construction.

    2 17th Ave, Peigan, Anderson/Bow Bottom, Glenmore Tr & Southland Dr. (Intch Loops, Ramps, & Cross Roads)

    Preservation/Overlay .Contract for 2009 Construction.

    2 Structure: 196 Ave Br Twinning DEERFOOT TRAIL (82011E-01)

    Interchange - Bridge Structure .

    2 Deerfoot Trail Intch Completion CALGARY STONEY TRAIL NW

    Interchange - Grade, Base, Paving .

    2 N of McKnight Boulevard - S of City of Calgary NCL (SBL)

    Preservation/Overlay 9

    2 Barlow Tr/Peigan Tr Intch Imp DEERFOOT TRAIL Interchange Upgrading .Contract for 2008 & 2009 Construction.

    2 Beddington Tr - 64th Ave Widening DEERFOOT TRAIL(BF 81800Z1&2)

    Reconstruct/Re-Alignment 2

    2 Bow River Calf Robe Bridge on Highway 2/Deerfoot Trail, At Calgary (78880-1) (NBL)

    Bridge Rehabilitation .

    2 32nd Avenue Improvement(EBL) (within Deerfoot right of way)

    Intersection Improvement .

    2 Deerfoot Trail: Ivor Strong Bridge - S of 17Avenue S (NBL & SBL)

    Preservation/Overlay 22

    Tuesday, March 31, 2009 Page 2 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    2 CPR and CNR Overpass on Deerfoot Trail, at Calgary (SBL)

    Bridge Rehabilitation .

    2 S of Crossfield - N of Acme Road Interchange (NBL & SBL)

    4 - Lane Median Widening 21Contract for 2007, 2008, & 2009 Construction.

    2 Yankee Valley Blvd. Interchange (East Side Ramps & Loop)

    Interchange Upgrading .Contract for 2008 & 2009 Construction.

    2 Structure: Yankee Valley Blvd. Interchange, Airdrie (NBL & SBL) Structures

    Interchange - Bridge Structure .Contract for 2008 & 2009 Construction.

    2 S of Hwy 2A - N of Town of Bowden (SBL) Preservation/Overlay 8

    2 Access Management: Minor Access Removals @ Various Locations

    Access Control .

    2 Major Access Closure in Red Deer County, Rear Service Road Construction required at:Twp Rd 360, Twp Rd 392

    Access Control .

    2 Major Access Closure, Lacombe County, Rear Service Road construction required at : 1 mile N of Hwy 597, Twp Rd 400, Grumpy's Diner, Duckett Road, Wolf Creek

    Access Control .

    2 S of Hwy 604 - Hwy 53 (NBL) Preservation/Overlay 11

    2 S of Hwy 53 - Hwy 13 (SBL) Preservation/Overlay 33

    2 Roadside Turnout: SRA C-009 A (SBL), S of Ponoka Rest Area / Truck Turnout .

    2 Climbing Lane: Blindman River, N of Red Deer (SBL) Passing/Climbing Lane 2

    2 Hwy 13 - Hwy 39 (NBL selective) Preservation/Overlay 23

    2 Hwy 13 - Hwy 39 (SBL selective) Preservation/Overlay 27

    Tuesday, March 31, 2009 Page 3 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    2 50 Street Over Highway 2 Interchange, at NW Boundary of Leduc (77994-1)

    Bridge Rehabilitation .

    2 N of Hwy 812 - S of Lawrence Lake Preservation/Overlay 16Contract for 2009 Construction.

    2 E of Kinuso - Faust Preservation/Overlay 14

    2 E of High Prairie - W of High Prairie Preservation/Overlay 3Contract for 2009 Construction.

    2 Intersection Improvement: @ RR 172 (High Prairie) Intersection Improvement .Contract for 2008 & 2009 Construction.

    2 Hwy 679 - McLennan Preservation/Overlay 14

    2 E of Hwy 735 - Hwy 732 (Fairview) Preservation/Overlay 27

    2 Structure: Peace River (73949) Dunvegan Bridge Bridge Rehabilitation .Contract for 2008 & 2009 Construction.

    2 Watercourse Culvert on Hwy 2, 6 km North of Dunvegan (73273-1)

    Structure Replacement .

    2 Highway 2 and Hwy 49 (Rycroft) includes service roads

    Intersection Improvement .

    2 Interchange @ Hwy 2 and 43: Service Roads Interchange Upgrading .

    2A S of Hwy 543 - Hwy 7 Preservation/Overlay 11Contract for 2009 Construction.

    2A Hwy 2A and Township Road 40-0 (Lakeside Sargant Road, N of Blackfalds) includes re-alignment

    Intersection Improvement .

    2A N of Hwy 2 - S of Town of Ponoka Preservation/Overlay 3

    2A S of City of Wetaskiwin - S of Hwy 13 Preservation/Overlay 12

    3 W of Piikani IR (IR147) E Bdry - W of Hwy 810 Preservation/Overlay 6Contract for 2009 Construction.

    Tuesday, March 31, 2009 Page 4 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    3 Lethbridge WCL - Lethbridge ECL (EBL & WBL) Preservation/Overlay 14Contract for 2009 Construction.

    3 E of Coaldale - W of Barnwell (WBL & EBL) Preservation/Overlay 20Contract for 2009 Construction.

    4 Hwy 501(W) - Milk River BF 84503 - River Protection Twinning - Grade, Base, Stage Paving 3Contract for 2008 & 2009 Construction.

    4 Milk River - N of Milk River Twinning - Grade, Base, Stage Paving 4Contract for 2008 & 2009 Construction.

    4 S of Hwy 501 - Milk River Preservation/Overlay 5Contract for 2008 & 2009 Construction.

    5 Cardston - S of Spring Coulee Preservation/Overlay 18

    9 N of Hwy 1 - N of Hwy 566 (BF73842) Widen And Overlay 22

    9 W of Hwy 21 - E of Hwy 836 (BF74487,82167,69,70) Widen And Overlay 15

    9 N of Hwy 566 - S of Beiseker Widen And Overlay 20Contract for 2009 Construction.

    9 Irricana - S of Beiseker Preservation/Overlay 2Contract for 2009 Construction.

    9 E of Hwy 836 - E of Hwy 840 2nd Stage Paving 14

    11 Horburg - E of Horburg Preservation/Overlay 17

    11 E of Condor - Hwy 766(E) Preservation/Overlay 6

    11 W of Hwy 20 - W of Hwy 596 (EBL) Twinning - 2nd Stage Paving 13Contract for 2008 & 2009 Construction.

    11 W of Hwy 781 - E of Hwy 2 Preservation/Overlay 17Contract for 2009 Construction.

    11A Hwy 752 - Hwy 11 Preservation/Overlay 2

    11A Hwy 2 and Hwy 11A Interchange (Diamond Conversion)

    Interchange Upgrading .

    Tuesday, March 31, 2009 Page 5 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    11A Highway 11A Over Highway 2 Interchange, at NW Boundary Of Red Deer (75336-1...Deck Joints, Bearing Repair, Paint, Slope Protection)

    Bridge Rehabilitation .

    12 E of Hwy 792 - W of Hwy 2 Preservation/Overlay 5Contract for 2009 Construction.

    12 Hwy 12 & Hwy 2 Interchange Upgrades Interchange Upgrading .

    12 Town of Stettler Preservation/Overlay 4

    13 E of Hwy 20 - Hwy 2 Preservation/Overlay 33

    13 W of Bittern Lake - E of Hwy 21 Preservation/Overlay 16

    13 6 Km W of Village of Strome - Hwy 36 Preservation/Overlay 22

    13 Battle River Bridge on Highway 13, 2 km S of Hardisty (74222-1)

    Bridge Rehabilitation .

    14 Passing Lanes - East and West of Tofield Passing/Climbing Lane 6

    14 E of Hwy 857 - Hwy 36 Preservation/Overlay 18

    14 Hwy 36 - E of Hwy 870 Preservation/Overlay 31

    16 E of Hinton - W of Obed (EBL) Preservation/Overlay 10Contract for 2009 Construction.

    16 Town of Edson (EBL & WBL) (Phase II) selective Preservation/Overlay 3Contract for 2009 Construction.

    16 Edson - E of Edson (EBL) Preservation/Overlay 4Contract for 2009 Construction.

    16 Various Intersection Improvements along Hwy 16 (Edson - W of Hwy 753)

    Intersection Improvement .Contract for 2009 Construction.

    16 E of Hwy 32 - E of Hwy 753 (EBL & WBL) selective Preservation/Overlay 38Contract for 2009 Construction.

    Tuesday, March 31, 2009 Page 6 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    16 Lobstick River Bridge on Highway 16, 2 km E of Niton Junction (72007-2 EBL)

    Bridge Rehabilitation .

    16 Hwy 753 - W of Hwy 22(N) (EBL & WBL selective) Preservation/Overlay 17Contract for 2009 Construction.

    16 Roadside Turnout: SRA NC-015B (WBL) W of Entwistle

    Rest Area / Truck Turnout .

    16 Roadside Turnout: SRA NC-016B (EBL) W of Entwistle

    Rest Area / Truck Turnout .

    16 Hwy 753 - W of Hwy 16A Preservation/Overlay 15

    16 Hwy 22(W) - Hwy 22(E) Preservation/Overlay 8

    16 6 Km W of Hwy 43 - Hwy 43 Preservation/Overlay 7

    16 Hwy 43 - 2 km E of Hwy 43 Preservation/Overlay 2

    16 Hwy 16A - 1 km E of Hwy 16A Preservation/Overlay 2

    16 W of Hillview Road (231st Street) - E of Hwy 216 (EBL)

    Preservation/Overlay 5

    16 Roadside Turnout, W of Mundare: SRA C-018 C (EBL)

    Rest Area / Truck Turnout .Contract for 2008 & 2009 Construction.

    16 Roadside Turnout, W of Mundare SRA C-017 C (WBL)

    Rest Area / Truck Turnout .

    16A 1 km W of UAR 115 - Hwy 16 Preservation/Overlay 6

    16A Hwy 16 - W of Spruce Grove (WBL & EBL) Preservation/Overlay 24

    16A Hwy 16 Interchange (Stony Plain Rd) Anthony Henday Road (BF 81038)

    Interchange - Grade, Base, Paving .Contract for 2009, 2010, & 2011 Construction.

    Tuesday, March 31, 2009 Page 7 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    16A Hwy 16 - Town of Vegreville (ECL) Preservation/Overlay 8

    17 City of Lloydminster N Boundary - Hwy 45 Preservation/Overlay 23Cost Shared with Sask. Govt.

    20 N of Hwy 12 - N of Hwy 53 Preservation/Overlay 26Contract for 2009 Construction.

    20 Intersection of Hwy 20 and Hwy 607 Intersection Improvement .Contract for 2009 Construction.

    20A Rimbey Town limit - Hwy 20 Preservation/Overlay 1Contract for 2009 Construction.

    21 Intersection Improvement @ Hwy 583 Intersection Improvement .Contract for 2009 Construction.

    21 Intersection Improvement @ Hwy 27E Intersection Improvement .Contract for 2009 Construction.

    21 S of Hwy 27(E) - N of Hwy 27(W) (selective) Preservation/Overlay 16Contract for 2009 Construction.

    21 Intersection of Hwy 21 and Township Road 322 (N of Three Hills)

    Intersection Improvement .Contract for 2009 Construction.

    21 Threehills Creek Bridge on Highway 21, 10 km S of Three Hills (1409-1)

    Bridge Rehabilitation .

    21 Intersection Improvement @ Hwy 27(W) Intersection Improvement .Contract for 2009 Construction.

    21 Hwy 595 - Hwy 12 Preservation/Overlay 27Contract for 2009 Construction.

    21 S of Bashaw - Hwy 53(W) Preservation/Overlay 14

    21 N of Hwy 611 - Hwy 13 Preservation/Overlay 20

    21 Hwy 53(W) - N of Hwy 611 Preservation/Overlay 22Contract for 2009 Construction.

    21 S of Hwy 628 - Hwy 16 & Interchange @ Hwy 16 & Hwy 21

    Twinning - Grade, Base, Stage Paving 11Contract for 2008 & 2009 Construction.

    Tuesday, March 31, 2009 Page 8 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    22 N of Hwy 1 - S of Hwy 1A Preservation/Overlay 10

    22 Climbing Lanes, N of Hwy 580 (NBL & SBL, 3 sections)

    Passing/Climbing Lane 11

    22 Climbing Lanes, S of Hwy 27 (NBL & SBL, 2 sections)

    Passing/Climbing Lane 7

    22 Installation of pedestrian crosswalk with flashers @ Jct Hwy 580 (Cremona)

    Signalization / Lighting .

    22 Town of Sundre: Intersection of Hwy 27, 22, & 584 Intersection Improvement .

    22 Hwy 11 - Hwy 53 Preservation/Overlay 34

    22 Climbing Lane (SBL) S of Hwy 53 - Hwy 53 Passing/Climbing Lane 5

    22 3 km N of Hwy 39 - Town of Drayton Valley Reconstruct/Re-Alignment 7

    22 Structure: North Saskatchewan River (74381-23) Drayton Valley

    Structure Replacement .

    22 Highway 22 and 50 Avenue in Drayton Valley Intersection Improvement .Contract for 2008 & 2009 Construction.

    22 Town of Mayerthorpe (N of Hwy 43) Preservation/Overlay 1

    23 Hwy 520(W) - Little Bow River Preservation/Overlay 12Contract for 2009 Construction.

    23 Little Bow River - N of Champion Preservation/Overlay 22Contract for 2009 Construction.

    23 Hwy 542 - E of Hwy 2 Preservation/Overlay 42

    24 Hwy 22X - Hwy 1 Preservation/Overlay 15

    25 Highway 25 Over Highway 3 Interchange, at NW Boundary of Lethbridge (76177-1)

    Bridge Rehabilitation .

    Tuesday, March 31, 2009 Page 9 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    27 Town of Sundre - Town of Olds Preservation/Overlay 36

    27 Town of Olds - Hwy 2 Preservation/Overlay 8

    27 E of Hwy 2 - E of Hwy 791 Preservation/Overlay 16

    27 E of Hwy 836 - W of Hwy 56 Preservation/Overlay 25Contract for 2009 Construction.

    28 Various Curve Revisions (3) W of Redwater, Hwy 38, N of Redwater

    Reconstruct/Re-Alignment 3

    28 Hwy 651 - W of Hwy 827 Preservation/Overlay 14

    29 Hwy 855 - Hwy 857 Preservation/Overlay 18Contract for 2009 Construction.

    29 Duvernay Bridge - W of Hwy 646 Preservation/Overlay 17Contract for 2009 Construction.

    32 Roadside Turnout: SRA P-025 (NBL) S of Swan Hills Rest Area / Truck Turnout .Contract for 2009 Construction.

    32 S of Freeman River - Hwy 33 Preservation/Overlay 27Contract for 2009 Construction.

    32 Roadside Turnout: SRA P-025 A (SBL) S of Swan Hills (E-013)

    Rest Area / Truck Turnout .Contract for 2009 Construction.

    33 E of Ft. Assiniboine - W of Ft. Assiniboine Preservation/Overlay 29Contract for 2009 Construction.

    33 Hwy 18 - W of Hwy 18 Preservation/Overlay 2Contract for 2009 Construction.

    33 W of Ft Assiniboine - Swan Hills Preservation/Overlay 34Contract for 2009 Construction.

    35 Intersection Improvement @ North Star Access Intersection Improvement .

    35 Intersection Improvements & Service Road, Manning to N of Manning (to Grims gas station)

    Grading, Base, Full Paving .

    Tuesday, March 31, 2009 Page 10 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    35 S of Meander River - N of Meander River Preservation/Overlay 21Contract for 2009 Construction.

    35 S of Indian Cabins - NWT Border Preservation/Overlay 25Contract for 2009 Construction.

    36 S of Hwy 53 - S of Hwy 26 Preservation/Overlay 57

    36 Tributary to Iron Creek Bridge on Highway 36, 7 km S of Killam (1763-1)

    Structure Replacement .

    36 N of Hwy 55 - Hwy 881 Preservation/Overlay 19

    36 Amisk River Bridge on Highway 36, 6 km NE of Kikino (75305-1)

    Bridge Rehabilitation .

    40 Mcleod River Bridge on Highway 40, 12 km NE of Cadomin (72640-1)

    Bridge Rehabilitation .

    40 Climbing Lanes, N of Hwy 16 - S of Berland River (various locations)

    Passing/Climbing Lane 11

    40 Kakwa River Bridge on Highway 40, 93 km S of Grande Prairie (79472-1)

    Bridge Rehabilitation .Contract for 2009 Construction.

    40 Intersection of Hwy 40 and Hwy 668 Intersection Improvement .Contract for 2009 Construction.

    41 Intersection of Hwy 41 and 54 Avenue In Bonnyville (including traffic signals)

    Intersection Improvement .

    42 Penhold - Hwy 816(N) Preservation/Overlay 24Contract for 2009 Construction.

    43 Hwy 723 - Hwy 724 (BF's 86016, 86165, 66 & 67) Twinning - Grade, Base, Stage Paving 14

    43 E of Crooked Creek - Sturgeon Lake IR West Bdry Twinning - Grading 21

    43 Sturgeon Lake IR (W Bdry - E Bdry) Twinning - Grading 15

    Tuesday, March 31, 2009 Page 11 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    43 Sturgeon Lake IR (W Bdry - E Bdry) Clearing 15

    43 S of Asplund Cr- S of Twp Rd 662 Twinning - 2nd Stage Paving 23Contract for 2009 Construction.

    43 Little Smoky River Bridge on Provincial Highway 43, at NW Boundary of Little Smoky (includes partial painting) (73836-1)

    Bridge Rehabilitation .

    43 E of Green Court - W of Sangudo Twinning - 2nd Stage Paving 18Contract for 2009 Construction.

    43 Hwy 658 - 3 km W of Hwy 18 Preservation/Overlay 7

    43 E of Sangudo - W of Hwy 764 (EBL) Preservation/Overlay 12Contract for 2009 Construction.

    43 Pembina River Bridge on Highway 43, at N Boundary of Sangudo (73919-1 EBL)

    Bridge Rehabilitation .

    43 2 km W of Hwy 764 - 1 km W of Hwy 764 Preservation/Overlay 1

    43 S of Onoway - Hwy 16 (NBL) Widen And Overlay 12

    43X 116 Street (RR63) - Hwy 2 and 43, N of Grande Prairie

    Grading, Base, Full Paving 7

    44 Flatbush Access - S of Chisholm Preservation/Overlay 22Contract for 2009 Construction.

    47 Sundance Creek Culvert on Provincial Highway 47 Near Edson (8814-1)

    Structure Replacement .

    49 Structure: Smoky River (70241-03) Watino Structure Replacement .Contract for 2007, 2008, & 2009 Construction.

    49 E of Hwy 739 - Watino Bridge Preservation/Overlay 14

    52 Town of Raymond (ECL to WCL) Preservation/Overlay 2

    53 Hwy 21 - Bashaw Preservation/Overlay 0.40

    Tuesday, March 31, 2009 Page 12 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    54 W of Hwy 766 - E of Spruceview Widen And Overlay 13

    54 Waskasoo Creek Structure on Provincial Highway 54 Near Innisfail (81266-1)

    Bridge Structure .

    54 Waskasoo Creek Structure on Provincial Highway 54 Near Innisfail (81273-1)

    Bridge Structure .

    54 N of Innisfail - S Innisfail Intch. (BY-PASS) Grading, Base, Stage Paving 5

    54 E of Spruceview - W of Red Deer R BF01647,07959 Widen And Overlay 13Contract for 2008 & 2009 Construction.

    55 Pine Creek 3 Bridge on Provincial Highway 55 Near Donatville (9939-1)

    Structure Replacement .Contract for 2009 Construction.

    55 E of Hwy 858 - Hwy 881 Preservation/Overlay 21

    55 Hwy 28 - Saskatchewan Boundary Preservation/Overlay 14Contract for 2009 Construction.

    56 Hwy 1 - S of Hwy 561 Preservation/Overlay 22

    58 East Sousa River Bridge - E of Chinchaga River Widen And Overlay 20Contract for 2008 & 2009 Construction.

    58 Structure: Chinchaga River (76425-04) W of High Level

    Structure Replacement .Contract for 2008 & 2009 Construction.

    58 Tributary to Sousa Creek Bridge on Highway 58, 12 km S of Chateh (76634-1)

    Structure Replacement .

    58 Roadside Turnout: SRA P-004 A (EBL) W of High Level (km 27.22)

    Rest Area / Truck Turnout .

    58 Sixth Meridian - S of Negus River Widen And Overlay 16

    58 E of Chinchaga River - Sixth Meridian Widen And Overlay 14

    Tuesday, March 31, 2009 Page 13 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    58 Pedestrian Walkway, Bushe River First Nation to High Level

    Miscellaneous .

    58 Watercourse Structure on Local Road Near Ft Vermilion (81942-1) (Garden River Road)

    Bridge Structure .

    58 Garden River Road: W of Wentzel River - E of Wentzel River

    Grading .

    58 Rennie Creek Structure on Local Road Near Ft Vermilion (81938-1) (Garden River Road)

    Bridge Structure .

    58 Watercourse, BF86226, Garden River Road Bridge Structure .

    58 Garden River Road: E of Wentzel River - Wood Buffalo Park Boundary

    Grading .

    58 Fitz Creek Structure on Local Road Near Ft Vermilion (81940-1) (Garden River Road)

    Bridge Structure .

    58 Watercourse Structure on Local Road Near Ft Vermilion (81943-1) (Garden River Road)

    Bridge Structure .

    58 Pakwanutik River Bridge on Local Road Near Garden River (79359-2)

    Bridge Structure .

    58 Waldo Creek Structure on Local Road Near Ft Vermilion (81939-1) (Garden River Road)

    Bridge Structure .

    58 Wentzel River Bridge on Local Road Near Ft Vermilion (76302-1) (Garden River Road)

    Bridge Structure .

    61 S of Skiff - W of Foremost Widen And Overlay 16Contract for 2009 Construction.

    62 N of US Border - S of Jensen Reservoir Preservation/Overlay 17

    62 US Border - N of US Border Preservation/Overlay 21

    Tuesday, March 31, 2009 Page 14 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    62 US Border - S of Jensen Reservoir (Selective) Sideslope Improvement 38

    63 Stony Creek Culvert on Provincial Highway 63 Near Donatville (13751-1)

    Structure Replacement .

    63 Twinning on Highway 63 (location dependant on right of way acquisition)

    Twinning - Grade, Base, Stage Pave .

    63 S of Hwy 881 - S of Hwy 69 Twinning - 2nd Stage Paving 15

    63 Structure: Athabasca River Fort McMurray BF 78041N

    Bridge Structure .Contract for 2008 & 2009 Construction.

    63 Structure: Franklin Tunnel Phase 1 Fort McMurray (75217SE3)

    Structure Replacement .Contract for 2009 & 2010 Construction.

    63 Athabasca River- N of Confederation Way ( incl. Thickwood & Confederation Interchanges)

    Base, Staged Paving 10

    63 S of Thickwood Blvd - N of Confederation Way (Stage 1, rough grading, including Thickwood and Confederation Interchanges and service roads)

    Grading 10Contract for 2008 & 2009 Construction.

    63 Pinchpoint Tangent Pile Wall (N of Athabasca R.) Miscellaneous 1

    63 Structure: Interchange @ Thickwood Boulevard Interchange - Bridge Structure .

    63 S of Thickwood Blvd - N of Confederation Way (Stage 2, grading, including Thickwood and Confederation Interchanges)

    Grading 7

    63 Structure: Interchange @ Confederation Way Interchange - Bridge Structure .

    63 Roadwork - New Bridge/Steinhauer & Widening from Morrison to Bridge.

    Widen And Overlay 1

    88 Watercourse Culvert On Provincial Highway 88 Near High Level (76272-1)

    Structure Replacement .Contract for 2009 Construction.

    Tuesday, March 31, 2009 Page 15 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    201 CALGARY NORTH EAST RING ROAD (P3 Initiative) Grading, Base, Full Paving 21

    201 CALGARY SOUTH EAST RING ROAD (17th Ave SE to E of Macleod Trail Interchange) (P3 Initiative)

    Grading, Base, Full Paving 24

    201 Crowchild Trail Interchange (Phase 2) Interchange - Grade, Base, Paving .

    201 Country Hills Bvd - Deerfoot Trail (Incl Beddington Trail Interchange)

    Twinning - Base, Stage Paving 14Contract for 2007, 2008, & 2009 Construction.

    201 Tuscany/Scenic Acres Interchange CALGARY STONEY TRAIL NW (includes BF 82403N & 82403S)

    Interchange - Grade, Base, Paving .Contract for 2008 & 2009 Construction.

    216 EDMONTON NORTH WEST RING ROAD (Hwy 16 West to Manning Drive) (P3 Initiative)

    Grading, Base, Full Paving 22

    501 Hwy 4 - Milk River (ECL) Preservation/Overlay 1Contract for 2009 Construction.

    509 S of Hwy 3 - Hwy 3 Preservation/Overlay 22

    524 E of Hwy 879 - S of Suffield Preservation/Overlay 26

    529 E of Little Bow River - Hwy 23 Preservation/Overlay 16Contract for 2009 Construction.

    540 Squaw Coulee Culvert on Provincial Highway 540 Near Cayley (70635-1)

    Structure Replacement .

    542 Milo - Hwy 842(N) Preservation/Overlay 2Contract for 2009 Construction.

    556 Hwy 862 - Hwy 36 Preservation/Overlay 19

    579 Hwy 40 - W of Harold Creek(Selective) (Stage 3) (BF 80631,80632)

    Grading 5

    579 E of Hwy 40 - Wellsite Access Road (Stage 2) Grading 2

    Tuesday, March 31, 2009 Page 16 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    581 E of Hwy 2 - Hwy 791 Preservation/Overlay 14

    587 Red Deer River Bridge on Highway 587, 30 km W of Bowden (8800-1)

    Bridge Rehabilitation .

    590 Big Valley - Hwy 56 Preservation/Overlay 3

    592 N of Markerville - Hwy 781 Preservation/Overlay 5Contract for 2009 Construction.

    600 E of Hwy 41 - E of Cadogan Preservation/Overlay 15

    602 Hwy 36 - Alliance Preservation/Overlay 3

    607 Hwy 761 - W of Hwy 20 Grading 12Contract for 2008 & 2009 Construction.

    610 Hwy 894 - Hwy 899 Preservation/Overlay 15Contract for 2009 Construction.

    611 W of Hwy 2 - W of Hwy 2A Preservation/Overlay 11

    616 County Boundary - Hwy 21 Base, Staged Paving 14

    619 Hwy 14 - E of Hwy 14 (Town of Viking) Preservation/Overlay 1

    619 Tolland Road - Hwy 897 2nd Stage Paving 21

    623 E of Village of New Sarepta - W of PAR 109 Preservation/Overlay 7

    625 Sparrow Drive - 9th Street (Nisku) Reconstruct/Re-Alignment 3

    627 Hwy 779 - City of Edmonton Preservation/Overlay 21

    633 Sturgeon River Bridge on Highway 633, 3 km E of Villeneuve (2302-1)

    Bridge Rehabilitation .

    651 E of Hwy 33 - Busby Preservation/Overlay 29Contract for 2009 Construction.

    Tuesday, March 31, 2009 Page 17 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    658 Blue Ridge - N of Athabasca River Preservation/Overlay 5

    658 Bull Creek Culvert on Provincial Highway 658 near Blue Ridge (72273-1)

    Structure Replacement .Contract for 2009 Construction.

    658 N of Corbett Creek - Goose Lake Preservation/Overlay 15

    659 E of Hwy 28 - Hwy 892 (includes surfacing for 5 intersection improvements)

    Preservation/Overlay 16

    659 E of Hwy 28 - Hwy 892 (Grading for 5 intersection improvements and sidesloping).

    Sideslope Improvement 16

    667 Beaverlodge River Bridge on Highway 667, 4 km S of Beaverlodge (7064-1)

    Bridge Rehabilitation .Contract for 2009 Construction.

    671 E of BC Border - W of Goodfare 2nd Stage Paving 10Contract for 2008 & 2009 Construction.

    671 W of Goodfare - Hwy 43 Preservation/Overlay 18Contract for 2008 & 2009 Construction.

    672 Valhalla Creek Bridge on Provincial Highway 672 Near Hythe (8442-1)

    Structure Replacement .Contract for 2009 Construction.

    677 Hwy 724 - Hwy 731 Grading, Base, Stage Paving 13

    677 Watercourse Culvert on Provincial Highway 677 Near Woking (72872-1)

    Bridge Structure .

    677 Watercourse Culvert on Provincial Highway 677 Near Woking (72114-1)

    Bridge Structure .

    677 Watercourse Culvert on Provincial Highway 677 Near Woking (71975-1)

    Bridge Structure .

    677 Watercourse Culvert on Provincial Highway 677 Near Woking (76914-1)

    Bridge Structure .

    Tuesday, March 31, 2009 Page 18 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    677 Watercourse Culvert on Provincial Highway 677 Near Woking (71976-1)

    Bridge Structure .

    679 1 km E of PAR 108 - Hwy 749 Preservation/Overlay 11

    682 Watercourse Culvert on Provincial Highway 682 Near Fairview (75379-1)

    Structure Replacement .

    722 S of Hwy 43 - Hwy 43 (Beaverlodge) Grading, Base, Full Paving 2

    727 Structure: Howard Creek (86141-01) Spirit River Bridge Structure .

    727 Hwy 49 - S of Hwy 680 Grading 12

    727 Structure: Ksituan River (86142-01) NW of Spirit River

    Bridge Structure .

    727 Structure: Watercourse (74083-02) NW of Spirit River

    Bridge Structure .

    730 Hwy 64 - Eureka River Base, Paving 12Contract for 2008 & 2009 Construction.

    731 Saddle Burnt River Bridge on Highway 731, 5 km W of Woking (71246-1)

    Bridge Rehabilitation .

    743 Watercourse Culvert on Provincial Highway 743 Near Peace River (77272-1)

    Structure Replacement .Contract for 2009 Construction.

    743 Tributary to Whitemud River Culvert on Highway 743, 48 Km NW of Peace River (77273-1)

    Structure Replacement .Contract for 2009 Construction.

    743 Whitemud River Bridge on Highway 743, 27 km SE of Deadwood (76026-1)

    Structure Replacement .

    743 Watercourse Culvert on Provincial Highway 743 Near Peace River (77271-1)

    Structure Replacement .

    Tuesday, March 31, 2009 Page 19 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    744 Intersection Improvement @: 96th Ave, Peace River Intersection Improvement .Contract for 2008 & 2009 Construction.

    751 Watercourse Culvert on Provincial Highway 751 near Hattonford (70347-1)

    Structure Replacement .

    754 Sandy Creek (Willow River ) Culvert on Highway 754, 66 km NE of Slave Lake (76594-1)

    Structure Replacement .

    766 Hwy 12 - Hwy 53 Preservation/Overlay 19Contract for 2009 Construction.

    766 N of Town of Eckville - Hwy 12 Preservation/Overlay 6

    779 Hwy 16 - MD Boundary (70344-1) Widen And Overlay 6

    779 Watercourse Bridge on Provincial Highway 779 Near Stony Plain (70344-1)

    Widen Bridge .

    791 S of Hwy 27 - Hwy 27 Preservation/Overlay 7

    791 S of Hwy 587 - Hwy 590 Base, Stage Paving 15Contract for 2009 Construction.

    812 W of Hwy 2 - Hwy 2 Preservation/Overlay 1Contract for 2009 Construction.

    815 S of Hwy 12 - N of Hwy 12 Preservation/Overlay 8

    821 N of Hwy 12 - S of Hwy 605 Preservation/Overlay 6Contract for 2009 Construction.

    836 Hwy 9 - S of Carbon Preservation/Overlay 9

    840 N of Hwy 564 - Hwy 9 Preservation/Overlay 22Contract for 2008 & 2009 Construction.

    842 Hwy 542 - S of Siksika IR Preservation/Overlay 13Contract for 2009 Construction.

    845 Town of Raymond: Hwy 52 - Raymond (NCL) Preservation/Overlay 2

    Tuesday, March 31, 2009 Page 20 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    855 Hwy 9 - Range Road 15-5 Oil Treatment 21

    855 N Saskatchewan River - Hwy 28 Preservation/Overlay 15

    855 Intersection Improvement Including Lighting (Victoria Trail)

    Intersection Improvement .Contract for 2008 & 2009 Construction.

    857 Hwy 16A - Town of Vegreville (NCL) Preservation/Overlay 1

    862 S of Gem - Hwy 556 Preservation/Overlay 2

    867 W of St Lina - Cty Bdy Preservation/Overlay 13

    879 South Saskatchewan River Bridge on Highway 879, 8 km NW of Bow Island (7256-1...Bearing Repairs, Deck Joints)

    Bridge Rehabilitation .

    881 North Saskatchewan River Bridge on Highway 881, 10 km N of Myrnam (74236-1)

    Partial Painting .Contract for 2009 Construction.

    881 PAR 129 - Hwy 858 Preservation/Overlay 24

    892 Beaver River Bridge on Highway 892, 11 km N of Ardmore (71316-1)

    Bridge Rehabilitation .

    893 North Saskatchewan River Bridge on Highway 893, at Heinsburg (75315-1)

    Bridge Rehabilitation .

    947 Athabasca River - Hwy 43 Grading, Base, Stage Paving 20Contract for 2007, 2008, & 2009 Construction.

    947 Athabasca River Bridge On Highway 947, 31 km S Of Fox Creek (76986-1...Girder Repairs)

    Bridge Rehabilitation .

    BOW RIVER WEIR

    Calgary Bow River Weir Modifications: W17236-03 Miscellaneous Water Project .

    Tuesday, March 31, 2009 Page 21 of 22

  • Highway Location Type of WorkEstimatedLength (km)

    Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2009-2012MAJOR PROVINCIAL HIGHWAY PROJECTS

    (Major Construction and Rehabilitation)

    VARIOUS Install Strobe lights on School Buses throughout the Province.

    Miscellaneous .

    UAR 125 Hwy 2 - Kinuso Preservation/Overlay 1

    UAR 113 Hwy 27 - Village of Morrin Preservation/Overlay 1Contract for 2009 Construction.

    UAR 206 Hwy 21 - Bashaw Preservation/Overlay 0.40

    LOCAL ROAD Structure: Nose Creek - Yankee Valley Blvd., Airdrie Widen Bridge .Contract for 2008 & 2009 Construction.

    Tuesday, March 31, 2009 Page 22 of 22