1But they still need lunch
Test procedures for ISOBUS DLG testing
2But they still need lunch
Test procedures for ISOBUS DLG testing
2nd ISOBUS workshop BrazilFebruary 22nd 2008
Melle van der MolenKverneland Group Mechatronics BV
3But they still need lunch
ISOBUS test
What it is: The official test of a component (software + hardware) for compliance to
the latest ISOBUS implementation level
Result: Certificate ISOBUS 20xx conform Added to www.isobus.net
Idea behind: Only compliant components make ISOBUS work in practice No free use of the term ISOBUS compatible
4But they still need lunch
ISOBUS test
Advantage for the manufacterer Commercial: Customer confidence + marketing argument Legal/Safety: all possible measures taken to ensure proper functioning Service:chances of failure limited to minimum
5But they still need lunch
Organization today
Initiative of VDMA (German federation of manufacterers) AEM (US federation of manufacterers) IGI, NAIITF (user groups)
Done by independent testing institute DLG (German agricultural association)
6But they still need lunch
Contents of the test
described in Test Protocol. maintained by IGI, NAIITF and others Updated continuously (certificate states year of testing)
7But they still need lunch
Contents of the test
ISO11783 requirements: Hardware ISO11783 - Part 2 Network, data, communication ISO11783 Part 3 5 Object pool data, VT ECU ISO11783 part 6 Other applications TECU, TC, FS ISO11783 part 7 - 14
8But they still need lunch
9But they still need lunch
Hardware
Bus length Connectors Frequency disturbances CAN lines Power supply 10 16 V Power supply interruptions (10mSec, period 100 mSec)
10
But they still need lunch
Physical
11
But they still need lunch
Communication
CAN Messages Identifiers Adress claims (variable, fixed) Transport protocol
12
But they still need lunch
Data
13
But they still need lunch
Object pools, VT ECU Object pool for various terminal configuratioins Storing of pool data
14
But they still need lunch
Object pools, VT ECU
15
But they still need lunch
Other applications
TECU Broadcasted messages
TC, FS to be implemented
16
But they still need lunch
Testing tools
17
But they still need lunch
Testing tools
18
But they still need lunch
Testing tools
19
But they still need lunch
BUS adapter 1(Nodes)
for the implementsincab-connectors,LBS-connectors
SUB-D connectors 9pin (CIA - standard)
BUS adapter 2like adapter 1
implement bus breakaway connector
oscilloscop check the voltage levels
(CAN_L and CANH)
multimeter check voltage levels,Power supply
ECU_PWR, TBC_PWR
Bus component 1 terminal for implements
(ISO 11783 part 6)
Bus component 2 terminal for implements
(ISO 11783 part 6)
Testing tools
20
But they still need lunch
CANstressBus Failures and Fault
Confinement,Open and Short
Failures,for power connection
scenarios
BUS adapter 3like adapter 1
Implement bus breakaway connector
BUS adapter 4 (Nodes)for the implements, LBS-connectors,
SUB-D connectors 9pin (CIA - standard)breakaway connector.
Feature connector (SUB-D 25 pin) for electrical tests with 16-channel AD-
transducer.
CANscopeOszilloskop check the
voltage levels(CAN_L and CANH).
Registration and record then Level of CAN_L and CAN_L
Testing tools
21
But they still need lunch
Complex electronic test equipment: - universal BUS adapter- multimeter - terminated resistors- oscilloscop - signal generator- PC
with CANcardx - Software CANoe 3.1
PC with CANcardx
oscilloscop
multimeter BUS adapter
signal generator
terminated resistors
Testing tools
22
But they still need lunch
Hints for developers
Have VTs and components available for developers Use of mask generator tool that usually produces correct code Electronics components: reuse, so no big issue (TBC, connectors,
cables Others terminals / ECUs In house use of P-convert: buy at DLG Plugfests Finish software prior to testing: new software = new testing procedure
23
But they still need lunch
Plugfest 2001
24
But they still need lunch
Plugfest 2007
25
But they still need lunch
Plugfest 2005: Opa!!
26
But they still need lunch
Costs
Testing ECU, TECU ~ EUR 5200 VT ~ EUR 6200 Advice ~ EUR 1200 - 1800(EUR 100 /hour + 1200 initial)
Minor changes to certified product cost less
Other services 3-day Training by DLG EUR 3000
ISOBUS, PConvert Pconvert (per year) EUR 600 (?)
27
But they still need lunch
Outlook
Organizational change: User Group
Multiple testing facilities
Test protocol development: TC, FS
Test protocol enhancements
28
But they still need lunch
Contact details DLG
Deutsche Landwirtschafts-Gesellschaft e.V.German Agricultural SocietyReinhard HbnerTest engineer electronicsLerchensteig 4214469 Potsdam-Bornim
Tel. 0049 331 / 56702-14Fax 0049 331 / 56702-90
E-mail: [email protected]: www.DLG-Frankfurt.de
29
But they still need lunch
Questions ?
Test procedures for ISOBUS DLG testingTest procedures for ISOBUS DLG testingISOBUS testISOBUS testOrganization todayContents of the testContents of the testSlide Number 8HardwarePhysicalCommunicationDataObject pools, VT ECUObject pools, VT ECUOther applicationsTesting tools Testing tools Slide Number 18Slide Number 19Slide Number 20Slide Number 21Hints for developersPlugfest 2001Plugfest 2007Plugfest 2005: Opa!!CostsOutlookContact details DLGQuestions ?