Virtualize your SAP?Only if you want to save money, Time, and
your companies future
Presenter: Christopher M. Carter Of CCI
www.ccierp.com
http://www.ccierp.com/mailto:[email protected]:[email protected]://www.ccierp.com/8/2/2019 2008 Virtual SAP Presentation_a
2/26
SAP deployments can generate significant server sprawl due to its tiered
architecture and
the need to provision separate systems for development, quality assurance/test and
production environments. As a result, SAP implementations often span 50, 100 or
more servers, and even smaller implementations feel the burden of a relatively large IT
footprint.
In a typical deployment, every layer of the environment is hosted on dedicated
physical systems that are not fully utilized much of the time. SAP implementations on
Microsoft Windows have an average application server CPU utilization rate of 15-20
percent.Underutilized hardware resources take up space and eat energy.
Computing equipment has become increasingly dense, energy costs are on the rise and
many datacenters simply lack the power or space IT services require. Industry analysts
estimate the annual cost of powering
a server will soon exceed its acquisition cost.
SAP customers use virtualization to reduce their hardware and energy costs anddramatically increase hardware utilization
8/2/2019 2008 Virtual SAP Presentation_a
3/26
Easing SAP Solutions Upgrades and Platform Migrations
Many SAP solutions deployments will undergo a major upgrade over the next year or two as SAP
ends support for SAP R/3 Enterprise and SAP R/3 4.6c 32-bit applications. Many of these companies are
using the upgrade window as an opportunity to move their SAP solution-based landscape from older,
proprietary platforms to cost-effective industry standard servers and Microsoft or open source
operating systems.Problems with the complex upgrade process can have a significant business impact. Upgrades
must be thoroughly planned and tested to ensure the smoothest and least disruptive transition
possible. You can accelerate and improve the planning and testing phase with virtualization,
achieving faster and more cost-efficient upgrades while reducing risk to the business.
Streamline provisioning of development, testing, and staging instances: An important task in the
upgrade project is the setup of environments. The initial setup is one part of this task, but ad-hoc
deployments of new environments for test or development purposes are commonly required as well.The ability to provide new environments as quickly as possible is especially important if the project
includes a migration or an operating system upgrade. In a traditional native deployment, this process
tends to be time consuming and can cause expensive project delays, particularly if available hardware
is not sufficient. Configuration drift may also become a source of problems for the non-SAP aspects
of the upgrade (OS, OS patches, database binaries, etc.).
8/2/2019 2008 Virtual SAP Presentation_a
4/26
Organizations need to
find ways to make their
IT budgets go farther
than ever.
8/2/2019 2008 Virtual SAP Presentation_a
5/26
Virtualization 1.0
Closed architecture Expensive Complex Heavy weight Needs a driver
Next Gen Virtualization
Open Virtually free Radically simple Lightweight Designed for ubiquity
8/2/2019 2008 Virtual SAP Presentation_a
6/26
Meeting SLAs for Availability, Application Performance,
and Disaster Recovery
SAP application owners, basis administrators and the IT staff
are on the hook to meet Service Level Agreements that
guarantee availability and performance targets for solution
users. Virtualization works alongside SAP-provided functionality to
deliver infrastructure and application performance and high
availability for critical businessfunctions.
8/2/2019 2008 Virtual SAP Presentation_a
7/26
Data centerEvolution
Under utilized
hardware
Increasing costs of
ownership
Difficult management
Barriers to expansion
Phase 1 Recognize
Dynamic Workload
Delivery
Automation / Policy
Chargeback / Utility
Pervasive
Virtualization
Phase 4 DynamicDatacenter
Some tier 1
applications
High Availability
Disaster Recovery
Mobility
Phase 3 Agility
Test/Dev
Encapsulation
Consolidation
Craplications
Phase 2 Consolidate
8/2/2019 2008 Virtual SAP Presentation_a
8/26
Barriers to adoption
?
Cost prohibitive
Complexity
Mission critical readiness
Performance
Traditional concerns
Platforms supported
Vendor Lock InPhysical requirement
Windows
LinuxWeb tier servers
Test/DevDBMS
Physical boxes
ProductionTier 1 apps
Custom Apps
86% Unvirtualized
OLTP
Infrastructure Servers
Etc
8/2/2019 2008 Virtual SAP Presentation_a
9/26
Dynamic Workload Streaming (Provisioning)
Network
storage
Provisioning Server
(streaming service)
Silo One
Silo Two
Silo Three
A
B
8/2/2019 2008 Virtual SAP Presentation_a
10/26
Reducing Server Count
Solution: Virtualize the server
3-4x more users per server
16 GB RAM
Two Quad-core processors
4 Virtual Machines
(4 GB RAM, 2 Virtual CPUs
for each)
Physical Server4 GB RAM
Two processors
Before100 usersAfter300+ users
AA
A
A
A
8/2/2019 2008 Virtual SAP Presentation_a
11/26
Citrix, Microsoft & VMware Three Horse
Race VMware is feature-
rich
Hyper-V is
affordable, but lacks
key functionality
Citrix is enterprise-
readyEnterprise Ready
Value
8/2/2019 2008 Virtual SAP Presentation_a
12/26
Business Continuity
Business
Continuity
With automated high availability
integrated disaster recovery, and tools
forzero-downtime server maintenance,Virtualization makes it easy to keep a
business running.
8/2/2019 2008 Virtual SAP Presentation_a
13/26
Dynamic Data Centers
Where and What
Heterogeneous server/storage data centers withcomplex IT environments
Organizations struggling to manage serverinfrastructure proactively
Organizations that want to treat application deliveryas a service
Data centers that need to scale computing resourcesup and down based on demand
Benefits
Rapid, on demand provisioning of servers andapplications
Scalable, efficient management of serverinfrastructure
End-to-end tools for desktop, application and servervirtualization
CCI makes pricing and packaging options to makeserver virtualization feasible across the enterprise
Dynamic
Datacenters
8/2/2019 2008 Virtual SAP Presentation_a
14/26
Simplest, efficient ways to virtualize servers
Virtualization decreases costs and increases IT agility
Builds on virtualization to deliver dynamic data center
Best virtualization partners platform forSAP
Build on the scalable and open support Unparalleledperformance, economics, and ease-of-use
Key Customer Benefits
8/2/2019 2008 Virtual SAP Presentation_a
15/26
YOUR OPTIONS
8/2/2019 2008 Virtual SAP Presentation_a
16/26
VMware and SAP
VMware Infrastructure 3 is a flexible and cost-effective industry-standard hardware virtualization suite for SAP solution
implementations, helping you introduce and manage a smarter
SAP application-based landscape.SAP AG provides full support
to its solutions in 64-bit Windows- and Linux-based productionenvironments running on VMware ESX, the first and so far
only virtualization platform to earn this distinction.
8/2/2019 2008 Virtual SAP Presentation_a
17/26
Top Ten Reasons to Run SAP Software Solutions on VMware Infrastructure
Upgrade safely to the latest SAP solutions and simplify the transition to 64-bit
environmentsIncrease availability of all environments at lower cost
Create cost-effective disaster recovery systems
Quickly deploy new SAP solutions-based environments for development and test
Align SAP resources with business priorities
Decrease SAP data center costs for space, energy, cooling, hardware, and labor
Increase SAP data center utilization, flexibility, availability, and agility
Increase software quality at lower cost for your own SAP application-based
development
Inrease uptime during planned maintenance
Realize immediate ROI
8/2/2019 2008 Virtual SAP Presentation_a
18/26
Xenserver5.com
8/2/2019 2008 Virtual SAP Presentation_a
19/26
XenServer with XenApp
Reduce server count up to 75%...
Enhance Agility
Increase Availability
without compromising performance
8/2/2019 2008 Virtual SAP Presentation_a
20/26
Microsoft Hyper-V:
Performance tests at SAP and with H/W partners went very well and the
performance numbers we have seen are very good. Current test results are based onSAP Web Application Server 7.00 on Windows Server 2003 in a VM with 2 virtual
processors. I expect soon to have the first published benchmark results on
http://www.sap.com/benchmark. SAP provides feedback on these tests as well as tips
for optimal configuration on their URL https://www.sdn.sap.com/irj/sdn/windows .
There is a general White Paper about virtualizing SAP applications on Windows as
well as specific Hyper-V info. Additionally, you can check SAP note 674851 which
is frequently updated.
http://www.sap.com/benchmarkhttps://www.sdn.sap.com/irj/sdn/windowshttps://www.sdn.sap.com/irj/sdn/windowshttp://www.sap.com/benchmark8/2/2019 2008 Virtual SAP Presentation_a
21/26
Recommendations
8/2/2019 2008 Virtual SAP Presentation_a
22/26
Citrix & VMware
Enterprise Features VMware XenServer
Multi-server managementa a
Role-based administration a
Auto-placement of VMs (load
balancing)a a
Live migration a a
High Availability a a
DR support a a
Optimized for XenApp a
Workload streaming (provisioning a a
Advanced storage integration a a
Proxy Server Backups a
Workload streaming (provisioning) a
8/2/2019 2008 Virtual SAP Presentation_a
23/26
CCI is the ONLY certified SAP partner to support,install and manage Virtualized SAP environments
around the world
CCI will provide SAP certified staff with Virtualized
certified staff from all virtualization products, wesupport you through POC, to purchases toimplementation and full testing before ANY go-live.
8/2/2019 2008 Virtual SAP Presentation_a
24/26
Please feel free to ask any and all questions thatyou may have?
Q&A Session
8/2/2019 2008 Virtual SAP Presentation_a
25/26
Known by the company we keep:
http://www.bearingpoint.com/http://www.eno.com/index.html8/2/2019 2008 Virtual SAP Presentation_a
26/26
Please visit us online at www.ccierp.com
Thank you!