154
2007 Spring Region Update Meetings

2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Embed Size (px)

Citation preview

Page 1: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

2007 Spring Region Update Meetings

Page 2: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Perkins Reauthorization Overview Perkins Reauthorization Overview

• Spirit of the New Perkins Law– Leading CTAE into the 21st Century

• Global Competition• Program Improvement• Rigorous, modern, and durable CTAE

programs

Page 3: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Perkins Reauthorization Overview Perkins Reauthorization Overview

• Purposes of the Act– Develop challenging academic and technical

standards and integrated instruction– Increase opportunities to keep America competitive– Focus on high-skill, high-wage, high-demand

occupations– Provide increased flexibility

Page 4: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Perkins Reauthorization Overview Perkins Reauthorization Overview

• Purposes of the Act– Conduct and disseminate research and

information on best practices– Promote partnerships (education, workforce

boards, business, industry, etc.)– Provide technical assistance and

professional development

Page 5: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Perkins Secondary Taskforce

Audrey Bergeron Evonne MobleyMichael Canady Wayne RandallCeleste Cannon Karey RussellSharon Cunningham Elaine ShapowDr. Ralph Gornto Mark SuttonDr. Steven Hankla Betty ThurmanBilly Hughes Laura YoumansDr. Richard Hylton

Page 6: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Schedule of Approval

• State Board Approval – April 12• Submit to OVAE – May 7

Page 7: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Major Changes

• Creation of Peach State Pathways – Programs of Study

• Transformation of Tech Prep to Education and Career Partnerships

• Indicators linked to NCLB indicators

Page 8: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Major Changes

• Funding Formula– 30% Ages 5-17 Census Data– 70% Ages 5-17 Poverty

• Major shifts in system funding• Intent – Reallocate carryover November

– Reserve Rural and/or High CTE– Not reallocate to those not using funds

Page 9: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

New Graduation Rule

• Effective with incoming freshmen in 2008• Eliminate tiered diploma options• Common set of diploma requirements• All graduates prepared for college-entry

courses AND the workplace without remediation• 23 units required for all students

Page 10: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Proposed Math Changes

Requirements for Mathematics• All students must complete 4 units of

mathematics, through Math 3 or higher• Eliminate the Core Math sequence• Add new course(s) for 4th year• EOCTs in first two years – progress monitoring• Support classes, interventions for all

Page 11: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Proposed ELA Changes

Requirements for English/Language Arts• All students must complete 4 units of English• EOCTs in ELA 1 and 2 (conventions,

composition and reading) – progress monitoring

• Drop American Lit EOCT

Page 12: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Proposed Science Changes

• All students must complete 4 units • 1 unit of Biology required (EOCT)• 1 unit of Physical Science or Physics (EOCTs) • 1 unit of Chemistry, Earth Systems, Environmental

Science, or an AP/IB course• 1 unit of a 4th science, including any AP/IB, academic

science, or career tech science (ex: Agricultural Science)

Page 13: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Proposed Social Studies Changes

Requirements for Social Studies• All students must complete 3 units • Required Courses:

– World History (EOCT)– US History (EOCT)– Am Government/Civics (½ unit with EOCT)– Economics (½ unit with EOCT)

Page 14: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Proposed Rule

Requirements for Health/PE• All students must complete 1 unit

Page 15: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Proposed Elective Changes

Electives• 7 units required, including:

– 3 units in a focused area of study (pathway)– 2 units of foreign language for college-bound

Page 16: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Related Issues

• All students required to have a College and Work Ready Plan

• Guidance/Advisement

Page 17: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Related Issues

Special Education Students• Diploma requirements for students with

significant cognitive disabilities

Page 18: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Timeline

• March – May: sub-committees work on details• April – May: 1st draft released, multiple input sessions

held around the state• June: 2nd draft of rule released for input• July: discussion item at Board Rules Committee• August: State Board initiation of rule• September: public hearing, State Board adoption• August 2008: implementation

Page 19: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Major Local Plan Changes

• CTAE Resource Network• Extended Day• Education and Career Partnerships• Career Based Education Grants• FCCLA Camp Grants

Page 20: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Major Local Plan Changes

• Web-Based Delivery– Local Plan Grants due May 15– All State Grants due June 1

• Due Dates are very critical– No submission after deadline

Page 21: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Legislative Update

• HB 94 FY07 Supplemental Budget• HB 95 FY08 Budget

– Capital Equipment

• SB 68 Career Academies Act• Senate Bill 85 Extracurricular Activities Act• To read acts go to www.legis.state.ga.us

Page 22: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Industry Sector Strategies

• Advanced Automotive Manufacturing (AAM)(West Georgia)

– Counties involved: Heard, Coweta, Troup, Meriwether, Harris, Talbot, Upson, Taylor, Marion, Muscogee, Chattahoochee

• Life Sciences-Bio Tech (Gwinnett-Clarke 316 Corridor)

- Counties involved: Gwinnett, Athens/Clarke, Walton, Oconee, Oglethorpe

Page 23: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

TALLTeachers

AsLeaders

AndLearners

Page 24: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

“TALL” Teachers As Leaders And Learners

Objectives– To develop leadership skills for CTAE instructors.– To recognize outstanding CTAE professionals.– To prepare CTAE professionals to serve as leaders in their

respective discipline.Criteria

– Are currently employed as CTAE classroom teacher.– Have been employed as a CTAE instructor for (3) years,– Are members of GACTE/ACTE, and held membership for (3)

consecutive years.– Have a desire to develop leadership skills.– Want to develop skills that will enhance role as a CTAE

professional.

Page 25: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

“TALL” Teachers As Leaders And LearnersSession Topics

• Session I Developing The Leader In You • Session II Becoming A Powerful CTAE

Presenter• Session III Developing Legislative

Engagement Skills• Session IV Developing Business

Engagement Skills• Session V Developing a CTAE Vision /

Mission with Realistic Goals.• Session VI Putting the Package Together

Page 26: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

“TALL” Teachers As Leaders And Learners Application Process

• Get an application and recommendation form from www.gacte.org.

• Recommendations from:– Principal– Career Technical Education Director, Division Chair– Industry Representative/Advisory Committee Member– Peer Teacher from another system

Applications for the 2007-2008 will be accepted from April 15-June 15, 2007

Applications available after this session for each system.

Page 27: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Program Development and Transitions

CTAE Leadership Spring Meetings

Page 28: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE/HSTW Workshop Goals

• Focus on Georgia students completing a CTAE concentration.

• Use data to examine the culture of the school including CTAE for school improvement.

• Use student data to determine actions adults in the school system must take to create high performance cultures.

• Examine the role of CTAE as it relates to student achievement and graduation rates.

Page 29: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE/HSTW WorkshopResults and Reminders

• Participation: 70 school teams of approx. 8 members each at 6 January workshops

• Feedback: “Excellent”• System Follow-up: Submit action plan

developed to address the identified areas in support of school improvement.

• Next Dates: June 11-12 & 14-15, 2007• Reminders will be sent to school team leaders

on workshop locations (TBA).

Page 30: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

JROTC Under CTAE Umbrella

• Previously: just for C/T seal purposes and regular academic FTE funding

• Now: JROTC curriculum and FTE will be under CTAE

• FTE: lab weight funding instead of academic funding

• No Perkins funds may be expended on JROTC programs or instructors.

Page 31: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

JROTC: GACTE – Liability Insurance

• Please encourage JROTC instructors to join GACTE under the New and Related Division.

• Professional development will be provided for JROTC instructors at GACTE in July.

• JROTC instructors are now covered by the state liability insurance. (see www.doas.georgia.org)

Page 32: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE Curriculum Revision Phase II• Twenty-one Career Pathways

• Three related, advanced courses for Phase I

• Curriculum drafts with survey for feedback to be posted after April 12, 2007 SBOE meeting (for 60 days)

• Make necessary revisions

• SBOE Adoption anticipated July 12, 2007

• Career Pathway Information - http://www.georgiastandards.org/career.aspx

Page 33: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Question: What is a career pathway?

Answer: A career pathway, also called Peach State Pathways, is the secondary curriculum established to help students align their academic and career, technical and agricultural studies to better prepare them for graduation, post-secondary education, and career opportunities.

Page 34: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition
Page 35: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Question: How does a career pathway relate to the definition of a “program of study” as defined by the new Perkins IV Legislation?Answer:

Programs of study are very similar to career pathways. In Georgia, career pathways will become a program of study. A program of study, as defined by the new Perkins IV Legislation, incorporates secondary education and post-secondary education elements; includes coherent and rigorous content aligned with challenging academic standards and technical content in a coordinated, non-duplicative progression of courses that align secondary education with post-secondary education to adequately prepare students to succeed in post-secondary education. Below see an outlined schedule for career pathway implementation:

– Phase I: Development 05-06; Training 06-07; Implementation 07-08.– Phase II: Development 06-07; Training 07-08; Implementation 08-09.– Phase III: Development 07-08; Training 08-09; Implementation 09-10.

(Please see the CTAE Career Pathway Development document at http://www.georgiastandards.org/career.aspx. )

Once the Georgia State Plan has been developed, it will create benchmarks upon which career pathways will be developed for students.

Page 36: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition
Page 37: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Middle School CTAE Curriculum Revision

• A curriculum team was formed and has worked to develop a preliminary document containing standards for Career Development.

• Work will resume upon filling a position for a Middle School Curriculum Coordinator.

Page 38: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE Phase I Roll-Out Training• 61 Workshops Posted @ CTAE Resource Network

• To Date 17 Workshops Completed

• Engineering Pathway Training Still In Planning Stage

• All Workshops Posted @

www.ctaern.org

Page 39: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE Lesson Building Project• Performance Task Builder instruction is part of the Phase I Roll-Out

Training.• Presently working with Georgia Standards.Org Programmer to modify

the Performance Task Builder to better suit CTAE needs.• When Performance Task Builder Modifications are complete, Lead

trainers will notify Pathway Instructors to start Development Process.• Access Point to Performance Task Builder will remain at Georgia

Standards.Org• To build lessons, each teacher will have to have a My GADOE Log-In

My GADOE Login

• All Lessons will go through a Jury Process prior to being posted on website for use.

Page 40: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

End-of-Pathway Assessments• New Perkins Legislation Mandate

– Requires states to validate technical skill attainment for CTAE Students

– Technical skill attainment will be measured after student has completed a sequence of courses in a career pathway

– End-of-course testing only measures knowledge in a particular course

– Does not fulfill the requirements of Perkins IV

– Formative assessment activities will be developed to assist CTAE instructors with measuring student achievement

– New CTAE Resource Network will make formative assessment activities available to instructors

Page 41: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

End-of-Pathway Assessments

• Assessment Development– Assessments for Phase I Curriculum will be developed

during the 2007-2008 school year– Subject Matter Expert (SME) groups will be formed to build

assessments– Will include two types of assessments– New Assessments – Existing/Modified Assessments – One of your instructors may be contacted to serve a SME

group member

Page 42: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition
Page 43: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Key Elements in Perkins IV• Emphasis on accountability &

program improvement• Intensified

secondary/postsecondary connections

– Programs of Study – Articulation Agreements

• Comprehensive professional development and “career guidance and academic counseling”

• Focus on academic and career and technical rigor/integration

• Increased focus on business and industry

Page 44: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Merging Title I and Title II:How does it work?

• Perkins IV allows “pooled” funds; thus, secondary and postsecondary educational partners receive allocation as grants (part of Local Plans).

• Use of “reserve” funds (approx. 7.5%) with commitment to fund same amount as past Tech Prep allocation (approx. 3 mi.) minus carry over.

• Creation of formula using “reserve” criteria (Sec. 112)– Rural areas;– Areas with high percentages of CTE students;– Areas with high numbers of CTE students

• All contribute to partnership based on existing service area or forfeit funds.• Funds “pass through” to designated fiscal agent and must be identified and

tracked “separately through either GOARS or People Soft state accounting systems.

• Additional funding sources can be identified “outside total grant amount.”

Page 45: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

That was then; this is now.

OLD NEWTech Prep Education and Career Partnership

Title II – Separate Funding Title I – Merged Funding

Consortia Membership Structure with 50/25/25:

Partnership Membership Structure with 25/25/50:

Dominance by Secondary Balance among Partners

Restricted Ownership! Shared Ownership!

Broad Grant Activities Focused Grant ActivitiesSupporting Key Elements - Perkins IV!

Supporting Programs of Study/Career Pathways!

Page 46: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Education and Career Partnerships StructurePeach State Pathways

The State of Georgia career pathways umbrella initiative will align local, regional, and state resources to support local/regional economic development and expansion so

the current and future workforce can thrive in a knowledge economy. Building Georgia’s career pathways system will be a process of adapting existing programs and service

and the possibility of adding new ones that will enable all students to advance to higher levels of education and

employment.

Page 47: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

State-Wide SPECIFIC PathwayCommittee

State-Wide SPECIFIC PathwayCommittee

State-Wide SPECIFIC PathwayCommittee

State-Wide SPECIFIC PathwayCommittee

School or CollegeTeam*

School or CollegeTeam*

School or CollegeTeam*

Task CommitteeCommunity Teaming

Task CommitteePostsecondary Credit

Opportunities

State-Wide SPECIFIC Pathway

Committee

Task CommitteePrograms of Study

School or College

Team*

State-Wide Ed & Career Partnership Steering Committee: GaDOE; DTAE; Economic Dev agencies; B/I; expand to others as CP initiative grows

State-Wide Specific Pathway: Business/Industry specific

Local Ed & Career Partnership: Sec; PS; B/I; local Economic Dev; Chamber; DOL; etc

SchoolCollege Site Team*: Adm; Counselors; Academic; Technical; can be part of existing school teams (school improvement team; strategic planning team; curriculum dev team; CTE advisory committee)

Task Committee: As needed and can be expanded, i.e., Data Collection, Communications, etc,

Ed & Career Manager

Executive Committee

State-Wide SPECIFIC PathwayCommittee

Task CommitteeCareer Dev.

Task CommitteeProf. Dev.

Governing Body ofPartnership

Page 48: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

• Joint Leadership• Shared Resources• More Flexibility• Involved Customers • Alignment with Economic

Development• Alignment of Secondary to

Postsecondary Curriculum• More Accountability• System vs. Institution• Benefits the Student!

Page 49: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

• Fosters ownership through input by all partners. • Focuses on an assessment of strengths and

weaknesses. • Identifies “career pathways” as integral to seamless

transitioning.• Establishes priorities to create roadmap.• Targets expected outcomes for statewide

consistency in accountability and program improvement.

“Ideas” along with “Money”

Page 50: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Strategic Plan

• Five Program Components– Programs of Study/Career

Pathways– Community Teaming– Postsecondary Credit

Opportunities– Career Development– Professional

Development

• Three-part Strategic Plan– Needs Assessment– Career Pathways

(target one pathway in FY08)

– Evaluation Outcomes

Page 51: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

NEEDS ASSESSMENT

Program Component Strengths Areas Needing Improvement

Programs of Study and Career Pathways

Community Teaming

Postsecondary Credit Opportunities

Career Development

Professional Development

Page 52: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

SELECTION

Program ComponentsList Minimum of 1 Career Pathway

(Targeted as part of funding for each program area selected)

Programs of Study and Career Pathways

Community Teaming

Postsecondary Credit Opportunities

Career Development

Professional Development

Page 53: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

EXPECTED OUTCOMES(end of FY08)

Program Components

Activities to Improve Outcome

Timeline Expected Outcomes

Method of Evaluation

Programs of Study/Career Pathways

Community Teaming

Postsecondary Credit Opportunities

Career Development

Professional Development

Page 54: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Plan of Action: Strategic PlanFront Door - proactive Back Door - passive

• Invite to “brainstorming session” first.

• Compile ideas (use existing school improvement/strategic plans as resources).

• Distribute summary and ask for individual reviews.

• Bring partners together again.• Discuss ideas and look for

similarities/differences.• Prioritize and rank. • Create “draft” of strategic plan• Bring together again to tweak and

finalize.

• Ask for “rough draft” of partners’ ideas.

• Compile first (use existing school improvement/strategic plans as resources).

• Call meeting to share and summarize.

• Discuss similarities/differences• Prioritize targeted goals and

activities to put in grant.• Complete plan and share with

partners. • Make sure all partners have been

heard and a consensus is reached.

Page 55: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Planning for Change

Timeframe InvolvementMarch 13-23 Deliver timelines and strategic plan and information to partners

March-April CTAE Directors Update – Tech Prep Coord/Guidance Couns.

April Technical Assistance Visits (3/30, 4/2, 4/3, and 4/9)

April – June Use ECP short/long structure documents as guidance in transition/decision making process (available soon on CTAE webpage)

By April 21 Partners meet, plan and decide: Education and Career Manager, chairperson, fiscal agent, executive committee, funding, strategic plan, budget

April 23-27 Executive Committee Meeting – finalize grant

April 30 – May 4 Make final grant revisions

May 7-14 Meet with Consortium for grant approval- mail to DOE; send electronically to DOE and DTAE

May 16 GRANT DEADLINE (written copy to DOE)

Beginning in July, 2007 (FY08)

Partnership Training (systemic and ongoing)(EC, ECP Managers, Chairperson, Fiscal Agent)

Page 56: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

“…When you get it set, with the direction you are headed, Georgia will truly have an industry-based, employer-friendly guidance

and counseling system for students.”

Mark Whitlock, CEOCentral Educational Center

Newnan, GA

Page 57: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Program Delivery UpdateDanny Fleming

[email protected]

Page 58: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

• Architecture, Construction & Transportation• Business & Computer Science • Engineering & Technology• Family & Consumer Sciences• Marketing, Sales & Services• Special Populations• Program of Work

• Annual Report Reporting Process

Page 59: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Architecture Construction TransportationACT

Sonny Cannon, Program Specialist404-657-8308

[email protected]

Page 60: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

ACT News

• PSC Teacher Certification – Flight Operations (2007)• EDD Program Accreditation – CEFGA & ADDA• Foundation for Air & Ground Transportation Programs

TEFGA (2007)• SkillsUSA Georgia – Gayle Silvey, State Director

[email protected] • 2007 SkillsUSA National VIP (3) – Kansas City, MO• 2008 SkillsUSA Georgia State Leadership Skills

Conference and Career Expo – Galleria and Waverly

Page 61: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

ACTFoundations & Certification

Construction Education Foundation of Georgia (CEFGA) www.cefga.org

Transportation Education Foundation of Georgia (TEFGA) May 2007

Foundation for Communication Programs in 2008

CEFGA – Construction, Metals, HVACR, EDD www.cefga.org

NATEF – Ground Transportation www.natef.org

PrintEd – Graphic Communications www.gaerf.org

Page 62: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

2007 ACT Dates To Remember• April 26-28 SkillsUSA State Leadership Skills Conference

• May 2-3 Ford/AAA Student Contest

• June 11-15 & 18-22 DCT Endorsement Workshop

• June 18-21 Camp T&I & Industry Certification Workshops

• June 25-30 SkillsUSA National Leadership Skills Conference

• July 12 NATEF Certification Workshop

• July 19 Industry Accreditation/Certification Workshops

• October 5-6 SkillsUSA Fall Leadership Conference

Page 63: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Business & Computer ScienceJeff Chandler, Program Specialist

[email protected]

Page 64: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Engineering and Technology EducationRon Barker, Program Specialist

[email protected]

Page 65: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Engineering and Technology Education

• Phase I - Engineering Pathway is in place• We are taking a look at the total program and a

re-branding in light of the current pathway development

• Research and focus group activity is ongoing• Impact will be seen in the 08-09 local plan

regarding facilities, equipment, state support, and other aspects of the program

Page 66: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Engineering and Technology EducationImportant Dates to Remember

• April 19 – 21, 2007 Georgia Technology Student Association 45th Annual State Conference, GA National Fairgrounds and Agricenter, Perry, GA

• June 24 – 28, 2007 National TSA Conference, Nashville, TN

NOTE: We can use your support judging.

Volunteer by emailing [email protected]

Or contact [email protected] THANKS!

Page 67: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Family & Consumer SciencesLaura Ergle, Program Specialist

[email protected]

Page 68: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

FCCLA Camp Grant FY08

We will be introducing a

$1000 FCCLA Camp Grant

for any FCCLA adviser attending

a five day FCCLA Leadership Camp,

with a minimum of

three FCCLA members.

Page 69: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

The Process:

• Go to the CTAE Website.• Click on “online forms.”• Click on “FY 2008 FCCLA Camp Grant”• Download it to your local computer.• Complete the application detailing the number of

teachers in your system applying for the grant.• Save the application to your hard drive.• Then email your application to:

[email protected] by May 16th

Page 70: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Other News

• Program Branding - we will host focus groups around the state for all stakeholders to give recommendations.

• We will host a facilitator training for the “Teaching as a Profession” pathway. Electronic registration is available: http://teach.valdosta.edu/coeadvising

• We will retain our current State Funded Courses for the 07-08 school year, as we have no new pathways in Phase 1.

Page 71: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Marketing, Sales & ServicesLinda Smith, Program Specialist

[email protected]

Page 72: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Marketing Education (Including Entrepreneurship and

International Business & Marketing)Register Early for the NEW

“Entrepreneurship and International Business/Marketing Mini-Conference”

Saturday, July 14, 2007Waverly Renaissance Hotel at Galleria in Atlanta

Fabulous International Speakers!

(Friday, July 13th… Evening Instructional Resources Session for Teachers)

Incredible One Day Conference for Administrators and Teachers!

Page 73: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Marketing Education Segment of the GACTE Summer Conference:

What Are The Benefits? Curriculum Updates for Phase I, Phase II and Phase III Instructional Lesson Plans for NEW Promotional Marketing Course and

International Business & Marketing Course Plus Business Ethics Unit High Level Business/Marketing Speakers (Speakers Power Point

Presentations included on CD with lesson plans) Explanation of Re-Engineered Work-Based Learning Programs DECA State and International Update for 2007 – 2008 And much more!

C

Page 74: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Two New Entrepreneurship Courses:

Two New/Revised Entrepreneurship (ENT) Courses, One in Business & Information Technology and One in Marketing Education, Will Be Available In Fall 2007.

The Business ENT Course Is Found In The Small Business Development Pathway.

The Marketing ENT Course Is Found In The Marketing & Management Pathway.

Page 75: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Why Two Entrepreneurship Courses In Two Programs and Two Pathways?

In the Phase I Curriculum Re-Engineering Process…

Entrepreneurship Was Approved For Both Program Areas And Headed By Different Committees With Different Objectives and Viewpoints.

Page 76: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

The Two Resulting Entrepreneurship Courses Are Quite Different:

• Business Entrepreneurship: (1) Included In Small Business Development Career Pathway.

The Intention Is That “Business Essentials” And The “Legal Environment of Business” Will Be Taken Before “Entrepreneurial Ventures.”

(2) “Entrepreneur Ventures” has 43 standards.

• Marketing Entrepreneurship: (1) Included in Marketing & Management Pathway. The

“Entrepreneurship: Building a Business” Course May Be Taken After The Recommended Foundational Course, Marketing Principles.

(2) “Entrepreneurship: Building a Business” has 10 standards.

Page 77: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Entrepreneurship: Who May Teach These Courses?How Should Systems Proceed?

Will ENT Become One Course In Phase III?

In Fall 2007, Both Business and Marketing Teachers May Teach Either Course.

Systems/Schools Should Determine The Course That Best Suits Their Needs.

Entrepreneurship Will Be Revised in Phase III To Become One Course Which May Be Taught By Either Business Or Marketing.

Page 78: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Special PopulationsVirginia Turner, Program Specialist

[email protected]

Page 79: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Coordinated Vocational Academic Education

Name Change – CVAE & VOCA Coordinated Career and Academic Education

(CCAE) Georgia Career Student Association (Georgia CSA) Coordinators will write (CCAE) curriculum to match

the new GPS format during the 3rd phase

Page 80: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Related Vocational Instruction

RVI Name Change Career & Technical Instruction (CTI) All changes were voted on by the Intervention Advisory

Board Inclusion of all coordinators in meetings that involve

the GPS training

Brochure / Grant from the Science Department @ UGAA summer workshop for CCAE and /or CTI Coordinators

w/a math teacher - KeyTrain

Page 81: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Extended Day Activities Funded Through the

Teacher Support Grant

Page 82: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Extended Day Requirements• Purpose-Activities conducted beyond the school day• Standards-All teachers must comply with four

standards to be eligible: Advisory Committee, Career Related Education, CTSO Sponsorship, and Professional Learning

• New POW and Monthly Report process on the CTAE Resource Network- has been designed to provide accountability with local control

• Due May 15, 2007 – CTAE Resource Network Profile

Page 83: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE Resource Network• Program of Work will be available on each

teacher’s “Teacher Profile” page• Submitted for approval to school supervisor• System Director submits budget for approved

POW’s• Monthly Reporting System documents activities

conducted• End of year assessment is automatic for

continuance in FY09

Page 84: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

• FY 06-07 Year End Annual Report for Teacher Support Grant Activities

• Last year to report under current reporting format

• No teacher password to login• Available for online reporting beginning April 16• Deadline for Reporting – June 1

Page 85: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Access for Online Reporting• Go to DOE Website, Access CTAE Division• Scroll down to Information Heading• Under this heading you will see the link to

access 06-07 Annual Report for Teacher Support Grants

Page 86: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Demonstration/Details

• Dwayne Hobbs – completing the POW, entering documentation on the monthly report, points, approval process, etc.

• End of year assessment process for FY 08

Page 87: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agricultural Education Update

Page 88: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update

TEACHER EVALUATION PROCESS• 1st Year and selected teachers will be evaluated on-site.• Teachers for on-site evaluation will be notified.• Teachers should complete the online Program of Work

Evaluation. Print and submit a copy to the CTAE Director for approval and required signatures.

• The CTAE Director should mail 1 completed copy with required signatures to the appropriate Agriculture Region Coordinator by May 15th.

• The Program of Work Evaluation will be available online at the Ag. Ed Website on April 20th.

Page 89: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

PROGRAM OF WORK• Teachers should complete the online Program of

Work. Print and submit a copy to the CTAE Director for approval and required signatures.

• The CTAE Director should mail 1 completed copy with required signatures to the appropriate Agriculture Region Coordinator by May 15th.

• The Program of Work will be available online at the Ag. Ed Website on April 20th.

Page 90: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

Agricultural Education

Extended Day and Year• FY 2008 allocation will be based on completed

Agricultural Education budget template.• Submit completed budget template to Agricultural

Education Region Coordinators by May 1, 2007. The budget template will be reviewed and returned with any corrections. Corrected figures can then be used on the Consolidated Application.

Page 91: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

Agricultural Education Region Coordinators

• North Region – John Bridges – [email protected]

• Central Region – Cindy Greene– [email protected]

• South Region – Melvin Thompson– [email protected]

Page 92: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

• Agriculture Teachers receive “full” extended day only.• The Agricultural Education Program of Work is to be

completed by May 15 for each teacher in your system. If you have a vacant position, please have the new teacher complete the Program of Work as soon as they are hired. The final deadline for newly hired teachers to complete the Program of Work is August 15, 2007.

• Applications for funding received after May 15, 2007 will be considered for approval later in the year.

Page 93: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

Young Farmer Program• The Young Farmer Program of Work is to be completed by

May 15 for each teacher in your system. If you have a vacant position, please have the new teacher complete the Program of Work as soon as they are hired. The final deadline for newly hired teachers to complete the Program of Work is August 15, 2007.

• Applications for funding received after May 15, 2007 will be considered for approval later in the year.

Page 94: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

Young Farmer Program (Cont.)• If you have a Part-Time Young Farmer Position,

please contact your Regional Coordinator for directions on completing the funding application.

• Travel grants will be $3,000.00. The local match for travel is $1,300.00.

• If your system does not have a Young Farmer Position, please delete the $3,000.00 from your budget summary.

Page 95: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

Food ProcessingThe food processing grants will be awarded upon the

completion of the following items:• FY 2008 Budget template with required employee,

salary, and days of operation completed.• The Agricultural Education Region Coordinators will

be forwarding Food Processing allotments to the Local Systems within the next week.

Page 96: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Agriculture Update (continued)

Industry Certification• For Renewal of Industry Certification or Initial

Certification, complete the FY 2008 Initial / Renewal Industry Certification application.

• A dollar amount has NOT been decided for certification at this point.

Page 97: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

GACTE Update

Barbara Wall

President

Page 98: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Career Related Education

Page 99: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

The Reengineering of Work-Based Learning

The mission of reengineering Work-Based Learning is to provide age appropriate activities for all students in all CTAE program areas in a model that is efficient and effective for the school size being served.

Page 100: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

The Reengineering Process• Assess current program status• Conduct research on a national level• Meet with YAP coordinators in each region• Conduct focus groups by region• Recommend course numbering for each pathway• Recommend extended day activities and standards the for

Teacher Support Grants• Produce a new WBL manual/activity guide• Re-define certification standards for WBL• Recommend necessary changes to State Board Rules• Establish new data collection procedures• Design recognition of exemplary programs

Page 101: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Focus Group Consensus Issues• Definition of WBL / CRE• Appropriateness of the name WBL• Student access and equity• Categories of WBL/CRE activities• Supervision of WBL placements• Business Partnerships• Assessment of current program implementation• 24 new and revised standards for WBL• The school-wide WBL Coordinator model• Employability Skill Development• Extended Day/ Teacher Support Grants• Credit and Student Work Hours• FTE Funding Issues and Class size

Page 102: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE Delivery Model

CTSO Participation

Career Related

Education

Instruction and Lab Activities

Curriculum Peach State Pathways Facility Specifications Recommended Equipment Professional Learning Advisory Committees

Career Awareness Career Exploration Instructional Related Connecting Activities Work-Based Learning

Placements

Leadership State Affiliation National Affiliation Chapter Events Team Events Individual Events

Page 103: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Career Related Education Continuum

Grades 6-8 Grades 9-10 Grades 11-12 Post-Secondary

Guest Speakers Career Day Study / Field Trips Career Fairs Presentations Videos Transition visitation to HS and DTAE schools

Career Guidance/Advisement Career Interviews J ob Shadowing Student Portfolios Internet Searches/Reports Research Projects Internet Based Career Planning Tool CTSO Projects/Competitions

Entrepreneurship Projects School Based Enterprises Employability Skill Attainment Clinical/ Internship Experiences Advisory Committee Articulation Creating Business Partnerships Student Placements

Employability Skill Development (proposed) Cooperative Education Internship

Youth Apprenticeship Program

Page 104: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Work-Based Learning ComparisonsCriteria ESD Internship/Practicum Clinical COOP YAP Purpose Employability Skill

Development. Pre-established portion of the training plan specifies some content to be mastered.

Short term experience or credit course to apply what has already been learned. Internship course may be structured for summer.

Extension of the curricula in upper level courses to apply what has already been learned.

J ob placement is an application of what is being learned in the class concurrently.

Application of coursework already taken and new skill development, culminating in a post secondary credential.

Policy Limitations

No more than 25% of total WBL student placements. Funded at “D” weight.

Currently Funded at “D” weight. Proposed Funding at “K” weight.

Part of the class component funded at “K” weight.

Currently Funded at “D” weight. Proposed Funding at “K” weight.

Already funded at “K” weight.

Student Responsibilities

Required Portfolio and completion of assignments.

Conditions as set by the Work-based Learning Coordinator.

Conditions as set by the clinical instructor

Conditions as set by the Work-based Learning Coordinator.

Conditions as set by the Work-based Learning Coordinator.

Personnel Responsibilities

WBL Coordinator WBL Coordinator Clinical Instructor WBL Coordinator WBL/YAP Coordinator

Coursework Currently enrolled in or taking a CTAE course

Minimum of 1 unit in CTAE pathway already earned

Extension of the curricula

Enrolled in course matching placement

Minimum of 1 unit in CTAE pathway already earned

Time Duration 1 year only 1 week to 1 year. May be during summer.

Variations within the course duration

1 year or two years 1 or more years beyond high school

Credit 1 unit or 2 units 1 or more units Credit within the course

1 or more units 1 or more units

Credentials None None Possible (ie:CNA) None Post secondary

Evaluation Worksite Mentor/WBL Coordinator

Worksite Mentor/WBL Coordinator

Clinical Instructor Worksite Mentor/WBL Coordinator

Worksite Mentor/WBL/YAP Coordinator

Wages Paid Paid or non-paid Non paid Paid Paid – Progressive Wage Scale

Page 105: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Employability StandardsEmployability Skill Development (proposed)

• Work Habits – Ethics, Personal Characteristics, Employer Expectations

• Communication Skills – Communicating at Work, Speaking, Listening, Presenting Yourself, Non-Verbal Communication

• Work Place Effectiveness – Time Management, Problem Solving, Customer Service, Teamwork

• Business Etiquette – On the Job Etiquette, Person-to-Person Etiquette, Telephone and E-mail Etiquette, Meeting Etiquette

Page 106: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Career Related Education (CRE)Implementation Grants

• $10,000 grants, 7 for each region of the state (north, central, south) to be strategically located by geographic region to serve as pilot sites.

• Agree to implement the CRE model by the new manual and guidelines with one school-wide Work-Based Learning Coordinator.

• Grant Guidelines posted on the web-site under “On-line Forms”.

• Grant Application to be completed with other grants in the Consolidated Application process. Deadline June 1, 2007

Page 107: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Teacher Support Grant (Extended Day)

• Teacher accesses the Program of Work (POW) through the Teacher Portal (CTAERN.ORG)

• Complete the POW for each Standard• 100 points in CTSO• 100 points in Professional Development • 100 points in Career Related Education

(50 points required for CRE in middle school)• 100 points in Advisory Committee

Page 108: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

POW Approval Process

• Click “SUBMIT” at the end of the Advisory Committee standard

• Message sent to CTAE school administrator• Extended Day Administration: school contact shows all

POW’s pending and approved• Review with teacher and click “submit to next

level/reject”• Message sent to system contact• Extended Day Administration: system contact shows

schools and all approved POW’s at each school.• Due May 15, 2007 to CTAE Resource Network Profile

Page 109: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Monthly Report

• Teacher accesses the Extended Day Monthly Report through the Teacher Portal (CTAERN.ORG)

• May be entered daily• Click submit on the due date specified each

month• Extended Day Administration: school contact;

shows all Monthly Reports submitted by month

Page 110: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Dwayne HobbsWork-Based Learning Specialist

Georgia Department of Education1752 Twin Towers East

Atlanta, GA 30334Office Phone - 404-657-8334Cell Phone - 770-656-3463

[email protected]

Page 111: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE Resource Network

Marvin Brown

Bob Leffew

Page 112: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

FY 2009 CTAE FY 2009 CTAE Program ReviewsProgram Reviews

Page 113: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Program Reviews 2007-2008

Page 114: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Program Reviews 2007-2008

Page 115: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Five-Year CTAE Program Review Schedule

Page 116: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

New CTAE Leaders’ Academy for New CTAE Leaders’ Academy for 2007-20082007-2008

Page 117: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

New CTAE Leaders’ Academy2007-2008

Orientation for New Leaders

CTAE Georgia Performance Standards & Career Pathways

Human Resources, Budgeting, & Finance

Leadership, School Climate, & Continuous Improvement

Legislation, Policy, & Legal Issues

Economic Development & Business Engagement

CTAE Program Review Job Shadow Assignment

Georgia Strategic Industries "Center of Innovation“ visits

Page 118: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

FY 2008 Perkins IV Transition FY 2008 Perkins IV Transition Local PlanLocal Plan

Page 119: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Notice: New for 2008…2-Step

CTAE Online Grant Application Process

Step One – Complete Online Grant Proposals May 15, 2007 Local Plan (Perkins IV) Grant Proposals

Submitted to the Consolidated Application-No Budget/No Allocations

June 1, 2007 is the deadline to complete all other State Grant Proposals on the Consolidated Application.

Page 120: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE Grant Process… Second Step! Step 2: Complete the Budget Detail (July 2007) GaDOE reviews the proposals Funds for grants are determined based on the system

proposals State Board of Education approval of the grant funds July 2007: Grant allocation is entered into the

Consolidated Application and the System Coordinator and Superintendent will complete the budget and sign off.

Page 121: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

New CTAE Online Section of the Consolidated Application

• A new “Tab” will be visible on the Consolidated Application-Perkins IV Grant

• All sections of the Perkins IV Local Plan will be located under this tab.

• Perkins IV Local Plan will have pull-down menus, auto-populated areas, text boxes of 500 characters or less, and check boxes will be necessary. (Previous years: files had to be uploaded)

Grant Proposals

Page 122: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

2008 New Perkins IV Transition (Local Plan) Application Process

• Log on to the Consolidated Application

Page 123: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Select: “Consolidated Application”

Page 124: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Timeline for CTAE Grant Application Process

2007• April 17-June 1 Consolidated App Available/Begin

Planning & Completing• May 1 Ag. Local Plan to Ag. Reg. Coord.• May 15 Deadline to complete Federal grants

on the Consolidated Application• May 15 Deadline to upload Ag grants to the

Consolidated Application• June 1 Deadline to complete all State Grants

• Dec. 31 Unused funds revert/DOE

2008• June 30, 2008 Deadline for grant purchases• July 1, 2008 Deadline to draw down funds

Page 125: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Important CTAE Perkins IV/Local Plan Dates

• CTAE Administrators are strongly encouraged to attend one of the Spring Update Workshops and one of the Local Plan (Perkins IV Transition) Technical Assistance workshops.

• Local plan technical assistance on the new “Online” Local Plan (Perkins IV) process will be provided by the GaDOE Administrative Staff

Page 126: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Local Plan/Perkins IV Regional Technical Assistance

Assistance will be available – Region Coordinators and CTAE State Staff

Date Region Location

April 17 South Tifton-Rural Dev Center April 18 Central Macon CentreplexApril 19 North Gwinnett Marriott

May 1 North Dalton, Wingate InnMay 2 Central Macon Centreplex May 3 South Jesup, Altamaha Tech

Page 127: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Look for Another New Tool for CTAE Administrators…

2008 Perkins IV Local Plan Guide (Downloadable from the CTAE Website)

• A copy of the new “Perkins IV Transition Local Plan Guide” will now be available on the CTAE webpage of the GaDOE website

• The guide will serve as a resource tool to follow during the new “online” Perkins IV Local Plan planning and submittal process on the Consolidated Application.

Page 128: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

The Good News…!!

• Most items on the new 2008 Perkins IV Transition Local Plan are the same or very similar to Local Plan applications of the past.

Page 129: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

NOTE: Local Plan Board Approval Date Change

Local Board of Education Approval Date According to the new Perkins IV Legislation, federal

funds are now tied to the date that the Perkins IV Local Plan is approved by the local Board of Education

Funds will not be reimbursed retroactively. NOTE: Local Board Approval must be between May 1,

2007 and September 30, 2007

Page 130: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Select the Date that the 2008 Local Plan was approved by Local Board

Action

Local Board Approval Date

Page 131: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Perkins IV Local Plan Online Assurances Section

• The CTAE Administrator must indicate Agreement or Non-Agreement with the Perkins IV Local Plan Assurances

Page 132: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

New CTAE Programs Offered Section of the Perkins IV Local Plan

Please select your local systems areas of concentration and career pathways

Select Area(s)ofConcentration

Area(s) of Concentration SelectCareer Pathway(s) NOTE: select Not less than one pathway

Career Pathways

X Architecture, Construction & Transportation

X Transportation Logistical Operations

Transportation Logistical Support

Engineering & Technology Engineering

Business & Computer Science Small Business Development

Page 133: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Support Programs SectionFor any of the program areas listed in the section above in the Perkins IV plan, indicate the number of support programs.

SUPPORT PROGRAMSFrom any of the program areas listed, indicate the number of support program in

place.

Special Population StudentsIndividuals with disabilities; individuals from economically disadvantaged families, including foster children; individuals preparing for non-traditional fields; single parents, including single pregnant women; displaced homemakers; and individuals with limited English proficiency

Support Programs in

Place Support Programs

Yes__ No___ CVAE

Yes __No ___ Project Success

Yes__No___ RVI

Page 134: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Advisory Council Section – New for 2008

List the Dates of Proposed 2007-2008 Advisory Council Meetings

List the Advisory Council Members– Male Advisory Council Members– Female Advisory Council Members– Minority Advisory Council Members– Disability Membership

Page 135: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

New for 2008: Automatic Comparison… Online local plan process stops for editing

New Maintenance of Effort Compariso

n

Page 136: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Maintenance of Effort Object Codes for Federal Grants

Page 137: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Examples of new 2008 Perkins IV Local Plan Narrative Items

Page 138: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Federal CTAE Grants

• Due May 15, 2007– Perkins IV Grant (Local Plan)

• Due June 1, 2007– Perkins IV Professional Development Grant– Perkins IV Reserve – Education and Career Partnerships Grant

• Completed online on the Consolidated Application• Details of the three Perkins IV Grants will follow

Page 139: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Federal Grant - Perkins IV Grant

• Complete the online Local Plan Grant Proposal on the Consolidated Application

• CTAE Administrator and the System Superintendent should sign off on the grant proposal by May 15, 2007

• GaDOE staff will send back to the systems any section of the Local Plan that needs revision

Page 140: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Federal Grants - Perkins IV Professional Development

and the Education and Career Partnerships Grants • Perkins IV –

Professional Development Grant

• Complete the online grant proposal on the Consolidated Application concerning joining of the CTAE Resource Network Consortium

• CTAE Administrator and System Superintendent should sign off by June 1, 2007

• Perkins IV Reserve: Education and Career Partnerships Grant

• Complete the online grant proposal on the Consolidated Application

• CTAE Administrator and System Superintendent should sign off by June 1, 2007

Page 141: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

State CTAE Grants

• Deadline to complete state grants: June 1, 2007• CTAE Administrators should complete the grant

proposals by June 1, 2007. • Different from Prior CTAE Grants:

– After June 1, 2007, no further grant proposals may be submitted for CTAE grants

Page 142: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

CTAE State Grants (Deadline June 1, 2007)

• CTAE Supervisor Grant

• Complete the online grant proposal on the Consolidated Application

• CTAE Administrator and the System Superintendent will sign off by June 1, 2007

• Industry Certification Grant

• Complete one grant proposal on the Consolidated Application

• Drop-down menu for selecting the CTAE Program Concentration

• CTAE Administrator and the System Superintendent will sign off by June 1, 2007

Page 143: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

State CTAE Grants (continued)

• Youth Apprenticeship Grant

• Complete the online grant proposal on the Consolidated Application

• CTAE Administrator and System Superintendent sign off by June 1, 2007

• Capital Equipment Request for FY 2009

• Complete the online grant proposal on the Consolidated Application

• Drop-down menu to select either Vocational or Agriculture equipment grant

• CTAE Administrator and System Superintendent sign off by June 1, 2007

Page 144: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

State CTAE Grants (continued)

• Career-Related Education Implementation Grant

• New Competitive Grant for 2008 – only 20 systems

• Complete online grant proposal on the Consolidated Application

• CTAE Administrator and System Superintendent sign off by June 1, 2007

• FCCLA Camp Grant• New Competitive Grant for

2008• Download the grant proposal

from the CTAE Website• Complete the grant and then

send the grant application as an attachment to the following email address: [email protected] by June 1, 2007

Page 145: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

State CTAE Teacher Support Grant (Extended Day) Deadline June 1, 2007

• Step 1: Interested CTAE Teachers should complete an Extended Day Application located on the CTAE Resource Network webpage

• Step 2: Extended Day Application Point System determines CTAE Teacher Eligibility for Extended Day

• Step 3: School CTAE Contact reviews CTAE Teacher Extended Day eligible applications for eligibility

• Step 4: System CTAE Administrator determines the number of approved Extended Day Grantees based on the amount of Extended Day funds– (see next page for final steps)

Page 146: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

State CTAE Teacher Support Grant (continued from previous page)

• Step 5: System CTAE Administrator runs the “Report of Approved CTE Extended Day Teachers” on the CTAE Resource Network webpage

• Step 6: System CTAE Administrator uploads the “Report of Approved CTE Extended Day Teachers” file to the Consolidated Application (CTE Teacher Support Grant)

• Step 7: The CTAE Administrator and System Superintendent sign off on the CTE Teacher Support grant by June 1, 2007

Page 147: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Student Population Definitions

Participants - A participant is a secondary student enrolled in a career and technical education (CTE) course.

Concentrators - A concentrator is a secondary student who earned four or more Carnegie Units (credits) in career and technical education (CTE) courses, of which three are in a concentrated CTE program of study

Completers - A completer is a career and technical education concentrator who completed high school and earned a Career/Technical Prep or Both College Prep & Career/Technical Prep (Dual) diploma.

Transition Year Performance Indicators: Accountability & Evaluation

DRAFT DRAFT

Page 148: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Transition Year Core Indicators Accountability & Evaluation

Secondary Core IndicatorsSame or similar to Perkins III Items

New Perkins IV Items

1-Year (Transition)

Plan

6-Year Plan

1S1 Academic attainment – Reading/language arts Yes X

1S2 Academic attainment – Mathematics Yes X

2S1 Technical skill attainment (assessment) No X

3S1 Secondary school diploma No X

3S2 GED or other State-recognized equivalent No X

3S3 Diploma & other credential (if offered) No X

4S1 Student graduation rates Yes X

5S1 Secondary placement No X

6S1 Nontraditional participation No X

6S2 Nontraditional completion No X

Page 149: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Example of the Core Indicators

Page 150: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Perkins IV Performance Indicators: Core Indicator Strategies for Unmet Indicators

10 Possible Strategies10 Possible Strategies:

1.Establish High Expectations2.Revise Career/Technical Studies3.Revise Academic Studies4. Change the Instructional Process5. Program of Study6. Guidance & Advisement 7. Implement Work-Based Learning8. Help Teachers Work Together9. Provide Extra Help and Extra Time10. Use HSTW Assessment Data for School Improvement

Page 151: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Accountability & Evaluation

Local school system accountability requires local programs to be responsible for meeting established targetsLocal systems may accept state performance targets orWork with the state to negotiate levels of performance

Perkins IV Core Indicators - Changes

Page 152: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Accountability & Evaluation

Sanctions are possibleThe DOE may consider financial sanctions if a local system: - Does not implement an improvement plan OR- Does not make improvement in meeting performance targets once improvement plan is in place OR- Does not meet at least 90 percent of the same measure’s performance target in 3 consecutive years

Perkins IV Core Indicators- Changes

Page 153: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Accountability & Evaluation

Academic attainment will now be measured by the academic assessments a state has approved under No Child Left Behind (NCLB)

Graduation will be measured as defined in NCLB Technical proficiency includes student achievement

on technical assessments aligned with industry recognized standards when possible

Changes to specific core indicators

Page 154: 2007 Spring Region Update Meetings. Perkins Reauthorization Overview Spirit of the New Perkins Law – Leading CTAE into the 21 st Century Global Competition

Performance Indicators – Federal Perkins IV Funds – New for 2008

Indicate the Total Perkins Funds Used to Address those Core Indicator Benchmarks that were not met by the system________