1
General Information
Accredited Thermographers
2006 Thermographic Inspection
Terrific Towers 1001 Sparks St Sydney NSW
Vol. 9
Client ACME Electrical Pty Ltd Job No. 1386 Address 1050 Sydney St Sydney NSW 200 Date 28/03/06 Tel. (02) 5555 6666 Fax (02) 5555 5555 Time 07:00 AM Contact Eddie the Electrician Vol. Nine (9) Location Terrific Towers 1001 Sparks St Sydney IR Camera Avio TVS 610 Serial No. 0342A1141AD Visual Camera Kodak DX3600 Serial No. KJCAJ14422070 Load Measurement Device Kyoritsu-2017 Serial No. KY90-1198B Thermographer Accreditation No. AINDT - 2067
An Infrared Thermal Scan of Listed Electrical Switchboards was conducted 28th March 2006. The complex was drawing load from the Local Supply Authority at time of inspection. Internal switchgear components and associated wiring were inspected for abnormal operating temperatures effected by load or equipment condition. Wiring and terminations were inspected for high resistance connections and insulation condition. Load conditions were as experienced during periods of normal demand. All inspected switchboards and associated wiring within were thermally operating within load conditions. Internal wiring insulation and terminations appear to be sound with exceptions as listed within.
8/139 Woolooware Rd Burraneer NSW 2230 T. (02) 9544 3588 F. (02) 9544 3688 E. [email protected] W. www.thermalimagingservices.com.au
2
General Information Application Thermal Scanning
The information listed below is to assist in the interpretation and discharge of appropriate remedial action of reported faults or potential areas of concern. Recommendations listed within this report are within the area of our expertise and recommend you discuss the implementation of service/repair with your maintenance service provider. Scope Infrared Thermal scan of electrical switchgear and associated conductors to detect the evidence of equipment operating near or above rated thermal temperatures. Where possible load readings are taken to ensure proper diagnosis of prospective faults. Australian and IEC Standards along with Copper & Brass Association publication No.22 are used as benchmarks for assessing permissible temperature limits. Method All accessible covers are removed from the switchboards with internal PVC shrouds removed when installed in a manner that facilitates safe removal. Switchboards assigned a segregation rating greater than two (2), in accordance with AS3439, or where fitted with internal busbar shrouds can be arranged to be scanned with the arrangement of at least two shutdowns to remove and reinstall covers. Internal metal covers will not be removed whilst the switchboard is on line. An infrared radiometer with its range initially set at 20° C and 40° C is passed over all switchgear, bus system and cable connections. Areas displaying abnormal temperature variations are further investigated by means of equipment application analysis, load measurement and pinpoint temperature readings. Faults and areas of concern have infrared thermal and digital images saved for report and condition monitoring tasks. Results A priority rating schedule along with suggested remedial action plans are included for prioritising rectification works. Where faults of a life or property threatening situation are detected, notification will be immediately made to the client’s representative. Ultimately it is the owner or plant operator’s responsibility to implement or gain further advice of the recommended repairs contained within this report. Each thermal image is uniquely identified to correspond with a label placed upon the affected equipment for ready identification by maintenance personnel.
Priority Rating Recommended Action 0 No Fault. Re-scan within 12 months 1 Disconnect supply immediately 2 Arrange service /repair within 24 hours 3 Arrange service/repair at very next service opportunity 4 Arrange service/repair at next scheduled maintenance 5 Condition monitor
Licensed electricians must perform all repairs and service. Services Available Annual preventative maintenance surveys. Design and repair advice. Procurement of services Property/asset reports Condition Monitoring Compliance Reports Insurance Audits
3
Table of Contents
Section Equipment Priority Page Chiller 2 Located Roof Plant Room
Compressor 3 DOL Starter 3 4
MSSB-2 Located Catwalk
SF3 – AHU-3 C Phase Supply Fuse
2 5
Main Switchboard Located Carpark Main Switchroom
Non Essential Main Switch 3 6
Mechanical Services MCC-3 Located Level 16 Plant Room
SF3 – AHU-3 C Phase Fuse S1 Dry Store C Phase Fuse
2 7
Main Switchboard (Panel 7) Located Boiler Plant Room
Un-marked Fuse 2 8
Summary of Inspection List of Reported Items 9 Fault Log of Inspected Assets 10 &11
Certification Details 12
4
Inspected Equipment Operator:
Chiller 2 Located Roof Plant Room
Malcolm Rhind
Equipment Compressor 3 DOL Starter
Equipment Type Interconnection Cable
Additional Information
Loadings A Phase – 86.2 Amperes B Phase – 85.9 Amperes C Phase – 86.1 Amperes
Date 25/04/2006
Time 11:24 AM
Working conditions:
Plant mounted within a ventilated plant room
Thermoteknix TV S-600 11:24:08 AM 25/04/2006 e : 0.95 Bg : 30.0°C
-20.0
150.0
-7.7
80.5
C elsius
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0115.9
Max.
115.958.9
IR Image Details
Image No.
Emissivity 0.95
Spot 1 115.9°C
Spot 2 58.9°C
Area 1 Max. 115.9°C
Area 2 Max. <unknown>
Background 30.0°C
Description of Fault High resistance termination at circuit breaker terminal. Evidence of cable insulation deterioration.
Priority Rating 3
Recommendation Replace interconnecting cable. As only 5 of 10 contactors were on line at time of inspection a complete re-tension of all connections is advisable.
Previous Fault Description
Date Image
Vol. Code Page Time Remedial Action Taken
Authorised
Reference Image
Thermal Image
5
Inspected Equipment Operator:
MSSB-2 Located Catwalk
Malcolm Rhind
Equipment SF3 – AHU-3 C Phase Supply Fuse
Equipment Type Alstom RS100
Additional Information
Loadings A Phase – 36.7 Amperes B Phase – 32.1 Amperes C Phase – 33.6 Amperes
Date 24/06/2006
Time 12:17 PM
Working conditions:
Located within a well ventilated area.
Thermoteknix TV S-600 12:17:09 PM 24/06/2006 e : 0.95 Bg : 28.0°C
-20.0
150.0
28.0
96.1
C elsius
40.0
50.0
60.0
70.0
80.0
90.0
92.4
76.5
Max.
131.9
131.9
IR Image Details
Image No.
Emissivity 0.95
Spot 1 92.4°C
Spot 2 76.5°C
Difference <unknown>
Area 1 Max. 131.9°C
Area 2 Max. <unknown>
Background 28.0°C
Description of Fault High resistance connection on C Phase load side fuse fitting.
Priority Rating 2
Recommendation Ensure fuse cartridge is securely fixed to carrier and that carrier is making firm contact with base upon insertion. Ensure load side termination is tensioned.
Previous Fault Description
Date Image
Vol. Code Page Time Remedial Action Taken
Reference Image
Thermal Image
6
Authorised
Inspected Equipment Operator:
Main Switchboard Located Carpark Main Switchroom
Malcolm Rhind
Equipment Non Essential Main Switch
Equipment Type Dumeco 1250A
Additional Information
Date 13/09/2004
Time 10:14 AM
Working conditions:
Floor mounted within an air conditioned switchroom
Thermoteknix TVS-600 10:14:10 AM 13/09/2004 e : 0.95 Bg : 18.5°C
-20.0
150.0
6.8
72.7
Celsius
10.0
20.0
30.0
40.0
50.0
60.0
70.0
Spot 184.4
Spot 282.6
Spot 327.9
Spot 432.7
Spot 531.7
Spot 622.9
IR Image Details
Image No.
Emissivity 0.95
Spot 1 84.4°C
Spot 2 82.6°C
Difference <unknown>
Area 1 Max. <unknown>
Area 2 Max. <unknown>
Background 18.0°C
Description of Fault High resistance connection A & B Phase load side busbars to main switch. Deterioration most probably caused by downstream short circuit
Priority Rating 3
Recommendation Clean contact surfaces and re-tension. Ensure busbars are not supported by main switch as pressure on connecting tags can cause internal contact misalignment.
Previous Fault Description
Date Image Vol. Code Page Time Remedial Action Taken
Reference Image
Thermal Image
7
Authorised
Inspected Equipment Operator:
Mechanical Services MCC-3 Located Level 16 Plant Room
Malcolm Rhind
Equipment SF3 – AHU-3 C Phase Fuse S1 Dry Store C Phase Fuse
Equipment Type Alstom RS100
Additional Information
Loadings Fuse 2 – 42.8 Amperes Fuse 4 – 27.1 Amperes
Date 24/06/2005
Time 12:18 PM
Working conditions:
Located within a well ventilated area.
Thermoteknix TV S-600 12:18:56 PM 24/06/1906 e : 0.95 Bg : 28.8°C
-20.0
150.0
37.2
99.6
C elsius
40.0
45.0
50.0
55.0
60.0
65.0
70.0
75.0
80.0
85.0
90.0
95.0136.6124.0
Max.
113.8
Max.
139.2
IR Image Details
Image No.
Emissivity 0.95
Spot 1 136.6°C
Spot 2 124.0°C
Difference <unknown>
Area 1 Max. 113.8°C
Area 2 Max. 139.2°C
Background 29.0°C
Description of Fault High resistance connection on load side of fuse fittings.
Priority Rating 2
Recommendation Ensure fuse cartridges are securely fixed to carrier and that carriers are making firm contact with bases upon insertion. Ensure load side terminations are tensioned.
Previous Fault Description
Date Image
Vol. Code Page Time Remedial Action Taken
Reference Image
Thermal Image
8
Authorised
Inspected Equipment Operator:
Main Switchboard (Panel 7) Located Boiler Plant Room
Malcolm Rhind
Equipment Un-marked Fuse
Equipment Type HRC Fuse
Additional Information
Loading – 11.9 Amperes
Date 8/03/2006
Time 09:53 AM
Working conditions:
Floor mounted within a non-ventilated plant room. Ambient temperature influenced by plant equipment.
Thermoteknix TVS-600 9:53:27 AM 8/03/2006 e : 0.95 Bg : 32.3°C
-20.0
150.0
11.6
60.3
Celsius
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
113.2
Max.
113.2
IR Image Details
Image No.
Emissivity 0.95
Spot 1 113.2°C
Spot 2 <unknown>
Difference <unknown>
Area 1 Max. 113.2°C
Area 2 Max. <unknown>
Background 32.0°C
Description of Fault High resistance connection load side of fuse fitting.
Priority Rating 2
Recommendation Make good cable end and re-terminate. Ensure fuse is securely fixed to carrier and that the carrier is making firm contact with the fuse base.
Previous Fault Description
Date Image
Vol. Code Page Time Remedial Action Taken
Authorised
Reference Image
Thermal Image
9
List of Reported Items Switchboard Component Fault Priority Recommendations Chiller 2 Located Roof Plant Room
Compressor 3 DOL Starter
High resistance termination at circuit breaker terminal. Evidence of cable insulation deterioration.
3 Replace interconnecting cable. As only 5 of 10 contactors were on line at time of inspection a complete re-tension of all connections is advisable.
MSSB-2 Located Catwalk
SF3 – AHU-3 C Phase Supply Fuse
High resistance connection on C Phase load side fuse fitting.
2 Ensure fuse cartridge is securely fixed to carrier and that carrier is making firm contact with base upon insertion. Ensure load side termination is tensioned.
Main Switchboard Located Carpark Main Switchroom
Non Essential Main Switch
High resistance connection A & B Phase load side busbars to main switch. Deterioration most probably caused by downstream short circuit
3 Clean contact surfaces and re-tension. Ensure busbars are not supported by main switch as pressure on connecting tags can cause internal contact misalignment
Mechanical Services MCC-3 Located Level 16 Plant Room
SF3 – AHU-3 C Phase Fuse S1 Dry Store C Phase Fuse
High resistance connection on load side of fuse fittings.
2 Ensure fuse cartridges are securely fixed to carrier and that carriers are making firm contact with bases upon insertion. Ensure load side terminations are tensioned.
Main Switchboard (Panel 7) Located Boiler Plant Room
Un-marked Fuse High resistance connection load side of fuse fitting.
2 Make good cable end and re-terminate. Ensure fuse is securely fixed to carrier and that the carrier is making firm contact with the fuse base
10
Fault Log of Inspected Assets
Location Switchboard 98 99 00 01 02 03 04 05 06 Basement Main Switchroom
Main Switchboard 1 F √ √ √ F √ F √ F
Power Factor Correction Unit
√ √ √ √ √ √ √ NOL √
House DB-B √ √ √ √ √ √ √ √ √
Roof Plant Room
Air Compressor 1 Control Panel
√ √ √ √ √ √ √ √ √
Air Compressor 2 Control Panel
√ √ √ √ NOL NOL √ √ √
Chiller 1 Controls √ √ √ √ √ F F √ √
Chiller 2 Controls √ √ √ F F F √ √ F
MP1-04 √ √ √ √ √ √ √ √ √
Vacuum Pump Panel √ √ √ √ √ √ √ √ √
MCC-1 Services/CIP √ √ √ √ √ √ √ √ √
MCC-2 Services/CIP √ √ √ √ √ √ √ √ √
CWP VLT Cabinet √ √ √ NOL √ √ √ √ √
Catwalk MSSB-2 √ √ √ √ √ √ √ √ √
Level 16 Plant Room
Mechanical Services MCC-3
√ √ √ F √ √ √ √ F
Level 15 Riser Cupboard
Tenant DB-15 √ √ F √ √ √ √ √ √
House DB-H15 √ √ √ √ √ F F √ √
Level 14 Riser Cupboard
Tenant DB-14 √ √ √ √ √ √ √ √ √
House DB-H14 √ √ √ √ √ √ √ √ √
Level 13 Riser Cupboard
Tenant DB-13 √ √ √ √ F √ √ √ √
House DB-H13 √ √ √ √ √ √ √ √ √
Level 12 Riser Cupboard
Tenant DB-12 √ √ √ √ √ √ √ √ √
House DB-H12 √ √ √ √ √ √ √ √ √
Level 11 Riser Cupboard
Tenant DB-11 √ √ √ √ √ √ √ √ √
House DB-H11 √ √ √ √ √ √ √ √ √
Level 10 Riser Cupboard
Tenant DB-10 √ √ √ √ √ √ √ √ √
House DB-H10 √ √ √ √ √ √ √ √ √
Level 9 Riser Cupboard
Tenant DB-9 √ √ √ F F F √ √ √
House DB-H9 √ √ √ √ √ √ √ √ √
Level 8 Riser Cupboard
Tenant DB-8 √ √ √ √ √ √ √ √ √
House DB-H8 √ √ √ √ √ √ √ √ √
Level 7 Riser Cupboard
Tenant DB-7 √ √ √ √ √ √ √ √ √
House DB-H7 √ √ F √ √ √ √ √ √
Level 6 Riser Cupboard
Tenant DB-6 √ √ √ √ √ √ √ √ √
House DB-H6 √ √ √ √ √ √ √ √ √
11
Location Switchboard 98 99 00 01 02 03 04 05 06 Level 5 Riser Cupboard
Tenant DB-5 √ √ √ √ √ √ √ √ √
House DB-H5 √ √ √ √ √ √ √ √ √
Level 4 Riser Cupboard
Tenant DB-4 √ √ √ √ √ √ √ √ √
House DB-H4 √ F √ √ √ √ √ √ √
Level 3 Riser Cupboard
Tenant DB-3 √ √ √ √ √ √ F √ √
House DB-H3 √ √ √ √ √ √ √ √ √
Level 3 Riser Cupboard
Tenant DB-3 √ √ √ √ √ √ √ √ √
House DB-3 √ √ √ √ √ F F √ √
Level 2 Riser Cupboard
Tenant DB-2 √ √ √ √ √ √ √ √ √
House DB-H2 √ √ √ √ √ √ √ √ √
Level 1 Riser Cupboard
Tenant DB-1 √ √ √ √ F √ √ √ √
House DB-H1 √ √ √ √ √ √ √ √ √
Ground Level East Service Cupboard
Retail Tenant DB-1E √ √ √ √ √ √ √ √ √
Retail Tenant DB-2E √ √ √ √ F F √ √ √
Retail Tenant DB-3E √ √ √ √ √ √ √ √ √
Retail Tenant DB-4E √ √ √ √ √ √ √ √ √
Retail Tenant DB-5E F F F √ √ √ √ √ √
Retail Tenant DB-6E √ √ √ √ √ √ √ √ √
Ground Level West Service Cupboard
Retail Tenant DB-1W √ √ √ √ √ √ √ √ √
Retail Tenant DB-2W √ √ √ √ √ √ √ √ √
Retail Tenant DB-3W √ √ √ √ √ √ √ √ √
Retail Tenant DB-4W √ √ F F √ √ √ √ √
Retail Tenant DB-5W √ √ √ √ √ √ √ √ √
Retail Tenant DB-6W √ √ √ √ √ √ √ √ √
F = Fault √ = No Fault Detected NOL = Not on Line
12