Project : Doc. no. : Ver. : 1
Page no. 1 of 6
RRRRMM SSYYSSTTEEMM SSAALLEESS
EELLEECCTTRRIICCAALL SSYYSSTTEEMM EENNGGIINNEEEERRIINNGG PPAACCKKAAGGEE FFOORR RRRRMM EEQQUUIIPPMMEENNTT
0 31.05.12 Project specific scope defined JKH
Version Date (dd-mm-yy)
Description
Document Owner
Checked by
Table of Contents:
Project : Doc. no. : Ver. : 1
Page no. 2 of 6
1 PROJECT SPECIFIC SCOPE (RRM equipment integration) ................................................... 3 1.1 RRM equipment, main electrical interfaces ..................................................................................................... 3 1.2 RRM equipment, positioning ........................................................................................................................... 3 1.3 RRM equipment system engineering ................................................................................................................ 4 1.4 Summary of RRM equipment cable schedule ................................................................................................... 5 1.5 Automation and remote control system ........................................................................................................... 5 1.6 Review/comment by RRM on el. drawings which are made by third parties ..Error! Bookmark not defined.
2 EXCLUSIONS FROM THE SCOPE ............................................................................................. 6
3 TECHNICAL INPUT ...................................................................................................................... 6
Project : Doc. no. : Ver. : 1
Page no. 3 of 6
1 PROJECT SPECIFIC SCOPE (RRM EQUIPMENT INTEGRATION) The documentation from RRM equipment suppliers are gathered and upgraded and prepared for merging into final production information
1.1 RRM equipment, main electrical interfaces
1.2 RRM equipment, positioning
1.1 RRM equip. main el. interfaces
Comment
Electrical interface list, RRM equipment
Showing main functional interactions between main machinery control systems for: RRM equipment RRM equipment RRM equipment YARD equipment Final list contain terminals marking on both sides MS Excel file format.
NOTE: This list is internal document and only part which describe interface between RRM and Yard equipment will be delivered to final customer
1.2 RRM equip. positioning
Comment
Layout of Main Control Cabinets, RRM equipment shown on GA
Indicating most appropriate positions (areas) for el. cabinets and components on General arrangement. Final positions to be decided and verified by Yard.
Project : Doc. no. : Ver. : 1
Page no. 4 of 6
1.3 RRM equipment system engineering
1.3 RRM equipment system engineering.
Comment
Tunnel Thrusters control system, cable block diagram
CABLE DIAGRAMS: Adapting and marking-up of el. equipment and cables on the RRM suppliers documentation for electrical equipment.
Making of unique drawings for each particular RRM component (f.i.. 4 generators = 4 drawings) Defining the el. cables according to suppliers recommendations (using suppliers catalogue provided by Yard). Indicating most appropriate positions (areas) for el. cabinets and components (final positions to be decided and verified by Yard). Marking of equipment in a way to be clear which component belongs to which system and according to Yard standards (if available). Marking of special notes related for particular systems which will help to Yard during installation CONNECTION DIAGRAMS: Upgrading of RRM equipment suppliers documentation with coordinated information for connection. No internal connection diagrams are provided for motor starters etc NOTES: For some of systems, cable and connection diagrams are merged in one common drawing for practical reasons
Tunnel Thruster drive system, cable & connection diagram
Main propulsion drive system, cable & connection diagram
Main propulsion remote control system, cable block diagram
Main propulsion remote control system, connection diagram
Main engines/generators control system, cable block diagram
Main engines/generators control system, connection diagram
POSCON Independent Joystick system, cable block diagram
POSCON Independent Joystick system, connection diagram
Main Switchboard control system, cable and connection diagram
Emergency/Harbour Switchboard control system, cable and connection diagram
Main one line diagram (MSBD, ESBD) Power distribution, cable block diagram Bridge alarm system, cable block diagram Bridge alarm system, connection diagram Emergency telegraph, cable block diagram
ACON, Pumps and valves remote control system, cable and connection diagram
ACON, Machinery alarm system, cable and connection diagram Starter list, RRM equipment
Project : Doc. no. : Ver. : 1
Page no. 5 of 6
1.4 Summary of RRM equipment cable schedule
1.5 Automation and remote control system
1.4 Summary of RRM equipment cable schedule
Comment
Cable booklet, Power cables Cable booklets showing cable id, cable type (using
suppliers catalogue provided by Yard) and EMC class, to and from equipment.
Cable booklet, Signal cables Cable booklet, Special cables NOTE: Routing and project length are not included
1.5 Automation and remote control system
Comment
Instrumentation and automation list (Alarm list unmanned engine room)
List of all remote alarms and indications required by class based on machinery system diagrams and equipment vendor's information.
Extension of Instrumentation and automation list with Pumps and Valves remote control system I/O
Contains: - Pre-warning and failure indication - Read-outs of temperatures and pressures - Flow meter reading - Hour counting (rotating equipment) - General start/stop control for remotely controlled machinery - Control/indication of remote controlled valves
Project : Doc. no. : Ver. : 1
Page no. 6 of 6
2 EXCLUSIONS FROM THE SCOPE
The following documents/actions are not included within scope described above and are assumed to be received/performed by the Shipyard / 3rd parties :
a) Electrical initial/basic design drawings/documents which have to be approved by Class
b) Elaboration of drawings for production of machinery systems Mimic diagrams
c) Definition of machinery process parameters range and alarm set points
d) Various systems safety equipment documentation (CO2, safety stops, power failures) which has to be signalized within ACON plant
e) List of equipment to be remotely controlled (stand-by pumps starting is assumed to be activated automatically but locally, using e.g. a locally mounted pressure switch; only signalization of pump stand-by start activated or equivalent will be signalized within ACON plant)
f) List of tanks to be remotely monitored
3 TECHNICAL INPUT The Yard is responsible to provide all necessary input (General arrangement, Tank Plan, Hazardous areas plan, Machinery system drawings, Yards Electrical system drawings, List of alarms for Yard equipment, etc) for the above work except for the RRM equipment which is responsibility of RRM.
1 PROJECT SPECIFIC SCOPE (RRM equipment integration)1.1 RRM equipment, main electrical interfaces1.2 RRM equipment, positioning1.3 RRM equipment system engineering1.4 Summary of RRM equipment cable schedule1.5 Automation and remote control system
2 EXCLUSIONS FROM THE SCOPE3 TECHNICAL INPUT