4
8 1. Create Quality Local Jobs Create high-paying, community-sustaining jobs by: Protecting and preserving existing manufacturing zoning for diverse industrial uses Building on existing employment centers - New York Container Terminal - Teleport/SI Corporate Park - Bricktown and Charleston Retail Centers Connecting industrial properties to infrastructure and improved transit opportunities - Goethals Bridge - Key roadway extensions and upgrades - Future express bus stops and park and ride locations - Freight rail expansion on the Travis Branch - Maritime and shoreline improvements Exploring new development - Maritime uses on public properties and waterfronts (e.g., Rossville; Bloomfield) - Commercial uses near existing Staten Island Railway stations and future bus stops/park and ride locations Working West Shore 2030 has defined four strategies for creating economic opportunity, managing growth, and providing infrastructure on the West Shore for the next 20 years. By accounting for demographic changes, physical constraints, the potential of existing job centers, and the unique residential neighborhoods of the study area, the framework targets future growth opportunities and infrastructure improvements to a limited number of areas that: Have concentrated amounts of developable and vacant/underutilized land; Are accessible to current and future transit stops and highway exits; Are near existing and future employment and commercial centers; and Would support existing communities by their development. Strategies for a Working West Shore 2 2 | Strategies for a Working West Shore Visy Paper Recycling Center NY Container Terminal Source: Visy Paper Freight Rail Commercial Industrial WSE Transit Corridor Bus Transit Hub 2030 Major Employment Centers

2 Working West Shore Strategies for a - New York€¦ · commercial centers; and • Would support existing communities by their development. Strategies for a 2 Working West Shore

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2 Working West Shore Strategies for a - New York€¦ · commercial centers; and • Would support existing communities by their development. Strategies for a 2 Working West Shore

8

1. Create Quality Local JobsCreate high-paying, community-sustaining jobs by:

• Protecting and preserving existing manufacturing zoning for diverse industrial uses

• Building on existing employment centers

- New York Container Terminal

- Teleport/SI Corporate Park

- Bricktown and Charleston Retail Centers

• Connecting industrial properties to infrastructure and improved transit opportunities

- Goethals Bridge

- Key roadway extensions and upgrades

- Future express bus stops and park and ride locations

- Freight rail expansion on the Travis Branch

- Maritime and shoreline improvements

• Exploring new development

- Maritime uses on public properties and waterfronts (e.g., Rossville; Bloomfield)

- Commercial uses near existing Staten Island Railway stations and future bus stops/park and ride locations

Working West Shore 2030 has defined four strategies for creating economic opportunity, managing growth, and providing infrastructure on the West Shore for the next 20 years. By accounting for demographic changes, physical constraints, the potential of existing job centers, and the unique residential neighborhoods of the study area, the framework targets future growth opportunities and infrastructure improvements to a limited number of areas that:

• Have concentrated amounts of developable and vacant/underutilized land;

• Are accessible to current and future transit stops and highway exits;

• Are near existing and future employment and commercial centers; and

• Would support existing communities by their development.

Strategies for a Working West Shore2

2 | Strategies for a Working West Shore

visy Paper Recycling Center Ny Container Terminal

Sou

rce:

Vis

y Pa

per

Freight Rail

Commercial

Industrial

WSE Transit Corridor

Bus Transit Hub

2030 Major Employment Centers

WWS 2030 Report_v5-6-2011.indd 8 6/6/2011 10:36:52 AM

Page 2: 2 Working West Shore Strategies for a - New York€¦ · commercial centers; and • Would support existing communities by their development. Strategies for a 2 Working West Shore

Creating Jobs, Improving Infrastructure and Managing GrowthWorking West Shore 2030

9

2. Connect the West ShoreConnect communities and businesses with the rest of the borough and the region, while reducing auto-dependency and minimizing the traffic impact of new development by:

• Improving the local road network

- Widen/upgrade existing roads

- Build new roads

- Separate truck traffic from residential communities

- Improve cross-island connections

• Creating a sustainable transit network

- Build upon SIEDC’s West Shore Light Rail Study recommendations to create a Rt. 440/WSE Bus Transit Corridor

- Expand local bus destinations

- Improve transit connections to New Jersey and regional destinations

- Create new park and ride facilities

- Relocate and improve Staten Island Railway stations

SIR Station

Arthur Kill Road Bus Stop

2 | Strategies for a Working West Shore

Bus Rapid Transit System

Proposed Freshkills Park bike paths along Richmond Avenue

Freight Rail

Staten Island Railway (SIR)

Improved Roads

New Road Connections

WSE Transit Corridor

Bus Transit Hub (Park and Ride, Bus Stop)

Relocated SIR Stations

Potential Bus Rapid Transit Corridor

2030 Transportation Network

Sou

rce:

Dep

artm

ent

of

Park

s &

Rec

reat

ion2030 Major Employment Centers

Pho

to e

nti

tled

Est

acio

nel

evad

a co

urt

esy

of

Mill

on

ario

WWS 2030 Report_v5-6-2011.indd 9 6/6/2011 10:36:57 AM

Page 3: 2 Working West Shore Strategies for a - New York€¦ · commercial centers; and • Would support existing communities by their development. Strategies for a 2 Working West Shore

10 2 | Strategies for a Working West Shore

3. Preserve and Link Open SpacePreserve existing open space and establish, activate and connect new ones to existing areas and to nearby communities by:

• Preserving natural lands

• Recovering and reutilizing brownfield areas

• Creating open space and new connections

- Arlington and Mariners Marsh, Freshkills Park and Fairview Park

• Expanding the Bluebelt system

• Bringing the West Shore to its shoreline

• Celebrating historic places

• Encouraging development that provides open space and remediation

Open Space Connections at Freshkills Park

Bluebelt system

Arlington marsh shoreline

NYC Parkland

Other Open Space and Recreation

Preserved Wetlands and Water Features

Open Space Connection

Continuous Waterfront Public Access

Waterfront Public Access

2030 Open Space

Sou

rce:

Dep

artm

ent

of

Envi

ron

men

tal P

rote

ctio

nSo

urc

e: D

epar

tmen

t o

f Pa

rks

& R

ecre

atio

n

WWS 2030 Report_v5-6-2011.indd 10 6/6/2011 10:37:02 AM

Page 4: 2 Working West Shore Strategies for a - New York€¦ · commercial centers; and • Would support existing communities by their development. Strategies for a 2 Working West Shore

Creating Jobs, Improving Infrastructure and Managing GrowthWorking West Shore 2030

112 | Strategies for a Working West Shore

4. Improve Community Services and Choices

Diversify housing options and concentrate expanded services and infrastructure investments adjacent to existing communities by:

• Creating and expanding local retail and services

• Providing more housing options for younger and older Staten Islanders

• Leveraging growth to improve sewer infrastructure and roadways in existing neighborhoods

• Focusing growth to support more transit options

Housing Diversity (shown: The Tides at Charleston)

Community-based Retail (shown:Westfield,NJ)

2030 Neighborhood Centers

Existing Communities

New Mixed Residential/Commercial Areas

Staten Island Railway

WSE Transit Corridor

Bus Transit Hub

Sou

rce:

Ti

des

at

Ch

arle

sto

n

WWS 2030 Report_v5-6-2011.indd 11 6/6/2011 10:40:07 AM