44
May 26, 1932 Minutes of the One Hundred and Fifty Fourth Meeting of the State Highway Commission held in the State Office Building, with the following members present: 5890 It is ordered by the Commission that each of the following contracts having been examined by the Commission, and i t being found that i t com- plies with the order of award by the Commission, is hereby approved in accordance with Section 12, Chapter 186, General Laws of Texas as passed by the 1925 Legislature, 39th Regular Session, COUNTY Brown Smith Van Zandt Van Zandt Van Zandt Van Zandt Brazoria Ellis Ellis Ellis Ellis Ellis Haskell Hemphill Hemphill Henderson Henderson Henderson Houston Kames Karnes Kendall Kendall Kendall Kerr Lubbock Matagorda Matagorda Matagorda Panola Randall Randall Uvalde Waller 2 W. R. Ely D. K. Martin Gone Johnson Gibb Gilchrist Chairman Member Member State Highway Engineer PEOJ NO. LENGTH UNIT DATE OP AWARD NAME OP CONTRACTOR AMOUNT 031 CONTRACT F.584-B-II S.386- P.629-A P.629-E P.363-D S.496-C S.889-D S.384-Reop P.384-Reop 8.794-3 P.507~A P.179-Reop P.587-A P.45-Beop P.625-C P.575-D P.575-E P.560 P.499-B S.789-B S.789-C P.631-C P. 631-C P.631-B P.631-D S,716-B S.976-B S.976-B (Spur) P.609-B S.591-C P.174-Reop S.1000-A P.289-Reop S.897.C 19.618 0.568 11.982 1.053 6.670 0.677 8.488 0.124 5.016 0.041 5.282 5.097 13.781 7.589 9.393 4.563 9.261 5,094 15.911 15.209 0.293 11.106 II II II II II II II II II II II II II III II II II II I II II I Bridges 0.485Bridge 1.999 12.896 0.352 0.568 9,954 5.980 15.220 0.316 0.739 1.947 I II II II II III II II IV II 4-23-32 E.F.Bucy & Son&C.T.Childs 4-20-32 Koss Construction Co. 4-20-32 Union Paving Company 4-20-32 Union Paving Company 4-20-32 Koss Const. Co. 4-20-32 Koss Const. Co. 4-23-32 Gulf Bitulithic Co. 4-23-32 Central Bitulithic Co. 4-23-32 Central Bitulithic Co. 4-23-32 Central Bitulithic Co. 4-23-32 Central Bitulithic Co. 4-23-32 Central Bitulithic Co. 4- 23-32 L.l.Whitham & Co. 5- 3-32 Stuckey Const. Co. 5-3-32 Stuckey Const, Co. 4-23-32 L . H . Lacy Company 4-23-32 L . H. Lacy Company 4-23-32 L . H, Lacy Company 4-23-32 J . S. Moore & Sons 4-23-32 Thomas & Batliff 4-23-32 Thomas & Batliff 4-23-32 J. P, Poty 4-23-32 Luther A, Turner 4-23-32 Cage Construction Co. 4-23-32 J. P. Poty 4- 23-32 Huddleston Const. Co. 5-10-32 Northwest Highway Co. 5-10-32 Northwest Highway Co. 5-10-32 Northwest Highway 4-23-32 E. W, McKinney 4-23-32 McClung Const. Co. 4-23-32 McClung Const. Co. 4-23-32 L , M. Mackey 4-23-32 J. P. Poty $131,761.45 9,897.3f 219,999.; 5 24,401.$ ) 117,268.1) 11,853.€> 122,438.6 . 2,130.9 3 74.316.4 J 747.4' 76.687.5 > 71.627.6 t 200.015.6 ' 126.064.8 ) 153.125.7 ' 81,685.1 168.072.9 > 92,874.3 , 49,410.0 i 120,703.5 1 4.217.7 i 52,517.8 i 21,479.4 93.971.7 i 3.424.8 I 74,629.7 12,871.2 135,490.9 23,232.3 80,672.0 2,022.5; 29,434.1! 40,364.01

2!) - Texas Department of Transportation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2!) - Texas Department of Transportation

May 26, 1932

Minutes of the One Hundred and F i f t y Fourth Meeting of the State Highway Commission held i n the State O f f i c e Bui ld ing , w i t h the f o l l o w i n g members present:

5890 I t i s ordered by the Commission tha t each of the fo l l owing contracts having been examined by the Commission, and i t being found that i t com­pl ies w i t h the order of award by the Commission, i s hereby approved i n accordance w i t h Section 12, Chapter 186, General Laws o f Texas as passed by the 1925 Legis la ture , 39th Regular Session,

COUNTY

Brown Smith Van Zandt Van Zandt Van Zandt Van Zandt Brazoria E l l i s E l l i s E l l i s E l l i s E l l i s Haskell Hemphill Hemphill Henderson Henderson Henderson Houston Kames Karnes Kendall Kendall Kendall Kerr Lubbock Matagorda Matagorda

Matagorda Panola Randall Randall Uvalde Waller

2

• W. R. Ely D. K. Mart in Gone Johnson Gibb G i l c h r i s t

Chairman Member Member State Highway Engineer

PEOJ NO. LENGTH UNIT DATE OP

AWARD NAME OP CONTRACTOR AMOUNT 031 CONTRACT

F.584-B-II S.386-P.629-A P.629-E P.363-D S.496-C S.889-D S.384-Reop P.384-Reop 8.794-3 P.507~A P.179-Reop P.587-A P.45-Beop P.625-C P.575-D P.575-E P.560 P.499-B S.789-B S.789-C P.631-C P. 631-C P.631-B P.631-D S,716-B S.976-B S.976-B

(Spur) P.609-B S.591-C P.174-Reop S.1000-A P.289-Reop S.897.C

19.618 0.568

11.982 1.053 6.670 0.677 8.488 0.124 5.016 0.041 5.282 5.097

13.781 7.589 9.393 4.563 9.261 5,094

15.911 15.209 0.293

11.106

I I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I

I I I I I

I Bridges

0.485Bridge 1.999

12.896 0.352 0.568

9,954 5.980

15.220 0.316 0.739 1.947

I I I I I I I

I I I I I I I I I IV I I

4-23-32 E.F.Bucy & Son&C.T.Childs 4-20-32 Koss Construction Co. 4-20-32 Union Paving Company 4-20-32 Union Paving Company 4-20-32 Koss Const. Co. 4-20-32 Koss Const. Co. 4-23-32 Gulf B i t u l i t h i c Co. 4-23-32 Central B i t u l i t h i c Co. 4-23-32 Central B i t u l i t h i c Co. 4-23-32 Central B i t u l i t h i c Co. 4-23-32 Central B i t u l i t h i c Co. 4-23-32 Central B i t u l i t h i c Co. 4 - 23-32 L.l.Whitham & Co. 5- 3-32 Stuckey Const. Co. 5 -3 -32 Stuckey Const, Co. 4-23-32 L . H . Lacy Company 4-23-32 L . H. Lacy Company 4-23-32 L . H, Lacy Company 4-23-32 J . S. Moore & Sons 4-23-32 Thomas & B a t l i f f 4-23-32 Thomas & B a t l i f f 4-23-32 J . P, Poty 4-23-32 Luther A, Turner 4-23-32 Cage Construction Co. 4-23-32 J . P. Poty 4- 23-32 Huddleston Const. Co. 5- 10-32 Northwest Highway Co. 5-10-32 Northwest Highway Co.

5-10-32 Northwest Highway 4-23-32 E. W, McKinney 4-23-32 McClung Const. Co. 4-23-32 McClung Const. Co. 4-23-32 L , M. Mackey 4-23-32 J . P. Poty

$131,761.45 9,897.3f

219,999.; 5 24,401.$ )

117,268.1) 11,853.€>

122,438.6 . 2,130.9 3

74.316.4 J 747.4 '

76.687.5 > 71.627.6 t

200.015.6 ' 126.064.8 ) 153.125.7 '

81,685.1 168.072.9 > 92,874.3 , 49,410.0 i

120,703.5 1

4.217.7 i 52,517.8 i 21,479.4 93.971.7 i 3.424.8 I

74,629.7

12,871.2

135,490.9 23,232.3 80,672.0 2,022.5;

29,434.1! 40,364.01

Page 2: 2!) - Texas Department of Transportation

2!)

Mar 26, 1932

5891 I t is ordered by the Commission that each of the following Project Agreements, having been examined by the Commission, and i t having been found that i t complies with the order of the Commission appropriating funds to each project, is hereby approved.

COUNTY PROJ. NO. LENGTH UNIT COST FEDERAL AID STATE FUND COUN1 T FUN: I

Brazoria Brazoria Brazos Brown Cherokee Cherokee Cochran Colorado m i l s Fayette Gaines Haskell Hemphill Hemphill Houston Karnes Karnes Karnes Karnes Karnes Live Oak Live Oak Lubbock Kendall Panola Pecos Pecos Pecos and Crockett Pecos and Crockett Bandall Randall Bandall Refugio (Tyler Upton Wheeler Wheeler Wheeler Young

S.889-C 13.834 I I $228,455.31 S.889-B 8.488 I I 134,682.35 F.490-E 9.687 I I 159,842.52 F.584-B 19.618 I I 151,687.19 F.566-C 7.637 I 49,612.97 S.961-C 1.007 I 8,274.68 S.205-D 12.194 I 9,063.14 S.765-C I 1,854.60 F.179-Reop 3.559 I I 78,790.40 S.765-A I 1,538.90 S.936-E 13.204 I 18,548.34 F.587-A 13.782 I I 221,278.44 F.45-A 7.589 I I I 138,671.26 F.625-C 9.393 I I 168,438.34 F.499-B 15.911 I 54,351.05 S.788-A 5.751 I I 15,532.11 S.788-B 0.473 I I 1,269.57 S.788-C 7.207 I I 19,652.68 5.788- D 0.191 I I 598.95 5.789-3 15.209 I I 139,784.00 S.886-A 13.071 I I 218,109.94 S.931-D 12.472 I I 35,427.49 3.716-B 12.896 I I 84,117.67 P. 631-C 11.106 I 81,396.99 3.591 5.980 I I I 25,555.59 P.612-B 24,16? I I 126,410.99 P.612-C 0.471 I I 4,659.06

76,000.00 72,000.00 24,000.00

16,380.86

102,000.00 65,000.00 80,000.00 26,000.00

39,000.00

60,000.00 2,000.00

& 96,995.21 124,223.84

30,561.68 29,124.79 12,757.79 4,137.34 5,531.57 1,236.40

20,432.14 1,025.93 9,274.17

45,518.96 27,447.50 32,292.22 10,234.03 14,576.51

693.84 10,005.60

480.49 106,751.59 157,388.32

17,713.74 42,058.84 34,278.79 12,777.80 24,273.99 1,106.04

$131,4 0.10 10,4 8.51 53,21 0.84 50,5i 2.40 12,8 5.18

4 ,1 ! 7.34 4,5! 1

6], 41,9'7

5:

.54

.20

.40 2.97

9,274.17 73,?( 9.48 46,2; 3.76 56,14 6.12 18,1] 7.02

9£ 5.60 51 5.73

9,64 7.08 11

33, 0C 3.41 60,72 L 17,7] 3.75 42,0

8,111 .83

B.60 12,77 7.79 42,12f 1,5E

.00 [5.02

F.619-F 0.643 I 75,396.76 36,000.00 14,264.50

3.903-0 0.113 I 17,453.48 14,544.5? F.60-A Reop 8.262 IV 38,223.01 18,000.00 14,723.01 S.1000-A 0.316 I I 2,288.81 - — — 1,388.81 F.546-G 8.345 I I 49,732.17 23,000.00 21,232.17 S.840-A 17.738 I I 287,020,84 — « _ — — 166,472.09 F.606-C 8.269 I 44,949.14 22,000.00 7,966.09 S.903-H 10.471 I I 56,234.64 — 28,117.32 F.547-2 12.623 I I 212,357.62 101,000.00 40,571.75 F.547-F 0.810 I I 15,551.86 7,150.00 3,217.91 S.844-E 0.675 I I 11,320.58 7,547.06 S.998-A 0.549 I 119,820.14 44,820.14

25,12

2,9C 5,5C )

9C ) 5C ) 54 i

5, 120, 14,99 28, 70,

6, 3,

75,

3.26

.46

.62

11 ' 78 5 18 J 77 5 00 )

.91

.00

.00

.00

.75

.05

.32

.87

.95

.52

.00

Page 3: 2!) - Texas Department of Transportation

^

May 28, 1932

Thofollowingagroements supplemental to contraotsproviously ap-provedand entered in to , havingboon examined and the terms andcon-ditions foundsatisfactory, and I t appearing tnat an additional approp­r ia t ion of funds w i l l not be required, arehereby approved;

Bell County, S.P, 880 Bev., Thomas^Bat l i f f , Contractors, provid­ing f o r Increased quantity of overhaul and additional Item of borrow; osD tlmatedoost of additional work $384.27.

Bell County, S.P. 824, Thomas^Bat l i f f , Contractors, providing fo r use of 5-ton Instead of 1C—tonroller on one Inch oallcbebase course; n change In contract cost.

Bowie County^ S.P, 137 Beoponed, BannahConstruction Co, andPred and Ban Ba l l , Contractors, providing f o r Increased quantities of l i g h t clearing andl ight grubbing; estimated cost of additional work $14.50.

BrasoriaCounty, S.P. 889-C, B. P. Bowney, ConstructlonCo., Con­tractors, providing f o r change in type of expansion jo in t f i l l e r , at no change i n cost.

Brown^McCulloch Counties, P.I .P. 584-1, Austin Bridge Co., Con­tractors, providing for decrease in quantity of class ^ concrete plus 10^ cement; estimatedoost of work eliminated $2,237.2C.

Calhoun County, S.P. 807-P, BeldenfelsBros., Contractors, provid-i n g f o r increased quantities of various contract items; actual cost of additionalwork $283.50.

Cherokee County, P.I.P. 588—1, Ceo. W. Condon Co., Contractorspro-viding f o r increased quantity of iron ore andsolid rock roadway excava­t ion; actual cost of additional work $1,599.80.

Concho County, P.I.P. 590-C, McClung, Construction Co., Contractors, providing f o r rec lass i f ica t ionof bridge excavation, with net reduction inces t of $144.45.

Benton County, S.P. 839-E, Bexter Construction Co., Contractors, p rov id ingfor concretepavement test blocks; estimatedoost of additional work $111.00,

Benton County, S,P, 839-E, Bexter Construction Co,, Contractors, pro^ viding f o r constructionof special intersectionwithhighwayHo. 10, not included inplans; estimatedoost of additional work $881.75,

PoardCounty, P,1,P, 538-C, J . B e e ^ E . I . V i l b i g , Contractors, pro­viding fo r various increases and decreases i n quantities of contract item; actual net increase in cost $3,711.94.

Grayson County,S.P, 980-1, General Construction Co., Contractors, providing fo r increased quantity of concrete curbing andadditional item of concretepavement test blocks; actual cost of additional work $100.80.

Barris County, P,1.P, 514-B, Moller^Boberts , Contractors, provid­i n g f o r various increases anddocroases in quantities of contract; items; actual net decrease i n cost $3,895.85.

Bemphill County. P.I.P. 821-1, B, P. whitham.^ Co., Contractors, providing fo r change in type of expansion jo in t f i l l e r , at no change in cost.

BoodCounty, P.I.P. 92-B, B, B, Bacy Co,, Contractors, providing for various increases and decreases in quantities of contract items; actual not decrease in cost $351.42.

Page 4: 2!) - Texas Department of Transportation

31

Continued: May 26, 1932

Jones County, S.P. 855-C, Balfanz Construction Co., Contractors, providing for changes in quantities of various contract items due to re­location; estimated net decrease in cost $73.62.

Karnes County, S.P. 789-A, E. B. Smith, Contractor, providing for o i l treatment of base course; estimated cost of additional work $1,500.00),

Karnes County, S.P. 789-A. R. B. Smith, Contractor, providing for various increases and decreases in quantities of contract items; actual net increase in cost $1,715.70.

Kerr County, P.A.P. 405-C, Word & Worrell, Contractors, providing for several items of extra work; total cost of additional work $360.30,

Kerr County, F.A.P. 405-C, Word & Worrell, Contractors, providing for elimination of class "B" culvert excavation and dry rip rap; actual reduction in cost $1,221.00.

King County, S.P. 854*1, Monarch Engineering Co., Contractors, pro­viding for increased quantities of unclassified structural excavation, rip rap and test piling; actual cost of additional work $652.30,

Knox County, S.P. 696-B, McClung Construction Co., Contractors, pro­viding for increases and decreases in quantities of various contract items; estimated net increase in cost $145.39.

Lipscomb County, P.A.P. 621-B, L. E. Whitham & Co., Contractors, providing for change in expansion joint f i l l e r , at no change in cost.

McLennan County, P.A.P. 265-B, J. E, Johnson Construction Co., Con­tractors, providing for additional items of dry channel excavation and class "A" concrete for culverts, also for elimination of test piling; es­timated cost of additional work $1,058.27.

McLennan County, P.A.P. 622-A, Dr. P.P. Jones, Contractor, providing for increased quantity of jetting and ponding; estimated cost of addition}' al work $549.00.

McLennan County, P.A.P. 622-A, Dr. P.P. J0nes, Contractor, providing for decreased quantities of various contract items; estimated cost of wor$ eliminated $532.50.

Havarro County, P.A.P, 463-A, Arcole Construction Co,, providing for increase in size of French drains; estimated cost of additional work $628.80.

Nolan County, F.A.P. 511-A, Morgan Construction Co., Contractors, providing for substitution of concrete pavement with curb and gutter for gravel base and bituminous surface treatment for 100 feet on each side of underpass section (P.A.P. 511-B), also for extension of curb and gutter an additional 200 feet on either side} total estimated cost of additional work $2,560.23.

Nolan County, P.A.P. 511-B (Supplement to F.A.P. 511-A), Morgan Con­struction Co,, Contractors, providing for construction of concrete pave­ment and curb and gutter; estimated cost of additional work $757.80.

Pecos County, P.A.P. 618-A, Sanders & Burlhurt, Contractors, provid­ing for additional item of dry rip rap and for changes in quantities of various contract items; net increase in cost $372.10*

Pecos County, P.A.P, 619-A, Dozier Construction Co., Contractors, pro­viding for increased quantity of unclassified structural excavation and the additional item Of rubble concrete; actual cost of additional work $850.03.

Page 5: 2!) - Texas Department of Transportation

5892

'Sit

Continued: May 26, 1932

Pecos County, S.P. 903-B, Hannah Construction Co., and Fred & Dan Hall, Contractors, providing for additional item of dry rip rap and changes in quantities of various contract items; net increase in cost $1,265.20.

Pptter County, F.A.P. 585-B, McClung Construction Co., Contractors, providing for increased quantity of solid rock structural excavation; actual cost of additional work $108,00.

Heagan Cointy, S.P, 904-B, P.P. Buoy & Son and C. T, Childs, Contract­ors, providing for substitution of unclassified roadway excavation for roqjd grader work; estimated increase in cost by reason of change $188,15.

San Jacinto County, S.P. 682-B, D.F. Jones Construction Co., Contrac*) tors, providing for increased length of timber piling; estimated increase in cost $103.76.

San Patricio County. S.P. 791-A, Nueces Construction Co., Contractor: providing for increased quantity of extra rolling and decreased quantity of sprinkling; estimated net increase in cost $144.16.

Smith & Van Zandt Counties, F.A.P. 298, Purvis & Bertram, Contractor: providing for elimination of grouted rip rap; decrease in cost by reason )f work eliminated $442.24.

Tarrant County, S.P. 859-E, Standard Paving Co., Contractors, pro­viding for increased quantity of unclassified roadway excavation; estimat­ed cost of additional work $1,308.00.

Tarrant County, S.P. 977-B, West Texas Construction Co., Contractors, providing for increased quantities due to revision of plans; estimated in­crease in cost $2,241.53.

Tarrant CountyS.P. B59-B, Jagoe Construction Co., Contractors, pro­viding for various changes in quantities of contract items; actual decreas^ jtn cost $802.70.

Tarrant County, S.P. 977-B, West Texas Construction Co., Contractors, providing for reduced quantities of dry channel excavation, sprinkling em­bankment and overhaul; estimated cost of work eliminated $704.90.

Tarrant County, S.P. 958-1, J. W. Zempter Construction Co., Contract-rs, providing for iron ore and gravel subgrade treatment; estimated cost

\ f additional work $1,018.50.

Tyler County, S.P. 890-D, J. S. Moore & Sons, Contractors, providing for various increases and decreases in quantities of contract items, net increase in cost $172.30.

Tyler County, F.A.P. 630-A, J. S. Moore & Sons, Contractors, provid­ing for increased quantities due to revision of plans; estimated cost of additional work $8,842.68,

Tyler County, F.A.P. 630-A, Ed Pettus, Contractor, providing for increase in quantity of class "A" culvert excavation; actual increase in cost $38.00.

Tyler & Jasper Counties, P.A.P. 606-A, Thomas & Batliff, Contractors providing for various increases and decreases in quantities of contract items; net increase in cost $565.32.

Page 6: 2!) - Texas Department of Transportation

3"

5892 Continued: May 26, 1932

Uvalde County, F.A.P. 289-D, H. K. McCollum, Contractor, providing for substitution of spread footing concrete bents for precast concrete piling substructure; estimated decrease In cost $2,011*67.

Van Zandt County, P.A.P. 629-E, Union Paving Co., Contractors, pro­viding for elimination of bottom dummy joints in concrete pavement; agreef. reduction in cost $115.20.

Van Zandt County, F.A.P. 629-A, Union Paving Co., Contractors, pro­viding for elimination of bottom dummy joints in concrete pavement; agreej reduction in cost $1,304.00.

Victoria County, P.A.P, 551-J, Buss Mitchell, Inc., Contractors, pro*} viding for additional item of borrow and changes in quantities of various contract items; estimated net increase in cost $522.31.

Wharton County, F.A.P, 518-D, John P. Buckner, Contractor, providing for elimination of pipes for drainage; agreed reduction in cost $210.14.

Wheeler County, P.A.P. 547-F, L, E. Whitham & Co., Contractors, pro­viding for elimination of bottom dummy joints in concrete pavement; no change in cost.

Wheeler County,OF,A.P. 547-1, L, E. Whitham Co., Contractors, pro­viding for elimination of bottom dummy joints in concrete pavement; no change in cost.

Wheeler County, F.A.P. 45-B, J. P. Foty, Contractor, providing for various increases and decreases in quantities of contract items; estimated pet increase in cost $1,279.31.

Wheeler County, F.A.P. 547-F, E. T. Prater, Contractor, providing foi revision of plans and changes in quantities caused thereby; estimated in­crease in cost $4,084.19. (Additional funds appropriated under Minute No. p780)

Wise County, S.P. 839-F, Dexter Construction Co., Contractors, pro­viding for making of concrete pavement test blocks; estimated cost of add! pional work $34.50.

Wise County, S.P. 52-Eeop. Dexter Construction Co., Contractors, pro­viding for making of concrete pavement test blocks; estimated oost of addi||» (lional work $7.50.

Irion County, S.P. 957-C, P. W. Bertram, Contractor, providing for changes in quantities of various contract items; estimated net increase in cost $61.23.

Concho County, P.A.P. 590-C, Crouch & Noland, Contractors, providing for reclassification of culvert excavation; actual net increase in oost $153.40.

Navarro County, F.A.P. 463-A, Arcole Construction Co., Contractors, providing for construction of 1491 feet of concrete pavement in the town of Richland; estimated cost of additional work $4,232.23.

Cameron County, S.P. 974-D, R, W, Briggs, & Co., Contractors, providi ing for changes in quantities of various contract items; estimated net de| crease in cost $738.80.

Calhoun County, S.P. 969-A, Heldenfels Bros., Contractors, providing for increase in dry channel excavation and decrease in 24-inch metal pipe actual net decrease in cost $252.48,

Page 7: 2!) - Texas Department of Transportation

3^

Continued May 26, 1932

Brewster County, P.I.P. 376DP, HannahConstruction Co., andPred^ Ban Ball* Contractors, providing for change In typo of wirecahlo guard fence at no change In cost.

San Batrlclo County, S.P. 791-C, Nueces Construction Co., providing f o r increased quantities of movingguard fence andaspha l t i co i l forhase; actual Increase in cost $56.36.

Motley County, P.I .P. 530-1, Huddloston Construction Co., Contract­ors, providing f o r additional i tomof stripping material pi ts also f o r changes In quantities of various contract Items; actual not decrease In oost $1,410.67.

Bouston County, P.I .P. 465-1, T. B. James^ Co., Contractors, pro­viding f o r decreased quantity of jet t ingandponding; actual decrease In cost $2,001.19.

Better County, S.P. 767DB, Highway Construction Co., Contractors, provld lngfor change in type of expansion jo in t f i l l e r atnochange In cost.

Mc^ennan^County, P.I.P. 605-1, W. W. Vann^ Co., Contractors, pro­v l d l n g f o r Increased quantity of r o l l i n g embankment and reducodquantlty of overhaul; actual net Increase in cost $366.22.

Wheeler County, P.I.P. 67BoopenedandBevisod, B. P. Whitham^ Co., Contractors, p rov ld lngfor change In typo of expansion jo in t f i l l e r at no change in cost.

BeWitt County, P.I .P. 542-B, P. P. McBlwrath^ Co., Contractors, p rov ld lngfor increased quantity of dry channel excavation ; estimated increase inces t $111.60.

Mason County, P.I.P. 17-Booponed, CageBrOS., Contractors, providing fo r increased quantities of so l id rock roadway excavation andunclassifie^ structural excavation; actual increase inces t $613.60.

Wheeler County. P.I.P. 547-B, InterstateContracting Co., Contractors, p rovld lngfor elimination of highearly strengthpavement; estimatedoost of work eliminated $100.00.

Upt^n County, S.P. 903-H, McClure^Benison, Contractors, providing fo r increased quantity of stripping material p i ts ; estimatedoost of additional work $400.00.

Stonewall County^ S.P. 655-P, Womack-Henning ConstruotionCo., Con­tractors, p rovld lngfor changes in quantities of various contract items due to relocation; estimated net increase in cost $609.79.

Wise County. S.P. 52-Boopened, Bexter Construction Co., Contractros, provldlngfor elimination of j e t t i ng andponding; estimated cost of work eliminated $314.00.

BeWitt County, S.P. 735-B, CvaldeBocklsphalt Co., Contractors, proD aiding f o r additional item of f l u x o i l prime coat; also fo r decreased quantity of precoatedcrushed stone; estimated net increase inces t $5.76.

BeWitt County, S.P. 735DB, Uvalde Bocklsphalt Co., Contractors, pro-riding f o r additional i temof f l u x o i l prime coat; also for decreased quantity of preooated crushed stone; estimated net increase i n cost $164.3^

BeWitt County, S.P. 735-1, Cocke^Braden, Contractors, providing fo r increased quantities of sprinklingand water hauledadditional mile; estimated cost of additional work $1,325.70.

Page 8: 2!) - Texas Department of Transportation

5892

Continued: May 26, 1932

Lubbock County, P.A.P. 503-A, Cocke & Braden, Contractors, provid­ing for increased quantities of various contract items; estimated cost of additional work $3,886.14.

Brewster County, S.P. 524-E, Hannah Construction Co. and Fred and Dan Hall, Contractors, providing for change in type of wire cable guard fence at no change in cost.

Ellis County, F.A.P. 385-A, E. Cf. Powell, Contractor, providing for changing two multiple box culverts to stock passes, the County agreeing to pay the added expense. 1

Brazos County, P.A.P. 471-F, B. B. Butler, Contractor, providing foi changes in quantities of various contract items and additional item of right of way markers; actual net increase in cost $957.11.

Van Zandt County, F.A.P. 363-A, Central Bitulithic Co., Contractors, providing for additional item of concealed metal dummy joints and change* in quantities of ponding and extra rolling; actual net increase in cost $636.14.

DeWitt County, S.P. 835-B, Cocke & Braden, Contractors, providing for increase in material hauled additional quarter mile; estimated cost of additional work $34.56.

Wheejer County, P.A.P. 547-D, Interstate Contracting Co., Contract­ors, providing for change in expansion joint f i l l e r at no change in cost.

McLennan County, F.A.P. 614-A, McCall Engineering Co., Contractors, providing for changes in quantities of various contract items; actual net|| increase in cost $2,384.91.

Cameron County, S.P. 974-B, B. W, Briggs & Co., Contractors, provid-|| ing for increases in quantities of various contract items; estimated cost of additional work $1,892.80.

Wharton County, S.P. 945-A, Dexter Construction Co., Contractors, providing for use of Sisaldraft paper fur curing pavement, also for con­struction of concrete box culvert; estimated net decrease in cost $279.94

Wheeler County, P.A.P. 57W, L. E. Whitham & Co., Contractors, pro-| viding for change in expansion joint f i l l e r at no change in cost.

Reeves, County, P.A.P. 607-D, J. S. Harrison Construction Co., Con­tractors, providing for elimination of dry rip rap and increased quantity| of grouted rip rap; actual not increase in cost $82.50.

Pecos County, S.P. 903*3, D. H. Buchanan Construction Co., Contractor providing for reduction in quantity of grouted rip rap and increased qu tity of dry rip rap* actual net increase in cost $119.38.

Potter County, F.A.P. 585-A, Earl W. Baker & Co., Contractors, pro-riding for elimination of inverted metal expansion joints; estimated cost )f work eliminated $276.50.

Potter County, F.A.P. 585-A, Earl W. Baker & Co., Contractors, pro­viding for reduction in quantity of high early strength concrete pavement;| Actual decrease in cost $896.00.

San Patricio County, S.P. 791-A, Nueces Construction Co., Contractors]], broviding for increased quantity of common roadway excavation; estimated post of additional work $227.26.

Fisher County, 8.P, 917-.E, Balfanz Construction Co., Contractors, pro iding for increase in unclassified structural excavation; also for elim-nation of grouted rip rap; estimated net decrease in cost $452.06.

Page 9: 2!) - Texas Department of Transportation

43

5893

County

Young Callahan Van Zandt Cherokee San August Wilson Consoles Karnes DeWitt Williamson Tr in i ty Caldwell Val Verde Kendall Dallas Kinney

5894

M-3-A-2 M-8-U-3 M-lO-U-6 M-10-V-6

in#M-ll-H-4 M-13-P-4 M~13-G~4 M-l 3*5-4

Oounty

I t i s ordered by the Commission that an appropriation of funds be made to cover the cost of making surveys, securing necessary data, and the preparation of plans fo r the following special bridge projects.

Engineering Project No. Hwy. No. Crossing Appropriation

May 26, 1932

I t is ordered by tbe Commission that each of the following contracts having been examined by the Commission and i t being found that i t com­plies with the order of award by the Commission is hereby approved in ac­cordance with Section 12, Chapter 186, General Laws of Texas as passed by the 1925 Legislature, 39th. Regular Session.

Job No. Hwy. No. Length Date Name of Contractor Amount

M-13-X-3 Division M-14-K-3 M-ll—J—4 M-14-G-5 M-15-D-4 M-15-P-3 M-18-A-3 M-22-A

67 0.93 S3 5.65 64 8.95 40 10.614 8 9.20

81 4.00 3 12.57

16 18.93 Office Blag.

29 15.00 94 14.648 29 7.00 3 460 f t , 9 11.71

14 6.85 3 18.664

4*5-32 II

4-23-32 u II II i i

II

II

4-5-32 4-23-32 4-5-32 4*23-32

i i

ii

i i

Brown & Boot, Inc. Done Star Const. Co. Haden & Austin Haden & Austin Haden & Austin Uvalde Bock Asph. Co. Thomas & B a t l i f f Uvalde Bock Asph. Co, Albert Nolte Brown & Root, Inc. R. W. McKinney Dozier Const. Co. Bart Moore Co. Thomas & Rati i f f Uvalde Const, Co. J . W. Gwin

$12,144.3, 6,623.7p

27,198.4 30,264.7% 6,542.9 I 3,454.9 3,497.6i

17,400.0 I 9,674.3:

19,836.0i 31,659*3 1 10,277.3» 1,800.0 i

11,836.2 I 3*132.1 4,200.0*

Jack S.568-B 66 Tr in i ty River Relief $ 800.00 Kimble 27 & 4 N. Llano River 1,200.00 Garza F.635-C 7 P. & S. P. R.R. Overpass 800.00 Bee 16 Medio & Papalote Creeks & S. A.

& A. P. R.R. Grade Separation 1,500.00 (500.00 deg. Harrison) F.481-D & E 43 Sabine River

1,500.00 (500.00 deg.

Panola ) (500.00 deg. Uvalde F.360-D 3 Nueces River 1,200.00 deg. Collingsworth F.573-E 4 Salt Fork of Red River 1,800.00 Wood S.1002-B 37 Lake Fork Creek Bridge 800.00 deg. Bexar ) (900.00 Guadalupe) F.31«Bo. 2 Cibolo Greek Bridge (900.00 Comal F.66-R0 2 York Creek Bridge 800.00 Erath S.158-BO. 10 Paluxy River 800.00 Terrel l F.324-F 3 Lozier & Pal ma Canyons 1,400.00

5895 In Bexar and Guadalupe Counties on bids received May 26, 1932, contract for Construction of Salado Greek Bridge consisting of 8-52* steel I-beam spans, concrete f loor slabs,,40* roadway steel cylinder type bents and abutments; Cibolo Creek bridge consisting of 1-120* steel through truss span, 6*52* steel I-beam spans, concrete f loo r slabs, 24* roadway, con­crete caisson type piers, steel cylinder type bents and abutments, and roadway approaches, from San Antonio to Schertz, a distance of 0.596 mile4 an State Highway No. 3-A F.A.P. No. 633-A Modified, i s awarded to D. F. Jones Const. Co., L i t t l e Bock, Ark. f o r $100,614.44, which is the lowest and best b id .

Page 10: 2!) - Texas Department of Transportation

AW

5896

5897

5898

5899

5900

5901

5902

5903

5904

May 26, 1932

In Callareas County on bids received May 26, 1932, contract fo r Grading and Drainage Structures from Prairie Dog Town Fork of Bed River to Collingsworth County Dine a distance of 12.902 miles, on State Highway No. 4, F.A.P. No. 673.0 is awarded to Huddles ton & Work, Orosbyton, Texas fo r $63,382.72, which is the lowest and best b i d .

In Childress County on bids received May 26, 1932, contract f o r Concrete Pavement from Childress to Hardeman County Line, Kirkland Loop, Approaches to Overpass on Hwy. 5 near Childress, Approaches to Underpass on Hwy. 4 in Childress a distance of 14.376 miles, on State Highway No, 4 & 5 F.A.P. No. 533mA, Unit No, I I , S.P. 771-A,B,D, S.P. 854-G, Unit No. I I and S.P. 728-1, Unit I I I is awarded to McClung Construction Co., Ft , Worth, Texas, fo r $232,239.89, which is the lowest and best b id .

In DeWitt County on bids received May 26, 1932, contract for Con­structing 10 and 6-26*-6" reinforced concrete deck girder spans, 22 f t , roadway, fo r Brushy Creek and Brushy Creek Relief Bridges, precast con­crete Pi l ing Type Substructures; located near Yoakum, a distance of 424 f t . on Stato Highway No. 72 F.A,P. No. 542-0 is awarded to Buckner Bros., Cleburne, Texas, fo r $19,414.95, which i s the lowest and best b i d .

In DeWitt County on bids received May 26, 1932, contract fo r Grading & Small Drainage Structures from Davaca County Line, to two miles S.W. of Yoakum a distance of 2.350 miles, on State Highway No, 72 F.A.P. No. 542-0 is awarded to Valley Dredging Company, Bryan, Texas, fo r $13,444,24 which i s the lowest and best b i d .

In Hudsoeth County on bids received on May 26, 1932, contract for Grading and Drainage Structures from Lasca to Sierra Bl anca a distance of 7.196 miles, on State Highway No. 1 S.P. No. 204-F is awarded to Hannah Const, Co. & Fred & Dan Hal l , Waco, Texas, for $26,608.28, which is the lowest and best bid*

In Leon County on bids received May 26, 1932, contract fo r Concrete Pavement from 2 miles southwest of T. & B.V. Railroad to Navasota River a distance of 11.977 miles, on State Highway No. 43 F.A.P. No. 582-B, Unit No. I I is awarded to G. L , LaBoiteaux, Bryan, Texas, f o r $164,679.76 which is the lowest and best b i d .

In McCulloch County on bids received May 26, 1932, contract fo r Con­structing San Saba River Bridge consisting of 1-15* steel through truss span, 6-52* steel I-beam spans, concrete f l o o r slabs, 12-28**6" concrete deck girder spans, 22 f t . roadway, concrete piers, bents and abutments, spread footing type; and roadway approaches, located near Camp San Saba about 7 miles south of Brady, a distance of 1*212 miles, on State Highway STo. 9 F.A.P. No. 223-Reop, 419-Reop. & S.P. 472-Reop. is awarded to Combs % Glade, Wichita Falls, Texas, for $53,982.31, which is the lowest and best b id .

In McLennan County on bids received May 26, 1932, contract f o r Grad­ing and Small Drainage Structures from Coryell County Line, to 5.5 miles northeast of McGregor, a distance of 11.470 miles, on State Highway No. 7 F.A.P. No. 323-Reop. is awarded to Word & Worrell, Itasca, Texas, f o r $41,477.02, which i s the lowest and best b i d .

In McLennan County on bids received May 26, 1932, contract f o r Con­structing 5-30*-6" concrete deck girder spans, 22 f t . roadway with con­crete bents and abutments over Harris Creek; and 3 multiple box culverts, Located near McGregor, a distance of 273.15 f t . on State Highway No. 7 P.A.P. No. 323-Reop. is awarded to Ed Pettus, Montgomery, Alabama, for ^13,949.02, which is the lowest and best b i d .

Page 11: 2!) - Texas Department of Transportation

^

May 26, 1932

InMoL^e^an Oounty on bids received May 26, 1932, oontraotfor Con-cretePavement fromWaco northeast to H i l l OountyLlne, ad is tanceof 13.329 miles, onStatoHlghwayNo. 3 l F . A . P . N o . 606-A, Unit No. 11 , lo awardedto Areola ^ Const. Co., Richland, Texas, fo r $174,669.63, which I s tho lowos t andbest b id .

In Presidio Oounty onbids received May 26, 1932, contract fo r Grad­ingand Small Drainage StructuresfromOchoaRoad, southto Presidio, ad i s t anceof 13.343 miles, on State Highway No.17 S.P.No. 970-Dls awardedtoThurber Const. Co., Ft . Worth^Texas, for $42,396.64, which lo thelowest andbest b i d .

InReeves^ Jeff Davis Oounty onbids received May 26, 1932, contract fo r Constructlng6, 3and6-26*-6" concrete deck girder spans, 2 2 f t . roadway, oonorotobont substruct^e for Prysor Draw, Cherry DrawNo. 1 andCherry DrawNo. 2 bridges; ond six multlplebox culverts; from Devisor to Toyahvale, adlstanos of 0 . l07mlles , on StateHlghwayNo. 27 F.A.P. No. 406-H I sawarded toL . D. Parks, Ft . Worth, Texas, f o r $26,706.76, whichis thelowest andbost b i d .

InReeves^ Jef f Davis Counties onbids received May 26, 1932, con­tract for Gradingand Small Drainage Structures f rom4ml les soutb of Intersection wlthHwy. No. 1 to point 4.6mllos nor thof Toyahvale a d l s ­tanos of 12.126 mllos, onStatoHlghwayNo. 27, F.A.P.N0. 406-Dls awardedto Hannah Construction Co. ^ Fred^DanHal l , Waco, Texas, fo r ^33,749.90, which I s tho lowos t andbos tb ld .

In Roberts Oounty onbids received May 26, 1932, contract for Con-cretePavement from Cray CountyLlno northeast to Hemphill CountyLlno, ad is tanceof 14.131 miles, onStatoHlghwayNo. 33F.A.P.No. 626-D, Unit No. 11 Is awardedtoL. F,. Whitham^ Co., Wichita Falls , Texas, f o r $221,426.66, whichis thelowest andbos tb ld .

InShelby County onbids received May 26, 1932, contract f o r Con­structing TenahaHayou Hridge conslstlngof 40-16* treatedtlmber spans, 20* roadway, concrete f loo r slabls, treated timber p i l i ng substructure, fromConter to Shelbyvllle adis tanceof 601 f t . onStatoHlghwayNo. 6 S.P. No. M-l l -L-4 Is awarded to J . M. Odom, Austin, Texas, fo r $12,300.44 which Is tho lowest andbest b id .

In Stonewall County, onbids received May 26, 1932, contract fo r Grading and Drainage Structures from Aspermont, north to King CountyLlno adistance of 17*634 miles onStatoHlghwayNo. 4S.P. No. 664-F, is awardedto Womack-Henning Const. Co., Sherman, Texas, fo r $63,424.67, which Is the lowest andbest b id .

InTarrant County, onbids received May 26, 1932, contract for Con­cretepavement from 1.1 miles oast of Grapevine to Dallas Coudty Line a distance of 2.972 miles, on State HighwayNo. 121S.P.No. 774--CUnlt No. 11 Is awarded to West Texas Construction Co., Ft . Worth, Texas, f o r $40,616.94, which Is the lowest andbest b i d .

In Jefferson County the following l e t t e r havlngbeen received from threemembers of the Commissioners^ Court of said County; dated May 26, 1

State Highway Commission, Austin, Texas.

Gentlemen;

"Wo, the three undersigned County Commissioners of Jefferson Oounty, Texas, request that bids to berecolvedon Friday, May 27th, fo r the construction of thebrldge across theproposedlntra-Coastal Canal on HighwayNo. 67 be ro-tumedunopened to the respectlveblddors, Jefferson County desiring to submit to the Commlsslonaproposal to handle

32:

Page 12: 2!) - Texas Department of Transportation

6913

6914

6916

6916

6917

May26, 1932

Continued:

th i s hridge as a County project .

Inasmuch as Jefferson County Is paying the entire cost of this improvement* webelleve tho StateHighway Commission should comply with this suggestion,"

Yours ve ry truly*

HenE, Shipley ^

H , C , M l l l s ^

L.Welch

The request o f t h e County Commissioners Is granted Inasmuch as the cost of t h i sp ro j ec t was t o h e h o m e h y Jefferson County, However, the Commissioners Court shouldhe advlsedthatunder thelaw end rules of the Highway Commission this Structure w i l l he, or at lea^t may heno longer part of thoHighway System, hut a County Hridge I f t h e p l a n o f t ^ County to construct same I t s e l f , as stated* Ispursued,

In Houston County I t Is ordered that as soonasplans andspeclflcaD) tlons are completed* checkedandapproved fo r unit 1 construction from Crockett t o H a t c l l f f on StateHighway ^ICStheState HIghwayEnglneer is authorized to advertise f o r h l d s fo r such construction, the County^s sha^ tohe f i f t y percent. County hashonds to cover I ts part of construction cost hut owing to thocondl t lonof thehond market lounable to convert them Into cash. County agrees to hold their honds Intact and not divert same to ^n^ other use and as soonaspractlcahle to sel l suchhonds to co D pensate thoHighway Department for the i r shareof construction.

In Milam County* the StateHighway Engineer Is dlrectedtopropare plans andspocl f lca t lonsandadver t l seforhlds for Improvement of State Highway ^43, from Milano to theHrazosHlverHrldge, ad is tanceof approx Imately 16,26mlles* fo r constructlonof gravel hase of 6 " loosegravel 22 f t , Inwidth* with asphalt surface treatment* estimatedoost $6C,CCC, C I t helng represented to the Commissionthat a l l of the rlght-of-wayhas heen secured.

In Husk County on StateHighway ^136 from CvertontoPltner^s Junction the StateHighway Engineer Is directed toprepareplans and specifications andhave estl^temade for anapproprlate gravel or crushed rockhase and furnish tho County authorities wlthestlmate of cos such estimate to cover adouhleor t r i p l e hltumlnous top* andthe amount that w i l l he necessary f o r t h e county to provide of the to ta l cost* In vl^w of tho fact that the County Is not now In funds a n d w l l l not have such funds u n t i l next year when their valuation w i l l he Increased; the County to enter such order as may he necessary and proper that they w i l l furnish their share of the cost when funds are available.

In Sabine County MinuteHo, 3976 regarding Improvement of StateHigh^ way ^93 fromHronson to Hemphill which was on condition that County f u r ­bish either worker funds equal to ^1C* CCCCO is amended to tho extent that the workhe carried on, the County not havlngthe funds at th is time conditioned* however, that when the County is in funds i t w i l l supply I t s share of $1C*CCC,CC as or ig inal ly agreedon; andwiththo further condition that i f local gravel is available* the County w i l l furnish thegravel In ^I tsandnot lessthanlCC f t , right-of-way.

Page 13: 2!) - Texas Department of Transportation

5

5918

5919

5920

5921

5922

6923

5-5x5x34;

5924

5925

5926

May 27, 1932

In Andrews County on bids received May 27, 1932, contract f o r Triple Asphalt Surface Treatment from Ector County Line, to Andrews a distance of 17.742 miles, on State Highway No, 137 S.P, No, 936-C Unit No. I l l i s awarded to Lone Star Const, Co., San Antonio, Texas, fo r $56,611.55, which is the lowest and best b id .

In Bexar County on bids received May 27th. 1932, contract for One Course Limestone Bock Asphalt Surface Course, from Salado Creek Bridge east, 1305.9 f t , or 0.247 mile, on State Highway No. 81, Job No. M-15-V-3 is awarded to Rodgers & Stewart, San Antonio, Texas, f o r $420.21, which is the lowest and best bid*

In Cherokee County on bids received May 27, 1932 contract fo r Iron Ore Top Soil Base Crs. and Bo ad Oil Surface Treatment from 7*4 miles east of Jacksonville to Busk County Lino, a distance of 9.267 miles on State Highway No. 43 F.A.P, No. 555-D Unit No. I I is awarded to P. P. McElwrath Construction Co., Corsicana, Texas, for $28,675.47, which is the lowest and best b i d .

In Palls County on bids received May 27, 1932, contract f o r Con­structing Big Creek Bridges consisting of 6-28* and 74-20* spans fo r main bridge and 36-20* spans f o r r e l i e f bridge, steel I-beam stringers, concretj|e f loor slabs,,22* roadway, treated timber p i l i n g substructures* from i a r l i n , to Reagan, a distance of 2368 f t . on State Highway No. 6 S.P. To. 53-A, is awarded to Thomas & R a t i i f f , Rogers, Texas, f o r $61,090.66, jvhieh i s the lowest and best b id .

In Gray County on bids received May 27, 1932, contract f o r Grading prainage Structures & Caliche Base Courses with 'Single Bituminous Surface 'reatment from Pampa, northeast to Roberts County Line, a distance of 4.316 miles, on State Highway No. 33 P.A.P. No. 625*A, Unit No. I 411 .s awarded to Cocke & Braden, Marshall, Texas, fo r $113,369.77, which .s the lowest and best b id .

In Pecos County on bids received May 27, 1932, contract f o r Con­structing 8 multiple concrete box culverts as follows: 10*6x6x24; 4»6x3xft4; 6-10x10x34; (30 degree skew); 6-8x8x24; 14-5x5x24; 20-4x4x24 and 5-6x6x34 located about 40 miles east of Ft . Stockton, a distance of 454.85 f t . on State Highway No. 27, F.A.P. No. 618-D is awarded to Sanders & Hurlburt, F t . Stockton, Texas, f o r $18,642.69, which is the lowest and best b id .

In Pecos County on bids received May 27, 1932, contract fo r Grading and Small Drainage Structures from 39 miles east of Ft . Stockton to 21 miles west of Sheffield a distance of 10.992 miles, on State Highway No.27 F.A.P. No. 618-D is awarded to Sanders and Hurlburt, Pt. Stockton, Texas, f o r $27,553.60, which is the lowest and best b id .

In Reagan County on bids received May 27, 1932, contract fo r Caliche and Water—Bound Broken Stone Macadam Base Courses from Upton County Line, east to Big Lake,, a distance of 18.578 miles, on State Highway No. 99 S.P. No. 904-A, Unit No. I I is awarded to R. W. Briggs, Pharr, Texas, for $73,603.48, which is the lowest and best b id .

In Sutton County on bids received May 27, 1932, contract for Con­structing Six Multiple Box Culverts as follows: 19-6x6x24| 2-10x8x34; 1-6x3x34; 2-10x8x34; 5-5x5x34; 2-8x6x34 and one bridge consisting of Ll-28 , -6" concrete deck girder spans, 22 F t . roadway, column type spread footing substructure, from 10 miles west of Sonora to Sonora, a distance )f 572.71 f t * on State Highway No. 27 F.A.P. No. 617-C is awarded to

Floyd Maicom & Co., Abilene, Texas, fo r $24,744*94, which is the lowest and best b id .

Page 14: 2!) - Texas Department of Transportation

5;t

6927

5928

5929

5930

5931

6932

6933

6934

693^

MaB 27* 1932

In Sutton County onbids received May 27* 1932, contract fo r Con­structing 8, 14 ahd7-26*-6" concrete deck girder spans, 22 f t . roadway* spread footing typebents and abutments forNoName Creek* BevIlsBIvor and Granger Creek Bridges and twomultlple boxculverts, from Crockett-Sutton CountyLlno east 11 miles* ad i s tanceof 946 .63f t . onState HighwayNo. 27F.A.B.No. 617-B Isawardedto Crouch^NoIand* Strawn, Texas, fo r $36*607.70, which Is tbe lowest andbos tb ld .

^nSuttpn^County onbids received May 27, 1932* contract for Grading and Small Drainage Structures from 10 miles west of Sonora to Sonora* ad is tanceof 10.046 miles* onStatoHlghwayNo. 27F.A.B. No. 617-C Is awardedtoTom Archers Co.* Ft. Worth* Texas* for $41*291.26, which Is tbelowest andbos tb ld .

InSutton County onbids received May 27, 1932, contract for Grading and Small BralnageStructures fromCrockett CountyLlno, to apolnt I I mlleseast* adis tanceof 10.963 miles, onStatoHlghwayNo. 27F.A.B. No. 617-B Isawardedto A. B. Murdocb, Dallas, Texas, for $46,679.66* which Is tbelowest andbest b id .

In Val Verde County onbids recelvedMay 27, 1932* oontraotfor One Course Limestone Bock Asphalt Surface Cour^ from Bel Bio 6.6 miles south on StateHighway No. 66, JobNo,M-16-^3, IsawardsdtoBodgers ^Stewart, San Antonio* Texas, fo r $11*666.60* whichis tbelowest and best b id .

InHooklns County theStatoHIghwayEnglneer Isd l rec ted to Inves­tigate tbe most economical andpractloal t y p e o f construction f o r U n l t I on State Highway #164fromSu1phurSprIngs to the WoodCountyLIneand make report and recommendation to tbe Commission* Includlngan estimate of oost.

In San Jacinto County theStateHighway Engineer Is dlrectedto fu r -nlsban estlmateof cost of constructlonof Unit l i o n State Highway #160 from Coldsprlngto tbe Walker CountyLlno.

In Whartonand Austin Counties theStateHIghwayEnglneer I sd l rec te to make an Investlgatlonof tbe right-of-way reoulrements from Bast Ber­nard* InWharton County* to Wallls* InAust ln County andwhencountles have fumlsbed tbe necessary rlghtDof-way tnat tbe deslgnatlonbe rein­stated.

InWood County tbe StateHighway Engineer Is directed to prepare plans and specifications fo r construction of Unit I onStateHIghway #164 from^ultman to theHopklns CountyLlno* oncondl t lontbat County w i l l , at I t s ownexpense, f u m l s b f u l l y fenced rlgbt-of-way, not less thaniOO* Inwidth* onlooatlon approvedby tbe Stato BIgnway Engineer* andthat Wood County w i l l furnish I t s shareof c o n s t r u c t i o n i s t already agreed upon.

I n B o B e t l t l o n o f Hon. Fierce B. Ward andothersof Johnson County fo r permission to erect sultablemonument or slab to theMemory of Bobert Crockett* son of BavidCrockett* at the si te of tbe highway bridge now nearlng completion, across the Brazos Biver connectlngHood and Johnson Countless

The Commission havlngoonsldered said memorial* declares that I t has beenthe uniform poIIcyoftheCommlssIonthat no highway struoturebeby I t o f f l c l a l l ydes lgna t edo r ln sc r lbed to any particular Individual to whlchpollcy the Highway Commlsslonstlll adheres; however, I n v l e w o f th^ circumstances stated I n s a l d memorial* theHIghw^ Commission makes no object lonto tho erection, at orneartheapproachto saidbridge, of a

Page 15: 2!) - Texas Department of Transportation

5935

May 37, 1932

Continued:

suitable monument or tablet in honor of the memory of the said Robert Crockett, with appropriate facts and circumstances, by the citizens of th() two counties named, or an association of said citizens having said matter

in hald • %he exact location of the monument to be made by the State Resident Engineer in connection with the citizens interested, at some point on the highway where i t w i l l not interfere with tr a f f i c and where the traffic would not 1 ikely injure or deface the monument.

5936 May 38, 1932

In Anderson County, i t is ordered that the Commission approve the report dated Apr i l 29, 1932, of the Division Engineer in accepting the contract of T. L . James and Co., as being sat isfactor i ly completed on F.A.P. 403-D Highway No. 19 said work being hereby accepted by the Com-nission, and that said contractor be paid a l l monies due on the f i n a l estimate.

5937 In Andrews County, since County funds are not immediately available, and since conditions require the immediate construction of Triple Asphalt Surface Treatment on Highway No. 137, S.P. No. 936-C, extending from the Ector County Line to Andrews, a distance of 17.742 miles, which is es­timated to cost $65,103.28 the Department agrees to advance such County funds as necessary and to proceed with construct ion with the understand­ing and agreement on the part of said Countythat i t w i l l enter into an agreement with the State Highway Department providing fo r the payment of the County*s one-half share of the actual construction cost of a l l uni ts , and that payment w i l l be made as soon as the condition of the Oounty de­pository w i l l permit. This minute is subject to a l l other provisions of minutes numbered 2621 and 5000.

5938 In Angelina County an i n i t i a l appropriation of $23,540,00 State Fundi is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 94, from Lufkin to Nechos River, a distance of 9.1 miles for widening of Roadway and culverts, and rebuilding bridges. This appropriation being made fo r Betterment Work, Job No. M-ll-N-4 and on condition that said county w i l l furnish such right-of-way as may be required to be not less than 100 f t . in width, fencing to be done by the County.

A.F.E.-32-329

5939 In Anderson County an i n i t i a l appropriation of $62,125.58, State Fun is hereby made to be expended under the direction of the State Highway Engineer through tho Maintenance Division on State Highway No. 23 from jnd of City pavement in Palestine to Neches River at Cherokee County Line, i distance of 14.4 miles f o r Revising grade l ine to provide additional light distance, and hauling and placing Iron Ore Gravel Base. This ap­propriation being made for Betterment Work, Job No. M-10-W-6 and on coa­l i t i on that said county w i l l furnish such right-of-way as may be required to be not less than 100 f t . in width, fencing to be dono by the County.

A.F.S.-32-330

5940 In Archer County an i n i t i a l appropriation of $9*724.00 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 30 from Wichita County to Baylor County, a distance of 18.757 miles f o r raising concrete pavement near high jo in t s , and rebuilding shoulders. This ap­propriation being made f o r Betterment Work, Job No. M-3-C-2 without right-of-way requirements. A.F.E.-32-33!

Page 16: 2!) - Texas Department of Transportation

6941

6942

6943

6944

6946

^ ^

May28, 1932

In Atascosa County since the Ccunty hasbeenunable tc disposeof I t honds at a reasonableprice and since the Commission desires the Immediate constmction of the gravel hase courses and douhlehltumlnous surface treatment on 3.P. 828DD^ C, HighwayNo. 97, extending from Jourdanton to Hindes, adistance of 22,884, tho Commissionagrees to advance such Count funds asnecessary andto proceed with the constructlonof the a^ove gravel courses and asphalt surfacing which Is estimated to cost $188,132.^9 Atascosa County tou l t imate lypoy fo r th is work $38,C37.16which amount I s t h e county^s sharebased on6C^of tho cost of Units 1 and 11 and a f te r allowing the County ac red l t of $68,C29.14onUnit 1 work, This action Is taken with tho understanding and agreement on the part of Atascosa County that i t w i l l place such honds i n escrow to cover the $38,C37.16 and that neither saldhondsnor proceeds shall he directed to any other use or purpose, andthat Atascosa County shall convert said honds Into cash I f so orderedhy the Com^issionand rolmhursethe State HighwayUepartment with the County^s pro-ratashare of theactual Con-structloncost of Units 1 ^ 11. Thoseconditions In Minute No. l7C8date^ June 26, 1929, which stipulates that the HighwayEepartment would not pay any money Into theconstruct ionof thisHighway from Jourdantonto Powlertonuntil theentirehighwayhadbeenfinanced throughout, are herehy removed as far as Atascosa County Is concerned.

I n E ^ i l ^ C o u n t y , the StateHighway Engineer Is authorized and direct to prepare plansandapeclflcatlons fo r thocons t ruc t lon of gradingand drainage structures onHighway No. 7 across saidCounty; contingent up­on the County furnishing, f u l l y fenced, suchright-of-way asmaybero-qu i r ed tobeno t less than ICC f t . Inwld thon loca t lon toheapprovedhy the StateHighway Engineer; wi th the further understanding that whenfund^ areavallahle the county w i l l f u m l s h l t s p r o ra tashareof t h e t o t a l con struct loncost , which Is 33 1^3^. I t Is o r d e r e d t h a t n o p a r t o f thOhigh^ wayhe submitted toh lds forgradlnganddralnage structures u n t i l r igh t -of-way has heen secured.

InEoe^Countyan I n i t i a l appropriationof $28,874.81 State Pundsis herehy made tobeexpendodunder t h e d i r e c t i o n o f theState HIghwayEn­glneer throughthe Maintenance Ulvlslonon StateHlghwayNo. 1 8 ^ 1 2 , f r ^ Heevllle southcl ty l i m i t to turn in Skidmore with 13CC f t . exception at Aransas Creek a n d a t o t a l of 18CC f t . exceptlonatnorthedge of Skidmore account proposednew location, adistance of 1C.19 miles fo r widening pavement 18 inchoson each side, taking depressions out of oldpave^ent andPituminousSeal Coat. This appropriationheingmade forEetterment Work, Job No. M-18-J-3 and oncondition that saidcounty w i l l furnish suchright-of-way asmayberequiredto he not less t h a n l C C f t . In width, fencing to bedonoby the Connty.

A.P.E.-32-332

In Hell County, the StateHighway Engineer is authorized and d i r e c t s to make locatlonandprepare plans and specifications on StateHighways from Helton southto t heno r thendo f S.P. 88C-Hevised, at the Amity School House, adistanceof approximately 8.2 miles, and to advertise fo r hide for Unit 1, whenHell County has furnished not less than ICC f t . right-of-way on the approvedlocatlon.

I t Is orderedhy the Commission that tho State Highway Engineer he authorized to exocutea supplemental agreement with J . E. Dunlap Company fo r the extension of thepavement of Highway #63, coveredhy the Contract f o r pavement of S.P. 87C-C, Hell County, f romthe end of their present contract to the Palls County Dine, a distance of 3.3mlles, at theUnlt prices o f t h e original contract with the exception of the I temof concret pavement, w h l c h w l l l he increased from $l.C6per square yard to $1.27 per square yard on account of the IncrOasedprlce of cement and the additional haul required on material f o r the construction of the extension, th is i n -creasedprlce seeming reasonable to the Commission, andprovlded further that this agreement shall not be executeduntll Hell County hasplaced in escrow6C^ of the cost of construction of said extension in cash.

Page 17: 2!) - Texas Department of Transportation

6946

6947

6946

6949

6960

6961

6962

6962

May 26, 1932

In Bexar Oounty an I n i t i a l appropriationof $6,236,99 State Funds is hereby made to he expendedunderthe direction of the StateHighway En­gineer through theMaintenanceDivision on State HighwayNo, 3 from west oity l imi t s of San Antonio west to beginning of EAB-469, adistance of 7,7 miles fo r Bituminous Seal Coat, This appropriation being madefor Betterment Work, JobNo, M-16-E-4and without right-of-way requirements,

A,E,E,-32-333 InBosoue Oounty an increaseappropriationof $1,214,00 StateFunds

ishereby made tobe expendedunderthe d i rec t ionof the State Highway Engineer throughthe MaintenanceDivision onStatoHlghwayNo, 144 from Somervell CountyLineto 0,39 miles southof Walnut Spr ingsnor thci ty l i m i t s , adistance of 6,07mlles forBoadway Maintenance for f i sca l year endingAugust 31, 1932, ana theStateHlghwayEnginoer i s i n s t r u c t e d t o take this sect lonof road ove r fo r maintenance inasmuchas a l l conditions Imposed In this designationhaveboen complledwlth. This appropriation beingmade for General Maintenance Budget, M-9-D-4without right-of-way requirements, A,F,E,D32-334

In Bowie Oounty, tho StateHighway Engineer isauthorized and direct edtoprepare plans foraconoretepavement on StateHlghwayNo, 1 between Maudand Oarbondale, adistance of six miles; the condit ionof th is im­provement being that saidcounty w i l l furnish not less t h a n a l O O f t , r i g^ t -of-way on location approvedby theStateHlghwayEnginoer,

InB^wie^Countyan increase appropriation of $1,111,30 State Eunds ishereby made tobe expendedunderthe d i rec t ionof the St te Highway Engineer throughtheMaintenanceBivision on StateHlghwayNo, 11 , from Bed Biver toDeKalb, ad is tanceof 11,113 miles forBoadway Maintenance for f i sca l year endingAugust 31, 1932, and theStateHlghwayEnginoer i s i n s t r u c t e d t o t a k o this sectionofroad over fo r maintenance inasmuch 21s a l l conditions imposed i n t h i s designation havebeencompliedwith, ^his appropriationbeing madefor General Maintenance Budget, MD,19-D,

A,F,E,-32-336

In Brazos Oounty, i t is ordered that the Oommissionapprove tho report dated March2^, 1932, o f t h e Division Engineer, in accepting the contract of B, B, Butler as being sat isfactor i ly completed on S,B, 736-F HighwayNo, 6 saidworkbeinghoreby acceptedby tho Oommlsslon, andthat said Gontractorbepaid a l l monies due on the f i n a l estimate.

In Brazos Gounty, i t is ordered that the Oommissionapprove the report dated Apri l 10, 1932, of the Division Engineer in accepting the contract of B , B , Butler, asbe ingsa t i s fac tor l ly completed on S,B, 736-H HighwayNo, 6 saidworkboinghereby acceptedby tho Gommissionandthat saidcon^ractor b o p a i d a l l monies due on the f i n a l estimate.

In Brazos Oounty, i t i ^ ordered that the Commission approve the re­port dated Apr i l 10, 1932, of theDivision Engineer in accepting the con­tract of B, B ,But lo r , a sbe ingsa t i s fac tor l ly completedonE,A,B, 471DE HighwayNo, 6 saidworkbeinghoreby acceptedby the Commission, andthat said contractor b e p a i d a l l monies due on the f i n a l estimate,

InBrazos Oounty an increase appropriation of $1,991,67 State Funds is hereby made to be expendedunder the direction of the State Highway En­gineer throughthe ConstructionDivision on StateHlghwayNo, 6 S,B, No, 736-Hfrom College Station south, adistance of 4,417miles, fo r the con­struction of Drainage Structures, Clearing andGrubbing oncondition that saidcounty w i l l furnish $996,64 for such improvement. This appropriation is i n add i t i ^n to Minute No,4766,

A,F,E,-32-336

Page 18: 2!) - Texas Department of Transportation

6

5954

5955

5956

5957

5958

5959

5960

5961

May 28, 1933

In Burleson County the State Highway Engineer is authorized to pre­pare an estimate for the construction of Unit I on State Highway #21 through said County and submit to the Commission.

In Caldwell County, the State Highway Engineer is authorized and directed to advertise for bids for Unit I on State Highway No. 142 from lockhart to Martindale, a distance of 9.1 miles, as soon as and when planj£ and specifications are completed.

On December 1st. 1931 bids were received for the construction of Treated Timber Bulkhead and Channel Change at San Marcos River Bridge sit|£, S.P. 787-C in Caldwell County, and contract was awarded to lowest bidder Jagoe Construction Company of Denton, Texas. The Jagoe Construction Com­pany having f a i l ed to execute the contract and bond covering this work, i t is ordered by the Commission that the $500.00 check accompanying the J igoe Construction Company's bid be deposited to the credit of the State Highwar funds and that th is project be readvertised.

In Calhoun County an increase appropriation of $454.77 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Construction Division on State Highway No. 57 S.P. No. 807-F from Port Lavaca to Lavaca Bay Bridge, a distance of 1.648 mile i fo r the construction of Grading and Drainage Structures on condition, that said county w i l l furnish $418.85 for such improvement. This appropriate is i n addition to Minute No. 4691 and is required to pay f i n a l estimate

A.F.E.-33-337 In Calhoun County an increase appropriation of $1,549.50 State Funds

is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 57 between Port Lavaca and Matagorda County Line a distance of 18.605 miles for Road* way Maintenance for f i s c a l year ending August 31, 1932, and the State Highway Engineer is instructed to take this section of road over f o r Main-tenance inasmuch as a l l conditions imposed i n this designation have been complied wi th . This appropriation being made f o r General Maintenance Budget, M-l3-0-4. A.F.E.-3S-338

In Callahan County an increase appropriation of $6,872.11 State Fundi is hereby made to be expended under the direction of the State Highway En­gineer through the Maintenance Division on State Highway No, 23, from end af pavement on Cross Plains to the Coleman Gounty Line a distance of 5.65 niles for placing additional base gravel pr ior to Double Bituminous Sur­face Treatment. This appropriation being made for Betterment Work, Job Jo. M-&-U-3 without right-of-way requirements.

A.F.E.-39.339

I t is ordered by the Commission that Maintenance be continued on Highway No. 77 from Douglasvillo to Atlanta in Cads County, for another year, without aid from the County, and that the conditions outlined in Minute Number 2664, passed by the Commission March 19th, 1930, wherein i t was specified that i f Cass County shall not have provided funds in the amount of 50$ of the cost of construction by March 1, 1932, this desig­nation on that date shall be automatically cancelled, be waived, and the date on which this designation shall automatically be cancelled for failure to comply with the outlined conditions is extended to March 1, 1933.

In Cass, County, the State Highway Engineer is directed to prepare plans and advertise for bids on approximately five miles of State Highway No. 47, beginning at Atlanta and extending to or near Johns Creek, in the direction of Linden; the nature of this improvement to be a nine f t * con­crete slab in addition to the one already constructed; the condition of this improvement being that Cass County w i l l furnish a 100 f t . right~of-wfly on this improvement.

Page 19: 2!) - Texas Department of Transportation

61

6962

6963

6964

6966

May 26, 1932

In Castro County, I t Isorderedby tho Commission that Mln^teNo, 6011, dated October 20, 1931, which authorise Statepartlclpatlon In cost of pavlngHlghway No, 66 in the c i ty of Dlmmltt, he amendedto allo^ State participation onasect lonbeglnnlngat apolnt f i f t y feet west of the west proper tyl lne of 6th, street, and extending east adis tanceof 2,320feet, This action Is takenwlththeunderstandlng that State par­t ic ipat ion w i l l he two-thirds of the cost of the center twenty feet ona basis of $1,00 per squareyard, t h l s n n l t price to Include a l l Items enter­ing Into the cos tof the compl^etedpavement, A l l other provisions of Minute No, 6011 are to remain In f u l l forceand ef fec t .

In Castro County, the StateHighway Engineer Is authorized and d i r ­ected to prepareplans and specifications for construction of grading and drainage structures on HighwayNo, 33 from Parmer County Line to Deaf Smith CountyLlno, adistance of approximately 2,36mlles, contingent upon the County furnishing, f u l l y fenced, such right-of-way as may he re­ouired t o h e n o t less than 100 feet In width on location approvedby the State HIghwayEnglneer, with the fur ther understanding that when funds ar^ available the County w i l l furnish i t s p r o rata share of the to ta l con­struction cost, which Is 3 3 1 ^ ^ ,

InCherokae County, an I n i t i a l appropriationof $76,671,47 State and Federal Funds Is hereby made to bo expendedunderthe d l rec t lonof the StateHighway Engineer throughthe ConstructionDivision on StateHighway No, 43, F,A,P, No, 666-D, extending f romapo in t 7,4mlles East of Jack­sonville to the Husk County Line, ad is tanceof 9,267 mlles, f o r t h e c o n -s t ruc t lonof IronOreTopSollEase Courses, HoadOll SurfacoTreatment, and Bituminous Surface Treatment, on conditionthat whan fundsbecome available, Cherokee County shall reimburse the StateHighway Department to the extent of one-thlrdof theactual cost of constructing a l l u n l t s . That part of Minute No, 3961, dated March31st, 1931, I n c o n f l l c t w l t h theabovo. Is hereby cancelled, A,F,E,-32D340

In Childress County, since a l l unexpended County funds al lot ted fo r highway construction, with the exception of approximately $66,266,06, are not Immediately avallablebecause of a Court restraining order, and since the importance of theprojects shownbelow requires their Immediate con­struction, the State Highway Depart^nt agrees, upon acceptance of this order by the Commissioners* Court of Childress County, to advance such County funds asnecessary, except asprovlded herein, and toprooeedwlth construction, with theunderstandlng ondagreement on thepar t of Children bounty that a l l necessary right-of-way w i l l be furnished the State free of charge, andthat a l l available County funds remalnlngafter paying the en­t i recos t of a l l u n l t s on S,P, 771-H^D, ^ha l lbeapp l ledonF,A,P ,No, 33DA, HighwayNo, 6; andwlth the further understanding and agreement tha) hen the County funds now Impoundedare releasedfrom said restraining

^rder, the County w i l l furnish such additional funds as necessary to pro­vide fo r the County^s proportionate share of theactual Af eachproject, as Indlcatedbelow, State andFederal i l l o t t e d t o provide for theDepartment^s pro rata share of the construction ^ost of each of theseprojocts.

construction cost Funds are hereby

Hwy. Type Limits Est.

Cost

Co*s u l t . share

State* u l t . share

PAP 533mA &SP 771-A

SP 771-B

20 » Width Cone. Pvt.

18' width Cone. Pvt.

Childress to Harde-$227,284.07 l / 3 man Co .Line ,12.4 61 miles

2/3

Loop connection $12,080.10 from Hwy. 5 through Kirkland, 0.735 miles

100$ 0$

Page 20: 2!) - Texas Department of Transportation

65

5967

May 28, 1932

Continued:

Proj ect Hwy. Type Limits Est .

Cost Co.*s U l t .

Share

State 1

U l t . Share

SP 771-D 18* & 60' Width

Cone, Pvt«

Spur connection from 5 over iiain St . i n K i r k ­land to point 1 block so. i n t e r ­section wi th loop connection, 0,183 miles . $7,751.84 100$ 0$

SP 854-0

SP 728-1 Unit I I I

FAP 573-0

18* & 30* Width Cone. Pvt.

5 18* width Cone. Pv t .

4 Or, & Dr. Structures

Prom end of S.P. 854-A north to intersection with Hwy. 5, 0.754 miles $16,219.65 100$

Approaches to FW & DN Ry. overpass West of Childress, $4,257.07 0.244 mi les .

Prairie Dog Town fork of Red River to Collingsworth $73,109.91 County Dine, 12.202 mi les .

l / 3 2/3

1/3 2/3

The provisions of Minutes 2471, and 2604 and 4775, i n c o n f l i c t wi th the conditions and requirements out l ined above are hereby voided. A l l other provisions i n these minutes are to remain i n f u l l force and e f f e c t . I t i 1 the understanding that a l l funds now avai lable not impounded (especially the $58,288.06) are made avai lable f o r the construction to which they are to apply.

I n Collingsworth County the State Highway Engineer i s authorized and directed to prepare plans and speci f ica t ions f o r construction of grading and drainage structures on Highway No. 4 from Childress County Line to Wheeler County Dine, a distance o f approximately 31.0 mi les , contingent upon the County f u r n i s h i n g , f u l l y fenced, such r ight -of -way as may be re ­quired to be not less than 100 fee t i n wid th on loca t ion approved hy the State Highway Engineer, w i t h the f u r t h e r understanding that when funds are avai lable the County w i l l f u rn i sh i t s pro rata share o f the t o t a l con­s t ruc t ion cost, which i s 33 l / 3 $•

In Crockett County an increase appropriat ion of $1,966.15 State and Federal Funds i s hereby made to be expended under the d i r ec t ion of the State Highway Engineer through the Construction Div i s ion on State Highway) No. 27 F.A.P. 619-B from Pecos County Line to Live Oak Creek, a distance of 3.170 miles , f o r the construction of Grading and Drainage structures on condit ion that said County w i l l f u r n i s h $983.07 f o r such improvement. This appropriat ion i s i n addi t ion to Minute No. 5161 and i s necessary on account o f increase i n drainage s t ructures .

A.F A . 32-341

Page 21: 2!) - Texas Department of Transportation

5965

5969

5970

5971

5972

5973

5974

6

26,1932

In Dawson, Martin and Howard Counties, theStateHighway Engineer Is authorized anddirectod to prepare plans and specifications fo r the con-s t ruc t ionof gradinganddrainage structures onHighway No, 9; contingent uponthe respective counties furnishing, f u l l y fenced, such right-of-way as may he reouired, to henot less thaniOO f t , Inwid th on location to beapprovedby the StateHighway Engineers with the further understand Ing that when funds areavailable thecounties w i l l furnish their pro rat^ share of the to ta l constructloncost, which is 33 1^3$, I t i s ordered that nopart of thehighway he submitted to bids forgradlng anddralnage structures u n t i l right-of-way hasbeen secured,

InDawson Oounty the StateHighway Engineer is authorizedanddir-ectod to prepareplans and specifications f o r construction of grading and drainage structures onHighwayNo, 9 from Lynn OountyDine to Damesa, a distance of approximately 17,5miles, contingent upon tho Oounty furnish­ing f u l l y fenced, suchright-of-way asmayberequi red tobe not less tha^ lOOfeet inwidthonlocat ionapprovedby tho StateHighwayEngineer, wit^ tho further understanding thanwhenfunds are available the Oounty w i l l furnish i t s p r o r a t a ^ h a r e o f t h o t o t a l constructloncost, whichis 3 3 l / ^ $ ,

In Deaf Smith Oounty the StateHighwayEngineer is authorised and directedtoprepare plans and specifications fo r constructionof grading anddrainage structures onHighway No, 33 fromOastro Oounty Dine to Handall Oounty Dine, ad i s tanceof approximately 21,2 miles, contingent uponthe Oounty furnishing, f u l l y fenced, suchright-of-way asmaybe re­quired t o b e n o t less thaniOO feet in widthonlocationapprovedby the StateHighwayEngineer, w i th the further understanding that when funds areavailable the Oounty w i l l furnish i t s p r o rata share of the total con­structloncost, whichis 33 1^3$,

In DeWitt Oounty, an i n i t i a l appropriationof $37,766,07 Stato and Federal Funds ishereby made tobe expendedunderthe d i rec t ionof the StateHighwayEngineer throughthe Construction Divisionon StateNighway No, 72, F,A,P,No, 542-0, extending fromtho DavacaOountyDine t o a point two miles southwest of Yoakum, ad is tanceof 2,350 miles, f o r the construction of CradingandDrainageStructures, on condition that said Oounty w i l l furnish suchright-of-way as maybe required, fencing t o b e done the Oounty, andwith tho further understanding that whenfundsbe-come available, DeWitt Oounty shall reimburse the Stato Highway Departmen to the extent of one-third the actual cost of construction,

A,F,E,-32-342

In DeWitt Oounty, the StateHighway Engineer is directed to prepare plans and specifications and advertise for bids for constructionof Dhit onState HighwayNo, 29, between Ouoro andHochhoim, on condition that Oounty w i l l furnish 100 f t , right-of-way on locationapprovedby theState HighwayEngineer andconditionodfurther that when unit 11 is constructed the Oounty wi l lp rov ide i t spropor t ion of cost of bothDnits 1 and 11,

In D eWi t Countyan increase appropriation of $2,000,00 Stateand Federal Funds is hereby made to be expendedunder tho d i r ec t ionof the StateHighway Engineer throughthe OonstruotionDivision on StateHighway Jo, 119 S,P, No, 635-OfromYorktownto ColiadCountyDine, ad is tanceof 5,699 miles, f o r the construction of OalichoDase Courses, oncondition ^hat said Oounty w i l l furnish such right-of-wav as may be required, to be lot less thaniOO f t , i n w i d t h , fencing to b e ^ b y the County,

A,F,E,-32-34^ In Ector County the StateHighway Engineer is authorizedanddireoteo

^o prepare plans and specifications for theimprovement of the necessary ealignment of State HighwayNo, 137 from Odessa south to tho Crane County

^ine; thecondition of this improvement being that Ector County w i l l furnish he sumof $12,000,00 fo r constrnctionand inadd i t ionno t loss thanalOO ftD

'ight-of-way onlocation approvedby the StateHighway Engineer,

Page 22: 2!) - Texas Department of Transportation

69

May 26, 1932

I n E l l i s County, I t Is ordered that the Commission approve the re­port dated Apr i l 27th, 1932, o f t h e Division Engineer Inaoceptlng the contract of 0, E, Duces, asbeln^ sat isfactor i ly completedon S,P, 163-Reop, HighwayNo, 14, saldworkbelnghereby acceptedby the Commission, and that said contractorhe paid a l l monies due on t h e f l n a l estimate,

in E l l i s County, i t i s orderedthat the Commission approve the re­port dated Apr i l 27, 1932, of the Division Engineer Inacceptlngthe con* tract of C, E, Ducas as helng sat isfactor i ly completed on S,P, 364-Beop, HighwayNo, 14 saldworkhelnghereby accepted hy the Commlss^n, and that sa ldcontrac torhepaldal lmonles due on t h e f l n a l estimate.

I n E l l i s County, I t is ordered that the Oommissionapprove therepo^t dated Apri l 27th, 1932, of theDlvls lon Engineer In accepting thecontrac^t of C, E, Ducas ashelng sat isfactor i ly completedon S,P, 794-A Highway No, 14 saidworkbeinghoreby acceptedhy the Commission and that said contractor he paid a l l monies due on the f i n a l estimate.

In El Paso Countyan I n i t i a l appropriationof $6,901,53 StatePunds Is herehy made to he expendedunderthe direction o f t h e State Highway Engineer through theMaintenance Division on State Highway No, 1 auuro^-Imat^lysevenmllesnorth of El Paso onHighwayNo, 1 f o r bul ldlngan additional mul t lp leboxculver t and approaches, and repalrlnglevees and roadbed damagedby flood waters, This appropriationheingmade for Betterment Work, Job No, M-24-Aandon condition that said county w i l l furnish such right-of-way as maybe reouired to be not les^ than 60 f t . In width, fencing to be done by the County,

A,P,E,-32-344

In Palls Countyan I n i t i a l appropriationof $59,690,94 State Funds Is hereby made to be expendedunderthe d l rec t lonof the State Highway Engineer through the ConstructionDivision on StateHlghwayNo, 6 S,P, No, 53-Aa distance of 0,446 mlles fo r the constructlonof Dig Creek Bridges conslstlngof 6-26* and 74-20^ spans fo r malnbrldge and 36-20* spans fo r r e l i e f bridge; steel IBeam stringers concrete f loor slabs, treated t im­ber p i l i ng substructures, and roadway approaches on condition that said omnty w i l l fumlsh$29,645,47 fo r such Improvement and such right-of-way as maybe reouired, to benot loss thaniOO f t , Inwid th , fencing tobe doneby the County; andwl th the further understanding that shouldthe cost of Improvement exceed the foregoing estimate Palish County shall fur*^ nlsh Itsproportlonate share of the additional cost. This matter Is sub­ject to conditions of MlnuteNo, 6466 datedMarchlst , 1932,

A,P,E,-32-345

InErath County, the State HIghwayEnglneer Is authorized to proceed wi th the construction of grading andbrldges on HighwayNo, 10 from Dublin east 6,611 miles, onthe approved location, conditioned that Erath County furnlshnot less than alOO f t , right-of-way onapuroved location f u l l y fenced,

InEayette County, P,A,P, 417-A, Highway #71 fromDaGrange southeast 4,577 miles. I t Is orderedby the Commission that MlnuteNo, 5754 dated April 6, 1932 be cancelled, andthat MlnutesNos, I536 and4l69 are to remain In force.

I t Is orderedby the Commission that the State Highway Englneerbe authorized and directed to enter into anagreement with the Houston Llghtlng^Power Company fo r the furnishing of power for the operation of the sump pump motor which has been instal led to drain the underpass fo r HighwayNo, 3 In Port Bend County, StateProject 973-B,

Do Port Bend County, I t Is ordered that the Commission approve the report dated Pebruary 15th, 1932, of the DlvlslonEnglneer, Jim Douglas In accepting the contract of Orant Williams asbelng sat isfactor i ly com­pleted on S,P, 669-B HighwayNo, 36 saidworkbeinghoreby acceptedby th^ commission, andthat said contractorhe paid a l l monies due on the f i n a l estimate.

Page 23: 2!) - Texas Department of Transportation

71

May 28, 1932

I t Is orderedby tbe Commissionthat payment of $118,I9be made to Brown end Beet, Inc. , Contractors onS,P, 973-HIghway#3, PortBend County, In f u l l settlement of the i r claim f o r additional compensation due to delays over which they had no control, This payment Is recom­mendedby tbe Resident Engineer, BIvIsIonEnglneer* and Committee on Claims,

In Port Bend County, I t Is ordered tbat tbe Commlsslonapprovotho report dated Apr i l 13* 1932* of theBIvIsIon Engineer Inacceptlng tbe contract of Browne Boot, I n c , asbelng sat isfactor i ly completedon S,P, 973HIghway No, 3 saidworkbeinghoreby acceptedby tbe Commission, and tbat said contractor b e p a l d a l l monies dne onthe f i n a l estimate.

In Cray County, since the Coun^ hasbeen nnable to dispose of I ts bonds at areasonable price* and since conditions require the Immediate constmction of th i s project* the StateHighway Department agrees to ad­vance suchCounty funds asnecessaryandprocoedwlththe constmction of Grading* Drainage Structures and CalicheBase Courses with Bituminous Surface Treatment onP,A,P, 825-A^ extending from Pampa northeast to the Boberts CountyDIne, ad is tanceof 14,318 miles on HighwayNo, 33, This construction Is estimated to cost $184,906,67, and two-thirds State and Pe^ral Punds arehereby a l lo t ted for ^uchconstmctlonwlththe under­standing andagreement on thepa r t of Cray County that sufflclentbonds ^ 1 1 be placed In escrow to cover the County*s o^e-thlrdshare of the cost* that neither saldbonds nor theproceeds therefromshall be dlrectedto any other use or purpose, and that Gray County shall convert saldbonds Into cash. I f so orderedby the Commission* and reimburse the Stato HIghwayDepartment wi th the County*spro ra tashareof the actual con­stmction cost, Thlsmlnuto Is subject to the provisions of MlnuteNo, 6C8C*dated October 21, 1931,

In Gray and Bonley Counties theStateHighway Engineer Is authorised toproceedwlth thepreparatlon of plans andaward of contract for Unit on StateHlghwayNo, 78 fromthe Gray Carson County l l n e t o thewost end of P,A,P,647-B (S,P,844-B),UnIt I I , On this proposed Improvement Gray County Is to furnish the right-of-way andpay one-thlrdof tho cost of constmctionof bothUnlt l a n d U n l t I I from theGray CountyDIne f o r a dlstanceof 3,7 miles, at whlchpolnt thehighway follows very closely theGray-Bonley CountyDIne, but Is generally In Bonley County, fo r the ,8 miles on theEast endof t h i s Improvement which the ^tate Is to con­struct as apa r t of the Bonley County Improvement without participation fromGray County, In thematter of right-of-way In Bonley County, this roadbelngadjacent to the CountyDIne and not serving any particular part of Bonley County* an appropriationof $10,000,00 Ishereby made to cover the purchaseof right-of-way on the remalnlng11,3ml1es o f t h o a b o ^ authorized Improvement and authority Is hereby given to purchase, or to condemn, thenecessary right-of-way with the above l imitat ion* I t being understood that the route I s t o boon thelocat lon approvedby the State HIghwayEnglneer and right-of-way Is to be not less thaniOO feet . Upon securing the necessary right-of-way* authority Is given to secureblds fo Unit I , NoB contract Is to b e l e t f o r U n l t l u n t l l a l l right-of-way has been secured.

In Glllesule County* on thenew routing of StateHlghwayNo, 9 from Fredericksburg to the Kerr County Bine, the StateHighway Engineer Is authorized to proceed, through the Commissioners* Court* to secure the neceasary right-of-way provided suchright-of-way does not cost to exceed $10*000^00; andprovlded further that Gillespie County* throughlts Com­missioners* Court* w i l l propose* saldproposal to be spread on their min­utes, that money so paid for right-of-way shall be returned to the State Highway Department one-fourth for eachyear boglnnlngMarchl* 1933* whe the f i r s t payment w i l l be duo. Upon the securing o f t h e right-of-way* the State Highway Engineer Is authorized to propareplans and specifications and advertise fo r Unit I ,

Page 24: 2!) - Texas Department of Transportation

7^

6996

May 26,1932

In Hamilton Countyan in i t i a lappropr ia t ion of $9,617.30 StateFunds is hereby made to be expended under the direotion of the State Highway Engineer throughthe MaintenanceDivision on State Hi^h^ay No. 67 from Erath County Line, to connectionwith Highway #67 in City of Hico, a d i s ­tance of 1.692 miles for grading end drainage structures and Caliche Sur­face. This appropriationheingmade for Betterment Work, JobNo. M-9-E-4 andon condition that saidcounty w i l l furnish such right-of-way asmay be required to benot less thaniOO f t . fromErath County Line to Lamar S t r ^ t ^n Hico and 60 f t . in Hico from Lamar St. to Cedar St. , Fencing tobedoneby County. A.F.E.D32-346

In Hamiitonand Bosque Counties, the StateHighway Engineer is d i ­rected to prepareplans and specifications and advertise f o r b i d s for the construction of Unit I onHighwayNo. 67 fro^Meridian to Hico^ on con­di t ion that the respective counties w i l l furnlshnot less t h a n a l O O f t . right-of-way onlocation to beapprovedby the StateHighway Engineer; and conditioned f u r t ^ r that when Unit I I is constructed, the counties wi l lp rov ide their pro^or t ionof the cost of bothUnits I and I I .

InHarr i s County an i n i t i a l appropriationof $4,237.43 StateFunds ishereby made to be expendedunder the d i rec t ionof the StateHighway Engineer through the Maintenance Division on StateHlghwayNo. 19 from Ft. Bend County Lino north to Beginning of Concrete, a distanceof 1 .6mi^s for widening andreshapingbase, and placingDouble Bituminous Surface. Thisaupropriationbeingmade forBotterment Work, Job No.M,-I2-E-6, andwithout right-of-way requirements, as 100 f t . right-of-way previously furnished. A.F.E.-32D347

In Hidalgo and Cameron Counties aState Bighway is hereby condition­a l ly designated from Edinburg, in Hidalgo County, to Combes, in Cameron County, the condit ionof th is designationbeingthat the respective coun­ties w i l l furn lshnot less thanalOO f t . right-of-way onlocationapprove^I by the State HighwayEngineer. In the event therespective Countiesagre^ o th isorder , theStateHlghwayEnginoer is directedto make suchlocatio^

changes as are necessary and furnish thecounties with right-of-way maps. Jopart of th is road is to betaken over f o r maintenanceuntil the r igh t -^f-way has been secured throughout andwhen this-hasbeen done, theState highway Commission w i l l construct thegaps in said road of adurable type o provide analtemate route into thelower Bio Crande Valley*

In Hidalgo County, the City of Bha rr having proposedtoprovido the State Highway Department a tract of land 300 feet square I n b l o o k B on Cage Boulevard, one-half of whichisdonated free and theo the rha l f to b^ p a i d f o r b y theState RighwayDepartment for $1000.00 thisproperty to be] used for the StateHighway Department's DivisionHeadquarters. I t is ordered that plans and specifications be prepared for the constructionof a division o f f i c e b u i l d i n g and division warehouse, the cost not to exceed $10,000.00 and an appropriation for which is hereby made and, inadd i t ion thereto, an appropriation of $1000.00 to purchase the s i t e .

A.F.E.-32-346

In H i l l Oounty, the StateHighway Engineer is directed to prepare plans and specifications andadvertise f o r b i d s for the constructionof Unit I o n StateHlghwayNo. 22fromAcqui11aCreekto Whitney; oncon­d i t i o n t h a t the County w i l l f umisha lOO f t . right-of-way onlocation approvedby the StateHighway Engineer; andconditionedfurther that when Unit I I is constructed; the County w i l l provide i t spropor t ion o f t h e cos) of bothUnits I and I I .

In Hunt Countyan i n i t i a l appropriationof $6,306.60 StateFunds is hereby made to be expendedunderthe d i rec t ionof the State Highway En­gineer through theMaintenance Division on State Hi^way No. 34from Wolfe City to .26 miles southot Tidwell, ad is tanceof 12.36 m i l e s f o r Bituminous Seal Coat. This appropriationheingmade for Betterment Work, JobNo. M-1DW-6 without right-of-way requiremtns.

A.F.E.D32-349

Page 25: 2!) - Texas Department of Transportation

5996

5997

5998

5999

6000

6001

6002

S

May 28, 1932

I t is ordered by the Commission, that Minute No. 6760$ dated A p r i l 6 th , 1932 be amended to read as followss

"In Hutchinson County an i n i t i a l appropriation of $53,614*15 State Funds i s hereby made to be expended under the d i r ec t ion of the Stete High­way Engineer through the construction Div i s ion on State Highway No. 117, S.P. 925-B, extending from the top of the Cap Rock northeast to the Hansford County Line, a distance of 11.822 miles f o r the construction of Grading, Drainage Structures, Caliche Base Courses and Single Bituminous Surface Treatment, on condi t ion that said County w i l l f u r n i s h $26,807.07 \ f o r such improvement and r ight -of -way as may be required, fencing to be done by the County, and w i t h the f u r t h e r understanding that should the cost of improvement exceed the foregoing estimate, Hutchinson County w i l l f u r n i s h i t s proportionate share of t h e addi t iona l cost . This Minute i s subject to the conditions of Minute No. 1320, dated March 19th, 1932.

A.F.E.-32-350

I n Hudspeth County, the State Highway Engineer i s hereby authorized to proceed wi th the construct ion of Grading and Drainage Structures on 3.P. No. 204-F, Highway No. 1 , extending f rom Lasca to Sierra Blanca, a di|p« tance of 7.196 miles , on condi t ion that the County pay the en t i re cost of construction. This minute i s subject to the provisions of Minute No. 5163% dated December 2, 1931.

I n Jackson County, i t i s ordered that the Commission approve the report dated May 1 1 , 1932, of the Div i s ion Engineer i n accepting the con-ract o f C. T, Ingram as being s a t i s f a c t o r i l y completed on S.P. 969-B,

lighway No. 57 said work being hereby accepted by the Commission, and that ja id contractor be paid a l l monies due on the f i n a l estimate.

I n Jackson County, an increase appropriat ion o f $6,000.00 State and Federal Funds i s hereby made to be expended under the d i r ec t i on of the State Highway Engineer through the Construction Div i s ion on State Highway No. 67 S.P. No. 969-B f o r the construct ion of Grading and Drainage Struc­tures on condi t ion that said county w i l l f u r n i s h such r ight-of-way as may be required, to be not less than 100 f t . i n width, fencing to be done by the County. A.F.E.-32-351

I n J e f f Davis County, an i n i t i a l appropriation of $31,407.26 State and Federal Funds i s hereby made to be expended under the d i r ec t i on o f t h ^ State Highway Engineer through the Construction Div i s ion on State Highway Ho. 27, F.A.P. No. 408-B, Section 2, a section 4.755 miles i n length, w i t t e rmin i at the Beeves County Line , f o r the construction of Grading and Drainage Structures, on condi t ion that said County w i l l f u r n i s h such r i g h of-way as may be required, fencing to be done by the County.

A.F.E.-32-352

I n Jim Wells County, Minute No. 5291, i s hereby amended to provide authori ty f o r widening the shoulders and rearranging ditches on any portioJ|a of the road between A l i ce and Brooks County Line where the required r i g h t jf-way of not less than a 100 f t . can be obtained i n stretches of not lese than ten mi l e s .

In Jones County, an increase appropriat ion of $1,951.77 State Funds Lg hereby made to be expended under the d i r ec t i on o f the State Highway Engineer through the Construction Div i s ion on State Highway No. 4 S.P. No. J55-C from Hamlin to Fisher County Line , a distance of 3.760 miles , f o r thjp construction of Grading and Drainage Structures on condit ion that said jounty w i l l f u r n i s h $975.89 f o r such improvement, and such r ight-of-way is may be required, to be not less than 100 f t . i n width , fencing to be Lone by the County; and w i t h the f u r t h e r understanding that should the iost o f improvement exceed the foregoing estimate County shal l f u r n i s h Its proportionate share of the addi t ional cost. This addi t ional approp-' i a t i o n i s required on account of increase i n cost due to complete revisioj i . i f plans and re locat ion lengthening the pro jec t from 3.471 miles to 3.760 Pi les . A.F.E.-32-853

Page 26: 2!) - Texas Department of Transportation

^

6003

6004

May 26, 1^32

In Kaufman Oounty the StateHighway Engineer Is directed to prepare plans and specifications f o r the repair and reconstruction of StateHigh way No. 40 fromthe Henderson Oounty Dins to Kaufmanandto report the oost to tho Oommlsslon. The distance ahout 26 miles.

In Kendall Countyan I n i t i a l appropriationof $106*000.23 State and Federal Funds Isherehy made tohe expendedunderthe d l r eo t lonOf the State HIghwayEnglneer through the Construction Division on State Highway No. 9, F.A.P. 631-D* adistance of 0.46 miles* for theconstructionof OuadalupeHiverHridgenear Comfort consist ingof 27-20*-6" concretegir^ dor spans; 22' roadway; 2-62ft . steel IDeam spans; 1-200 f t , steel span 29 concrete p i l e hents; 4 open calssontypeplers; and roadway approaches on condition that Kendall County w i l l furnish such right-of-way asmay b reouired to he not less than 100 feet and with the further understanding that this appropriation Is subject to the conditions of MlnuteNo. 2917 dated May 20th, 1930, wherehy the county is toprovido $100*000.00 for the construction of HighwayNo. 9and 27.

A.F.E.-32-364

InKinney Oounty, i t Is orderedthat the Oommissionapprove the re­port dated Apr i l 19* 1932* of the Dis t r ic t Hesident Engineer i n accept­ing the contract of J . Floyd Malcom^ Co.* as heing sat isfactor i ly com-pletedonF.A.P. 464-DHighway No. 3 said work heingherehy accepted hy the Commission and that saidcontractor h e p a i d a l l monies due on tho f i n a l estimate.

I t i s orderedhy the Commissionthat payment ^ f $1*317.36bemade to J . W. Owin in f u l l payment of his claim fo r additional compensation on F.A.P. 464-A^H Highway 3, Kinney County* fo r the cost of moving eouipment into the Oi l Dine P i t ; delay i n the p i t and the cost of moving material out of p i t which had tob^ ahandonedonaccount of the material heing unsuitable. This payment has heen recommendedby the Hesident En­gineer on the project andby the commission on Claims.

In Knox County* i t i s ordered that the Commission approvers report dated May 20* 1932, of the Dis t r ic t Hesident Engineer inacceptingthe contract of McClung Const. Co.* asbeing sat isfactor i ly completed on S.P. 696-BHighway No. 24* saidworkbeinghoreby acceptedby the Commission andthat said contractor be p a i d a l l monies dueon the f i n a l estimate.

InDamar Countyan i n i t i a l appropriationof $6,906.02 StateFunds ishereby made to be ^pendadunder the d i rec t ionof the StateHighway Engineer throughtheMaintenan^o Division on StateHlghwayNo. 6 between Hed Hiver CountyDIne and Paris adistance of 13.77mi1es for placing local stone on shoulders of s t eeph i l l s , ano t d is t^ce of 207.6 stations This appropriationheingmade forDetterment Work* Job No. M-1-^D^ withon nght-of-way requirements, A.F.E.D32-366

InDamar Countyan i n i t i a l appropriationof $6,116.76 StateFunds is hereby made to be expendedunder the direction of the StateHighway Engineer throughthe MaintenancoDivision on StateHlghwayNo. 24* between Paris andDamar-Delta County Dine, a distance of 12.96mi1esforp1acing local stone on shoulder of s t eeph i l l s , ane t distance of 341.9 stations. This appropriationheingmade fo r Detterment Work* JobNo. M-1-Y-6 without right-of-way requirements. A.F.E.-32-366

In Damb County, the StateHighway Engineer is authorized and directs ed to prepare plans and specifications for the constructionof grading and drainage structures on StateHlghwayNo. 7 across saidcounty; contingent uponthe county furnishing, f u l l y fenced, suchright-of-way asmaybe re­quired, to be not less thaniOO f t . i n w i d t h onlocation to beapproved by the StateHighway Engineer; with the further understanding that when funds are available, the county w i l l furnish i t s p r o rata share o f t h e total c o n s t r u c t i o n i s t , whichis 331^3$. I t i ^ orderedthat no part of thehighway be submittedto b i d s f o r gradinganddrainage structures unti^ right-of-way hasbeen secured.

Page 27: 2!) - Texas Department of Transportation

6011

6012

6013

6014

6015

6016

^

May 26, 1932

In Lampasas Gounty, MlnuteNo. 5564, regarding the constructionof Unit I o n State Highway No. 66throu^hsaidcounty, theState HIghwayEn­glneer Is authorized to do th is work through theMaintenanceDopartmant.

In Leon Oounty, since the Oounty hasheenunahleto dispose of I t s honds at areasonableprice, and since conditions reaulre the Immediate construction of t h i sp ro jec t , the StateHighway Department agrees to ad­vance such Oounty funds asnecessary andproceed wi th the construction of OoncretePavement on F.A.P. No. 562-E, extendingfromapoint two miles southwest of t heT . ^ E . V . Hallroadto the Navasota Hiver, a d i s ­tanceof 11.977mlles onHighwayNo. 43* This construction Is estimated to cost $191,262.04 andtwo-thirdsStatoand Federal funds are herehy al lot ted for such construction with the understandingand agreement on th^ part of Leon Oounty that the $300,000.00 Oountyhonds In escrowshallhe applicable to a l l construction on HighwayNo. 43, and with the further understanding and agreement that Leon Oounty shall convert saldbonds Into cash, I f requested by the State Highway Oommlsslon, and reimburse the Department wi th the Oounty*s one-third share of the actual construct­ion costs. A l l other provisions of Minutes numbered 2053, 3155^ and 5566shall remain In f u l l force andeffect . Oounty not to divert any portion of theproceeds of saldbonds to any other use or purpose.

In Lipscomb Oounty wlthreferencotoMlnute No. 5351, In vlewof tho fact that State HighwayNo. 4 aslocatod crosses the Southwest corner of Lipscomb Oounty for adistance of four miles, andthat no towns are served by this highway route, and due to the further fact that Lipscomb Oounty Is without funds to purchase right-of-way and also that th is constitutes, or w i l l constitute, agap on StateHlghwayNo. 4, an appropriation of $4000.00 Is hereby made to cover thepurchase of right-of-way andthe necessary fencing on this highway, the right-of-way t o b e n o t less than 100 feet in width andonalocationapprovedby the State Highway Enginee Any money paid for right-of-way on State HighwayNo. 4 shall be deducted fromthe appropriationof State money to Lipscomb Oounty on StateHighway No.117.

In Williamson Oounty, StateHlghwayNo. 104 Ishereby extended from Georgetown west to aconnectlon with State HighwayNo. 29, ad is tanceof 11.2 miles, at the most practicable and convenient point, th is designation beingmade with theunderstandlng that Williamson Oounty w i l l furnish f u l l y fenced not less thanalOO f t . right-of-way onlocation approvedby the StateHighway Engineer; a n d w l l l , Inadd l t lon , furnish suitable inter* sectlonrlght-of-way where this designation intersects HighwayNo. 29. T^a Stato Highway Engineer is dlrectedto make an estimate fo r the construction of Unit 1, with the exception of the San Gabriel Hridge InGeorgetown whlchwl l l boused for tho present, but right-of-way Is to be obtalnedon the approved location to an intersection with StateHlghwayNo. 2.

In LlveOak Oounty, In thehear lngof Gage Eros, fo r additional com­pensation on the project between George West and the Live Oak Oounty Line, the additional compensation Is declinedas the p r l c e b l d fo r excavation includedall classes; furthermore, claimants allege that additional com­pensation was paldon theproject north of George West under similar con­dit ions. In th is case, i t appears that the price for excavation was 15 cents and!6 centsper cubic yard, while the Gage Brothers* contract was 23 cents. I f theyardage claimed as earth by GageHros. Is f ixed at s ix­teen cents, the balance would show more than seventy-five cents per cubic yard to arrive at anaverageprlce of 23 cents.

In Lubbock Oounty an Increaseapproprlatlonof $2,165.07 Stato Funds Is hereby made to be expendedunderthe direction of the State Highway En- Linear through the OonstructlonDlvlslon on State HighwayNo. 137 S.P. ^o. 716-H from Lubbock to Hockley Gounty Line, adistance of 12.692 miles for the constructlonof Grading and Drainage Structures, on conditionthat saidcounty w i l l furnish $3,299.14for such Improvement. This appropriation is inadd l t lon to MlnuteNo. 4630 and is reouiredtopay f i n a l estimate ^ndpreliminary engineering incurred Marchls t . 1927.

A.F.E.D32-357

Page 28: 2!) - Texas Department of Transportation

6017

6016

6019

6020

6021

6022

6023

^

May 26*1932

InLynnCountytheStateHighwayEngine^r isauthroizedanddirect -ed topreparep lansandspec i f ica t ionsfor constructionof gradingand drainage structures on Highway No. 9 from Lubbock CountyLinetoDawson County Line, adistance of approximately 30.6 miles, contingent upon the County furnishing, f u l l y fenced* suchright-of-way asmay be requirodto benot lees thaniOO f^et i n w i d t h on locationapprovedby the State HighwayEngineer, wi th the further understanding that when funds area-vai lablethe Oounty w i l l furnish i t s p r o rata share of the total con­struction cost, which Is 33 1^3$.

In Mason Oounty* I t Is orderedthat the Oommlsslon approve the repor dated February 27* 1932* of the Division Engineer In accepting thecontra of CageHros., as helng sat isfactori ly completed onF.A.P. 17-Heop. High­wayNo. 9 said workbeinghereby acceptedhy the Oommlsslon, andthat said contractor, hepald a l l monies due on the f i n a l estimate.

In McCulloch Oounty an i n i t i a l appropriation of $79,640.34 State and Federal Funds Is herehy made to he expendedunderthe direction of the State Highway Engineer throughthe Construction Division on State Highway No. 9, F.A.P. 223-Peopenedand419-Heopenedadistance of 1.212 miles* f o r the construction of San Saha Hiver Hridge consisting of 1-160* Steel Span, 6-62' Steel LDDeam Spans,concrete f l o o r slabs, 12-26*-6" concrete deck girder spans* concretepiers, bents and abutments and roadway ap­proaches ^n conditionthat said county w i l l furnish such right-of-way as maybe required, to benot less thaniOO f t . i nwid th , fencing to bedone by the Oounty; wlththeunderstandlng that when funds are available McCulloch County w i l l furnish I t s share of the cost of thisbridgeprojec^s which share Is one-third. A.F.E.-32-366

In McLennan County, I t Is ordered that the Commission oprove the re­port dated Apri l 16, 1932, of the Division Engineer In accepting the con­tract of Dr. F.P. Jonesasbeing sat is factor i ly completedonF.A.P.No. 622-A Highway No. 44 saidworkbeinghoreby acceptedby the Commi^ion* andthat said contractor bepaid a l l monies due onthe f i n a l estimate.

In McLennan County on State Highway No. 67 i t is ordered by the highway Commission upon the rocommendation of the Claims Committee, that theL . H. Lacy Company bepaid the sumof $3160.67 on S.P. 696-A-2on account of additional work, due to flooding the bridge s i te , by the clos­ing o f t h e gates of the dam, which required the contractor^reorganizehis ^orkat an additional expense audioes of materials. Thi^ order is not intended as anadmission that the City of Waco is not responsible for ^his damage.

In McLennan Countyan increaseappropriationof $6*224.71 StateFunds is hereby made to be expendedunder the direction of the State Highway En Linear throughthe Construction Divisionon StateHlghwayNo. 2F.A.P. No. 614-AfromWaco to 2.0 miles nor thof Druceville, adistance of 14.69 miles, fo r the construction of Grading andDrainage Structures on con­di t ion that saidcounty w i l l fumish$624.96 for such improvement. This appropriationis subject to conditions of MinutesNo. 3120 and 3297.

A.F.E.D32369

In McLennan County, since thecounty hasbeenunable to dispose of i bonds at a reasonable price, and since conditions require the immediate construction of this project, the State Highway Department agrees to ad­vance such County funds asnecessary and proceedwith the construction of ConcretePavement on F.A.P. 606-AandS.P. 943-A, extending fromWaco northeast to t h e H i l l CountyDIne, ad is tanceof 13.329 miles onHighway No. 31. This construction ^ estimatedto cost $202,667.16, andone-hal^ State ^nd Federal iunds are hereby a l lo t ted fo r such construction with th^ understanding and agreement on the part of McLennan County that sufficient bonds w i l l bo placed in escrow to cover one-half of the cost, that neither saldbonds nor theproceeds therefrom shall be directedto any other use orpuspose, andthat McLennan County shall convert said bonds into cash, i f so orderedby the Commission, and reimburse the State Highway Department wi ththe County's pro rata share of the actual construction cost. This minute is subject to the provisions of Minutesl l62and 3000.

Page 29: 2!) - Texas Department of Transportation

8024

8026

8028

8027

8028

83

May28, 1932

DuMcDennan Oounty, since the Oounty hasbeenunable to dispose of I t s bonus at a reasonable price, and since conditions require tbe 1m-mediate construction of th is project, tbe StateHighway Department agrees to advance sucb Oounty funds asnecessary andproceed with the Constmct-^ Ion of Cradingand Drainage Structures onF,A,B. No, 323DReopened, extends Ing f romthe Ooryell Oounty Dine to apo ln t 6,6mlles northeast of Mc­Gregor, ad is tanceof 11,470 miles onHighwayNo, 7, This construction Is estlmatedto cost $83,739.96and60$ Stateand Federal Funds arehere-by a l l o t t o d f o r such construction with theunderstandlng and agreement on thepart of McDennan Oounty that suff ic ient bonds w i l l be placed In escrow to cover one-half of the cost, that neither saldbonds nor the proceeds therefrom shall be dlrectedto any other use or purpose, and that McDennan Oounty shall convert said bonds Into cash, I f so ordered by the Oommlsslon, and reimburse the State Highway Department with the County's pro rata share o f t h e actual construction cost. This minute Is subject to theprovlslons of Minutes 1182 and 3000,

Dn Montague Oounty, the StateHighway Engineer Is authorized and directed to make a loca t lon on State HighwayNo, 2 from the R d River Hridge project to the town of Bowls and to prepare plans and specifications for the construction of this road; conditioned that Montague Oounty w i l l furnlshnot less thanalOO f t , right-of-way on locationapprovedby the StateHighway Engineer and also Montague Oounty to furnlshnot less than alOO f t , right-of-way on State HighwayNo, 6 across that Oounty, The StateHighway Engineer Is authorized and directed to enter Into negotia­tions with theM-K-THallroadand theRock Inland Rallroadforgrade separations on StateHlghwayNos, 6 and 2 a t or near Ringgold, The State HIghwayEnglneer is directed to take t h i ^ matter up with o f f i c i a l s of Montague Oounty with a view to getting these projects under way.

In Nacogdoches Oounty an I n i t i a l appropriationof $176,337,98 State

^ ^ ^ ^ ^ ^ way^No, ^8^ from Intersectlon^lthB^gnway^o, 21 near Nacogdoches to Attoyac River, adistance of 16,43mlles, for grading and structures on newlocatlon from Attoyac River west 2,6 miles, widening roadbed and re­building bridges fromthat point to Intersection with HighwayNo, 21 near Nacogdoches, and local gravel base andDoubleBltumlnous Surface Treat­ment on both sections. This appropriationheingmade fo r Betterment Work JobNo, M-ll-0-4 andon condition that county w i l l furnish such r ight-of-way asmay be required to be no t ices t h a n l O O f t , I nwid th , fencing to by doneby the Oounty, A,F,E,-32-380

In Nacogdoches Oounty an i n i t i a l appropriation of $138,0l8,62State Funds Is hereby made to be expendedunder tho direction of the State Hlgh^ way Engineer through theMalntenanceDlvlslonon StateHlghwayNo, 21, from west c i t y l imi t s of Nacogdoches to Angelina Rlv^r, a distance of 18,Smiles for widening roadbed, small bridges and culverts, resurfacing wl th loca l IronOre Gravel andDoubleBltumlnous Surface Treatment, This appropriation beingmade for Betterment Work, JobNo, M-ll-B-4 and on conD] dl t lon that saidcounty w i l l furnish such right-of-way as maybe required to benot less thaniOO f t , Inwid th , fencing to be done by the Oounty,

A,F,E.-32D381

In Navarro Oounty an I n i t i a l appropriationof $2,177,70 State Funds Is hereby made tobe expendedunderthe direction of the State Highway ^Engineer through the Maintenance Divis ionon State HighwayNo, 14between Oorslcanaand the E l l i s CountyDIne for Triple Bituminous Surface Treat-m^nt on Chambers Creek Brldgesand Briar Creek Bridge, This appropriation beingmade forBotterment Work, JobNo, M-l8DE-3and on conditionthat said County w i l l furnish suchrlght-of-way asmay be requl red tobenot less thaniOO f t , I nwid th , fencing tobe doneby the County,

A,F,E^33D382

Page 30: 2!) - Texas Department of Transportation

6029

6030

6031

6032

6033

6034

^

M^ 26, 1932 said Oounty

In Ochiltree Oounty^avlng votedbonds for tho construction of Stat^ Highways of that Oounty, and unit 1 havlngbeen completedon State High-way 117 from theHansford OonntyLlne to Perryton, a distance of ISmlle^ and in view o f t h e fact that Unit 1 andUhlt 11 on State HighwayNo. 4 nor thof Perrytonare to he constructed j o i n t l y due to local conditions and the fact that very l l t t l e g r a d l n g w i l l he required, the StateHighway Engineer Is authorized to proceedwlththe preparation of plans for Unit 11 fromthe Hansford Oounty Line to PerrytonandHnlt 1 andHnlt 11 on StateHlghwayNo. 4 f romPer ry ton t^ the Oklahoma Line, thecondltlon of this order helng that Ochiltree Oounty w i l l furnish, free of cost to the State, any necessary right-of-way, to he not less thaniOO feet wide, on alocatlonapprovedby the State Highway Engineer on State High­wayNo. 4 n o r t h o f Perryton. Inylew of the fact that there is nomarket at this time for Oounty honds, Ochiltree Oounty is to place In escrow, or In trust as may he required, a s u f f l c l e n t number of honds to cover the i r shar^ of the cost of this Improvement, and that said Oounty w i l l agree to convert saldhonds Intocashwhen requiredby the State Highway Oom­mlsslon. Thlsorder Is not tohecome effective u n t i l Ochiltree County's honds haveheenapprovedhy the Attorney General.

In Nueces Oounty, I t Is orderedthat alocatlonhemade and plans pre­pared f o r U n l t 1 on State Highway No. 126from0alallentoHobstownand to advertise for hids for suchconstructlon, on condition thatNueces Oounty furnlshnot less than 100ft. right-of-way on location approvedhy the State HIghwayEnglneer; and inadd l t lon theretoput In trust Nueces Oountyhonds to the extent of f i f t y percent of the cost of such construc­t i o n .

In Nueces Oounty, the offer of said county to furnish right-of-way o^ theapprovedlocatlonof StateHlghwayNo. 9 f r o m t h e SanPatricio Oounty Line to the point wher^ saldlocatlon Intersects the present Oalallen Head Is acceptable at this time; andthe StateHighway Engineer Is direct ed to carry out this order whenrlght-of-way has heen securedon State HighwayNo. 9, the matter of continuing Into the c i ty to he takenup at a l a t e r date.

In Parker Oounty an I n i t i a l appropriationof $4,669.66 StatePunds Is herehy made to he expendedunder the direction of the State Highway Engineer throughtheMalntenance Division on State HighwayNo. 69 from West edge of Weatherford to Parker-Palo Pinto Oounty Line, adistance of 17.13mlles for clearing and gruhhlng right-of-way. No.right-of-way is required as Hlght-of-way is to hefumlshedon S.P. 176-A. This approp­riationheingmade forHetterment Work, JobNo. M-2-1-4.

A.P.E.-32D363 ^

InParmer Oounty, the StateHighway Engineer Is authorized and dlrec ed to prepare plans and specifications fo r the construction of grading and drainage structures onHighwayNo. 33 fromParwell to the Oastro Oounty Line, adistance of approximately 36mlles, andon State Highways from Parwell to the Halley Oounty Line, a distance of approximately 6 ml l i s ; contingent upon the Oounty furnishing, f u l l y fenced, such right-of-way as may he required, to he not less thaniOO feet Inwid th on location t o h e approvedby the State Highway Engineer; wi th the further understanding that when funds are available the Oounty w i l l furnish i t s p r o rata share o f t h e to ta l construction cost, which Is 33 1^3$. I t Is orderedthat no part of either hlghwaybe submitted to bids for grading anddralnage structures u n t i l right-of-way hasbeen secured onboth highways.

In Pecos Oounty, since Oounty funds are not Immediately available, and since conditions require the Immediate construction of Gradingand Drainage Structures onHighwayNo. 27, P.A.P. No. 616-D, extendlngfrom the endof P.A.P.No. 616-0, apolnt approximately 39mllesEast of Pt. Stockton, to the beginning of P.A.P. No. 616-E, apoln t approximately 21 ^nlleswest of Sheffield, adistance of 10.992 miles, tho Department agreed

Page 31: 2!) - Texas Department of Transportation

81

May 28, 1932

Continued;

to advance such County funds as necessary andto proceed withconstruot-ion withtheunderstandingand agreement on the part of saidCounty that i t w i l l enter into anagreement with the State Highway Department pro­v l d l n g f o r thepa^^ment of the County's one-third share o f t h e actual construction cost, and that payment w i l l he made as soonas thecondit io^ of tbe County depository w i l l permit, This construction is estimated to cost $63,125,73, and Stateand Pederal funds in theamount of $35,417^5 are herehy al lot ted to cover the Departments two-thirds share o f t h e co^t,

InPot ter County, i t is orderedthat the Commission approve the re­port dated March 15, 1932, of t h e D i s t r i c t Hesident Engineer inacceptin the contract of Earl W, Bakers Co,, asbeing sa t is fac tor i ly completed onP,A,P, 585-A, HighwayNo, 5 saidworkbeinghoreby acceptedby the Commission, and that said Contractor, be paid a l l monies due on the fina^ estimate.

In Presidio County, i t i s ordered that the Commission approve the report dated May 14, 1932, of t h e D i s t r i c t Hesident Engineer inaccept-ing the contract of Allhands^Davis as being sat isfactor i ly completed onS,P, 970-B HighwayNo, 17, said workbeinghereby acceptedby the Commission, and that said contractor be paid a l l monies due on the f i n a l estimate.

In Presidio County, an i n i t i a l appropriation of $24,378,01 State funds is hereby made to be expendedunderthe direction of the State HighwayEngineer through the ConstructionDivision on StateHlghwayNo, 17, S,P,No, 970-D, extending from Ochoa Head SouthtoPresidio, a d i s ­tance of 13,951miles, f o r theconstruction of Grading and Small Drainage Structures, oncondition that said county w i l l fumish$24,378,00 fo r s u h improvement and suchright-of-way asmay be reouired, fencing t obe done by the County, andwith the further understanding that shouldthe cost of improvement exceed the foregoing estimate. Presidio County shall f u r -ish i t s proportionate share of the additional cost, which is one-half. This minute is subject to theprpvisions of MlnuteNo, 2489,dated Peb­ruary 24, 1930, A.P,E,-32-384

In Heagan County, since County funds are not immediately available, ^nd since conditions require the immediate construction of Caliche and Water-Hound Broken Stone MacadamBase Courses andBituminous Surface Treatment onHighwayNo, 99, S,P,No, 904-A, extending from theHpton CountyBine toBigBake, adistance of 18,578 miles, theDepartment agrees to advance such County funds as necessary and to proceedwith sta^e construction with theunderstanding and agreement on the part of said County that i t w i l l enter into an agreement with the State Highway Depart ment provld lngfor the payment of the County's one-half share of the actual construction cost, andthat payment w i l l bemade as soon as the condition o f t h e County depository w i l l permit. This constructionis estimatedto cost $122,307,97, andState funds i n t h e amount of $81,153,99 arehereby a l l o t t e d t o cover theDepartment*s one-half share of the cost, Thisminute is subject to the provisions of MlnuteNo, 2284, dated Docemberl8, 1929,

In Heagan Countyan increase appropriation of $2,418,12 StatePunds ishereby made tobe expendedunderthe direction of^he StateHighway Engineer throughtheConstruction Divisionon State Highway No, 99, S,P, No, 904-B from Big Bake to IrionCounty Bine, adistance of 11,885 miles, f o r t hecons t ruc t i ono f Gradingand Drainage Structures oncondition tha^ saidcounty w i l l furnish $2,418,12 for s^chimprovement. This additional appropriationbeingrepuired to pay overruns,

A,P,E,-32-385

Page 32: 2!) - Texas Department of Transportation

6040

6041

6043

6043

6044

6045

8S

May 23, 1932

In Liberty County i t i s ordered by the Commission that i n view of the d i f f i c u l t i e s existing i n the town of Cleveland in the matter of the underpass with the Sante Fe R. R. which for the present at least seems to block the further construction or improvement of Highway #35 through said town on the new location, that the State Highway Engineer is direct-} ed to bring Highway #35 to Cleveland on the present location and continuj use of same on Second Street and across the present grade crossing u n t i l the situation can be cleared up.

In Red River and Franklin Counties an i n i t i a l appropriation of $2,637,51 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No, 49, from South end of Trent Lake Bridge to Titus County Line a distance of 5,169 f t , f o r Double Bituminous Surface Treatment, This appropriation being made fo r Betterment Work, Job Ho, M-l-A-7 and with­out right-of-way requirements, as right-of-way was furnished on previous job. . A.P.E.-32-366

In Reeves County» i t is ordered that the Commission approve the re­port dated A p r i l 4, 1932, of the Division Engineer in accepting the con­tract of J . S, Harrison Const, Co. as being sat isfactor i ly completed on F.A.P. 607-D Highway No. 17 said work being hereby accpeted by the com­mission, and that said contractor be paid a l l monies due on the f i n a l estimate,

In Reeves County, an i n i t i a l appropriation of $38,117,87 State and Federal Funds ia hereby raede to be expended under the direction of the State Highway Engineer through the Construction Division on Stste Highway No, 27, P.A.P. No. 408-3, Section 1, a section of 7,370 miles i n length, extending from a point 4,0 miles south of an intersection with Highway No, 1 to a point 4,5 miles north of Toyahvale, with the exception of a section of 4,755 miles in length which extends into Je f f Davis County, f o r the construction of Grading and Drainage Structures, on condition that said county w i l l furnish such right-of-way as may be required, fencing to be done by the County, and with the further understanding that when funds become available, Reeves County shall reimburse the State Highway Department to the extent of one-third the actual cost of con­struction, A.F.E.-32-S67

In Reeves County an i n i t i a l appropriation of $81,980.17 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 1, from Ward-Reeves County Line to Reeves - J e f f Davis County Line a distance of 44.44 miles fo r widening roadway from 26 to 34 f t . f la t tening slopes, widening base 6 f t . and widening asphalt surface from 16 to 20 fee t . This appropriation being made for Betterment Work, Job No. M-6-T-3 and on condition that said county w i l l furnish such right-of-way as may be required to be not less than 100 f t . in width, fencing to be done by the County. A.F.E.-32-368

In Roberts County, since County funds are not immediately available, and since conditions require the immediate construction of Concrete Pave­ment on Highway No, 33, F.A.P. No. 625-B, extending from the Gray County Line to the Hemphill County Line, a distance of 14,131 miles, the Depart ment agrees to advance such County funds as necessary and to proceed with] construction with the understanding and agreement on the part of said County that i t w i l l enter into an agreement with the State Highway Depart ment providing fo r the payment ofthe County's one-third share of the actu i l construction cost, and that payment w i l l be made as soon as the condition of the County depository w i l l permit. This construction is estimated to cost $255,096.67, and State and Federal Funds in tho amount of $170,064.4]: are hereby a l lo t ted to cover the Department * s two-thirds share of the cos

the

Page 33: 2!) - Texas Department of Transportation

8046

6047

6046

6049

6050

6051

6052

^

May 28, 1932

la San Augustine Oounty, on State HighwayNo. 21, I t Is ordered tha^ surveysandplansbemade from Nacogdoches County Line to San Augustine f o r a similar type road a has beon authorlzedon saldhlghway In Nacogdoches Oounty; provided that material Is found that w i l l make such an Imporvement economical. Should thlshe the case, the StateHighway Engineer Is authorized to proceedwith th is work through theMaintenance Department, provided San Augustine Oounty w i l l furnish not less thana 100 f t . right-of-way on the approved location.

I t Is orderedhy the Oommlsslon that Mlnute#4861, dated September 23rd, 1^31 he amendedto readasfol lows;

In San Jacinto Oounty an I n i t i a l a p p r o p r i a t i o n o f $26,704.34 State Funds 1 herehy made to he expendedunderthe direction of the State HIghwayEnglneer through the ConstructlonBlvlslon on StateHighway #150, S.P. 682-AD extending fromOoldsprlng to Sheppard, ad is tanceof 11.105 miles, f o r the constructlonof Gravel Surface Oourse. This appropriation ismade inaccordance wlthMlnuteNo. 3156 datedAugust 1st. 1930 which states that San Jacinto Oounty w i l l not he reouired to furnish any funds fo r this construction. A.F.E.-32-369

In San Jacinto Oounty an I n i t i a l appropriationof $9,316.95 State Funds Is herehy made to he expendedunder the direction of the State HIghwayEnglneer throughthe MalntenanceBlvlslon on StateHlghwayNo. 4 fromWalker-San Jacinto Oounty Line to Point Blank, ad is tanceof 7.76 miles forhaul lngandplac lng 6" SandOlay. This approprlatlonbelng made forBotterment Work, Joh No. M-ll-0-4 without right-of-way require­ments. A.F.E.-32-370

InSan Patricio Oounty an Increase appropriation of $13.67 State Funds Isherehy made to he expendedunder the direction of the StateHlgh^. way Engineer throughthe Construction Division on StateHlghwayNo. 126 S.P.No. 791-0 wl th ln the town of Sinton, ad is tanceof 1.222 miles, f o r the constructlonof Grading, Drainage Structures andTwo CourseLlmoston^ Hock Asphalt on CalicheBase, on condition that saidcounty w i l l furnish $1,790.10 fo r such Improvement. This additional appropriation Is required to pay f i n a l estimate and Is supplemental to Minutes No. 4696 andNo. 2406. A.F.E.-32-371

I t i s ordered bythe Commission that the appropriation of $48,098.19 State Funds made In Minute No. 5594 to S.P. 886-G^h^San Patricia Gounty he cancelled for the reason that suff ic ient funds were previously approp­riated In Minute No. 5062, October 21st. 1931.

In Scurry Gounty, on StateHlghwayNo. 7, the State HIghwayEnglneer Is authorlzedanddlrectedto prepareplans and specifications fo r const­ruction of grading and drainage structures and reconstruction of thepre -sent asphalt surface; contingent upon the county furnishing, f u l l y fenced such right-of-way asmaybe required, to benot less thaniOO f t . In wldthonlocat lon tobe approvedby the StateHighway Engineers wi th the further understanding that whenfundsareavallable the county w i l l furnish I t s p r o rata share o f t h e to ta l construction cost, whichis 33 1^3$. I t Is ordered that no part of thehighway be submitted to bids for grading and drainage s t ructuresunt l l right-of-way has been secured.

In Shelby Gounty an I n i t i a l appropriationof $16,762.96 State Funds ishereby made to b^ expendedunder the direction of the State Highway Engineer through theMaintenance Division on State HighwayNo. 6, a dis­tance of 601 f t . or 0.113 mile fo r constructlngaBrldgeacross^enaha Bayoubetween Center and the San Augustine CountyLlno, 5.52 miles south of Santa FeHallroadtracks at Center. This approprlatlonbelng madofor Betterment Work, JobNo. M-l l -L-4andon conditionthat saidcounty w i l l furnish such right-of-way as maybe required t o b e n o t less thaniOO f t . i nwid th , fencing to be doneby the County.

A.F.E.-32-372^

In Sherman County on StateHlghwayNo. 9, fromthe Mqqre CountyLlno to Stratford, an appropriation of $11,906.00 Is hereby made to apply on theconstruct ionof bridges ontheabove section, the condltlonof t h i s order beln^that ShormanCounty shall furnish not les^ thanlOOfe^t of right-of-way onlocatlonapprov^dby t^e StateHighway Engineer and shall

gradethe highway underthe direction of t h e D i s t r i c t BesldentEnglneer ^nd to h^s ^a t l^ f^o t i^n .

Page 34: 2!) - Texas Department of Transportation

6054

6055

6056

6057

6058

6059

9i May 28, 1932

In. Smith Cotmty an increase appropriation of $11,820.00 State Funds is hereby made to be expended under the directionof the State Highway Engineer through the Maintenance Division on State Highway Ho. 31 &64 , a distance of 19.7 miles to complete work authorized under Minute #5600 and covering widening roadbed and structures on the Browning road to be used as detour fo r Highways 31 and 64 from Tyler to Kilgore. This approp|> r i a t ion being made for Betterment Work, Job No. M-10-T-6. This approp­r ia t ion made with understanding that Smith County w i l l furnish for this additional improvement the sum of $11,820.00.

A. F.E.-32-37 5

I t is ordered by the Commission that a special appropriation be made in the amount of $2,000.00 to cover the cost of making repairs to the Heches Biver Bridge on Highway No. 64, between the Counties of Smith and Van Zandt, Division No. 10, for the replacing of three damaged girders and dressing up of certain burned portions caused by the collision of two gasoline trucks and the f i r e damage caused by same which occurred on Apr! 4th, This work is to be performed under the supervision of the Maintenance Division by maintenance forces.

A. F.E—32-374

In Stonewall County, an i n i t i a l appropriation of $72,938.61 State funds is hereby made to be expended under the direction of the State Higty, way Engineer through the Construction Division on State Highway No. 4, S.P. No. 854-F, extending from Aspermont to the King County Line, a dis­tance of 17.633 miles, f o r the construction of Grading and Drainage Struoj tures on condition that said County w i l l furnish such right-of-way as may be required, fencing to be done by the County, and with the further under4 standing that when funds become available, Stonewall County shall reim­burse the State Highway Department to the extent of one-third the actual cost of construction. This minute is subject to the provisions of Minute Ho* 1767, dated June 26th, 1929,

In Stonewall County, the State Highway Engineer is authorized to pro­ceed with surveys, the preparation of plans, and award of contract fo r th* construction of Grading and Drainage Structures, on Highway No. 18, from the Haskell Gounty Line to Aspermont, on condition that the County furnist such right-of-way as may be required, to be not less than 100 feet i n aldth, fencing to b e done by the County, and with the further understand­ing that when funds become available, Stonewall County shall reimburse the State Highway Department to the extent of one-third the actual cost of construction.

In Stonewall County an i n i t i a l appropriation of $1,019.40 State Fundi Is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance; Division on State Highway No. 4, from 540 f t . north of S & NW M i l way in Aspermont to Stonewall-Fisher County jine, a distance of 13.592 miles for Roadway Maintenance fo r f i sca l year aiding August 31, 1932, and the State Highway Engineer is instructed to :ake this section of road over for maintenance inasmuch as a l l conditions Imposed i n th is designation have been complied with. This appropriation )eing made f o r General Maintenance Budget, M-8-K-4.

A.F.E.-52-375

In Sutton County, since the County has been unable to dispose of i t s bonds at a reasonable price, and since conditions require the immediate construction of t h i s project , the State Highway Department agrees to ad­vance such County funds as necessary and proceed with the construction of Grading and Drainage structures on F.A.P. 617-B & C, extending from the Crockett County Line to Sonora, a distance of 20.998 miles on Highway No. 27, This construction is estimated to cost $173,791.98 a n d two-third^ State and Federal funds are hereby a l lo t ted for such construction with the understanding and agreement on the part of Sutton County that s u f f i c ­ient bonds w i l l be placed in escrow to cover the County's one-third share of the cost, that neither said bonds nor the proceeds therefrom shall be directed to any other use or purpose, and that Sutton County shall conver said bonds into cash, i f so ordered by the Commission, and reimburse the State Highway Department with the County's pro rata share of the actual construction cost.

Page 35: 2!) - Texas Department of Transportation

96

May 28,1932

In Tarrant Oounty, the StateHighway Engineer Is herehy authorized to proceedwiththo construction of OoncretePavement on S.P. No. 774-0* HighwayNo. 121, extending f romapo in t I . I m i l e s east of Grapevine to theD^llas OountyLine, ad is tanceof 2.972mi1es, on condition that Tarrant Oounty pay the entire ooot of construction. Thisminuto Is supplementary to MlnuteNo. 862,datedSeptember19* 1928.

In Terry Oounty. I t Is ordered that the section of Highway No. 137 fromBrownfield to theGaines Oounty Linebe Included I n t h e order pre­viously passed for the section from Brownfieldto theHockley Oounty Line^

In Titus Oounty* I t Is ordered that the Oommlsslon approve the repo^ dated March18th, 1932* of theDivisionEngineer i ^ accepting the contra^ of J . D. Georgeas helng sat isfactor i ly completed OnF,A.P. No. 227-Beop. HighwayNo. 49 saidworkbeinghoreby acceptedhy tho Oommlsslon* and ^hat ^a idcon t r ac to rbapa ida l l monies due on the f i n a l estimate.

In Tom Green Oounty. In regard to the Oounty*s proposal to vote a hond Issue fo r the construction of Highway No. 70 from San Angelo to the Ooke Gounty Line* adistance of approximately 13 miles* the StateHighway Oommlsslon agrees that I f saidOounty w i l l fum^sh$76,000.00 n e t f o r construction* and In addition thereto fenced right-of-way of not less thaniOO feet In width, onlocatlonapproved hy the State HighwayEngineer theStateHighway Department w i l l supplement Oounty funds in such amount as necessary and complete th is highway.

InTravis Oounty an i n i t i a l appropriation of $2*378.37 StateFunds sherehymade to he expendedunder the direction of the State Highway

engineer through theMaintenance Division on StateHlghwayNo. 2, from Austin Oi tyLimits to apo in t Smilesnor th , adistance of 3miles fo r Sealingcracks i n rock asphalt surface. This appropriationheingmade for Betterment Work* JobNo. M-14-K-6 without right-of-way requirements.

A.F.E.-32-378

InTr^y^Oountyan increase appropriationof $6*000.OOStateFunds isherehy made tohe expendedunder the d i rec t ionof the StateHighway engineer through theMaintenanceDivision on StateHlghwayNo. 2* 20* 29 ^ 71* fromAustin Oity Limits to three miles out* adistance of 18 miles ^or heavy patchingof surface and fo r testing of newmaterialsonthe road ^his appropriationheingmade f o r General MaintenanceBudget.

A.E,E.-32-377^

In Tyler Gounty an increase appropriationof $169.88 Stateand Federal Funds is herehy made tohe expendedunder the direction of the StateHighway Engineer throughtheOonstruction Division on StateHighway No. 40* F.A.P. No. 808-0 fromNeches Hiver Bridge to Oolmesniel* a d i s ­tanceof 8.289mi1es* fo r theconstruction of Gradingand Brainage Structures.* on condition that saidcounty w i l l furnish $79.84 for suoh improvements This additional appropriation is requiredfor the reason that^he allottment of n^undsmade inMinute 6777 wasbasedonabidwhich was not accepted. A.F.E.D32-378

In Tyler Oounty i t is orderedhy the Oommlsslon that the following appropriation hemade as an amendment to and is to supersedeMinuteNo. 4888, dated September 23rd. 1931 and MlnuteNo. 6148* dated December 1st 1931, F.A.P. 830-A and F.A.P. 830-0, fo r the reasonthat thesetwo projects in accordance with theBureauof Public Beads request have been combinedandmado oneproject:

^InTy^er Oounty an i n i t i a l appropriation of $88*223.14 State andFed­eral Funds is hereby made to be expendedunder thedl rec t lon of the State highway Engineer, through the OonstructionDivision onState HighwayNo. ^0* F.A.P. 830-A ^Formerly 830-A^ 0^* fromBardlnOountyLine t o H i l l e s t ^ r

distanceof 10.434 miles^br theconstruct ionof the Grading, Drainage structures and Bridges over Hickory and Oypress Greeks, on condition that ^yler Gounty w i l l furbish $33,311.67 for such improvement, and such rights ^f-way asmay be required to benot less thaniOO feet* fencing to bedon^ ^y the Gounty; andwiththo further understanding that should the cost of improvement exceed the foregoing estimate Tyler Oounty w i l l furnish i t s

proportionate share of the additional cost, which is one-third. This minute is subject top rov i s ionsof MlnuteNo. 2829,dated March 18* 1930.

A.F.E.-32-379

Page 36: 2!) - Texas Department of Transportation

9V

6068

6069

6070

6071

6072

6073

6074

6075

May 28, 1932

I n Uvalde County an i n i t i a l appropriation of $1,155,00 State Funds i s hereby made to be expended under the d i r e c t i o n of the State Highway Engineer through the Maintenance Div i s ion on State Highway No, 3 between Medina County Line and Uvalde f o r approaches to Dry Frio River Bridge. This appropriation being made f o r Betterment Work, Job No. M-22-B and without r ight-of-way requirements.

A.F.E.-32-380

I t i s ordered by the Commission that the sum of $145,45 be paid to Central B i t u l i t h i c Company on t h e i r claim f o r addi t ional compensation o f F.A.P. 363-A-I I , Highway 15 in Van .Zandt County; on account of the i n ­creased cost due to the f a c t that the pavement was opened to t r a f f i c by order of the State before the pavement had been en t i r e ly completed. This payment was recommended by the Div i s ion Engineer and the Committee on Claims.

I t i s ordered by the Commission that the sum of three thousand three hundred do l la rs ($3,300.00) be appropriated f o r the purpose of paying f o r the pavement of the gap on F.A.P. 551-J, Highway 12, j u s t west of V i c t o r i a , i n V i c t o r i a County.

In Walker County an i n i t i a l appropriat ion of $8,709.15 State Funds i s hereby made to be expended under the d i r e c t i o n of the State Highway Engineer through the Maintenance Div is ion on Stato Highway No, 45, from Phelps Spur to San Jacinto-Walker County Line , a distance o f 7.23 miles f o r hauling and placing 8" Sand-Clay. This appropriation being made f o r Betterment Work, Job No, M-17-F-4 without r ight-of-way requirements,

A.F.E.-32-381

I n Wilbarger County an appropriation of $1,500 State Funds is hereby made f o r p lac ing Gravel surface on .9 mile detour f o r Highway No,5, ju s t south of present underpass s tructure on FW & DC Railway. ,This approp­r i a t i o n i s made on condit ion that Wilbarger County f u r n i s h 100 f t . o f r igh t -o f -way , fencing to be done by the County, and do a l l necessary earth work and grading on t h i s section of road, and f u r n i s h a l l g rave l .

A.F.E.-32-382

I n Williamson County an increase appropriation of $2,337.50 State Funds i s hereby made to be expended under the d i rec t ion of the State High4 way Engineer through the Maintenance Div i s ion on State Highway No. 104, f o r the construction of a Bridge over a Branch at Jonah, on proper locatidJn. This appropriation being made f o r Betterment Work, Job No. M-14-L-4 and o$ condi t ion that said county w i l l f u rn i sh such r ight-of-way as may be re­quired to be not less than 80 f t , i n width , fencing to be done by the County. A.F.E.-32-383

I n Wilson County an i n i t i a l appropriat ion of $12,839,36 State Funds i s hereby made to be expended under the d i r ec t i on of the State Highway Engineer through the Maintenance Division on State Highway No, 16 from Bexar-Wilson Bounty Line to a point approximately 3 miles south of F l o r e s v i l l e , a distance of 14.940 miles f o r Bituminous Seal Coat, This appropriation being made f o r Betterment Work, Job No. M-15-F-4 without r ight -of -way requirements. A.F.E.-32-384

I n Wilson County an i n i t i a l appropriation of $22,577.43 State funds i s hereby made to be expended under the d i r ec t i on of the State Highway Engineer through the Maintenance Div i s ion on State Highway No, 81 from Bexar County Line to Pandora, a distance o f 26,875 miles f o r Bituminous Seal Coat. This appropriation being mcdm f o r Betterment Work, Job No. M-15-G-4 without r ight-of-way requirements.

A .F .E . - 32-385

Page 37: 2!) - Texas Department of Transportation

99

6076

6077

6078 - ^ A .

vM iV'\

6079

Whereas, i t is deemed advisable that complete plans and specificat be prepared for two sizes of Division Offices and Division Warehouses; and

May 28, 1932

In Wood County an i n i t i a l appropriation of $64,565.49 State Funds is hereby made to be expended under the direction of the State Highway Engin. eer through the Maintenance Division on State Highway No. 37 from a point ten miles south of Wlnnsboro to a point 3.2 miles south of Quitman, a distance of 9.28 miles fo r widening roadbed, revising grade l ine to pro||. vide additional sight distance, and regravelling. This appropriation be­ing made fo r Betterment Work, Job No. M-10-X-6 and on condition that said county w i l l furnish such right-of-way as may be required to be not less than 100 feet in width, with the exception of Section through Quitman which should be 80 f t , wide, fencing to be done by the county.

JWL&&=322386_

Whereas, in the construction of Division Offices and Division Ware­houses, i t i s deemed advisable that these Offices and Warehouses be b u i l t of a standard design; and v

10 IS

Whereas, hids were requested of several Architects for the preparatii n of complete plans and specifications of standard designs of thesestructurfts; and

Whereas, i t appears that the proposition as submitted by Gieseoke & Harris is the most complete and best bid as submitted, their price being #1,107.00, for the preparation of complete plans and specifications for these four structures.

I t is therefore, ordered that the State Highway Engineer be authorized to enter into the contract with this firm forthe preparation of complete plans and specifications for these four types of buildings. This contract is to provide for the payment of $1,107.00 for this work.

I t is further ordered that an appropriation of $1,107.00 is hereby oade to cover the cost of t h i s work, to be paid upon the delivery to this Department, of plans and specifications satisfactory to the State Highway engineer. A.F.E.-33-387

Until the further order of the Commission, i t is hereby declared to be the policy and purpose of the State Highway Commission that eighty-five percent of a l l steel or steel products used in future construction or improvement of Texas highways shall be of American produced steel, where such American steel is available. The State Highway Engineer is hereby directed to at once adopt a practical plan of putting this order into prompt effect.

I t appearing, however, that the State of Texas now has sixteen (16) fabricating concerns engaged in the business of fabricating steel product^ and employing more than five hundred (500) men; and i t further appearing that unless the fabrication of steel products is limited to Texas concern^ that more than four hundred (400) men w i l l be thrown out of employment, i t i s ordered by the Commission that steel that goes into highway con­struction shall be limited to steel actually fabricated in Texas.

I t is ordered by the Commission that $750.00 be appropriated and set aside for uhe purchase of the present county warehouse site in Milam, Texas, said price to include a l l buildings and improvements located therej-on. A.F.E.-32-388 _

Page 38: 2!) - Texas Department of Transportation

6080

6081

6082

6088

101

Bay 28, 1982

I t la ordered by the Oommlsslon that $1,800,00 he appropriated end eet aside f o r the purchase of the present county warehouse site in Log-ot t , Texas, said price to Include a l l buildings and improvements located thereon, A,P,E,-22-289

I t I s ordered by the Oommlsslon that $1,500,00 be appropriated and set aside f o r the purchase of the present county warehouse si te i n Orove^ ton, Texas, said price to Include a l l buildings and Improvements located thereon, A,F,E,-22-890

I t Is ordered by the Oommlsslon that Mr, M, 0, Frederick he em­ployed as Inspector f o r the now State Highway Building, at a salary of $800,00 per month. This Is to be charged against Legislative approp­riations f o r the construction of the bui lding,

i t i s moved by the 8tate Highway Oommlsslon that an appropriation of $1118,60 bo made to cover the purchase of the following eouipment from^ the Linn Motor Oompany, Port Arthur, th is f i r m being the lowest bidder on earned

2 Latest Model Ford Station Wagons P.O.B. Atlanta, Texas Lis t Price 693.00 ea. 1386.00 Discount 60.70 " 121.40 Net Price 1264.60

6084

Less allowance on trade in of the following: 1 Ford A Pickup St&te #3384 Allowance 146.00

NET DIFFERENCE - - - - 1118.60

NOTE:- The "Net Difference" is the amount the Department pays out and covers the price of the new machines, less discount and allowance on the old machine traded i n . A l l bids received are tabulated showing the "Net Difference" price. A.F.E.-32-391-

I t is moved by the State Highway Commission that an appropriation of $4346.60 be made to cover the purchase of the following equipment from the Servis Equipment Company, Dallas, this f i rm being the lowest bidder on same:

2 Servis Model 30 C Power Maintainers powered with L I Case Tractor P. 0. B. Camp Mabry, Texas List Price 3400.00 6800.00

Discount 340.00 680.00 Met Price ~ 6120.00

Less allowance on trade in of the fol lowing: 1 Wehr Pordson Maintainer State # 1104 Allowance 886.70 1 Avery Maintainer " # 1369 " 886.70 1773,40

NET DIFFERENCE — « 4346.60

NOTE: - The "Net Difference" is the amount the Department pays out rurt covers the price of the New Machines, less discount and allowance on the old machines traded i n . A l l bids received are tabulated showing the "Net Difference" price. A.F.E.-32-392

Page 39: 2!) - Texas Department of Transportation

6085

6087

6086

May 28, 1932

I t i n moved "by the State Highway Commission than an appropriation of $4371.80 he made to cover the purchase of the fo l lowing equipment from the Servis Equipment Company, Dallas, t h i s f i r m being the lowest bidder on same:

2 Servis Model 30 C Power Maintainers powered wi th L I Case Tractor P. 0, B. San Angelo, Texas L i s t Price 3400.00 68Q0.00

Discount 340.00 680.00 Net Price 6120.00

Less allowance on trade i n of the f o l l o w i n g : 1 H.P. Maintainer State #1119 Allowance 1 H.P. " " # 1181 "

NET DIPPERMCE - 4571.80

ROTE:- The "Net Difference" i s the amount the Department pays out and covers the p r i ce of the new machines, less discount and allowance on the o l d machines traded i n . A l l bids received are tabulated showing the "Net Difference" p r i c e . A.E.E.-32-393

I t i s moved by the State Highway Commission that an appropriation of $1785.00 be made to cover the purchase of the fo l lowing equipment from the Inman Chevrolet Company of Port Ar thur , t h i s f i r m being the lowest bidder of the same:

3 Latest Model Chevrolet Trucks f . o . b . Beaumont, Texas L i s t Price 895.00 ea, 2685.00 Discount 150.00 " 450.00 Net Price 745.00 "

Less allowance on trade i n of the f o l l o w i n g :

d

874.10 874.10 1748.20

2235.00

1 In ternat ional Truck State #3731 1 " " " #3728 1 » " " #3724

MET DIEFEBMCE

150.00 Ea. 150.00 " 150.00 " 450.00

-1785.00

NOTE:- The "Net Dif ference" i s the amount the Department pays out and covers the cost of the new machines, less discount and allowance on the o l d machines traded o f f . A l l bids received are tabulated showing the "Net Difference" p r i c e . A.F.E.-32-394

I t i s moved by the State Highway Commission that an appropriation o f $9153.49 be made to cover the purchase of the fo l lowing equipment from the Alamo I ron Works, San Antonio, Texas, t h i s f i r m being the lowest bidder on same:

3 Latest Model Mud-Jack Machines del ivered to points as fo l lows :

1 Machine F.O.B. Paris , Texas 3040.29 1 " " Waco, » 3055.72 1 " " San Angelo, Texas 3057.48

TOTAL 9153.49

A.F.E.-32-295

Page 40: 2!) - Texas Department of Transportation

10

May 28, 1932

I t i s moved by the State Highway Commission that an appropr-i - i t ion of $13026,00 be made to cover the purchase of the f o l l o w i n g euipment

rom the Servis Equipment Company, Dallas , t h i s f i r m being the lowest bidder on same:

6 Servis Model 30 C Power Maintainers powered wi th L I Case Tracterr F.O.B. Amar i l lo , Texas L i s t Price 3400,00 20400,OC

Discount 340.00 2040.00 18360.00

Less allowance on trade i n of the f o l l o w i n g :

1 Wehr Pordson Maintainer State # 1384 Allowance 2667,00 1 » " " " # 1350 " 2667,00 5534.00

NET DIFFERENCE . 13026.00

NOTE:- The "Net Dif ference" i s the amount the Department pays out and covers the new machines, less discount and allowance on the old machines tra.ded i n . A l l bids received are tabulated showing the "Net Difference" p r i c e . A.F.E.-32-596

I t i s moved by the State Highway Commission that an appropriation of $4394,20 be made to cover the purchase of the fo l l owing equipment from the Servis Equipment Company, Dallas, t h i s f i r m being the lowest bidder on same:

2 Servis Model 30 C Power Maintainers powered with, L I Case Tractor P.O.B. Lubbock, Texas L i s t Price 3400,00 6800.00

Discount 340.90 680.00 Net Price 6120,00

Less allowance on trade in. o f the f o l l o w i n g : 1 Hol t 10 ton Tractor State # 2237 Allowance

NET DIFFERENCE -

1725.80

- 4094.20

NOTE:-. The "Net Difference" i s the amount the Department pays out and cov­ers the p f i c e of the new machines, less discount and allowance on the o l d machine traded i n . A l l bids received are tabulated showing the "Net Dif ference" p r i c e . A. F.E.-32-397

I t i s moved by the State Highway Commission that an appropriation of $1465,68 be made to cover the purchase o f the fo l l owing equipment from the Glosserman Chevrolet Company, Lockhart, t h i s f i r m being the lowest bidder of the same:

2 Latest Model Chevrolet Pickups, standard equipped P.O.B. San Antonio

1 Latest Model Chevrolet equipped P.O.B. Sen Antonio

i i / ;

Less allowance on trade i no f : 1 Ford Pickup State #3447

L i s t Price 579.00 Ea. Discount 100.00 " Net Price

ton Truck, standard L i s t Price Discount Net Price Total Net Price

Allowance NET DIFFERENCE

1158.00 _200.00

958.00

874.00 300.00 674.00

1632.00

.*6&ga 1465.68

NOTE:- The "Het Dif ference" i s the amount the Department pays out and covers the p r ice of the new machines, less discount and allowance on the o l d machine traded o f f . A l l bids received are tabulated showing the "Net Dif ference" p r i c e . A.E.E.-33-398

Page 41: 2!) - Texas Department of Transportation

6091

6092

6093

Lis t Price 575.00 ea, Discount 110,00 " Net Price 465.00 "

Less allowance on trade in of the following: 1 Ford Pickup State #3440 Allowance 130.00

107

May 2'0| 193

I t is moved by the State Highway Commission that an appropriation of $1,323.00 be made to cover the purchase of the following equipment from the Curtis Norman Company, Brady, this f i rm being the lowest bidder of the same:

3 Latest Model Ford Pickups F.O.B. Uvalde, Texas Lis t Price 547.50 ea. Discount 30.45 " Net Price

Less allowance on trade in of: 1 Ford A Pickup State #3457 less license plates

1,642.50 91.35

1,551.15

228.15 NET DIFFERENCE 1,323.00

NOTE:- The "Net Difference" is the amount the Department pays out and covers the price of the new machines, less discount and allowance on the old machine traded i n . A l l hids received are tabulated showing the "Net Difference" price. A.F.E.-32-399

I t is moved by the State Highway Commission that an appropriation of $2390.00 be made to cover the purchase of the following equipment from the Inraan Chevrolet Company, Port Arthur, this f i rm being the lowest b id­der on same:

6 Latest Model Chevrolet Pickups F.O.B. Beaumont, Texas

1 1

#344* #3442

170.00 100,00

3450.00 660.00

2790.00

400.00

NET DIFFERENCE 2390.00

U0TE:~ The "Net Difference" is the amount the Department pays out and covers the pr ice of the new machines, less discount and allowance on the old machines traded i n . A l l hids received are tabulated showing the "Net Difference" price. A.F.E.-32-400

I t is moved by the State Highway Commission that an appropriation of $1260.00 be made to cover the purchase of the following equipment from the Curtis Norman Company, Brady, Texas, this f i r m being the lowest bidder of the same:

_9U35_ 1551.15

3 Latest Model Ford Pickups, P.O.B. Wichita Falls, Texas Lis t Price 547.50 ea. 1642.50 Discount 30.45 " Net Price

Less allowance on trade-in of the following less license plates

1 Ford Pickup State #3390 Allowance 95.00 ' 1 " " " #3392 " 96.15

1 " " " #3635 " JLOOtPO NET DIFFERENCE*- -""

_29ljl§_ 1260.00

NOTE:- The "Net Difference" is the amount the Department pays out and covers the price of the new machines, less discount and allowance on the old machines traded i n . A l l hids received are tabulated showing the "Net Difference" price. A.F.E.-32-4Q1

Page 42: 2!) - Texas Department of Transportation

6094

6095

6096

10B

May 28, 1922

I t i s moved by the State Highway Commission that an appropriation of $2031.44 he made to cover the purchase o f the fo l lowing equipment from the Closserman Chevrolet Company, Locldiarfc, t h i s f i r m being the lowest bidder on same:

2 Latest Model 1 ' i f 2 ton Chevrolet Trucks F.O.B. Paducah, Texas L i s t Price 775.00 ea. 1550.00 Discount 150.00 " 300.00 Hi t Price 1250.00

2 Latest Model Chevrolet Pickups F.O.B. Paducah, Tex. L i s t Price 580.00 " 1160.00 Discount 100.00 " Net Price Total Hot Price

Less allowance on trade In o f : 1 Ford Pickup State #3391 Allowance 89.28 1 " " " #3375 " 89.28

_jS&*op_ 960.56

2210,00

NET DIFFERENCE

178,56

2031.44

NOTE:- The "Net Difference" i s the amount the Department pays out and covers the pr ice of the new machines, less discount and allowance on the o l d machines traded i n . A l l bids received are tabulated showing the "Net Difference "price. A.F.E.-52?402

I t i s moved ny the State Highway Commission that an appropriation of $2519.12 be made to cover the purchase of the fo l lowing equipment f rom the Grloseerman Chevrolet Company, Lockhart, t h i s f irm being the lowest bidder of same:

4 Latest Model 1 l / 2 ton Chevrolet Trucks P.O.B, Dallas, Texas L i s t Price 900,00 3600.00 Discount 200.00 800.00 Wet Price

Less al lonance on trade i n of the f o l l o w i n g : 1 - 1 1 / 2 ton Federal Truck State #3182 1 Indiana Truck " #3035 1 " " " #3039 1 " " " #3029

2800.00

55.88 75.00 75.00 75.00 280.88

NET DIFFERENCE 2519.12

NOTE:- The "Net Dif ference" i s the amount tho Department pays out and covers the pr ice of the new machines less discount and allowance on the o ld machines traded o f f . A l l bids received are tabulated showing the "Net Difference" p r i c e . A.F.E.-32-403

I t i s moved by the State Highway Commission that r»n appropriation o f $1837,85 be made to cover the purchase o f the fo l lowing equipment from the Glosserman Chevrolet Company, Lockhart, t h i s f i r m being the lowest bidder on same:

3 Latest Model 1 l / 2 ton Chevrolet Trucks F.O.B. Fort Worth L i s t Price 874.00 ea. 2622,00 Discount 219,71 " ___6R_9,JL5__ Net Price 1962.85

Less allowance on trade i n o f tho f o l l o w i n g :

1 Ford Pickup State #3361 Allowance 50.00 1 Ford 1 1/2 ton Truck #3560 " 75.00 125.00

NET DIFFERENCE 1837.85

NOTE;-, The "Net Difference" i s the amount the Department pays out and covers the pr ice of the new machines, less discount and allowance on the o ld machines traded o f f . A l l bids received ars tabulated showing the "Net Difference" p r i c e . ,.„&F.E,-3.2-404__

Page 43: 2!) - Texas Department of Transportation

6097

6098

6099

l i t

May 28, 1932

I t i s moved by the State Highway Commission that an appropriation of $1691.88 he made to cover the purchase of the following equipment from the G-losseraan Chevrolet Company, Lockhart, this f i rm being the lowest bidder on same*

3 Latest Model 1 l / 2 ton Chevrolet Trucks, without bodies F, 0, B. Camp Mabry, Texas Lis t Price 725.00 2175.00

Discount 150,00 450.00 l e t Price

Less allowance on trade in of the following: 1 Ford I Truck State #3300 Allowance

1725.00

33.12

NET DIFFERENCE 1691.88

NOTE:- The "Net Difference" is the amount the Department pays out and covers the price of the new machines, less discount and allowance on the old machine traded i n , A l l bids received are tabulated showing the '(Net Difference" price. A.F.E.-,32-405

I t is moved by the State Highway Commission that an appropriation o: $1899,55 be made to cover the purchase of the following equipment from the Glosserman Chevrolet Company, Lockhart, this f i rm being the lowest bidder on same:

1 Latest Model 1 l / 2 ton Chevrolet Truck F.0.B, Ban Angelo List Price 875,00

1 Latest Model 1 l / 2 ton Chevrolet T ruck F.O.B. San Angelo List Price 925.00

1 Latest Model Chevrolet Station Wagon F.O.B. San Angelo Lis t Price 800,00

Total Lis t Price 2600.00 Discount 600.00 Net Price 2000.00

Less allowance on trade in of: 1 Reo Truck State # 3264 Allowance 100.45

NET DIFFERENCE 1899,55

TOTE:- The "Net Difference" is the amount the Department pays and covers he price of the new machines, less discount and allowance on the old lachine traded o f f . A l l bids received are tabulated showing the "Net D i f -erence" price. A.F.E.-32-406

I t i s moved by the State Highway Commission that an appropriation of $3539.50 be made to cover the purchase of the following equipment from the Glosserman Chevrolet Company, this f i rm being the lowest bidder on same:

5 Latest Model 1 l / 2 ton Chevrolet Trucks F.O.B. Wichita Falls, Texa L i s t Price 975.00 ea. 4875,00 Discount 200.00 " 1000.00 Net Price 3875.00

Less allowance on trade h Of the following: 1 - 1 1 / 2 ton Wichita Truck Model 3 OU State #3286 165.00 1 1 ton Indiana " " #3002 170.50 355.50

NET DIFFERENCE - - - 3539,50

STOTE:- The "Net Difference" is the amount the Department pays out and covers the price of the new machines, less discount and allowance on the aid machines t raded i n . A l l bids received are tabulated showing the "Net Difference" price. A.F.E.-32-407

Page 44: 2!) - Texas Department of Transportation

113

May 28, 1932

I t is moved by tbe State Highway Commission that an appropriation of $2093.85 be made to cover the purchase of the -'following equipment from the James W. Francis Company, San Antonio, this f i r m being the lowest bidder on same:

1 Latest Model Crawler type Cletrac Model 48-30 Tractor F.O.B. Van Horn, Texas List Price 2811,75

Discount 281.17 l e t Price 2530.58 ~

sss allowance on trade in of the following: 1 Best 30 Tractor State #2212 Allowance 436.83

NET DIFFERENCE 2093.75

NOTE:- Tho "Net Difference" is the amount the Department pays out and covers the price of the new machine, less discount and allowance on the old machine traded o f f . A l l bids received are tabulated showing the "Net Difference" price. A.F.E.-32-408

I t is ordered by the Commission that on or after June 1,1932, i t is here­by directed that general contractors bidding in and performing work on State Highways of Texas shall be equipped fo r and shall actually perform with their own forces, the major item of the contract, or, in case of a contract involving two general itsms, o f nearly equal amount, the general contractor shall be required to do with his own forces at least one of such itsms, and shall , at a l l times, maintain a superintendent to rep­resent him on each and every project.

APPROVED:

Member