2 TEXAS CHILDREN’S HOSPITAL

2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M Initial Construction Budget (10% Contingency Included) $6.6M Actual Construction Budget $13 M

Embed Size (px)

DESCRIPTION

Computer Simulation

Citation preview

Page 1: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

2TEXAS CHILDREN’S HOSPITAL

Page 2: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

TCH Conversion

$6.6M – Initial Construction Budget (10% Contingency Included)$6.6M – Actual Construction Budget

$13 M – Overall Approved Project Budget$12.6M – Actual Total Commitment To Project

Building Relationships with Community – Metro, Local Council

Managing non-TCH tenants (Dental) – infrastructure heavy & delayed opening timing

Page 3: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Computer Simulation

Page 4: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Overview Of Simulation Modeling

Page 5: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

ARRIVAL AT MEDICAL HOME

PT TO SUB WAITING FOR NAVIGATOR

GATHERS ANY SIGNITURES AND

REVIEWS NECESSARY DOCUMENTS

CHECK-IN KIOSKS FOR ESTABLISHED

PATIENTS? 3-5 MINS

SICK CHILDWELL VISITNEW VISIT

%$ WELL VS. SICK

SICK VISIT

WELL VISIT

NEW VISIT

PT TAKEN TO EXAM ROOM

VITALS TAKEN ON WAY LAB

DRAW AR VITALS IF REQ

3-5 MINS

PT TAKEN TO EXAM ROOM

VITALS TAKEN ON WAY 3-5 MINS

PT TAKEN TO EXAM ROOM

VITALS TAKEN ON WAY 3-5 MINS

EXAM VISIT HISTORY & PHYSICAL

TIME BASED ON ESTABLISHED PT

HISTORICAL DISTRIBUTION

5-40 MINS

EXAM VISIT HISTORY & PHYSICAL

TIME BASED ON ESTABLISHED PT

HISTORICAL DISTRIBUTION

5-40 MINS

EXAM VISIT HISTORY & PHYSICAL

TIME BASED ON ESTABLISHED PT

HISTORICAL DISTRIBUTION

10-60 MINS

DISCOVERY OF ISSUE

DISCOVERY OF ISSUE

DISCHARGE IN EXAM ROOM

UNLESS COMPLEX DISCHARD NEEDED 3-10 MINS

TO COMPLEX DISCHARGE AREA FOR

SCHEDULING DIAG OR

TREATMENT10-20 MINS

DISCHARGE IN EXAM ROOM

UNLESS COMPLEX DISCHARD NEEDED 3-10 MINS

TO COMPLEX DISCHARGE AREA FOR

SCHEDULING DIAG OR

TREATMENT10-20 MINS

TO TREATMENT ROOM

20-90 MINS

PATIENT LEAVE MEDICAL HOME

PATIENT LEAVE MEDICAL HOME

THIS SIMPLIFIED FLOW DIAGRAM IS USEFUL TO LOOK AT THE NUMBER OF EXAM ROOMS IN A STANDARD CARE TRACK. HOW WITH THIS FLOW DIFFER FOR PED PATIENTS IN A CENTERING

CONCEPT? WHAT % OF PATIENTS COULD THIS BE?

DID WE WANT TO MODEL PATIENTS HAVING THEIR PERSCRIPTIONS BROUGHT TO THEM IN THE EXAM ROOM, OR

WAITING IN A SUB-WAITING AREA?

TCH MEDICAL HOME PEDI PATIENT PROCESSMODEL - 01/30/2012

Page 6: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Medical Home – Space Program SummaryTotal Area

50,458 sf Quantity of Rooms

Public Area 3,528 sfPediatric Service Module 8,338 sf 25 Exam Rooms, 2 Consult RoomsOB Service Module 4,726 sf 11 Exam Rooms, 4 Consult RoomsCentering Module 2,030 sf 2 Centering RoomsService Module Support 1,972 sfDiagnostics 5,340 sf 1 Gen Rad, 2 UltrasoundPharmacy 3,074 sfEye Clinic 5,733 sf 4 Exam RoomsDental Clinic 3,560 sf 9 OperatoriesSpecialty Clinic 2,160 sf 4 Observation RoomsMember Education 2,849 sfAdministration 4,874 sfSupport 2,273 sf

Page 7: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Site Selection

Reflects Pilot Program Preferred Area

-Membership Density-Proximity To Potential Partner Hospitals-Near Major Freeways

site

TMC

CBD

Page 8: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Vehicular Access- Site Along Beltway Feeder Road- Can Be Approached From Multiple Directions

N

I 45

B 8

Page 9: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Existing BuildingTCH Medical Home

Page 10: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Site OrganizationParking1.1=Patient & Public Parking

2.Staff Parking3.Patient Flow from Bus Stop

4.Main Entry5.Public Retail Entry

6.Staff Entry

4

3

65

6

N

1

2

1 2

Page 11: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Public Areas

1.Main Entry/Drop-Off

2.Public Retail Entry- North/East Natural Light

3.Waiting/Circulation

4.Retail Corridor

3

1a

a

42

3

Page 12: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Program Plan

3 1a

a

2

Public/Retail/EDU/Admin1.Main Entry/Drop-Off2.Public Retail Entry3.Waiting/Circulation4.Retail Corridor5.Pharmacy6.Dental7.Optometry8.Education9.AdministrationStaff10.Staff Work AreaOB Program Space11.OB Clinic12.CenteringPeds Program Space13.Primary Care Clinic14.Specialty Clinic15.Diagnostics

13

14

15

10

12

1111

89106

57

4

Page 13: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

ReceptionTCH Medical Home

Page 14: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

WaitingTCH Medical Home

Page 15: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Team WorkstationsTCH Medical Home

Page 16: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

ReceptionTCH Medical Home

Page 17: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

3Lessons Learned

Page 18: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

POE Methodology

(to be provided at learning session)

Page 19: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

POE Results

(to be provided at learning session)

Page 20: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Common Takeaways – Conversion “Pros”

- Large, open footplate- Opportunity for various ceiling heights / high ceilings- Potential for second floor / mezzanine- Opportunity for skylights- Potential for separate front-of-house and back-of-house - Good visibility from major thoroughfares- Ample parking- Economical investment- Places care directly in the target community - Create a feeder system to or away from hospital campus

Page 21: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M

Common Takeaways - Conversion “Cons”

- Inappropriate column spacing - Undersized / shared utilities with adjoining tenants- Usually no emergency generators- Inappropriate / unusable mechanical systems- Low-budget original construction- Poorly documented building alterations over time- Undocumented / undiscoverable existing conditions- Potential limitations to exterior façade changes- Significant saw-cutting for under-floor plumbing- High roof: ceiling-mounted equipment challenging- Security

Page 22: 2 TEXAS CHILDRENS HOSPITAL. TCH Conversion $6.6M  Initial Construction Budget (10% Contingency Included) $6.6M  Actual Construction Budget $13 M