    ABS CABS CONSULTINGONSULTING IINC.NC.

    Boiler/Vessel and Piping-Repair

    and Alteration Course

    11ABS Consulting IncABS Consulting Inc

  • 8/3/2019 2- Related Post Construction Codes and Standards

    2/38

    ABS CONSULTING INC. / Thailand BranchABS CONSULTING INC. / Thailand Branch

    2-Related post construction Codes and Standards

    22ABS Consulting IncABS Consulting Inc

  • 8/3/2019 2- Related Post Construction Codes and Standards

    3/38

    ASME CODE, STANDARS, GUIDEASME CODE, STANDARS, GUIDERELATED TORELATED TO

    AFTER INITIAL CONSTRUCTIONAFTER INITIAL CONSTRUCTION

    FORFOR

    PRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS

  • 8/3/2019 2- Related Post Construction Codes and Standards

    4/38

    This guide provides aThis guide provides a

    summary of some of thesummary of some of the

    more commonly used codes, stmore commonly used codes, st

    andards, recommended pandards, recommended p

    ractices, specifications and guractices, specifications and gu

    idelines produced byidelines produced byorganizations for maintainingorganizations for maintaining

    the integrity of fixed pressurethe integrity of fixed pressure

    equipment in process plantsequipment in process plants

    and in general industrial use.and in general industrial use.

    ABS Consulting IncABS Consulting Inc 44

    SCOPE (ASME PTBSCOPE (ASME PTB--22))

  • 8/3/2019 2- Related Post Construction Codes and Standards

    5/38

    Organization of this

    Guide (ASME PTB-2)

    This guide is organized by

    type of equipment as

    described below.

    a. Boilers.

    b. Pressure vessels.c. Storage tanks.

    d. Piping systems.

    e. Overpressure protection

    f. Etc.

    ABS Consulting Inc 5

  • 8/3/2019 2- Related Post Construction Codes and Standards

    6/38

    (ASME PTB-2)

    It like ae ROADMAP

    ABS Consulting Inc 6

  • 8/3/2019 2- Related Post Construction Codes and Standards

    7/38

    (ASME PTB-2)

    It like ae ROADMAP

    ABS Consulting Inc 7

  • 8/3/2019 2- Related Post Construction Codes and Standards

    8/38

    SCOPE

    (ASME PCC-1)

    The bolted flange joint

    assembly (BFJA) guidelines

    described in this documentapply to pressure-boundary

    flanged joints with ring-typegaskets that are entirely within

    the circle enclosed by the bolt

    holes and with no contact

    outside this circle. Etc.

    ABS Consulting Inc 8

  • 8/3/2019 2- Related Post Construction Codes and Standards

    9/38

    SCOPE

    (ASME PCC-2)

    This Standard provides methods

    for repair of equipment and pipin

    g within the scope of ASME Pressure Technol

    ogy Codes and Standards after ithas been placed in servi

    ce.

    These repair methods include

    relevant design, fabrication,examination, and testing practices

    and may be temporary or

    permanent, depending on the

    circumstances.

    ABS Consulting Inc 9

  • 8/3/2019 2- Related Post Construction Codes and Standards

    10/38

    Organization(ASME PCC-2)

    This Standard is divided into

    five parts.

    (a) Part 1 covers the scope, or

    ganization, and intent

    and is applicable to all articlesin this Standard.

    (b) Part 2 covers repair

    methods and techniques that

    include the use of welding,

    brazing, soldering, or other

    methods involving metal deposi

    t.

    ABS Consulting Inc 10

  • 8/3/2019 2- Related Post Construction Codes and Standards

    11/38

    Organization(ASME PCC-2)

    This Standard is divided into

    five parts. Contd d

    (c) Part 3 covers mechanical

    repairs, with or without

    sealant, such as bolteclamps or fixtures aninclu es all repair metho s

    not covere in Part 2 or

    Part 4.

    ( ) Part 4 covers repairsusing nonmetallic means,

    such as nonmetallic liners

    an wraps, an bon ing (e.g,

    joining by epoxy), etc.

    ABS Consulting Inc 11

  • 8/3/2019 2- Related Post Construction Codes and Standards

    12/38

    Organization(ASME PCC-2)

    This Standard is divided into

    five parts. Contd d

    (e) Part 5 covers examinatio

    n an testing metho s

    an techniques.

    ABS Consulting Inc 12

  • 8/3/2019 2- Related Post Construction Codes and Standards

    13/38

  • 8/3/2019 2- Related Post Construction Codes and Standards

    14/38

    NBICNBIC CODECODERELATED TORELATED TOAFTER INITIAL CONSTRUCTIONAFTER INITIAL CONSTRUCTION

    FORFORPRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS

  • 8/3/2019 2- Related Post Construction Codes and Standards

    15/38

    SCOPE

    NBIC-NB-23

    The NBIC recognized three

    areas of post-construction

    activities, and divided into

    three parts.

    Part-1 Installation

    Part-2 Inspection

    Part-3 Repairs and Alterations

    ABS Consulting Inc 15

  • 8/3/2019 2- Related Post Construction Codes and Standards

    16/38

    ORGANIZATION

    NBIC-NB-23

    The NBIC is oragnized into three parts. Each

    part provides general and specific rules,

    information, and guidance within each

    application post-construction activity. NBIC parts

    are identified as:

    Part 1, Installation- This part provides

    requirements and guidance to ensure all types o

    f pressure-retaining items are installed and

    function properly.

    Installation includes meeting specific safetycriteria for construction, materials, design,supports, safety devices, operation, testing, and

    maintenance.

    ABS Consulting Inc 16

  • 8/3/2019 2- Related Post Construction Codes and Standards

    17/38

    ORGANIZATION

    NBIC-NB-23(cont )

    The NBIC is oragnized into three parts. Each

    part provides general and specific rules,

    information, and guidance within each application

    post-construction activity.

    NBIC parts are identified as:

    Part 2, Inspection- This part provides informationand guidance needed to perform and document

    inspections for all types of pressure-retaining

    items.

    Includes information on personnel safety,

    non-destructive examination, tests, failuremechanism, types of pressure equipment,fitness for service, risk-base assessments, and p

    erformance-based standards.

    ABS Consulting Inc 17

  • 8/3/2019 2- Related Post Construction Codes and Standards

    18/38

    ORGANIZATION

    NBIC-NB-23(cont )

    The NBIC is oragnized into three parts. Each

    part provides general and specific rules,

    information, and guidance within each application

    post-construction activity.

    NBIC parts are identified as:

    Part 3, Repairs and Alterations- This part provides information and guidance needed to perform

    verify, and document acceptable repairs or

    alterations to pressure-retaining items regardless of

    code of construction.

    Alternative methods for examination, testing, heat treatment, etc., are provided when theoriginal code of construction requirements cannot

    be met. Specific acceptable and proven repair

    methods are also provided.

    ABS Consulting Inc 18

  • 8/3/2019 2- Related Post Construction Codes and Standards

    19/38

    APIAPI Code,STD,RPCode,STD,RP and Guideand GuideRELATED TORELATED TO

    AFTER INITIAL CONSTRUCTIOAFTER INITIAL CONSTRUCTIONN

    FORFORPRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS

  • 8/3/2019 2- Related Post Construction Codes and Standards

    20/38

    SCOPE

    API 510

    In-service inspection, repair,

    alteration, and rerating

    pressure vessels, piping,

    and pressure relief device.

    ABS Consulting Inc 20

  • 8/3/2019 2- Related Post Construction Codes and Standards

    21/38

    ORGANIZATION

    API 510

    This Code is divided into ten (10) section and five (5) appendix A, B, etc.

    ABS Consulting Inc 21

  • 8/3/2019 2- Related Post Construction Codes and Standards

    22/38

    SCOPE

    API RP 572

    This recommended practice

    (RP) covers the inspection of

    pressure vessel. It includes a

    description of the various types

    of pressure vessela a a .. a ..

    This RP also includes reasons

    for inspection, causes of

    deterioration, frequency and

    methods of inspection,methods of repair, and

    preparation of records andreports.

    ABS Consulting Inc 22

  • 8/3/2019 2- Related Post Construction Codes and Standards

    23/38

    ORGANIZATION

    API RP 572

    This Code is divided into eleven (11) section and three (3) appendix A, B, andC.

    ABS Consulting Inc 23

  • 8/3/2019 2- Related Post Construction Codes and Standards

    24/38

    SCOPE

    API 570

    Cover inspection, rating,

    repair, and alteration

    procedures for metallic an

    d fiberglass reinforced plast

    ic (FRP) piping systems and

    their associated pressurerelieving devices that have

    been placed in-service.

    ABS Consulting Inc 24

  • 8/3/2019 2- Related Post Construction Codes and Standards

    25/38

    ORGANIZATION

    API 570

    This Code is divided into nine (9) section and three (3) appendix A, B,C.

    ABS Consulting Inc 25

  • 8/3/2019 2- Related Post Construction Codes and Standards

    26/38

    SCOPE

    API RP 574

    This RP covers the inspection

    practices for piping, tubing, valves

    (other than control valves), and

    pttings used in petroleum refineries

    and chemical plants.

    Common piping components,

    valve types, pipe joining methods,

    inspection planning processes,

    inspection intervals and techniques,

    and types of records are describedto aid the inspector in fulfilling the

    ir role implementing API 570.

    ABS Consulting Inc 26

  • 8/3/2019 2- Related Post Construction Codes and Standards

    27/38

  • 8/3/2019 2- Related Post Construction Codes and Standards

    28/38

    SCOPE

    API STANDARD 653

    This standard covers steel

    storage tanks built to API 650.

    It provides minimum

    requirements for maintaining the

    integrity of such tanks after

    they have been placed inservice and addresses

    inspection, repair, alteration,

    relocation, and reconstruction.

    ABS Consulting Inc 28

  • 8/3/2019 2- Related Post Construction Codes and Standards

    29/38

    ORGANIZATION

    API STANDARD 653

    This Code is divided into thirteen (13) section and nine (9) appendix a,b, etc.

    ABS Consulting Inc 29

  • 8/3/2019 2- Related Post Construction Codes and Standards

    30/38

    SCOPE

    API RP 575

    This document provides informat

    ion and recommended

    practices for the maintenance

    and inspection of atmospheric

    and low-pressure storage tanks.

    This recommended practiceincludes:

    a. Descriptions of the various

    types of storage tanks.

    b. Construction standards.

    c. Maintenance practices.

    d. Reasons for inspection.

    ABS Consulting Inc 30

  • 8/3/2019 2- Related Post Construction Codes and Standards

    31/38

    SCOPE

    API RP 575 (cont )

    This document provides informat

    ion and recommended

    practices for the maintenance

    and inspection of atmospheric

    and low-pressure storage tanks.

    This recommended practiceincludes:

    e. Causes of deterioration.

    f. Frequency of inspection.

    g. Methods of inspection.

    h. Inspection of repairs. Etc..

    ABS Consulting Inc 31

  • 8/3/2019 2- Related Post Construction Codes and Standards

    32/38

    ORGANIZATION

    API RP 575

    This Code is divided into ten (10) section and three (3) appendix. a,

    b, and c.

    ABS Consulting Inc 32

  • 8/3/2019 2- Related Post Construction Codes and Standards

    33/38

    NACENACE,STD,STD--RP and GuideRP and GuideRELATED TORELATED TO

    AFTER INITIAL CONSTRUCTIOAFTER INITIAL CONSTRUCTIONN

    FORFOR

    PRESSURE RETAINING ITEMSPRESSURE RETAINING ITEMS

  • 8/3/2019 2- Related Post Construction Codes and Standards

    34/38

    SCOPE

    NACE Standard RP0472

    This standard establishes guideli

    nes to prevent most

    forms of environmental crackin

    g of weldments in carbon steel

    refinery equipment and piping.

    Weldments are defined toinclude the weld deposit, base

    metal HAZs, and adjacent base

    metal zones subject to residual

    stresses from welding.

    ABS Consulting Inc 34

  • 8/3/2019 2- Related Post Construction Codes and Standards

    35/38

    ORGANIZATION

    NACE Standard RP0472

    This Standard RP is divided into six (6) section and one (1) appendix.

    A.

    ABS Consulting Inc 35

  • 8/3/2019 2- Related Post Construction Codes and Standards

    36/38

  • 8/3/2019 2- Related Post Construction Codes and Standards

    37/38

    ORGANIZATION

    NACE Standard RP RP0296

    This Standard RP is divided into five (5) section and three (3) appendix.

    A, B, C.

    ABS Consulting Inc 37

  • 8/3/2019 2- Related Post Construction Codes and Standards

    38/38

    ENDEND

    ANY QUESTION?ANY QUESTION?