2-Claro B9 Enhanced Transmission Resource Management

Embed Size (px)

Citation preview

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    1/28

    All rights reserved 2005, Alcatel

    Enhanced Transmission ResourceManagement

    B9 Claro Workshop - February 14th, 2006

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    2/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 2

    Agenda

    Enhanced Transmission resource management

    M-EGCH Statistical Multiplexing

    Dynamic Abis Allocation

    Ater Resource Management

    DL Retransmission in the BTS

    Related parameters & counters

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    3/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 3

    M-EGCH Statistical MultiplexingM-EGCH link (I)

    An M-EGCH link (Multiplexed Enhanced GPRS CHannel) is a bi-directional link established between the MFS and the BTS.

    An M-EGCH link is a set of 16k GCH channels.

    An M-EGCH link is defined per TRX.

    The M-EGCH link of a TRX is necessary:

    To carry TBF traffic and PACCH signalling when TBFs are established on

    some PDCHs of the TRX,

    To carry signalling messages when MPDCHs are defined on the TRX,

    To carry UL signalling messages after one-UL-block allocation (UL two-phase access),

    To carry some BTS-MFS signalling.

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    4/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 4

    M-EGCH Statistical MultiplexingM-EGCH link (II)

    B8: one EGCH per RTS B9: one M-EGCH link forthe whole TRX

    0 1 762 3 4 5

    EGC

    H

    0 1 762 3 4 5TRX

    M-EGCH link

    1 to 36 GCHs

    composed of

    GCH

    EGC

    H

    EGCH

    EGCH

    EGCH

    EGCH

    EGCH

    EGCH

    GCH

    GCH

    GCH

    GCH

    1 to 5 GCHs dependingon the TRX class

    GCH

    composed of

    GCH

    GCH

    GCH

    GCH

    TRX

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    5/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 5

    M-EGCH Statistical MultiplexingFilling an M-EGCH link with PDUs (I)

    RLC header

    MEGCH header(next segments)

    MEGCH header(first segment)

    SYNC pattern +Z bit indicator

    Padding bits

    CRC + Tail bits

    MEGCH header(/NHP and addrbyte)

    DummyFilling PDU

    LEGEND

    320 bits 320 bits 320 bits

    320 bits

    20 ms 20 ms 20 ms

    GCH1

    GCH2

    GCH3

    GCH4

    RLC/MAC PDU 1 for DBN=x

    320 bits

    GCH5 Dummy Filling PDU

    DummyFilling

    Dummy Filling

    Dummy Filling

    RLC/MAC PDU 2 for DBN=x

    DBN=x+1DBN=x DBN=x+2

    MEGCH layer

    segmentation

    sub-layer

    RLC/MAC layer

    MEGCH

    layer

    framing

    sub-layer

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    6/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 6

    M-EGCH Statistical MultiplexingGains brought by the feature

    Reduction of the Abis and Ater consumption Resources are used in a more efficient way: Instantaneous reaction to radio variations (MCS variations).

    Example:

    No more TBF maximum MCS reduction is needed.

    The resources not used by delayed DL TBFs, extended UL TBFs, are used by otherTBFs.

    320 bits per GCH

    20 ms

    DBN mDBN m DBN m+ 1DBN m+ 1 DBN m+ 2DBN m+ 2

    20 ms 20 ms

    320 bits per GCH

    20 ms

    DBN mDBN m DBN m+ 1DBN m+ 1 DBN m+ 2DBN m+ 2

    20 ms 20 ms

    RB1 RB1 RB1

    RB1 RB1 RB1RB2 RB2 RB2

    RB2 RB2 RB2

    RB2 RB2RB3 RB3 RB3

    M- EGCH link composed of 4 GCHsM- EGCH link composed of 4 GCHs

    RB3

    GCH 1

    GCH 2

    GCH 3

    GCH 4

    GCH 1

    GCH 2

    GCH 3

    GCH 4

    GCH 1

    GCH 2

    GCH 3

    GCH 4

    GCH 1

    GCH 2

    GCH 3

    GCH 4

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    7/28All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 7

    M-EGCH Statistical MultiplexingTowards Dynamic Abis allocation

    In B8:

    The size of an EGCH link (associated to a PDCH) can be dynamically

    decreased.

    But the size of an EGCH link cannot be dynamically increased.

    In B9:

    The size of an M-EGCH link (associated to a TRX) can be dynamically

    decreased or increased.

    The algorithms to dynamically decrease or increase the size of an M-EGCH

    link correspond to the Dynamic Abis allocation.

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    8/28All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 8

    Agenda

    Enhanced Transmission resource management

    M-EGCH Statistical Multiplexing

    Dynamic Abis Allocation

    Ater Resource Management

    DL Retransmission in the BTS

    Related parameters & counters

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    9/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 9

    Dynamic Abis AllocationStatic versus Dynamic Abis allocation

    B8: static Abis allocation B9: dynamic Abis allocation

    0 1 762 3 4 5

    EGCH

    0 1 762 3 4 5TRX

    M-EGCH link

    1 to 36 GCHs (mixture of GCHs usingbasic, extra and bonus Abis nibbles)

    composed of

    1 to 5 GCHs depending on theTRX class (and only one GCHcan use a basic Abis nibble)

    GCHB

    a

    sic

    composed of

    EGCH

    EGCH

    EGCH

    EGCH

    EGCH

    EGCH

    EGCH

    GCHE

    x

    tra

    Basic Abis nibblesand

    Extra Abis nibblesare statically

    mapped to a RTS.

    They can only beused in the EGCH

    of this RTS.GCHE

    xtra

    GCHE

    x

    tra

    GCHE

    xtra

    GCHB

    asic

    GCHE

    xtra

    GCHB

    asic

    GCHE

    xtra

    No moreconstraints

    in B9!

    GCHB

    asic

    TRX

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    10/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 10

    Dynamic Abis AllocationAbis nibbles wasted in B8

    In B8, the following Abis nibbles were wasted:

    X X X X X XExtra Abis nibbles

    (number of nibbles per RTS = TRX class-1)

    X X Basic Abis nibbles

    B S M M P P T T TRX configuration on the air interface

    Legend:

    B: BCCH, S: static SDCCH, M: MPDCH, P: PDCH, T: TCH, X : Abis nibblewasted

    in B8, : Abis nibble usedin B8

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    11/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 11

    Dynamic Abis AllocationAbis nibbles usable for PS traffic (I)

    In B9, the following Abis nibbles are usable for PS traffic: The basic Abis nibbles mapped to a RTS currently available for

    PS traffic(see Autonomous Packet Resource Allocation" feature toknow the list of those RTSs) or mapped to a RTS used as MPDCH.

    Example:

    P P P P M C C C RTSs in a 2-TRX cell

    Legend:- C: RTS currently used for CS traffic (CS call),- P: RTS currently used for PS traffic (TBF or MPDCH traffic).

    RTS available for PS traffic

    RTS reserved for CS traffic

    The basic Abis nibbles of those RTS can beused to establish some GCHs

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    12/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 12

    Dynamic Abis AllocationAbis nibbles usable for PS traffic (II)

    The bonus basic Abis nibbles currently used for BCCH or

    static SDCCH channels:

    The list of bonus Abis nibbles depends on the cell configuration.

    All the extra Abis nibbles of the BTS:

    A number of 64k extra Abis TSs is defined for each BTS by O&M

    (N_EXTRA_ABIS_TS).

    The list of extra Abis TSs of a BTS is provided by the BSC to the MFS.

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    13/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 13

    ynam c s oca onLevel of sharing of the Abis nibbles usable for PStraffic

    The basic Abis nibbles mapped on a RTS allocated to MFS can

    be used in the M-EGCH link of any TRX of the CELL.

    The extra Abis nibbles can be used in the M-EGCH link of any TRX

    of the BTS.

    The bonus Abis nibbles can be used in the M-EGCH link of any

    TRX of the BTS.

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    14/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 14

    Dynamic Abis AllocationImpacts on existing scenarios and new scenarios

    Due to Dynamic Abis allocation, new messages have to be sent to the BTS to

    notify each TRE which Abis nibbles are associated..

    Those messages are sent via GSL and RSL interfaces.

    The following scenarios are therefore modified: GCH establishment.

    GCH release.

    New scenario appear to distribute GCH resources : Intra-cell GCH pre-emption : between TRXs of a cell

    Inter-cell GCH pre-emption : between cells of a BTS

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    15/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 15

    Agenda

    Enhanced Transmission resource management

    M-EGCH Statistical Multiplexing

    Dynamic Abis Allocation

    Ater Resource Management

    DL Retransmission in the BTS

    Related parameters & counters

    A R M

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    16/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 16

    Ater Resource ManagementPrinciples

    The Ater Resource Management in a given GPU is based

    on two complementary mechanisms:

    GPU Ater TS margin,

    High Ater usage handling.

    A strong requirement is to ensure GPRS access in all thecells of the GPU (no cell shall be blocked due to an Atercongestion).

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    17/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 17

    Ater Resource ManagementGPU Ater TS Margin

    GPU 64k Ater TS margin:

    Aim:

    Ensures that GPRS access can never be blocked in a cell due to lack ofAter resources in the GPU.

    Handled in each GPU to serve some priority requests at any moment and inany cell managed by the GPU.

    Priority request is the GCH establishment request for the first PS traffic ina cell (first TBF to establish in a cell).

    Management:

    Release of some GCHs when the remaining number of free 64k Ater TSs in

    the GPU becomes too low (O&M parameter N_ATER_TS_MARGIN_GPU). For a given TRX, when releasing GCHs, it is ensured that:

    Established_Nb_GCH remains higher than Min_Nb_GCH.

    At R M t

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    18/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 18

    Ater Resource ManagementHigh Ater usage handling (I)

    High Ater usage handling:

    Definition of the Ater usage of a GPU:

    Represents the consumption of Ater nibbles (by GCH channels)

    among the PCM links connected to the GPU,

    Ater usage can be either normal or high.

    Decision based on the comparison of the Ater nibble consumption

    with a threshold (Ater_Usage_Threshold O&M parameter).

    At R M t

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    19/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 19

    Ater Resource ManagementHigh Ater usage handling (II)

    Behaviour if Ater usage is high:

    Target_Nb_GCH values associated to TRXs of the GPU supportingsome PS traffic will be reduced:

    GCH_RED_FACTOR_HIGH_ATER_USAGE O&M

    parameter. The reduction factor is only applied on PDCHs newly open.

    newly open PDCH means that no radio resources werepreviously allocated on this PDCH.

    When evaluating Target_Nb_GCH on a given TRX:

    If PDCH already open, no reduction is applied, If PDCH is newly open, reduction is applied.

    At R M t

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    20/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 20

    Ater Resource ManagementHigh Ater usage handling (III)

    Example:

    Max_EGPRS_MCS = MCS-9,

    GCH_RED_FACTOR_HIGH_ATER_USAGE = 0,5

    1)Ater usage = normal

    2) Establishment of an EGPRS DL TBF on RTS0-3 Target_Nb_GCH = 4 * Nb_GCH(Max_EGPRS_MCS) = 4 * 4,49 = 18

    3)Ater usage = high

    4) Establishment of an EGPRS DL TBF on RST4-7

    Target_Nb_GCH = 4 * Nb_GCH(Max_EGPRS_MCS) + 0,5 * 4 *

    Nb_GCH(Max_EGPRS_MCS) = 4 * 4,49 + 4 * 0,5 * 4,49 = 27 (< 36)

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    21/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 21

    Agenda

    Enhanced Transmission resource management

    M-EGCH Statistical Multiplexing

    Dynamic Abis Allocation

    Ater Resource Management

    DL Retransmission in the BTS

    Related parameters & counters

    DL t i i i th BTS

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    22/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 22

    DL retransmission in the BTSPrinciples

    Goal:

    Avoid consuming transmission resources (Abis + Ater) in case of DL

    RLC data block retransmissions.

    Principles:

    Store for a certain time, in the memory of the TRE involved in the

    packet transfer mode with an MS, the DL RLC data blocks received

    from the RLC/MAC layer for this MS.

    Then, the RLC/MAC layer (in the MFS) can ask the TRE (in the

    BTS) to retransmit some data blocks.Data received from the MFS are stored in a buffer.

    DL t i i i th BTS

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    23/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 23

    DL retransmission in the BTSPrinciples

    This mechanism is enabled / disabled at TRX/TRE level:

    Gains:

    Higher available transmission bandwidth.

    M-EGCH link dimensioning is eased.

    EN_DL_RETRANS_BTS

    Round_Trip_Delay

    HW generation of the TRE

    CS-2

    (DRFU)

    CS-4

    (G3 or M4M)

    CS-4+MCS-9

    (G4 or M5M)

    Enabled < 500 ms Disabled Disabled Enabled

    Enabled 500 ms Disabled Disabled Disabled

    disabled - Disabled Disabled Disabled

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    24/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 24

    Agenda

    Enhanced Transmission resource management

    M-EGCH Statistical Multiplexing

    Dynamic Abis Allocation

    Ater Resource Management

    DL Retransmission in the BTS

    Related parameters & counters

    Related parameters & counters

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    25/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 25

    HMI name Definition Sub-system

    Instance

    OMC-Raccess

    Type Defvalue

    Range Unit

    NEW :N_EXTRA_ABIS_TS

    Number of extra Abis (64k) timeslots configured for aBTS.

    BSC BTS Changeable

    Number

    0 [0,60] None

    NEW :N_GCH_FAST_PS_ACCESS

    Two definitions are possible :

    - If EN_FAST_INITIAL_GPRS_ACCESS = enabled :number of GCHs required to be established due to theFast Initial PS Access feature,

    - If EN_FAST_INITIAL_GPRS_ACCESS = "disabled :

    number of GCHs to keep established when there is nomore (E)GPRS traffic in a cell (while theT_GCH_INACTIVITY_LAST timer is running).

    MFS MFS None(DLS)

    Number

    1 [1,5] None

    NEW : T_GCH_Inactivity - For Non Evolium BTS : Timer to postpone the releaseof one slave PDCH, when it does not support any(E)GPRS traffic.

    - For Evolium BTS : Timer to postpone the release ofthe "unused" GCHs of the M-EGCH link of a TRX (thecondition for some GCHs of the M-EGCH link of a TRXto become "unused" is that some TBFs

    MFS BSS Changeable

    Timer 3 [1,100] sec

    NEW :T_GCH_Inactivity_Last

    - For Non Evolium BTS : Timer to postpone the releaseof the last established slave PDCH of a cell, when itdoes not support GPRS traffic anymore.

    -For Evolium BTS : Timer to postpone the release ofthe last N_GCH_FAST_PS_ACCESS GCHsestablished in a cell, when the last TBF has beenreleased in the cell. -

    MFS BSS Changeable

    Timer 20 [1,200] sec

    Related parameters & countersParameters

    Related parameters & counters

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    26/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 26

    Removed parameters :

    NB_EXTRA_ABIS_TS

    T_PDCH_Inactivity

    T_PDCH_Inactivity_Last

    MAX_PDCH_PER_TBF_High_Ater_Usage

    HMI name Definition Sub-system

    Instance

    OMC-Raccess

    Type Defvalue

    Range Unit

    NEW :N_ATER_TS_MARGIN_GPU

    Number of free 64k Ater TSs that are kept in reservein order to be able to serve some prioritary requests incells managed by the GPU. The prioritary requests arethe GCH establishment requests launched when thefirst TBF has to be established in a cell.

    Note : In case of non-Evolium BTS, those are PDCHsthat will be established instead of GCHs.

    MFS BSS Changeable

    Number

    2 [0,10] none

    NEW :GCH_RED_FACTOR_HI

    GH_ATER_USAGE

    Reduction factor of the number of GCHs targeted perPDCH, when the Ater usage is high.

    MFS cell Changeable

    Number

    0.75 [0,1] none

    NEW :

    EN_DL_RETRANS_BTS

    This flag enables / disables downlink retransmission inthe BTS.

    MFS MFS None(DLS)

    Flag 1 [0,1] None

    Related parameters & countersParameters

    Related parameters & counters

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    27/28

    All rights reserved 2005, AlcatelB9 Claro Workshop / February 14th 2006

    Page 27

    Counternumber

    Name Definition

    P100c CUMULATED_TIME_BUSY_GCH_CELL The counter cumulates over the reporting period the timeduring which a GCH is busy in the cell.

    P100d MAX_NB_BUSY_GCH_CELL Maximum number of busy GCH (16k channel) in the cell.

    P105 i / j NB_DL/UL_TBF_EST_FAIL_CONG_ABIS Number of DL/UL TBF establishment failures due to a lackof Abis resources.

    P469 MAX_NB_DEFICIT_GCH Maximum number of GCH in deficit reached in the cell.

    P470 CUMULATED_TIME_DEFICIT_GCH Cumulative time (in seconds), per cell , during which thereis a deficit of GCH resources (16k channel).

    P471 CUMULATED_TIME_EXCESS_GCH Cumulative time (in seconds), per cell ,during which thereis a excess of GCH resources (16k channel).

    P472 CUMULATED_TIME_FREE_EXTRA_BONUS_ABIS_NIBBLES

    Cumulative time (in seconds), per BTS ,during which thereare free extra and bonus Abis nibbles available.

    P474 CUMULATED_TIME_FREE_ATER_NIBBLES Cumulated time during which a PDCH is used by at leastone DL TBF (in GPRS or EGPRS mode), cumulated overall the PDCHs of the cell.

    P484 MIN_NB_FREE_EXTRA_BONUS_ABIS_NIBBLE

    Minimum number of free extra and bonus Abis nibbles.

    P486 MIN_NB_FREE_ATER_NIBBLE Minimum number of free Ater nibbles.

    Related parameters & countersCounters

  • 7/29/2019 2-Claro B9 Enhanced Transmission Resource Management

    28/28

    All rights reserved 2005 AlcatelB9 Claro Workshop / February 14th 2006

    Page 28

    www.alcatel.com