Emergency Plan Guidelines
Policy Statement
[Company Name] is committed to having an emergency plan in place for each workplace toassist workers and the public to respond to any emergency situation.
Emergency Plan
All workplaces require:
a A method for reporting the emergency!b A list of workers responsible in emergency situations and how to contact them!c A plan for incident investigation and correction of the ha"ard!d A list of phone numbers for emergency and support services #should be posted by
telephones
$orkplaces may also require:a A method for sounding the alarm!b A description of potential emergencies!c A map of the workplace that shows evacuation routes and head count location% as well a
the location of emergency equipment% first aid station and fire e&tinguishers
d An evacuation% head count and rescue plan.
Plan Testing
At the discretion of the supervisor% emergency plan rehearsals may be held. A rehearsal shallrequire:
a Notification of emergency services% all supervision and possibly prior notification ofworkers!
b A pre'determined all clear signal to allow rapid return to work!c An evaluation system to determine the effectiveness of the emergency plan. #(his is
usually only a stopwatch timing to determine evacuation time..
Planning the Emergency Program
)f the pro*ect is located within a plant which has an e&isting emergency and evacuation plan% thesupervisor must learn it and establish only those procedures necessary to complement the plansystem and ensure a complete +mergency ,lan for the pro*ect site.
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
2/10
Guidelines for Preparing an Emergency Plan
All pro*ects require an emergency plan. (he magnitude and comple&ity of the plan depends onthe si"e of the pro*ect-workplace. equired elements are:
/. Assign a person that is responsible to provide or set up training for the emergencyresponse plan.
0. A method for reporting the emergency. 1enerally% telephone is the most effective!however% an alternative should e&ist if the emergency disables the site phones.
2. A list of workers responsible in emergency situations and how to contact them. (hisshould be plainly posted. +g. 3irst Aid
4. A plan for incident investigation and correction of ha"ard.
5. A list of phone numbers for emergency and support services. (his should be postedby the telephone.
6. A method for sounding an alarm% such as an air horn or warning bell.
7. A description of potential emergencies. (his is e&tremely important from aneducational standpoint. +mergency preparedness is essentially based on anticipatingall possible situations.
8. A map of the work place that shows evacuation routes% muster point% head countlocation% as well as location of emergency equipment% first aid station% firee&tinguishers. (his should be designed at the start of the *ob and posted where visibl
9. (he managers routine for shut down of the *ob. (his should be established to ensurethat if a shutdown occurs% no potential ha"ard may be left. 3or e&le% ensuring thathe power has been shut down before attempting an electrical contact rescue.
/;. A system for communication% both internal and e&ternal. (wo way radios% telephonesor alarms should be available.
//. An evacuation% head count and rescue plan. escues should only be attempted bytrained persons and only if they do not risk in*ury to themselves. +ach supervisorshould have a roll call system in place to ensure that all workers have been evacuatefrom the ha"ard area.
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
3/10
Muster Points – Sample
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
4/10
Emergency Procedure Checklist
Company Date
Completed by Site Site
In Progress CompletedDate
,rogram Administration #$ho is responsible for implementingthe plan>
+mergency esponse ?tandard @eveloped
@evelop ?ite +mergency ,lan
)dentify emergency access routes
)ndicate location of first aid stations-bo&es and fire
e&tinguishers
?how *ob office#s and storage facilities. #lankets and
special rescue equipment storage
+nsure speciali"ed ,,+ equipment is on site #indicate
location
+nsure sufficient medical aid supplies are available on
site #splints% stretchers etc. B location ocate other firefighting equipment #?tandpipes%
?iamese connections and hydrants
ocate main power supply to pro*ect
)dentify the location of emergency phones #,ost
emergency list
)dentify nearest hospital or medical center
)dentify worker evacuation route#s and assembly
area#s
Contact local fire% police and ambulance and providethem with your site plan and list of potentialemergencies.
ocate services to the pro*ect #both above ground and
underground
@evelop onsite traffic routes
ocate outside materials storage and fabricating areas
ocate cranes man-material hoists and unloading
docks
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
5/10
ocate flammable-combustible materials and cylinder
storage
In Progress CompletedDate
ocate garbage dumpsters and recycling bins
Complete Da"ard )dentification and +mergency
esponse checklist.
)dentify if Ehigh evelF rescue is a possibility.
@evelop +mergency esponse procedures for items
identified in your ha"ard assessment
+nsure that all trades on site keep daily personnel lists.
#)n the event of a ma*or emergency check namesagainst personnel gathered in the assembly area
)nclude requirements for written notices. #$hats
required> $hen> Completed by whom> $ho does it goto> ?ee legal obligations.
)dentify the emergency response team B alternates
#,ost names
,rovide speciali"ed training for + (eam members.
@esignate a contact person to call necessary
emergency services and +mployer
?elect member of + (eam to meet and directemergency services vehicles to accident scene
?elect team member to deal with the
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
6/10
Emergency umbers ! "
Date# $ocation#
Emergency %& '""
(ead %ffice#
Site Super)isor#
Safety Coordinator#
Emergency *esponse Team
Emergency Coordinator#
Call Person Emergency Ser)ices#
%nsite + %ff Site Coordinator#
Emergency Ser)ices Guide#
,irst -iders#
Site $ocation#
%ther#
General Contractor#
Cell o#
Sub!Contractor#
Cell o#
Sub!Contractor#
Cell o#
Sub!Contractor#
Cell o#
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
7/10
Emergency Numbers – 2
Company Name:
Ambulance
EMERGENCY RESPONSE TEAM
Police Co-ordinator:
Poison Control First Aid Attendants
Fire Department
Water Utility Stretcher Location
Electrical Utility
Gas Utility Site LocationAddress
Cable Utility
!ccupt"l #ealth $ Sa%ety Gate
OTHER
Name Position Office Phone After Hours
General Contractor
Electrical Contractor
&echanical Contractor
Sas'atche(an Dial )e%ore *ouDi+
,nsurance Company
(he nearest hospital is located at
,hone H
(he nearest clinic is located at
,hone H
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
8/10
P%ST E-* P(%ES./EEP C%P0 I 1E(IC$E
E)acuation Procedure
Emergency Call Se2uence
Call 9//Call pro*ect manager )mplement +mergency esponse ,rocedure
Definition#
An e)acuation is a pre'planned process for all personal on the construction site.
%nsite $ocation# ,re'arrange area where ,ersonal will report to. 3our areas could be plannedso that the area can be upwind of emergency location.
%ffsite $ocation: A pre'arrange location should be determined if the construction site area is nsafe.
Emergency *esponse Plan#
(he person who has this task will normally be the person in charge of the emergency responseoperation. )t is their task to ensure
• @elegate responsibility according to the training and e&perience of the workers in the
+mergency esponse (eam. e sure everyone clearly understands their roles andresponsibilities within the emergency response plan# +mergency esponse (eam '+mergency Numbers sheet )f this activity has been practiced or gone over during ameeting% this will help maintain order during the crisis.
• +nsure that emergency resources% whether people or equipment% are kept at adequate
levels in step with the progress of the pro*ect. (his can be done during work siteorientation% toolbo& or tailgate meetings% GBD? meetings or morning briefings.
Emergency *esponse Procedure#
+vacuation:
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
9/10
• ?ound the alarm = if there is an immediate threat to the occupants of the construction sit
#fire% gas leak% chemical spill. +vacuate to onsite location.
• Assume the roles and responsibilities of the +mergency esponse (eam.
• +liminate further loses and safeguard the area. Control the energy source causing the
emergency.
• )f the Construction ?ite is too dangerous% move personal to Gff ?ite ocation
Secure the ,acility Procedure
Emergency Call Se2uence
Call 9//
)mplement +mergency esponse ,lanCall +mployer
Definition#
?ite ?uperintendant-Charge ,erson = @esignated person who everyone reports to and theydirect all instructions to the staff.
?ecure the uilding =a preplanned process for securing all staff within the building in responseto an emergency situation outside the building. (he perimeter of the 3acility is locked% with all
occupants able to continue with regular activity.
Code $hite = a preplanned process for securing all staff within the building in response to anemergency situation inside the building. All occupants are secured in designated locked areas regular activities are stopped.
Emergency *esponse Plan#
Secure the 3uilding ! Intruder outside of building
• Call 9//
• Notify all personal in uilding that there is now a ?ecure the uilding
8/17/2019 2 03 Health and Safety Emergency Plan Guidelines
10/10
• Notify all personal in uilding that there is now a ?ecure Gffice or ?ecure oom.
• Secure and lock all e4terior and interior doors& ,ind a secure location a6ay from
intruder
• ,ull all blinds and curtains if required depending on the nature of the emergency
• Ieep everyone away from windows and doors and low to the floor.
• Contact @esignated Charge person with internal communication system and with any vit
information%
• emain Calm and wait for further information form charge person.
• @o not use radio% (J% or computers
• @o not open any doors unless directed by charge person
Tragic E)ents Procedure
Definition#
Any situation that occurs% on'site or off'site% that has a severe traumatic impact on the staff in thoffice% shop or on construction sites.
%nsite
Any critical incident that occurs at the construction site% shop or office can have a traumaticimpact on any first responders% witnesses% bystanders% and workers. 3ollowing the immediateactivity of any emergency response% whether it is a natural catastrophe or violent incident% the
shock and traumatic impact on any individual presents its self in many ways.
%ff!site
A tragic event that occurs in the surrounding community% locally% provincially% nationally% orinternationally could involve a staff member% their family or community member that it impactsthe individuals and construction company personal significantly. ?uch an event could be avehicle accident% serious illness% in*ury or death% a natural catastrophe or a violent act thatinvolves a individual who is part of the company.
Procedure
(he +mployer or designate shall:
• )f person is still at work have them go home with co worker or designated person.
• Activate a phone tree-or call an emergency meeting with workers.
• )nform workers of support system% if available.
• ,lan for debriefing