Indiana Bridge Inspection QA/QC Procedures
2017
INDOT
BRIDGE
INSPECTION
CONFERENCE February 15, 2017
Indiana Bridge Inspection QA/QC Procedures
Discussion Topics INDOT Quality Assurance Procedures/Scope
Focus Moving Forward/Reference Materials
Review of Changes to the Bridge Inspection Requirements
Indiana Bridge Inspection QA/QC Procedures
Need for QA/QC Procedures? Federal requirement for QA/QC
♦ 23 CFR 650.313(g) Quality Control and Quality Assurance requires each state to assure that systematic Quality Control (QC) and Quality Assurance (QA) procedures are being used to maintain a high degree of accuracy and consistency in the inspection program
Without QA/QC procedures in place, FHWA would find INDOT non-compliant, NBIS Metric #20
INDOT designated Beam, Longest & Neff (BLN) as Quality Assurance Officer (2011 – Present)
Indiana Bridge Inspection QA/QC Procedures
Goal of QA/QC Procedures?
To Help Ensure:♦ Accuracy
♦ Consistency
♦ A Quality Product
♦ Public Safety
♦ Maintenance and Repairs
♦ Prioritize Recommended Work
♦ Identify Training Needs
Indiana Bridge Inspection QA/QC Procedures
QA/QC Procedures
review is the Internal Review conducted from within an inspecting agency
Focuses on at-risk bridges
Office and field reviews
Reviewed by Inspection agency – INDOT or Inspection Consultant
Indiana Bridge Inspection QA/QC Procedures
QA/QC Procedures
review is the External Review conducted from outside an inspecting agency
Independent oversight reviews to focus on at-risk bridges
Reviews by INDOT and BLN
Indiana Bridge Inspection QA/QC Procedures
Quality Assurance Procedures Quality Assurance Reviews
♦ QA/QC Procedures – Part 2 Indiana Bridge Inspection Manual (IBIM)
♦ INDOT
Control Bridge – 2 year cycle
♦ BLN and BFS
Independent Oversight Review
Bridge File Review
County Load Rating Verification Reviews
Indiana Bridge Inspection QA/QC Procedures
Quality Assurance Review Scope♦ All reviews and forms in accordance with QA procedures per IBIM Part 2
♦ Bridge reviews as selected by INDOT
♦ 24 Bridges chosen for team leaders who did not attend control bridge, per IBIM Part 2, Section 3.2
Changes in Scope♦ QA form changes, IBIM Part 2, Appendix
♦ Office reviews revised to bridge file reviews
♦ Reviews based on Metric comparison and not a score
Quality Assurance Review Scope and Changes
Indiana Bridge Inspection QA/QC Procedures
Quality Assurance Review Scope and Changes Quality Assurance Form
♦ Metric Comparison vs. Scoring
Indiana Bridge Inspection QA/QC Procedures
Independent Oversight Review Independent review of inspection
data and findings for accuracy
Selected bridges based on posting, condition ratings, need for improvements, and Team Leader
Compared QA Officer results to original inspection results and notes
Reviews Conducted on District and Consultant Team Leaders throughout the state
Indiana Bridge Inspection QA/QC Procedures
Bridge File Review
Review of bridge files for accuracy and completeness
Selected bridges by INDOT search of files for known and suspected inaccuracies
Bridge file checked for required items as outlined in the AASHTO Manual for Bridge Evaluation, Section 2
Reviews of County and District bridges
Indiana Bridge Inspection QA/QC Procedures
Load Rating Verification Review
Independent Review of load rating computations for county bridges
Selected bridges based on INDOT query, consultant, team leader, condition ratings, and load posting
QA Officer performed field inspection and load rating
Compared QA Officer load rating to consultant load rating
Results reviewed based on QA form and NBIS Metric 13
Indiana Bridge Inspection QA/QC Procedures
Determined from findings from all QA reviews
Based on reoccurrence of similar comments and procedures♦ Bridge File
♦ Critical Findings
♦ Load Rating
♦ Fracture Critical Reports
Focus Moving Forward:
Indiana Bridge Inspection QA/QC Procedures
Bridge File Documentation IBIM Part 1, Section 2.5 and 4.1
Official bridge file is the central database information in BIAS, used to report NBI data and supplemental state information to FHWA
Historic data and updated bridge inspection data
Other attachments, past reports, load rating summary, correspondence, Scour Plan of Action reports, and special reports such as Underwater, Fracture Critical, Special Detail
Indiana Bridge Inspection Application System (BIAS): https://indot-it.bentley.com/login.aspx
Indiana Bridge Inspection QA/QC Procedures
Bridge File Documentation / Reports
Note enough deficiencies to provide justification for condition rating.
Verify deficiencies noted are consistent between sketches, comments, and executive summary
Bridge deck rating for adjacent box beam bridge without deck to be based on beam condition not wearing surface condition
Approve bridge data within 60 days of inspection
Use text and abbreviations that are easy to follow
Indiana Bridge Inspection QA/QC Procedures
Critical Findings Structural or safety related deficiency that requires
immediate follow-up inspection or action
IBIM Part 1, Section 5.2♦ All bridges - Notification to State Program Manager of critical finding and document finding in BIAS, IBIM 5.2.2
♦ Documented in BIAS under Maintenance Tab
Indiana Bridge Inspection QA/QC Procedures
Critical Findings IBIM Part 1, Section 5.2
♦ Locally owned bridges – Report to ERC and State Bridge Inspection Program Manager
♦ Inspection agency to document action taken in BIAS
♦ Take action in reasonable time
♦ Provide closeout documentation in BIAS to closeout critical finding report
Indiana Bridge Inspection QA/QC Procedures
Load Ratings IBIM Part 3
When in the Field……♦ Take extra time in field to verify structure member sizes, bridge dimensions, and section loss
♦ Document section loss and remaining section
♦ Verify condition at each phase of inspection, including annual inspections
Indiana Bridge Inspection QA/QC Procedures
Load Ratings
Indiana Bridge Inspection QA/QC Procedures
Load RatingsWhen in the Office…..
♦ If significant deficiencies or change in condition visible, calculate rating quickly and recommend load posting changes
♦ Verify remaining section or section loss noted matches load rating calculation
♦ Include shear and moment in load rating calculations
♦ Verify load rating calculations or summary are signed and include Load Rating Engineer(LRE) information
Indiana Bridge Inspection QA/QC Procedures
Load Ratings
When in the Bridge File…♦ Inspection agency to make sure load rating information added to bridge file in BIAS, does not have to include all pages of the calculation
♦ Make sure load rating matches BIAS data, must unapproved initial reports after load rating report approved
♦ Make recommendations for posting changes if needed. Remember to recommend advance posting signs.
Indiana Bridge Inspection QA/QC Procedures
Fracture Critical Reports IBIM Part 4
♦ Develop Fracture Critical or Special Detail reports
♦ Providing fatigue categories and ratings for all fracture critical members at connections
♦ Members within 12” of connection
Fracture Critical Member (Tension)
Limits of Fracture Critical Connection (12”)
Although this member is not
Fracture Critical, this portion is within the limits of a fracture critical connection
Fracture Critical Member (Tension)
Indiana Bridge Inspection QA/QC Procedures
Fracture Critical Reports IBIM Part 4
♦ Fracture Critical Reports to provide condition ratings and fatigue categories for floor beams at connections
♦ Need to report section loss
♦ Need to report cracks or holes
Indiana Bridge Inspection QA/QC Procedures
Fracture Critical Reports Fatigue Details – IBIM Part 4, Appendix B
Sample Report – IBIM Part 4, Appendix A
Indiana Bridge Inspection QA/QC Procedures
Additional Documents for Reference Indiana Coding Guide – BRAGI
FHWA Bridge Inspector’s Reference Manual
AASHTO Manual for Bridge Evaluation, 2010http://www.fhwa.dot.gov/bridge/nbis/pubs/nhi12049.pdf
Indiana Bridge Inspection QA/QC Procedures
Additional Documents for ReferenceManual for Repair and Retrofit of Fatigue Cracks in
Steel Bridges, FHWA-IF-13-020
AASHTO Manual for Bridge Element Inspection, 1st Ed.
http://www.fhwa.dot.gov/bridge/steel/pubs/hif13020/hif13020.pdf
Indiana Bridge Inspection QA/QC Procedures
Additional Documents for Reference Quality Control Documentation
♦ IBIM Part 2
NBIS Metrics for the Oversight of the National Bridge Inspection Program
https://www.fhwa.dot.gov/bridge/nbip/metrics.pdf
Indiana Bridge Inspection QA/QC Procedures
Past Year in Review Bridge Inspection Compliance Month (Memo 15-09)
♦ Counties > 150 bridges, inspection over 2 months (Memo 16-05)
Scour Assessment (Memo 16-01 & 16-13)♦ To be implemented per INDOT scour compliance schedule
♦ Now available in BIAS
Load Rating Policy (Memo 16-02)♦ Load Rating updates with AASHTOWare BrR per INDOT compliance schedule
Changes to Bridge Inspection Requirements
Indiana Bridge Inspection QA/QC Procedures
Changes to Bridge Inspection RequirementsPast Year in ReviewERMS Bridge Inspection Reports (Memo 16-03)
♦ Bridge Inspection Reports and files to be uploaded to ERMS bridge inspection documents database
Load Rating of New Bridges (Memo 16-06)
Culvert Type Structure Data in BIAS (Memo 16-07)
Reporting Critical Findings (Memo 16-08)
Team Member/Team Leader Profiles in BIAS (Memo 16-11)
Indiana Bridge Inspection QA/QC Procedures
Moving Forward… QA/QC procedures updates
♦ Always evolving process, QA procedures and forms
Review Compliance months for Load Rating and Scour Evaluations
Continue to reference bridge Inspection memos online ♦ Ongoing Discussion in INDOT/ACEC Bridge Inspection
Committee
♦ INDOT Bridge inspection home page
♦ Common errors during FHWA Reviews (Memo 15-08)
Changes to Bridge Inspection Requirements
Indiana Bridge Inspection QA/QC Procedures
Contact:
John Lukac [email protected]