1st Fortnightly KPI Report August,15

S. No. BSC Name Region Vendor

1X

Call Setup Success Rate (>=95%)

July-2nd

1 HYDBSC6680 STR1/STR5 Huawei 98.29

2 KHIZTEBSC-03 KTR ZTE 99.82

3 KHIZTEBSC-04 KTR ZTE 99.74

4 QTAZTE Overall WTR ZTE 95.4

Page 2: 1st 1X-EVDO Biweekly Report Summary August15 South

5 WTR ZTE 98.67

6 WTR ZTE 94.24

7 HYDZTEBSC STR1 ZTE 97.73

QTAZTE W/O Sites Basima and Sarap Zehri

QTAZTE only with Basima sarap zehri , Awaran , USF Mastung , naag , Nall

Page 3: 1st 1X-EVDO Biweekly Report Summary August15 South

8 QTABSC6680 overall WTR Huawei 97.2

9 WTR Huawei 98.24

10 WTR Huawei 95.64

QTABSC6680 W/O Sites Kohlu USF+Dhandhar+Chamalong

(WarZone)+tolegi

QTABSC6680 only with kohlu & USF Sites+Dhandhar and Chamalong

(WarZone) + tolegi

Page 4: 1st 1X-EVDO Biweekly Report Summary August15 South

1st Fortnightly KPI Report August,15

1X

Call Setup Success Rate (>=95%)Call Setup Success Rate (>=95%) Call Drop Rate (<=2%) Soft HO Success Rate (>=98%)

Aug-1st July-2nd Aug-1st July-2nd Aug-1st

98.28 1.53 1.97 99.67 98.48

99.76 0.73 0.51 99.89 99.9

99.84 0.93 0.92 98.65 98.65

89.66 1.59 1.49 99.6 99.3

Page 5: 1st 1X-EVDO Biweekly Report Summary August15 South

98.74 1.74 1.47 99.36 99.72

86.74 1.53 1.50 99.66 99.15

96.18 1.36 1.24 99.68 99.55

Page 6: 1st 1X-EVDO Biweekly Report Summary August15 South

97.55 3.45 2.88 98.88 99.12

98.62 3.14 2.63 99.07 99.35

96.09 3.94 3.23 98.6 98.83

Page 7: 1st 1X-EVDO Biweekly Report Summary August15 South

1st Fortnightly KPI Report August,15

1X EVDO Stats

TCH Congestion (<=2%) Connection Requests (Times)

July-2nd Aug-1st July-2nd Aug-1st July-2nd

0.02 0.06 1219609 1199655 98.3

0.01 0 12256501 13477563 97.09

0 0 9060677 9996451 97.26

3.98 10.71 6892836 7187614 91.32

Connection Setup Success Ratio (>=96%)

Page 8: 1st 1X-EVDO Biweekly Report Summary August15 South

0.2 0.18 6892836 7187614 91.32

5.39 14.58 6892836 7187614 91.32

0.85 1.57 9002446 9338343 93.8

Page 9: 1st 1X-EVDO Biweekly Report Summary August15 South

0.32 0.04 NO EVDO SITES NO EVDO SITES

0 0.02 NO EVDO SITES NO EVDO SITES

0.81 0.07 NO EVDO SITES NO EVDO SITES

NO EVDO SITES

NO EVDO SITES

NO EVDO SITES

Page 10: 1st 1X-EVDO Biweekly Report Summary August15 South

1st Fortnightly KPI Report August,15

EVDO Stats

Connection Drop Ratio (<=2%)

Aug-1st July-2nd Aug-1st

97.68 1.18 1.02

96.51 1.68 1.76

97.38 1.52 1.58

90.72 2.23 2.52

Connection Setup Success Ratio (>=96%)

Page 11: 1st 1X-EVDO Biweekly Report Summary August15 South

90.72 2.23 2.52

90.72 2.23 2.52

93.97 1.79 1.62

Page 12: 1st 1X-EVDO Biweekly Report Summary August15 South

NO EVDO SITES NO EVDO SITES

NO EVDO SITES NO EVDO SITES

NO EVDO SITES NO EVDO SITES

NO EVDO SITES

NO EVDO SITES

NO EVDO SITES

Page 13: 1st 1X-EVDO Biweekly Report Summary August15 South

1st Fortnightly KPI Report August,15

2nd Fortnightly July 2015 Comments

All KPIs within target limit.

All KPIs within target limit.

All KPIs within target limit.

EvDO kpis are too low because of RTR Freqeuncy point issues on different sites. TCH

congestion is bit high due to remote sites power and media issues.

Page 14: 1st 1X-EVDO Biweekly Report Summary August15 South

EvDO kpis are too low because of RTR Freqeuncy point issues on different sites. TCH

congestion is bit high due to remote sites power and media issues. CSR is bit low due to

Pa issues on turbat , uthal whereas congestion at naag and chitkan

EvDO kpis are too low because of RTR Freqeuncy point issues on different sites.

HYDZTEBSC EVDO CSSR is below the benchmark due to on-going Carrier Re-Framing

activity. RTR-B RSU are being swapped with RTR-D RSU supporting 1000 series carrier. It shall improve as the activity gets complete.

Page 15: 1st 1X-EVDO Biweekly Report Summary August15 South

KPI's overall are low due to 10 july STM issue connecting BSC to KHI MSC on 10th CSR is 10

% which is affecting overall BSC stats

KPI's overall are low due to 10 july STM issue connecting BSC to KHI MSC on 10th CSR is 10

% which is affecting overall BSC stats

KPI's overall are low due to 10 july STM issue connecting BSC to KHI MSC on 10th CSR is 10

% which is affecting overall BSC stats

Page 16: 1st 1X-EVDO Biweekly Report Summary August15 South

1st Fortnightly KPI Report August,15

1st Fortnightly August 2015 Comments

All KPIs within target limit.

All KPIs within target limit.

All KPIs within target limit.

EvDO are low because of "TCC Timinig Increase " on 1st and 8th of August (GAWADER BTS , a main

contributor) consquenlty CSSR degraded to 77 % and 84 % .CDR is a bit High because of PA disabling on "Shafi colony EvDO BTS " 1x CSSR is low and TCH

Congestion High because of distant users (FWD Power Shortage) on Naag , Awaran , Basima and USF BTS's

Kalat Coal Mines , Goal Patt and Killi Noor Muhammad BTS's

Page 17: 1st 1X-EVDO Biweekly Report Summary August15 South

EvDO Overall AvG KPI's are low because of TCC Timinig Increase on 1st and 8th of August (GAWADER BTS , a main contributor) consquenlty CSSR degraded

to 77 % and 84 % .CDR is a bit High because of PA disabling Issue on "Shafi colony EvDO BTS "

EvDO Overall AvG KPI's are low because of TCC Timinig Increase on 1st and 8th of August (GAWADER BTS , a main contributor) consquenlty CSSR degraded

to 77 % and 84 % .CDR is a bit High because of PA disabling on "Shafi colony EvDO BTS " 1x CSSR is low

and TCH Congestion High because of distant users (FWD Power Shortage) on Naag , Awaran , Basima and USF BTS's Kalat Coal Mines , Goal Patt and Killi Noor

Muhammad

HYDZTEBSC EVDO CSSR is on the improving trend as gradually RSU/Hardware issues are getting resolved.HW

& transmit power issues already highlighted with Operations Team.

Page 18: 1st 1X-EVDO Biweekly Report Summary August15 South

Overall CDR is a bit high due to Distant Users on Kalat , Harnai , Upper Chaman and Barshore BTS's.

Media/BTS Interruption on USF Baghdad and Kadin BTS's causes Neighbouring BTS's to share the load for

distance users causing droppage in calls ,

CDR is a bit High because of Distant Users on Kalat , Harnai , Upper Chaman , Barshore BTS's

High CDR is due to BTS Outages either due to (Power/Media ), main contributors are USF Baghdad ,Kadin and KHOLU BTS's causes

Neighbouring BTS's to share the load of distance users consequently result in High CDR

Page 19: 1st 1X-EVDO Biweekly Report Summary August15 South

EVDO Stats

Average Achieved Values 8239935 95.252

KPI (Targets) Connection Requests (Times)

Connection Setup Success   Ratio (>=96%)

Page 20: 1st 1X-EVDO Biweekly Report Summary August15 South

EVDO Stats CDMA 2000 1x Stats

1.7 96.88 1.50 99.17

Connection Drop Ratio (<=2%)

Call Setup Success  Rate

(>=95%)

Call Drop Rate(<=2%)

Soft HO Success Rate (>=98%)

Page 21: 1st 1X-EVDO Biweekly Report Summary August15 South

CDMA 2000 1x Stats

0.31

TCH Congestion (<=2%)

Page 22: 1st 1X-EVDO Biweekly Report Summary August15 South

S. No. BSC Name Region Vendor

CDMA 2000 1x Stats

Call Setup Success Rate (>=95%)

1 HYDBSC6680 STR1/STR5 Huawei 98.45 99.20 80.6 99.2

2 KHIZTEBSC-03 KTR ZTE 98.73 98.80 98.9 98.9

3 KHIZTEBSC-04 KTR ZTE

4 WTR ZTE

7 HYDZTEBSC STR1 ZTE 97.63 98.00 98.3 98.0

8 QTABSC6680 overall WTR Huawei 97.83 91.30 91.0 90.3

April Report #2

May Report #1

May

Report #2 June

Report #1

QTAZTE W/O Sites Basima and Sarap

Zehri

Page 23: 1st 1X-EVDO Biweekly Report Summary August15 South

1X EVDO Stats

Call Setup Success Rate (>=95%) Call Drop Rate (<=2%)

July-2nd Aug-1st July-2nd Aug-1st July-2nd Aug-1st July-2nd Aug-1st July-2nd Aug-1st

98.29 98.28 1.53 1.97 99.67 98.48 0.02 0 1219609 1199655

99.82 99.76 0.73 0.51 99.89 99.9 0.01 0 12256501 13477563

99.74 99.84 0.93 0.92 98.65 98.65 0 0 9060677 9996451

98.67 98.74 1.74 1.47 99.36 99.72 0.2 0.18 6892836 7187614

97.73 96.18 1.36 1.24 99.68 99.55 0.85 1.6 9002446 9338343

97.2 97.55 3.45 2.88 98.88 99.12 0.32 0.0

98.39 1.50 99.24 0.31 82399250 8239925

0

Soft HO Success Rate (>=98%)

TCH Congestion (<=2%)

Connection Requests (Times)

NO EVDO SITES

NO EVDO SITES

Page 24: 1st 1X-EVDO Biweekly Report Summary August15 South

EVDO Stats

July-2nd Aug-1st July-2nd Aug-1st

98.3 97.68 1.18 1.02

97.09 96.51 1.68 1.76

97.26 97.38 1.52 1.58

91.32 90.72 2.23 2.52

93.8 93.97 1.79 1.62

95.252 1.7

Connection Setup Success Ratio (>=96%)

Connection Drop Ratio (<=2%)

NO EVDO SITES

NO EVDO SITES

NO EVDO SITES

NO EVDO SITES

Page 25: 1st 1X-EVDO Biweekly Report Summary August15 South

Following BSCs have all Optimization (EVDO) KPIs upto the markHYDBSC6680KHIZTEBSC-03KHIZTEBSC-04

Sr.No

1

2

Page 26: 1st 1X-EVDO Biweekly Report Summary August15 South

BSC Bad KPIs

HYDZTEBSC DO CSSR (93.97%)

ZTEQTA DO CSSR (90.92%)& DO Connection Drop (2.52%)

Page 27: 1st 1X-EVDO Biweekly Report Summary August15 South

Remarks July #1

HYDZTEBSC EVDO CSSR is on the improving trend as gradually RSU/Hardware issues are getting resolved.HW

& transmit power issues already highlighted with Operations Team.

EvDO Overall AvG KPI's are low because of TCC Timinig Increase on 1st and 8th of August (GAWADER BTS , a

main contributor) consquenlty CSSR degraded to 77 % and 84 % .CDR is a bit High because of PA disabling

Issue on "Shafi colony EvDO BTS "

Page 28: 1st 1X-EVDO Biweekly Report Summary August15 South
Page 29: 1st 1X-EVDO Biweekly Report Summary August15 South

Following BSCs have all Optimization (EVDO) KPIs up to the mark:·         HYDBSC6680·         KHIZTEBSC-03·         KHIZTEBSC-04

Page 30: 1st 1X-EVDO Biweekly Report Summary August15 South