1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100
Page 2: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – External Beam Strengthening

Presentation tittle 2

Page 3: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Potential Markets

Presentation tittle 3

Page 4: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Potential Markets

No need forPre-stressed concretePre stressed concrete

anchor block

Presentation tittle 4

Page 5: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Industrial Volumes

Presentation tittle 5

Page 6: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Simple

• Off-Site Assembly & Grouting• Off-Site Strand Preparation• Light Stressing Equipment• Minimal Finishing Works

Presentation tittle 6

Page 7: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Flexible

• 1 Anchorage• 2 Anchoragesg

• 3 Anchorages• More …

Presentation tittle 7

Page 8: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – In-Built Corrosion Protection

• 1R15 Anchorage:1R15 Anchorage:Rilsan Coating (Fusion Bonded Nylon)

• Strand:• Strand: Ф15.7mm Galvanised, Greased & Sheathed

F ib• Freyssibar:Ф26.5mm @ 45% UTSHot Metal Spray (85%Zn 15%Al)

Presentation tittle 8

Hot Metal Spray (85%Zn - 15%Al)

Page 9: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Proven Technology

• Shear Anchorage

ESSAI 2 ( Rainuré , collé + pion )

300 300

Fv = 247.3 kN

200

250

L (k

N) 200

250

TAL

(kN

)

Fh = 134.5 kN

100

150EF

FOR

T VE

RTI

CA

100

150

EFFO

RT

HO

RIZ

ON

T

EFFORT VERTICALEssai fait sur béton B20 brute de

0

50

0

50

EFFORT HORIZONTALdécoffrage

0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16 0,18DEPLACEMENT ANCRAGE (mm)

Presentation tittle 9

Page 10: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Unobtrusive Upgrade

Presentation tittle 10

Page 11: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Features

• ComprehensiveS t i bl t h l• Sustainable technology

• Innovative• Inventive• Inventive • Repeatability• Versatibility• Versatibility• Adaptability• UpgradeUpgrade• Remedial• State of the ArtState of the Art• Architectural fixture

Presentation tittle 11

Page 12: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Repeatable

Presentation tittle 12

Page 13: 1R15 SYSTEM – External Beam Strengtheningfreyssinet.honlapberles.hu/pages/freyssinet/... · Fv = 247.3 kN 200 250 L (kN) 200 250 T Fh = 134.5 kN AL (kN) 100 EFFORT VERTICA 150 100

1R15 SYSTEM – Comprehensive

Presentation tittle 13