30
1 1QFY14 Results Presentation

1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

1

1QFY14 Results Presentation

Page 2: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

2

Key highlights – 1QFY14

Standalone performance

Highest ever Crude Steel production: 2.86 million tonnes

Saleable Steel sales: 2.55 million tonnes

Gross Turnover: `10,220 crores

Net Sales: ` 9,235 crores

Operating EBITDA: ` 1,749 crores

Net debt to equity: 1.14x

Consolidated performance

Gross Turnover: `11,155 crores

Net Sales: ` 10,141 crores

Operating EBITDA: ` 1,879 crores

Net debt to equity: 1.38x

JSW Steel –JSW Ispat merger update

The Scheme of Amalgamation and Arrangement has become effective from June, 2013.

Page 3: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

3

Agenda

Business Environment

Operational Performance

Financial Performance

Iron ore update and Guidance

Projects Update

Page 4: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

4

Global economy

Source: Bloomberg, Reuters

Global economic recovery is sluggish

-15

-10

-5

0

5

10

15

20

Au

g-07

Jan

-08

Jun

-08

No

v-08

Ap

r-09

Sep

-09

Feb

-10

Jul-

10

De

c-10

May

-11

Oct

-11

Mar

-12

Au

g-12

Jan

-13

Jun

-13

US Eurozone China Japan

Industrial Production (% YoY growth)

40

45

50

55

60

Ap

r-07

Oct

-07

Ap

r-08

Oct

-08

Ap

r-09

Oct

-09

Ap

r-10

Oct

-10

Ap

r-11

Oct

-11

Ap

r-12

Oct

-12

Ap

r-13

US Eurozone China Japan

Purchasing managers Index

Page 5: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

5 Source: World Steel Association, Steel Business Briefing, Platts, NBS China, JSW Steel

WSA forecasts CY2013 global steel demand growth of 2.9%

Global steel scenario

-6.0%

-3.0%

0.0%

3.0%

6.0%

9.0%

No

rth

Am

eri

ca EU

Ko

rea

Sou

thA

me

rica CIS

Afr

ica-

Mid

dle

Eas

t

Wo

rld

Jap

an

Ind

ia

Ch

ina

Global crude steel production for 1HCY2013 (% YoY growth)

475

550

625

700

775

850

Ap

r-11

Jun

-11

Au

g-11

Oct

-11

De

c-11

Feb

-12

Ap

r-12

Jun

-12

Au

g-12

Oct

-12

De

c-12

Feb

-13

Ap

r-13

Jun

-13H

RC

pri

ces

($/t

on

ne

)

North America Dom. ExW Europe import CIFBlack Sea export FOB China export FOB

-12%

-6%

0%

6%

12%

18%

24%

Ap

r-11

Jun

-11

Au

g-11

Oct

-11

De

c-11

Feb

-12

Ap

r-12

Jun

-12

Au

g-12

Oct

-12

De

c-12

Feb

-13

Ap

r-13

Jun

-13

China Crude Steel Production (% YoY growth)China Apparent Steel Consumption (% YoY growth)

India and China have driven crude steel production growth in 1HCY13

HRC prices have weakened since Mar 2013 in key global markets (except North America)

However finished steel inventories across key markets are not at excessive levels

Page 6: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

6

Indian economy and steel industry

Source: Central Statistical Organisation, Bloomberg, MOSPI, JPC, JSW Steel

Good monsoon is expected to drive steel demand in 2HFY14

-15%

0%

15%

30%

Ap

r-08

Au

g-08

De

c-08

Ap

r-09

Au

g-09

De

c-09

Ap

r-10

Au

g-10

De

c-10

Ap

r-11

Au

g-11

De

c-11

Ap

r-12

Au

g-12

De

c-12

Ap

r-13

Overall IIP Durables Cement Vehicle Sales

0

5

10

15

Ap

r-07

Oct

-07

Ap

r-08

Oct

-08

Ap

r-09

Oct

-09

Ap

r-10

Oct

-10

Ap

r-11

Oct

-11

Ap

r-12

Oct

-12

Ap

r-13

Ch

ange

-%

Yo

Y

Overall WPI Food Inflation1

9.4

17

.819

.6

17

.8

Crude Steel Production Apparent Finished Steel

Consumption*Apr-Jun'12 Apr-Jun'13

1.0%0.3% Overall economic activities have been weak during

Apr-June 2013, Govt. policy actions/reforms not enough to counter headwinds of a high trade deficit, weakening INR

Though WPI Inflation is below 5%YoY, Jun 2013 print saw an uptick driven by food inflation

Steel demand has been flattish during Apr-Jun 2013

Page 7: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

7

Agenda

Business Environment

Operational Performance

Financial Performance

Iron ore update and Guidance

Projects Update

Page 8: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

8

2.14

2.86 2.84

1QFY13 (reported)

1QFY14 1QFY13 (proforma*)

Crude Steel Production

Volumes – standalone

All figures are in million tonnes

* Re-classified for the purpose of comparison only

YoY

34%

1QFY13

(reported) 1QFY14

1QFY13 (Proforma*)

Flat 1.61 2.23 2.28

Long 0.44 0.45 0.44

2.11

2.55 2.57

1QFY13 (reported)

1QFY14 1QFY13 (proforma*)

Saleable Steel Sales

YoY

21%

1QFY13

(reported) 1QFY14

1QFY13 (proforma*)

Flat 1.67 2.11 2.12

Long 0.38 0.42 0.38

Semis 0.05 0.03 0.07

Page 9: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

9

242

311

135

120

1Q FY13 (proforma*)

1Q FY14

JSW Steel JSW Coated Products

JSW Shoppe

* Re-classified for the purpose of comparison only

Retail Sales (in ‘000 tonnes)

377 441 Branded product sales up by 21 %

Colour Coated sales up by 72 %

Longs sales increased by 68%

Presence in 172 Districts and 25 States/ UT’s through 415 JSW Shoppes

YoY

17%

Page 10: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

10

Agenda

Business Environment

Operational Performance

Financial Performance

Iron ore update and Guidance

Projects Update

Page 11: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

11

Financials – standalone

*As reported

**Not Annualized

Particulars 1QFY14 1QFY13*

Gross Turnover 10,220 9,910

Net Sales 9,235 9,030

Operating EBITDA 1,749 1,773

Other Income 72 72

Finance Cost 642 407

Depreciation 644 468

Exceptional Items (853) (592)

Profit Before Tax (317) 379

Tax (97) 110

Profit after Tax (221) 269

Diluted EPS (`)** (9.47) 11.69

` Crores

Page 12: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

12

Operating EBITDA movement – standalone

•As reported

` Crores

1,773 1,749

(51)

(630)

395 11 20

231

EBITDA*1QFY13

Volume NSR Cost Mix Others Amalgamation and Arrangement

EBITDA1QFY14

Page 13: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

13

Key P&L data 1QFY14

Net Sales 1,938.19

EBITDA 78.90

Finance Cost 23.35

Depreciation 38.72

Exceptional Items (7.38)

Net profit After Tax 2.97

Volumes 1QFY14

Production 0.34

Sales 0.33

` Crores

Million tonnes

Operational performance – JSW Steel Coated Products

Page 14: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

14

Particulars 1QFY14 1QFY13

Turnover 79.76 103.67

EBITDA + Other Income 0.60 6.39

Profit After Tax (13.65) (8.16)

Sales (net tonnes) 1QFY14 1QFY13

Plate Mill 81,850 68,741

Pipe Mill 9,593 24,079

Production (net tonnes) 1QFY14 1QFY13

Plate Mill 91,256 98,102

Utilization (%) 35% 39%

Pipe Mill 8,433 22,011

Utilization (%) 6% 16%

USD mn

Operational performance – US Plate & Pipe Mill

Net tonnes = 0.907 metric tonnes

Page 15: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

15

Operational performance – Chile

USD mn

Particulars 1QFY14 1QFY13

Production (Tonnes) 209,623 194,886

Sales (Tonnes) 153,898 343,249

Turnover 17.36 44.75

EBITDA 0.86 8.48

Profit after Tax (0.72) 5.27

Page 16: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

16

Financials – consolidated

*As reported

**Not Annualized

Particulars 1QFY14 1QFY13*

Gross Turnover 11,155 10,781

Net Sales 10,141 9,902

Operating EBITDA 1,879 1,908

Other Income 19 31

Finance Cost 718 461

Depreciation 750 533

Exceptional Items (862) (595)

Profit Before Tax (431) 351

Tax (32) 151

Share of Associates and Minority Interest 17 (150)

Profit after Tax (382) 50

Diluted EPS (`)** (16.13) 1.86

` Crores

Page 17: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

17

19,533

29,135

2,687

(971) 1,020

522

6,344

Net Debt*as on Mar'13

New Loan Taken Repayments Fx Impact Movement in FD / MF

Amalgamation and Arrangement

Net Debt*as on Jun'13

Net debt* movement – consolidated

` Crores

*Net Debt excludes Acceptances

Particulars 30.06.2013 31.03.2013

(reported)

Cash & cash equivalent (` Crores) 1,377 1,813

Net Debt/Equity (x) 1.38 1.11

Net Debt/EBITDA (x) 4.08 3.00

Page 18: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

18

Agenda

Business Environment

Operational Performance

Financial Performance

Iron ore update and Guidance

Projects Update

Page 19: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

19

Projects' update – JSW Steel

Micro Pelletisation Plant (0.6 MTPA) at Vijayanagar : Commissioned in June 2013

Railway Siding Project at Dolvi: Commissioned in June 2013

Page 20: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

20

Projects' update contd.. – JSW Steel

600 TPD Lime Calcination Plant 3 at Dolvi: targeted to be commissioned in 2QFY14

Caster 4 (1,600mm wide in SMS 1) at Vijayanagar: Commissioned in July 2013

Page 21: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

21

Projects' update contd.. – JSW Steel

Cold Rolling Mill -2: Phase I is targeted to be commissioned in FY14 and Phase II by FY15

4QFY13 1QFY14

4QFY13 1QFY14

Page 22: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

22

Projects' update contd.. – JSW Steel

4 MTPA Pellet plant at Dolvi: targeted to be commissioned in FY14

4QFY13 1QFY14

4QFY13 1QFY14

Page 23: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

23

Projects' update contd.. – JSW Steel

1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

4QFY13 1QFY14

4QFY13 1QFY14

Page 24: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

24

Projects' update – JSW Steel Coated Products

Colour-coating line (appliance grade, 0.075MTPA)at Vasind : Commissioned in May 2013

New Galvanizing line at Tarapur : targeted to be commissioned in 2QFY14

4QFY13 1QFY14

Page 25: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

25

Projects' update contd.. – JSW Steel Coated Products

Railway Siding Project at Vasind: targeted to be commissioned in 2QFY14

4QFY13 July ‘13

Page 26: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

26

Agenda

Business Environment

Operational Performance

Financial Performance

Iron ore update and Guidance

Projects Update

Page 27: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

27

Karnataka Iron ore update

CEC: The Central Empowered Committee

MTPA: million tonnes per annum

Iron ore availability is improving but at a slow pace

Key outcome from the Hon’ble Supreme Court‘s decision

The Hon’ble Court has approved:

Resumption of mining operations in all the mines of category ‘A’ and 63 mines of category ‘B’ subject to certain terms and conditions as stipulated by the CEC

Sale of sub-grade Iron Ore

Cancellation of category ‘C’ mines and assigning/allotting through a transparent bidding process to end users

The Hon’ble Court has also allowed grant of fresh mining leases and consideration of pending applications

Status of R&R plan approvals by the CEC

29 mines in category ‘A’ (permitted capacity of ~8 MTPA)

28 mines in category ‘B’ (permitted capacity of ~8 MTPA)

Status on resumption of mining operations

10 mines in category ‘A’ (capacity of ~5 MTPA)

2 mines in category ‘B’ (capacity of ~1 MTPA)

Page 28: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

28

10.64

11.55

FY13 (proforma*) FY14 E

Saleable Steel Sales

Guidance for FY14 - Standalone

All figures are in million tonnes

* Re-classified for the purpose of comparison only

11.20 12.00

FY13 (proforma*) FY14 E

Crude Steel Production

YoY %

7% YoY %

9%

Page 29: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

29

Forward looking and cautionary statement

Certain statements in this report concerning our future growth prospects are forward looking statements, which involve a number of risks, and uncertainties that could cause actual results to differ materially from those in such forward looking statements. The risk and uncertainties relating to these statements include, but are not limited to risks and uncertainties regarding fluctuations in earnings, our ability to manage growth, intense competition within Steel industry including those factors which may affect our cost advantage, wage increases in India, our ability to attract and retain highly skilled professionals, time and cost overruns on fixed-price, fixed-time frame contracts, our ability to commission mines within contemplated time and costs, our ability to raise the finance within time and cost client concentration, restrictions on immigration, our ability to manage our internal operations, reduced demand for steel, our ability to successfully complete and integrate potential acquisitions, liability for damages on our service contracts, the success of the companies in which the Company has made strategic investments, withdrawal of fiscal/governmental incentives, impact of regulatory measures, political instability, legal restrictions on raising capital or acquiring companies outside India, unauthorized use of our intellectual property and general economic conditions affecting our industry. The company does not undertake to update any forward looking statements that may be made from time to time by or on behalf of the company.

Page 30: 1QFY14 Results Presentation - JSW · Railway Siding Project at Dolvi: Commissioned in June 2013 . 20 ... – JSW Steel 1 MTPA Coke Oven at Dolvi: targeted to be commissioned in FY14

30

Thank you