    PROJECT DIGEST

    Project Title : Railway Double Tracking of Semarang Gambringan

    Surabaya on Java North ine

    !a"ic Policy : #nfra"tructure #m$rovement to Su$$ort !u"ine""

    Develo$ment of Railway"

    Sector : Tran"$ortation

    Sub%"ector : Railway Tran"$ortation

    Program : Railway Develo$ment

    ocation" : &entral Java' (a"t Java

    Duration : )* month" +e,clu-ing warranty $erio-.

    /ain (,ecuting 0gency : Directorate General of Railway" +DGR.

    I. Background and Necessity of the Proect

    !. Background

    The management "tructure of the #n-one"ian railway organi1ation change- in 2333

    when the a-mini"trative right" were tran"ferre- from the government to the national

    railway cor$oration PT4 5ereta 0$i +Per"ero.4 The infra"tructure +railway track"'

    bri-ge"' "ignaling "y"tem"' etc4. i" "till owne- by the government' but other

    facilitie" an- o$erational e6ui$ment +"tation buil-ing"' rolling "tock' etc4. are now

    a""et" of PT4 504

    The #n-one"ian tran"$ortation "ector ha" become increa"ingly com$etitive an- PT4

    50 recently e"tabli"he- a bu"ine"" im$rovement $lan focu"ing on the i"lan-" of

    Java an- Sumatra4 Thi" $lan inclu-e" the following objective":

    7 8ithin five year"' the freight tran"$ort volume on the i"lan-" will be increa"e-

    by 9); from the $re"ent level4

    7 0" agree- to in a memoran-um between PT4 50 an- the Port 0uthority of

    Surabaya' 2' T(

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    2/15

    7 PT4 50 inten-" to $urcha"e 2= locomotive" an- 9'> wagon" for hauling

    freight on both i"lan-"4

    The ?ea"ibility Stu-y on !u"ine"" Develo$ment of Railway Tran"$ortation for PT4

    5ereta 0$i +Per"ero. ma-e by PT4 Pricewaterhou"e&oo$er" &or$4 ?0S an- Ja$anTran"$ortation &on"ultant" #nc4 in Se$tember 92 conclu-e- that:

    7 The $rocurement of 2 locomotive" an- 2'@2 wagon" i" re6uire- for Java

    #"lan-4

    7 0lthough PT4 50 e"timate" that freight tran"$ort by train between Surabaya an-

    Jakarta on Java North ine will amount to 2' T( an- ) train" re"$ectively4

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    3/15

    Cowever' a" the current average line ca$acity on the Semarang Gambringan

    an- Gambringan Surabaya "ection" i" only == an- =9 train" $er -ay

    re"$ectively' the line ca$acity will be e,cee-e- in the near future4

    &on"i-ering the limit" im$o"e- by the current line ca$acity a" well a" the

    e,$ecte- increa"e in -aily train fre6uency' -ouble tracking of the Semarang

    Gambringan Surabaya Pa"arturi "ection" "houl- be un-ertaken imme-iately4

    II. O#ecti$es

    . Su%%ary

    The -ouble tracking $roject aim" to:

    2. #ncrea"e line ca$acity on the Semarang Gambringan Surabaya "ection"

    9. Shorten railway travel time on the Semarang Gambringan Surabaya "ection"

    ). #ncrea"e o$erational "afety along Java North ine

    >. &on"truct continuou" -ouble tracking on the &ikam$ek &irebon Tegal

    Semarang &e$u Surabaya "ection"

    =. Su$$ort PT4 50A" bu"ine"" -evelo$ment $rogram an- national economic

    -evelo$ment by im$roving railway tran"$ortation

    III. &ine Ca'acity and Train (re)uency

    24 ine &a$acity an- Train ?re6uency between Semarang &e$u an- &e$u

    Surabaya Pa"arturi i" "hown in Table%2' Table%9' ?igure%9 an- ?igure%)

    re"$ectively4

    3

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    4/15

    4

    ?

    igure%2TrainB$erationforNew?

    reightTran"$ortationinJavaNorthine

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    5/15

    Ta#*e + !&ine Ca'acity and Train (re)uency

    #et,een Se%arang + Ce'u on Ja$a North &ine

    5

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    6/15

    Ta#*e +"

    &ine Ca'acity and Train (re)uency

    #et,een Ce'u + Sura#aya Pasarturi on Ja$a North &ine

    6

    (igure+" &ine Ca'acity and Train (re)uency

    Bet,een Se%arang Ta,ang and Ce'u

    Ja$a North &ine

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    7/15

    94 0" the above table" an- figure" "how' $artial -ouble tracking i" urgently re6uire-

    between Semarang an- Surabaya -ue to in"ufficient line ca$acity4 Cowever' -ouble

    7

    (igure+- &ine Ca'acity and Train (re)uency

    Bet,een Ce'u and Sura#aya Pasarturi

    Ja$a North &ine

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    8/15

    tracking of the whole line between Semarang an- Surabaya i" "trongly

    recommen-e- to en"ure "afe train o$eration"4

    I. Sco'e of /ork

    The -ouble tracking $roject of the Semarang Surabaya "ection inclu-e" both

    engineering "ervice" an- con"truction work4

    !. Engineering Ser$ices

    Survey" an- -etaile- -e"ign

    Pre$aration of ten-er an- contract -ocument"

    &on"truction co"t e"timation

    Ten-er a""i"tance an- evaluation

    &on"truction "u$ervi"ion

    ". Construction /ork

    Roa-be-"

    Track"

    !ri-ge"

    &T& "ignaling "y"tem" an- a""ociate- facilitie" for the "econ- track

    -. Construction Co%'onents

    The con"truction work inclu-e" the item" "hown below4

    #tem

    Semarang %

    Gambringa

    n

    Gambringan

    % &e$u

    &e$u

    %!abat!abat

    SurabayaTotal

    Section length *4)3 km E@4E3@ km E24** km *349 km 9E343E km

    Permanent way *4)3 km E@4E3@ km E24** km *349 km 9E343E km

    Track

    /ain lineSi-ing"

    Turnout"

    *4)3 km@ km

    @@ "et

    E@4E3@ km3 km

    33 "et

    E24** kmE km

    EE "et

    *349 km22 km

    292 "et

    9E343E km)= km

    )@= "et

    !ri-ge" E> E= *9 =E 9*@

    Tunnel" % % % % %

    /o-ification of

    8

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    9/15

    "ignaling

    -&T&

    -Station

    interlocking

    2 "et

    @ "ta

    2 "et

    3 "ta

    2 "et

    E "ta

    2 "et

    22 "ta

    > "et"

    )= "ta

    . I%'*e%entation Schedu*e

    The im$lementation "che-ule i" ba"e- on $a"t work e,$erience an- the e,$ecte- work

    volume of the $roject4 The "che-ule in ?igure F%2 "how" all major activitie" from the

    -e"ign "tage until $roject com$letion4

    9

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    10/15

    10

    I.

    Consu*tingSer$ices

    !.Sur$ey0Design

    ".Tender1ssistance

    II.

    Construction

    !.2anufacturing

    "./orkE3ecution4

    !5Per%anent/ay

    "5Tracks

    65Signa*ing

    +Signa*

    FHO

    FHO

    Non-Signal

    Signal

    WarrantyPeriod

    III.Consu*tingSer$ices

    forSu'er$ision

    (ig.

    +!4I%'*e%entationSchedu*eforDou#*eTr

    ackingofSe%arang+Ga%#ringan+C

    e'u+Sura#aya7"8"k%5

    1cti$ity

    9ear:2onth

    !st 9ear

    "nd9ear

    -rd9ear

    6th9ear

    ;th9ea

    r

    >

    &oncrete work on R& gir-er" m) ='3=

    (rection of R& gir-er" S 2

    (arth work m) )@@'3*=

    Pile work m) )'=2

    &oncrete work m) >)'=)

    Rebar" ton E'*>=

    Structural "teel work +tem$4 $rotection. ton 9'=99

    eveling concrete m) 2')=@

    &obble"tone" m) 9'E2

    ea"e" of machinery S 2/obili1ation-emobili1ation S 2

    /i"cellaneou" work S 2

    Tran"$ortation an- han-ling S 2

    7Ite% 4 Signa*ing faci*ities5

    #tem 3

    Tran"$ortation an- han-ling S 2

    II. Technica* Infor%ation 7Se%arang ? Ga%#ringan ? Ce'u ? Ba#at ? Sura#aya5

    !. E3isting Conditions4

    13

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    14/15

  • 7/25/2019 (1)Project Digest 3 Main-Railway Double Tracking on Java No

    15/15

    Double tracking will have an im$act on all "ocial an- economic level" both -uring

    con"truction an- after com$letion of the $roject:

    2. The $ercentage of local content i" very high a" almo"t all material" an- $ro-uct"

    re6uire- for con"truction +concrete' "tructural an- reinforcing "teel' etc4. are

    available in the local market4

    9. /any e,i"ting "mall an- me-ium%"i1e- firm" locate- a-jacent to the $roject "ite

    may be u"e- in the con"truction work a" "ubcontractor" or "u$$lier"4

    ). 0 large labor force will be em$loye- from aroun- the $roject "ite4 #t i" e"timate-

    that it will number in the thou"an-" $er -ay throughout the con"truction $erio-4

    >. Sub"tantial ca$ital inve"tment an- -i"bur"ement from a "ecure- loan will

    generate ca"h flow" which will "timulate the regional economy -uring thecon"truction $erio-4

    =. /ore fre6uent an- fa"ter rail "ervice" will generate higher traffic volume" which

    in turn will have a $o"itive im$act on regional economic -evelo$ment a" well a"

    touri"m' in-u"triali1ation an- commerce4 Such regional -evelo$ment will

    ultimately contribute to the revitali1ation of the national economy4

    *. The con"truction of -ouble tracking ha" been evaluate- a" being economic -ue

    to "aving" in $a""enger an- freight tran"$ortation time' energy e,$en-iture a"

    well a" roa- con"truction an- maintenance co"t"4

    E. Rail i" a form of ma"" tran"$ortation known for it" "afety' $unctuality an- "$ee-4

    Double tracking will increa"e rail traffic without "acrificing the"e benefit"4

    @. Double tracking will increa"e line ca$acity' allow the o$eration of more train"

    an- increa"e the volume of economy cla"" an- freight traffic' thu" im$roving the

    -i"tribution of "ta$le "u$$lie" an- "trategic goo-"4

    9) /o-ern railway" are con"i-ere- to have a "maller im$act on the environment

    -ue to lower energy con"um$tion an- re-uce- air $ollution' noi"e an- vibration

    level"4

    15