China Institute of Atomic Energy The Beam Commissioning of BRIF and Future Cyclotron Development at CIAE 19586HB2014 Workshop, MSU Tianjue Zhang for BRIF Project China Institute of Atomic Energy 2014-11-12

1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

The Beam Commissioning of BRIF and

Future Cyclotron Development at CIAE

1958年6月

HB2014 Workshop, MSU

Tianjue Zhang for BRIF Project

China Institute of Atomic Energy

2014-11-12

Page 2: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

The Beam Commissioning of BRIF

Future Cyclotron Development at CIAE

Page 3: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Tandem Accelerator

Superconducting LINAC

booster 2 MeV/q

Isotope Separator On-Line

20000 mass resolution

Compact proton cyclotron

100 MeV 200 mA

Brief Introduction of BRIF

(Beijing Radioactive Ion-beam Facility)

Page 4: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

N_q7

Tu

N_q4

BPMFC

N_sx1

N_q3

N_sy2

N_sw1

闸板阀

闸板阀

SSBPMN_sx2

BPMN_sy1管

道调节段

闸板阀

S_sy0

S_q1

S_sw0

S_q2

FCSS管道调节段

挡束靶

闸板阀闸板阀

闸板阀S_sx1 S_

sx4

S_sy4

S_sx2

FC

FC

S1S2

S3SS

SSSS

S_q5

S_q6 S_sy2

S_q9

S_q10

S_q13

S_q14

闸板阀

限束靶

S_q7

S_q8

闸板阀

闸板阀

N_sw0

N_q1

N_q2

N_sy0

管道调节段

FCSS

S_sy1

FC

S_sx5

S_sy5

S_q15

SS

S_q16

挡束靶

FC

S_q17

S_q18

N_q5

N_q6

闸板阀

New Building

Old Building

Page 5: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Radioactive Ion Beam Physics

Nuclear Physics

Medicine & Industry

Page 6: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Commence building on 2011-4-28

2012-1-16 Now

Page 7: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

General View of the 100 MeV Cyclotron

Page 8: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Characteristics: Compact structure;

CW mode, high beam current;

High electric power conversion rate;

70-100MeV energy variable;

Dual beam extracted simultaneously;

Low extraction beam losses.

Page 9: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

The installation, mapping and shimming of the main magnet

system are finished by July, 2013, total weight is 436 tons

Page 10: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

The measured Q factor

reaches 9500,world

record of the compact

cyclotron

RF system

Page 11: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Other sub-systems

Page 12: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Field map is measured in the

vacuum for the first time in

the world, the final phase slop

less than 10

First compact cyclotron with

straight sector pole for energy

beyond 70 MeV in the world

Developing a parallel computation code, which is implemented in 6

institutes to study space charge effects and multi-pacting effects.

Technical

Innovations

0 10 20 30 40 50 60 70 80 90 100

Energy/MeV

-15

-10

-5

-0

5

10

15

Inte

gral

Pha

se S

hift

dE=0.24MeV

Voltage form 60kev to 120kev

Voltage form 50kev to 100kev

Page 13: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

The multi-cusp ion source was tuned up and could provide 5mA,

38 keV H- beam.

On December 18 of 2013, we got 320 μA DC beam on an

internal target. The transmission efficiency from the ion source

to the exit of inflector is higher than 60%.

On June 16 of 2014, the internal target is moved to 1 MeV

region and successfully catch 109 μA beam under the condition

of 20% rf duty cycle, corresponding to an injection efficiency of

more than 10%.

we gradually increased the duty cycle and reached CW mode

operation.

Beam Commissioning

Page 14: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

加速器外荧光

靶上束斑

July 4, 2014, First 100 MeV Proton Beam Witness

Page 15: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

12 hours running test with beam current > 23 mA

July 25, 2014

Page 16: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

CCTV、新华社、中国新闻社、人民网、凤凰网、《科技日报》、《光明日报》《经济日

报》、《中国科学报》、《中国军工报》、《中国核工业报》、《健康报》和北京电视

台等多家地方电视台和网络媒体陆续报道。 Media Reports

Page 17: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

CIAE

来自回旋的质子束

RIB To

Tandem

The ISOL System

Page 18: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

CIAE

In May of 2014, the stable 39K beam is tested for commissioning

and is successfully transported to the front of the HI-13 tandem.

The mass resolution is better than 10000. The transmission

efficiency is higher than 70% under the high mass resolution

condition.

The ISOL System

Page 19: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Superconducting Booster

In March of 2014, The sputtering

experiment for the first QWR

cavity is done and the measured

quality factor is about 3108.

During low-temperature test, the

power is successfully fed into the

cavity and the measured

accelerating gradient is 2.5MV/m.

the procedure of low-temperature

rf conditioning is established and

the functionalities of the low-level

rf control system were debugged

in detail.

The QWR cavity before and after

the sputtering process

Page 20: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

The beam-loading

experiment of the pulsing

system is carried out for 2

times.

The pulsing equipment

results agreed well with

the designing. We tested

the chopper and buncher

by using the oxygen beam.

Superconducting Booster

The measured wave profile of the pulsed beam

by using the capacitive ring (FWHM of beam

length is 2 ns)

Page 21: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

The Beam Commissioning of BRIF

Future Cyclotron Development at CIAE

Page 22: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Ion Source ~1 MeV Pre-injector

(C-W or RFQ)

100 MeV Injector

Cyclotron

800 MeV Ring

Cyclotron

Target Station

Bending Magnet

CIAE High Power Cyclotron Proposal

Our option: p

(rather than H2+)

• Better extracted beam quality

• Mature technology

• Lower engineering risk

Target Station

Target Station

Page 23: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

We proposed an 800

MeV high power

proton cyclotron

complex to provide

high power proton

beam for ADS,

neutron science,

proton radiography,

radioactive ion

production and other

high power

applications.

CIAE Proposal

Page 24: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Top proton beam power accelerators

Page 25: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Layout of the 800MeV cyclotron pole number 9

kinetic energy (MeV) 100-800

magnetic rigidity (T∙m) 1.48-4.88

average orbit radius (m) 2.76-5.42

cyclotron radius (m) 8.0

RF frequency(MHz) 44.37

harmonic number

main cavity number 5

flat-top cavity number 1 or 2

Qr/ Qz at extraction 1.55/1.40

Qr max/min 1.85/1.10

Qz max/min 1.40/1.05

dR/dn at extraction (mm) 7 (centering

injection)

dR/dn max/min (mm) 35/6

[T.J. Zhang et al.,

NIM-B,2011]

Page 26: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Ideal Field Map

Tune diagram

Phase slip

Page 27: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

3D Magnet Design

3D FEM magnet model is built

Good isochronous magnetic field is found

The design of normal ring conducting coil is straightforward

Page 28: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Beam Dynamic Design

0.8

0.9

1

1.1

1.2

1.3

1.4

1.5

1 1.2 1.4 1.6 1.8 2 2.2

nur

nuz

三维磁场

理想场

Average field

Particle orbit

Phase slip

Tune diagram

Page 29: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Structure B

The space-charge-limited beam

current is increased to 2 mA by

avoiding the crossing of Qr=1 and

Qr=2Qz resonance. More work need

to further increase beam current.

Space charge simulation

by OPAL-cycl

Structure A

Page 30: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

RF cavity design

2.5 3.0 3.5 4.0 4.5 5.0 5.5

400

500

600

700

800

900

1000

r/m

Volta

ge

/ k

V

cavity number 5

peak voltage (MV) 1.0

frequency (MHz) 44.37

length (m) 5.0

height (m) 3.63

cavity center (m) 4.4

inner radius (m) 1.9

outer radius (m) 6.9

cavity width (m) 0.4

cavity azimuth (˚) 25.0

cavity rotation angle (˚) 15.0

Voltage profile

Page 31: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy 31

pole type straight sector

pole number 4

hill field (T) 1.15

average field (T) 0.36-0.41

pole radius (mm) 4134

Azimuth width (˚) 22-30

hill gap (mm) 40

yoke inner radius (mm) 4300

yoke outer radius (mm) 6100

cavity number 2

cavity type double-gap

outer radius (mm) 3900

Dee angle (˚) 22.5

peak voltage (kV) 500

Layout of the Injector

Cavity

Magnet

Page 32: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy 32

Injector: Ideal Field Map

Phase slip Differential Phase slip

Page 33: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy 33

Injector: Betatron Tune and Resonance

Conclusion: the resonance-crossing will not bring evident

influence on the beam’s quality.

Page 34: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy 34

Summary

The beam commissioning of the three sub-

systems of the BRIF project is in progress. The

results show that the driver of 100 MeV cyclotron

will be able to provide 200-500 μA proton beam in

the coming years. The joint commissioning of the

three sub-systems for RIB production is expected

to start soon.

From the pre-study of an 800 MeV high power

cyclotron complex, it is confirmed that a 3-4 MW

cw proton machine should be feasible based on our

existing technologies. We are eagerly expecting

extensive international collaborations.

Page 35: 1958 6 The Beam Commissioning of BRIF and Future Cyclotron … · 2015. 3. 3. · On December 18 of 2013, we got 320 μA DC beam on an internal target. The transmission efficiency

Research Activities Related to Low Energy Accelerators in CIAE

China Institute of Atomic Energy

Acknowledgement

We would like to thank the people from the project team, e.g. Dr Baoqun Cui, Dr Zhaohua Peng, Mr Hui Yi et. al. to provide the materials.

We also would like to extend our cordial gratitude to experts from TRIUMF, PSI, INFN-LNS and the international cyclotron community for their long-term support on the project.