7 6 5 4 3 2 1 8 9 INSTALLATION DIRECTIONS: Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation. The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size. Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size. A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line. Test a dry-install of one section for pattern layout and placement. Starting in one quadrant, stagger tiles in the brick pattern illustrated by the numbers above. Flow into the adjacent quadrants, keeping arrows facing each other in pairs. BRICK Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation. chalk line 1 chalk line 3 chalk line 2 For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW

18X36 Installation Guidelines

Embed Size (px)

Citation preview

Page 1: 18X36 Installation Guidelines

18X36BRICK

place an additional chalk line 18” from the base chalk line

dry install a portion of 18x36 to understand the pattern layout prior to installation

beginning in one quadrant placing the tiles in brick method as illustrated by the numbers above

flow into the adjacent quadrants keeping the arrows facing each other in pairs

directional arrows are featured on the back of the tile - the number featured within the arrow are for manufacturing purposes and are not related to installation

76

54 3 2 1

89

INSTALLATION DIRECTIONS:Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.

➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size.

➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size.

➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line.

➍ Test a dry-install of one section for pattern layout and placement.

➎ Starting in one quadrant, stagger tiles in the brick pattern illustrated by the numbers above.

➏ Flow into the adjacent quadrants, keeping arrows facing each other in pairs.

BRICK

Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation.

chalk line 1

chalk line 3chalk line 2

For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW

Page 2: 18X36 Installation Guidelines

BOXED IN

INSTALLATION DIRECTIONS:Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.

➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size.

➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size.

➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line.

➍ Test a dry-install of one section for pattern layout and placement.

➎ Starting in one quadrant, box-in tiles as illustrated by the numbers above.

➏ Continue to form boxes, constructing columns and staggering every other column 18"as in diagram.

Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation.

18X36BOXED IN

place an additional chalk line 18” from the base chalk line

dry install a portion of 18x36 to understand the pattern layout prior to installation

beginning in one quadrant placing the tiles in the boxed in method as illustrated by the numbers above

continue to form boxes constructing a column — every other column should be staggered 18” as illustrated above

directional arrows are featured on the back of the tile - the number featured within the arrow are for manufacturing purposes and are not related to installation

1 2

3 4

5 6

7

8

For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW

chalk line 1

chalk line 3chalk line 2

Page 3: 18X36 Installation Guidelines

18X36BASKETWEAVE

place an additional chalk line 18” from the base chalk line

dry install a portion of 18x36 to understand the pattern layout prior to installation

beginning in one quadrant placing the tiles in the basketweave method quarter turning in pairs of two

the pair tile directions should be opposing each other as illustrated above

directional arrows are featured on the back of the tile - the number featured within the arrow are for manufacturing purposes and are not related to installation

1

23 4

5 6 7

8

BASKETWEAVE

Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation.

INSTALLATION DIRECTIONS:Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.

➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size.

➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size.

➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line.

➍ Test a dry-install of one section for pattern layout and placement.

➎ Starting in one quadrant, place tiles in the basketweave pattern quarter turning in pairs of two as illustrated by the numbers above.

➏ The paired tile directions should oppose each other as shown in diagram.

chalk line 1

chalk line 3

chalk line 2

For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW

Page 4: 18X36 Installation Guidelines

HALF BASKETWEAVE

Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation.

INSTALLATION DIRECTIONS:Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.

➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size.

➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size.

➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line.

➍ Test a dry-install of one section for pattern layout and placement.

➎ Starting in one quadrant, place tiles in the half basketweave pattern illustrated by the numbers above.

➏ Continue to place tiles, constructing columns for ease of installation.

18X36HALF BASKETWEAVE

place an additional chalk line 18” from the base chalk line

dry install a portion of 18x36 to understand the pattern layout prior to installation

beginning in one quadrant placing the tiles in the half basketweave method as illustrated by the numbers above

continue to install tiles constructing columns for ease of installation

directional arrows are featured on the back of the tile - the number featured within the arrow are for manufacturing purposes and are not related to installation

1 2 3

45 6

chalk line 1

chalk line 3chalk line 2

For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW

Page 5: 18X36 Installation Guidelines

18X36 HERRINGBONE

place an additional chalk line 18” from the base chalk line

dry install a portion of 18x36 to understand the pattern layout prior to installation

beginning in one quadrant placing the tiles in the herringbone method as illustrated by the numbers above

flow into the opposite quadrant continuing the herringbone pattern

directional arrows are featured on the back of the tile - the number featured within the arrow are for manufacturing purposes and are not related to installation

1

2

3

4

5

6 7

8 9

HERRINGBONE

Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation.

INSTALLATION DIRECTIONS:Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.

➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size.

➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size.

➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line.

➍ Test a dry-install of one section for pattern layout and placement.

➎ Starting in one quadrant, place tiles in the herringbone pattern illustrated by the numbers above.

➏ Flow into the opposite quadrant, continuing the herringbone pattern.

chalk line 1

chalk line 3

chalk line 2

For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW