18th NATIONAL AWARD FOR EXCELLENCE IN ENERGY MANAGEMENT Presented by : TCS CENTRE, KOCHI
August 2017
2
Company Profile
Energy conservation Developments
Energy Consumption Trend
Specific Energy Consumption
Load Distribution
Design Brief
Innovative Projects
Encon Projects
Reduction in Carbon Foot Print
Step up Earth Hour
Encon Team Effort
ISO 50001 Initiatives
Utilization of waste
Best Practices
Snap shots
Awards and Recognition
Road Map
OVERVIEW
3
Campus : TCS Centre SEZ Campus, Co-Developer with Info Park (A Govt. of Kerala Initiative)
Land Extent : 15.72 Acres
Built-Up Area : 1.33 Million Square feet
Seating Capacity : 8831 Seats
Building Foot Print : 34 % of the land area
Facility houses : 2 Software Blocks(G+13 Floors),Customer Collaboration Center,Reception, Cafeteria, Library & Training,Multi-purpose Hall, Service Block, MLCP,Associate Rest Rooms, ATMs, Gym, etc.
COMPANY PROFILE
4
CAMPUS OVERVIEW
BLOCK NO. OF FLOORS CAPACITY/SERVICES
Software block A G+13 Floors 5,099 Seats
Software block B G+13 Floors 3,732 Seats
MLCP G+7 Floors 1,067 Cars
Cafeteria G+1 Floors 2,000 Seats
Service block B+G+2 Floors
Fire pump room , HT< main panels, Chiller
& cooling towers ,2000KVA-11KV DGs and
panels
Reception, CCC &MP hall G+2 Floors 242 Seats
Recreation Blocks G+1 FloorsIndoor games, GYM,ATM, Associate service
center
Library & Training Center G+1 Floors 332 Seats
Transit Quarters G+2 Floors 39 Rooms
Data Center - 2300 Sft
STP with MBR Technology - 700 KLD
Bio-Digester - 1500 KPD
5
ENERGY CONSUMPTION TREND
Energy Consumption For Last 3 Years
Employees Head Count
FINANCIAL
YEAR
Employee
Count
BUILDING
AREA IN Sq.m
2014-15 2265 36182
2015-16 4750 123424
2016-17 5950 123424
* Block A includes Software building A, CCC* Block B includes Software building B, Library* Service Block includes MLCP, Cafeteria, TQ &
other utilities.
FINANCIAL
YEARBlock A * Block B * Service Block *
Total Consumption
in kWh
2014-15 2647015 93034 2619489 51,73,470
2015-16 4322618 1121082 4698496 1,01,42,196
2016-17 3892509 1729742 4403435 1,00,25,686
6
SPECIFIC ENERGY CONSUMPTION
Sl.No Description 2014-15 2015-16 2016-17
1Total power consumption in
kWh51,73,470 1,01,4,2196 1,00,2,5687
2 Total occupied area in Sq.m 36,182 1,23,424 1,23,424
3Electricity Consumption
kWh/Sq.m143 82.17 81.22
4 Employee Count 2265 4750 5950
7
8
HVAC - Central chiller plant , AHU’S, Precision AC, VAV’s, CSU’s, VRF units, Exhaust fans , HRW.
RAW POWER - Coffee vending machine , Water coolers , HK equipment.
UPS - Emergency Lighting, Data Center, Work station , Hub Rooms
LIGHTING - All indoor and Out door Lightings.
MISCELLANEOUNS – PHE , Kitchen , STP , FPS and Elevators.
.
LOAD DISTRIBUTION
9
Double Glazed structural enclosures with natural day light harvesting.
Thermal underdeck insulation for roof slabs with 13mm thick Nitrile rubber.
Blinds with silver backing for light reflection & greater UV reflection.
External envelope – Thicker walls made of 200mm solid block with finishing
plaster on either side. A combination of Clay Tile & ACP cladding with
150mm air gap.
HT Chiller with IKW/TR of 0.65.
Zero Discharge Sewage Treatment Plant with MBR technology
Fresh air system with HRW.
Power Distribution with 11KV HT Supply.
Fuel Efficient DG sets with electronic fuel injection system.
UPS with IGBT technology.
LED lights equipped with occupancy sensor, lux level sensor and timers.
Energy Efficient Elevators with gearless Motor VVVF drive.
DESIGN - BRIEF
10
INNOVATIVE PROJECTS
1. UPS Optimization
11
Saving on Energy and Space by decommissioning of Tower B Data Centre by running
all Infrastructure Services from a centralized data centre in Tower A for the entire
Campus.
Result :
UPS energy Saving = 3,91,574 kWh/Year
HVAC energy Saving = 4,38,000 kWh/Year
Total energy saving = 8,29,574 kWh/Year
Total reduction in carbon foot print = 437185 kg
Area saving = 4,000 Sq.ft
Additional Seats = 130Seats
Decommissioned UPS = 2 X 300 kVA
Decommissioned PAC = 6 x 25 TR & 2 x 16 TR
2. Data Center Optimization
INNOVATIVE PROJECTS
12
3. Rain water Recharging system
INNOVATIVE PROJECTS
Project implemented to enhance the water table potential in surrounding land.
Power Saved due to gravity flow – 1600 kWh per year
13
Virtual Desktop Infrastructure (VDI)
Common Desktop : 60 WVDI System : 30WEffective Saving : 30W per unitAnnual saving : 86,400 kWh
INNOVATIVE PROJECTS
4. GREEN IT – INNOVATIVE PROJECTS
Deployment of Virtual Desktop (VDI) as local compute - 850 VDI deployed
Use of Thin Client for Projects connecting to Customer environment using VDI – 654 Thin
Clients deployed till date.
14
Solar Power Plant 170 KW
Cold Aisle containment in Data center
Smart box for common area lighting controls by mobile applications
Auto-Hibernation for all the computer system
Conservation of large FF CPU to tiny FF CPU’s
MLCP Parking solutions using RF ID Sensors
Innovation for automatic controller for the VRF indoor Units
Data Center Cancellation
UPS Optimization
Rain Water Recharging System
Virtual Desktop Infrastructure
Blackout Blinds for heat reduction in S-E & S-W directions.
ENCON PROJECTS
15
ENCON - O&M PRACTICES
15
Set point for chillers are manually controlled based on ambient condition. Automatic treated Fresh Air flow regulated based on CO2 level. Automatic Scheduling for AHUs and Ventilation fans. De- scaling of water cooled condenser tube and cleaning of air cooled condensers. Chemical Treatment for make up water. Cleaning of Air filters in AHUs. Cleaning of strainers Timers for external & MLCP lighting
16
REDUCTION IN CARBON FOOT PRINT
16
Sl No PROJECTS kWH Savings/YearEquivalent Carbon Foot
Print Kg/Year
1 Saving through UPS Optimization 4,56,000 240312
2 Savings through Data Center Optimization 8,29,574 437185
3 Savings through Green IT Initiatives 86,400 45533
4 Blackout Blinds 34,560 18213
5 Air Curtain 18,432 9714
6 External Lights with Solar Power 18,000 9486
7 Rain water Recharging by Gravity 1,600 843
TOTAL 14,44,566 7,61,286.48
17
STEP UP EARTH HOURS IN CAMPUS
Earth hour on 25 March 2017Total energy consumed from 7.30PM- 8.30 PM = 987 KWHTotal energy consumed from 8.30PM-9.30 PM= 585KWHEnergy consumption reduction :402 KWH, (59.5%)
Earth hour on 19 March 2016Total energy consumed from 7.30PM- 8.30 PM = 1166 KWH Total energy consumed from 8.30PM-9.30 PM= 717 KWH Energy consumption reduction :449 KWH, (38.5%)
Earth hour on 29 March 2015Total energy consumed from 7.30PM- 8.30 PM= 745KWHTotal energy consumed from 8.30PM-9.30 PM= 555 KWHEnergy consumption reduction :190 KWH, (26%)
As per corporate initiative, celebrating earth hour on last Saturday of every month. Saving FY 2016-17 – 3,300 kWh, equivalent Carbon – 1739 KG
18
ENCON – TEAM EFFORTS
Conducted Energy Audit through Autonomous body “Kerala State Productivity Council”
Conducted sales expo of LED lamps for associates at a discounted (20%) market rate to
promote energy saving practice as part of TCS sustainability month. Approximate sale
crossed 7000 Nos.
NO ‘C’ Fold Week – Celebrating on last week of every month.
Training/Awareness program to O&M team through external experts.
Celebrating energy conservation day.
As part of Energy Sustainability month, following events were carried out,
a) Wealth out of Waste
b) Quiz programs
c) Painting competition on water conservation for children of employees, aimed at
creating awareness on the subject from the childhood onwards.
19
ISO 50001 INITIATIVE
19
Resource Optimization Centre –---> Centralized Energy Management System PAN India TCS
Campuses
Effective interaction with ROC to meet corporate targets
Conducting energy audits at campuses on PAN India basis and analyzing the results
Close monitoring of energy & resources consumption
Fixing energy target for the entire campus
Analyzing data on real time basis
Open Access Power Trading
20
UTILIZATION OF WASTE MATERIAL
1) Bio digester Plant - Capacity 1500 KPDApproximately 45m3 of Bio gas is produced per day which is equivalent to 7 commercial gas cylinders
2) Vermi compost PlantVermi composting plant crushing machine capacity - 1000 KG per Day.
3) Sewage Treatment Plant 700 KLDTreated Water using for Flushing and gardening ,Sludge generated is used as manure
4) Plastic Bottle Crusher UnitPlastic bottles are crushed by crusher at campus and is disposed through licensed vendor for recycling
5) Paper RecycleShredded paper are disposed to authorized vendor and supply note pad, tissue paper in return.
6) E-Waste & Hazardous WasteDisposed through authorized vendor.
20
R – Reduce R – ReuseR – Recycle
21
BEST PRACTICE
Procurement – Procuring 5 star rated equipment's – Refrigerators, Water Dispenser, HK machineries.
Transport – Usage of Battery Operated Vehicle for internal transport.
Encourages Associates for using bicycles & installed cycle stands at MLCP.
Car Pooling Club for employees.
Bottle Crushers.
Free Pollution checks through automobile vendors.
Usage of ceramic cups in place of paper cups.
Display of daily food waste details.
22
SNAP SHOTS
22
23
AWARDS & RECOGNITIONS
17th Excellent Energy Efficient Unit Award by CII
GOLD LEED Certification by Green Building Council
24
Open Access Power Trading
Replacement of existing T5 with LED lighting
Chiller Optimization
UPS Optimization in Service areas
Additional Solar Power Generation by 2020
Additional Water recharging pits
Replacement of dynamic to regenerative braking system for elevators
Installation of Primary pump VFD
Implementation of Energy Audit suggestions in phased manner
ROAD MAP
2525