Upload
henjo-capelle
View
42
Download
0
Embed Size (px)
Citation preview
A1DOCUMENT NUMBER REFERENCE DOCUMENTS REV DATE REVISION DESCRIPTION DRN CHK ENG APP
DRAWN
CHECKED
ENGINEER
APPROVED
SCALEDRAWING NUMBER REV
1
A
B
C
D
E
F
G
H
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 87 9 10 11 12
A
B
C
D
E
F
G
H
$D
AT
E$
$T
IME
$$
FIL
EL
$
EMP
EMPLOYER
DISCLAIMER:-
182060001-GA-001
SHEET
02 1
PSCH
HCAP
RWEZ
10-05-2016
10-05-2016
10-05-2016
HCAP 10-05-2016
NOTES:
1. BOLTING/GASKETS FOR THE TIE-IN CONNECTIONS BY CLIENT / OTHERS.
2. REFERENCE DRAWINGS: 182060001-S-001, 182060001-M-001.
3. REFERENCE PROCEDURES: 182060001-P-004 (THERMAL INSULATION), 182060001-P-003 (COATING PROCEDURE).
4. SKID CLAMP (10X) WILL BE DELIVERED LOOSE. ANCHOR BOLT / FIXATION BY CLIENT / OTHERS.
5. HOSTING SLING LENGTH 8 M (MIN.) AND ANGLE 42°.
6. THERMAL INSULATION THICKNESS 40 MM (25 MM FOR DN25). SEE 182060001-S-001. FEEDWATER INSULATION IS N/A.
7. TAG NRS: SEE SHEET 03, ALL TAGNR'S PREFIX '20 GMF-PKG-001' NOT SHOWN IN SHEET.
GENERAL ARRANGEMENT
1:15
L= 8
000
MIN
IMUM
42°