18 Set 2008 JLab12.0
JLab e CEBAF
JLab12
Prima Riunione Plenaria
18 Settembre 2008
100m
5 Recirculation Arcs
0.6 GeV Linac
Extractionelement
End Stations
0.6 GeV Linac
45 MeV Injector
Central Helium Liquefier
Energy : 1.2 - 5.7 GeV Max current : 200A Polarization : ~80% Simultaneous delivery to 3 Halls
18 Set 2008 JLab12.0
Jefferson Lab
18 Set 2008 JLab12.0Linac
Linac
Arc
Arc
3 End Stations
18 Set 2008 JLab12.0
Hall A: Two High Resolution (10-4) Spectrometers
L[cm-2s-1] = 1039
18 Set 2008 JLab12.0
Hall B: The CEBAF Large Acceptance Spectrometer (CLAS)
L[cm-2s-1] = 1034
18 Set 2008 JLab12.0
Hall C: A High Momentum and a Broad Range Spectrometer
L[cm-2s-1] = 1039
18 Set 2008 JLab12.0
6 GeV CEBAF1112
Two 0.6 GV linacs1.1
CHL-2CHL-2
Upgrade magnets Upgrade magnets and power and power suppliessupplies
Enhanced capabilities in existing Halls
Lower pass beam energies still available
~ $310 M
18 Set 2008 JLab12.0
12 GeV Equipments (>2013)
18 Set 2008 JLab12.0
JLab/Finanziamenti e organizzazione
Finanziamenti: DOE (+ NewPort News + Virginia) JSA
18 Set 2008 JLab12.0
JLab/Info Pratiche
• Web Page: www.jlab.org• Registration and Training
– Richiede un paio di giorni, gran parte può essere svolto da web
– I diversi training hanno scadenza annuale o biennale
– il badge permette di accedere agli uffici, laboratori, acceleratori, secondo il tipo di training acquisito
• Business Visa richiesta per lavorare al JLab• Foresteria (ResFac)• ….
18 Set 2008 JLab12.0
Hall A
JLab12
Prima Riunione Plenaria
18 Settembre 2008
18 Set 2008 JLab12.0
Hall A• Alta luminosità• Ottima risoluzione momento/angolo• Sofisticato PID
• Flessibilità della configurazione sperimentale• La sala sperimentale più grande di JLab
18 Set 2008 JLab12.0
Hall A: Apparati 12 High ResolutionSpectrometers
BigBite:Large Angular Acceptance
18 Set 2008 JLab12.0
Hall A: Apparati 2
18 Set 2008 JLab12.0
Hall A: Apparati 3• DVCS Calorimeter• Polarimetri Moller e Compton• Bersagli di H, D, 3He, Be, C, Li, 16O, Pb, …• Bersaglio polarizzato 3He (n)
18 Set 2008 JLab12.0
Number Approved
Days Approved
Polarized beam
A status
Number Completed
Days run
Number Jeopardized
Days to be run
Nucleon and Meson Form Factors/Sum Rules
12 235 10 9 11 212 2 23
Few Body Nuclear Properties
18 281 8 4 16 246 6 35
Properties of Nuclei 11 200 2 5 7 135 7 91
N* and Meson Properties 10 170 9 4 4 91 2 79
Strange Quarks and Parity Violation
7 183 5 6 5 130 1 53
Total 58 1069 34 28 43 814 18 281
Conditionally Approved
2
0
0
0
0
Hall A : Esperimenti
Average time completion-submission of experiment: 20 months, 75% within 3 yearsHall A running for 10+ years, with an average publication output of 4+Top cited Hall A publications: 2 250+, 13 50+
18 Set 2008 JLab12.0
Hall A: Tentative Plan 6 GeV
10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5
Transversity (TMD)E06-010d2 (DF) E06-0143He SSA (GPD) E05-0153He AxAy E05-102HAPPEX III E05-109PV-DIS E08-011PREX E06-002DVCS (GPD) E08-027Deuteron Near ThrE08-008SRC E0'7-006N-Delta (SRC) E08-010g2p (res) E08-027GEP Low Q2 E08-007Hypernuclear 16O E07-012
20122008 2009 2010 2011
18 Set 2008 JLab12.0
Hall A: Upgrade per 11 GeVExisting Equipment
Baseline ($2 M): • DAQ per alta luminosità• Beam line per migliore qualità del fascio e misura (Moller and Compton Polarimeter)
Nuovo apparato ($2 M):• Super BigBite Spectrometer:
• large acceptance,• forward angle• moderate momentumand angle resolutions
• versatile detectors• Hadron PID
18 Set 2008 JLab12.0
Hall A: Approved Exp. 12 GeV• DVCS: Measurements of Electron-Helicity Dependent Cross Sections
of Deeply Virtual Compton Scattering with CEBAF at 12 GeV • A1N: Measurement of neutron asymmetry A1n in the valence quark
region using 8.8 GeV and 6.6 GeV beam energies and Bigbite spectrometer in Hall A
• GMP: Precision Measurement of the Proton Elastic Cross Section at High Q2
• GEP/GMP V: Large Acceptance Proton Form Factor Ratio Measurements at 13 and 15 (GeV/c)2 Using Recoil Polarization Method
Hall A sarà la prima sala ad essere servita dal nuovo fascio(dopo il 2013 ?)
18 Set 2008 JLab12.0
Hall A Management and Structure (da franco)
Organizzazione sala AHall leader
(J. Mougey, S. Nanda, K. De Jager)
Coordinating committee- 4 membri (elettivi)- Compiti - collabora con leader della sala per alcuni aspetti della gestione “scientifica” - valuta proposte di esperimento che si presentano come “Hall A collaboration proposals” (nomina referees ad hoc per ogni proposta”) - organizza e gestisce i meetings della collaborazione (2/anno) e workshops dedicati (tecnici deicati, fisica etc.) - ….
-
organizzazione della presa datispokespersonship <-> run coordinator
- Call for shifts
- essere in regola con i vari training (safety, radiation , Oxygen hazard etc.)
- waktrough in sala A
- generalmente 3 persone per shift (8-16 (day), 16-24 (swing) , 0-8 (night(graveyard))
- shift leader
- target operator (e’ necessarion un training (breve)
- third
- La partecipazione alla costruzione di apparati (ed altro (software etc)) dava diritto alla firma dei lavori dai primi 4 “commissioning” experiments (2 su O-16, 1 VCS, uno ff. He-3
-Tutti gli altri esperimenti sono stato presentati da gruppi di istituti con o senza il supporto “ufficiale” “ Hall A collaboration experiments”.
- In molti casi gli Istituti e Jlab hanno fornito fondi e manpower per integrare l’apparato di base
- calorimetro per DVCS- calorimetro per RCS- apparati pe misure di violazione di parita’- Bigbyte (spettrometro magnetico a grande accettanza)- Rivelatori per neutroni (per Gen ed altro)
- patecipazione ai singoli esperimenti- se presentati come “Hall A collaboration experiments”, tutti i membri della collaborazione possono partecipare seguendo le regole stabilite dalla spokespersonship (numero minimo di turni o altro tipo di contributo (software, analisi etc..)
- se “indipendenti”, decide al spokespersonship
- Non e ’piu’ possibile presentare proposte per la sperimentazione a 6 GeV (fino al 2012)
- la schedula e’ decisa e pubblicata su (…….) anche se andra’ rivista ogni 6 mesi anche sulla base dei fondi disponibili per il running