34
18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations 0.6 GeV Linac 45 MeV Injec tor Central Helium Liquefier Energy : 1.2 - 5.7 GeV Max current : 200A Polarization : ~80% Simultaneous delivery to 3 Halls

18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

Embed Size (px)

Citation preview

Page 1: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

JLab e CEBAF

JLab12

Prima Riunione Plenaria

18 Settembre 2008

100m

5 Recirculation Arcs

0.6 GeV Linac

Extractionelement

End Stations

0.6 GeV Linac

45 MeV Injector

Central Helium Liquefier

Energy : 1.2 - 5.7 GeV Max current : 200A Polarization : ~80% Simultaneous delivery to 3 Halls

Page 2: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Jefferson Lab

Page 3: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0Linac

Linac

Arc

Arc

3 End Stations

Page 4: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A: Two High Resolution (10-4) Spectrometers

L[cm-2s-1] = 1039

Page 5: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall B: The CEBAF Large Acceptance Spectrometer (CLAS)

L[cm-2s-1] = 1034

Page 6: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall C: A High Momentum and a Broad Range Spectrometer

L[cm-2s-1] = 1039

Page 7: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

6 GeV CEBAF1112

Two 0.6 GV linacs1.1

CHL-2CHL-2

Upgrade magnets Upgrade magnets and power and power suppliessupplies

Enhanced capabilities in existing Halls

Lower pass beam energies still available

~ $310 M

Page 8: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

12 GeV Equipments (>2013)

Page 9: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

JLab/Finanziamenti e organizzazione

Finanziamenti: DOE (+ NewPort News + Virginia) JSA

Page 10: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

JLab/Info Pratiche

• Web Page: www.jlab.org• Registration and Training

– Richiede un paio di giorni, gran parte può essere svolto da web

– I diversi training hanno scadenza annuale o biennale

– il badge permette di accedere agli uffici, laboratori, acceleratori, secondo il tipo di training acquisito

• Business Visa richiesta per lavorare al JLab• Foresteria (ResFac)• ….

Page 11: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A

JLab12

Prima Riunione Plenaria

18 Settembre 2008

Page 12: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A• Alta luminosità• Ottima risoluzione momento/angolo• Sofisticato PID

• Flessibilità della configurazione sperimentale• La sala sperimentale più grande di JLab

Page 13: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A: Apparati 12 High ResolutionSpectrometers

BigBite:Large Angular Acceptance

Page 14: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A: Apparati 2

Page 15: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A: Apparati 3• DVCS Calorimeter• Polarimetri Moller e Compton• Bersagli di H, D, 3He, Be, C, Li, 16O, Pb, …• Bersaglio polarizzato 3He (n)

Page 16: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Number Approved

Days Approved

Polarized beam

A status

Number Completed

Days run

Number Jeopardized

Days to be run

Nucleon and Meson Form Factors/Sum Rules

12 235 10 9 11 212 2 23

Few Body Nuclear Properties

18 281 8 4 16 246 6 35

Properties of Nuclei 11 200 2 5 7 135 7 91

N* and Meson Properties 10 170 9 4 4 91 2 79

Strange Quarks and Parity Violation

7 183 5 6 5 130 1 53

Total 58 1069 34 28 43 814 18 281

Conditionally Approved

2

0

0

0

0

Hall A : Esperimenti

Average time completion-submission of experiment: 20 months, 75% within 3 yearsHall A running for 10+ years, with an average publication output of 4+Top cited Hall A publications: 2 250+, 13 50+

Page 17: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A: Tentative Plan 6 GeV

10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5

Transversity (TMD)E06-010d2 (DF) E06-0143He SSA (GPD) E05-0153He AxAy E05-102HAPPEX III E05-109PV-DIS E08-011PREX E06-002DVCS (GPD) E08-027Deuteron Near ThrE08-008SRC E0'7-006N-Delta (SRC) E08-010g2p (res) E08-027GEP Low Q2 E08-007Hypernuclear 16O E07-012

20122008 2009 2010 2011

Page 18: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A: Upgrade per 11 GeVExisting Equipment

Baseline ($2 M): • DAQ per alta luminosità• Beam line per migliore qualità del fascio e misura (Moller and Compton Polarimeter)

Nuovo apparato ($2 M):• Super BigBite Spectrometer:

• large acceptance,• forward angle• moderate momentumand angle resolutions

• versatile detectors• Hadron PID

Page 19: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A: Approved Exp. 12 GeV• DVCS: Measurements of Electron-Helicity Dependent Cross Sections

of Deeply Virtual Compton Scattering with CEBAF at 12 GeV • A1N: Measurement of neutron asymmetry A1n in the valence quark

region using 8.8 GeV and 6.6 GeV beam energies and Bigbite spectrometer in Hall A

• GMP: Precision Measurement of the Proton Elastic Cross Section at High Q2

• GEP/GMP V: Large Acceptance Proton Form Factor Ratio Measurements at 13 and 15 (GeV/c)2 Using Recoil Polarization Method

Hall A sarà la prima sala ad essere servita dal nuovo fascio(dopo il 2013 ?)

Page 20: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

18 Set 2008 JLab12.0

Hall A Management and Structure (da franco)

Page 21: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

Organizzazione sala AHall leader

(J. Mougey, S. Nanda, K. De Jager)

Coordinating committee- 4 membri (elettivi)- Compiti - collabora con leader della sala per alcuni aspetti della gestione “scientifica” - valuta proposte di esperimento che si presentano come “Hall A collaboration proposals” (nomina referees ad hoc per ogni proposta”) - organizza e gestisce i meetings della collaborazione (2/anno) e workshops dedicati (tecnici deicati, fisica etc.) - ….

-

Page 22: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 23: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

organizzazione della presa datispokespersonship <-> run coordinator

- Call for shifts

- essere in regola con i vari training (safety, radiation , Oxygen hazard etc.)

- waktrough in sala A

- generalmente 3 persone per shift (8-16 (day), 16-24 (swing) , 0-8 (night(graveyard))

- shift leader

- target operator (e’ necessarion un training (breve)

- third

Page 24: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

- La partecipazione alla costruzione di apparati (ed altro (software etc)) dava diritto alla firma dei lavori dai primi 4 “commissioning” experiments (2 su O-16, 1 VCS, uno ff. He-3

-Tutti gli altri esperimenti sono stato presentati da gruppi di istituti con o senza il supporto “ufficiale” “ Hall A collaboration experiments”.

- In molti casi gli Istituti e Jlab hanno fornito fondi e manpower per integrare l’apparato di base

- calorimetro per DVCS- calorimetro per RCS- apparati pe misure di violazione di parita’- Bigbyte (spettrometro magnetico a grande accettanza)- Rivelatori per neutroni (per Gen ed altro)

- patecipazione ai singoli esperimenti- se presentati come “Hall A collaboration experiments”, tutti i membri della collaborazione possono partecipare seguendo le regole stabilite dalla spokespersonship (numero minimo di turni o altro tipo di contributo (software, analisi etc..)

- se “indipendenti”, decide al spokespersonship

Page 25: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 26: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 27: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 28: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 29: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 30: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations

- Non e ’piu’ possibile presentare proposte per la sperimentazione a 6 GeV (fino al 2012)

- la schedula e’ decisa e pubblicata su (…….) anche se andra’ rivista ogni 6 mesi anche sulla base dei fondi disponibili per il running

Page 31: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 32: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 33: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations
Page 34: 18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre 2008 100m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations