1
Community Park at the Recreation Center of Highland Park | Park District of Highland Park Master Plan | 12/20/2019 Project Number: 18-0054 0 100 Feet Engineering, Ecology and Landscape Architecture FUTUR E H AL F DAY ROAD A C C E S S T R A I L G A T E W A Y P A T H EXIST ING NORT H /S O U TH TRAIL ( thr u w a y ) Skokie River Highland Park Woods EXTEND SIDEWALK Existing golf hole to remain Legacy Club Condos Legacy Club Future City tree nursery Skokie River Park Avenue West Half Day Road TRAIL HEAD W/PARKING AND SIGNAGE GOLF LEARNING CENTER Quiet/Habitat Zone Family Zone Activity Zone Compton Ave POTENTIAL FUTURE SENIOR CENTER PARKING POTENTIAL FUTURE RECREATION AREA Skokie River X VISTA OVERLOOK Skokie River Woods Pond Shoreline Restoration (EPA 319 Grant Funded) Trees Natural Features Floodplain Boundary Floodway Boundary Hydrology Interactive Pathways Connector Trail (.75 mile 8’ wide) Gateway Path (.15 mile 10’ wide) Destination Pathways (1 mile existing primary routes) Observation Pathways (3 miles existing cart paths) Proposed Pathways (.25 mile new pathway connections) Cross-country Loop (1 mile mowed/soft surface) Future Half Day Road Access Trail Intergenerational Nature Play Turf Gathering Areas Small Group Areas Benches Park Signage Park Entrance Programming X FUTURE SEATING WALL RESTROOM FACILITY SAVANNA PICNIC GROVE THE GREEN THE GAZEBO REFLECTION GREEN TURTLE MEADOW GROUP EXERCISE VIEWS/ SEATING PICNIC AREA VISTA OVERLOOK ACOUSTIC CONNECTION ENTRY PLAZA FUTURE SEATING WALL SAND PLAY/ PICNIC AREA BERMS & CLIMBING COUNCIL RING & NATURE MAZE EXPLORATION GARDEN NORTH POND OVERLOOK X X X X X X X X

18-0054 PDHP HPCC CommunityPark MasterPlan Diagram 2019 … · 2021. 5. 5. · d Western Ave A u g u s t a W a y C o m t o Michigan Ave S k o k i e V a l l e y R d ... \18000\18-0054

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 18-0054 PDHP HPCC CommunityPark MasterPlan Diagram 2019 … · 2021. 5. 5. · d Western Ave A u g u s t a W a y C o m t o Michigan Ave S k o k i e V a l l e y R d ... \18000\18-0054

Skokie Valley Rd

Wes

tern

Ave

A ugusta Way

Co

mpt

o

Michigan Ave

Skokie Val ley Rd

£¤41

£¤41

WETLAND 10.01 ACRES

POND 10.36 ACRES

POND 26.56 ACRES

3

1

WETLAND 20.36 ACRESON-SITE

4WETLAND 31.90 ACRES

2

6

5

7

POND 30.62 ACRESON-SITE

POND 40.18 ACRESON-SITE

WATERS 12.10 ACRESON-SITE

WETLAND 4OFF-SITE

Prepared by: Project Name:

Prepared for:

Aerial Date:

Exhibit Title:

Highland Park County Club

Highland Park Park District

2017

Concept PlanProject Number: 18-0054

Scale: Orienta�on:

0 100Feet

Engineering, Ecology and Landscape Architecture

P:\1

8000

\18-

0054

PD

HP

HPC

C P

lann

ing\

Dat

a\C

AD\1

8-00

54 P

DH

P H

PCC

Pla

nnin

g- C

once

pt.d

wg,

Mas

ter P

lan,

9/2

7/20

18 1

2:40

:53

PM

Community Park at the Recreation Center of Highland Park | Park District of Highland Park Master Plan | 12/20/2019Project Number: 18-0054

0 100Feet

Engineering, Ecology and Landscape Architecture

FUTU

RE HALF D

AY ROAD

ACCESS TRAIL

GATEW

AY PATH

EXISTING

NO

RTH/SO

UTH

TRAIL (thruway)

Skokie River

Highland Park Woods

EXTENDSIDEWALK

Existing golf holeto remain

Legacy ClubCondos

Legacy Club

Future Citytree nursery

Skokie River

Park Avenue West

Half Day Road

TRAIL HEADW/PARKINGAND SIGNAGE

GOLF LEARNING CENTER

Qui

et/H

abita

t Zon

eFa

mily

Zon

eAc

tivity

Zon

e

Compton Ave

POTENTIAL FUTURE SENIOR CENTER PARKING

POTENTIALFUTURE RECREATIONAREA

Skokie River

X

VISTAOVERLOOK

Skokie River Woods

PondShoreline Restoration(EPA 319 Grant Funded)

Trees

Natural Features

Floodplain BoundaryFloodway Boundary

Hydrology

InteractivePathways

Connector Trail (.75 mile 8’ wide)

Gateway Path (.15 mile 10’ wide)

Destination Pathways(1 mile existing primary routes)

Observation Pathways (3 miles existing cart paths)

Proposed Pathways(.25 mile new pathway connections)

Cross-country Loop (1 mile mowed/soft surface)

Future Half Day Road Access Trail

IntergenerationalNature PlayTurf Gathering AreasSmall Group AreasBenchesPark SignagePark Entrance

Programming

X

FUTURE SEATINGWALL

RESTROOMFACILITY

GATEW

AY PATH

EXISTING

NO

RTH/SO

UTH

TRAIL (thruway)

Skokie River

Highland Park Woods

EXTENDSIDEWALK

Existing golf holeto remain

Legacy ClubCondos

Legacy Club

Future Citytree nursery

Skokie River

Park Avenue West

Half Day Road

TRAIL HEADW/PARKINGAND SIGNAGE

GOLF LEARNING CENTER

Qui

et/H

abita

t Zon

eFa

mily

Zon

eAc

tivity

Zon

e

RESTROOMFACILITY

Compton Ave

POTENTIAL FUTURE SENIOR CENTER PARKING

POTENTIALFUTURE RECREATIONAREA

Skokie River

X

VISTAOVERLOOK

Skokie River Woods

PondShoreline Restoration(EPA 319 Grant Funded)

Trees

Natural Features

InteractivePathways

Connector Trail (.75 mile 8’ wide)

Gateway Path (.15 mile 10’ wide)

Destination Pathways(1 mile existing primary routes)

Observation Pathways (3 miles existing cart paths)

Proposed Pathways(.25 mile new pathway connections)

Cross-country Loop (1 mile mowed/soft surface)

Future Half Day Road Access Trail

IntergenerationalNature PlayTurf Gathering AreasSmall Group AreasBenchesPark SignagePark Entrance

Programming

X

Floodplain BoundaryFloodway Boundary

Hydrology

Hemi-Marsh Footprint Mesic PrairieExtent of Excavation

ProposedHemi-Marsh

POTEN

TIAL HALF D

AY ROAD

ACCESS TRAIL

POTEN

TIAL HALF D

AY ROAD

ACCESS TRAIL

SAVANNAPICNIC GROVE

THE GREEN

THEGAZEBO

REFLECTIONGREEN

TURTLE MEADOW

GROUP EXERCISE

VIEWS/SEATING

PICNICAREA

VISTAOVERLOOK

ACOUSTIC CONNECTION

ENTRY PLAZA

FUTURE SEATINGWALL

SAND PLAY/PICNIC AREA

BERMS & CLIMBING

COUNCIL RING & NATURE MAZE

EXPLORATIONGARDEN

NORTH POND OVERLOOK

X

X

X

X

X

X

X

X

POND 26.56 ACRES

POND 1.36 ACRES

POND 3.62 ACRES ON-SITE

WETLAND 2.36 ACRES ON-SITE

POND 4.18 ACRES ON-SITE

WETLAND 1.01 ACRES

WETLAND 31.9 ACRES

WATERS 12.10 ACRES ON-SITE

WETLAND 4OFF-SITE