Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Skokie Valley Rd
Wes
tern
Ave
A ugusta Way
Co
mpt
o
Michigan Ave
Skokie Val ley Rd
£¤41
£¤41
WETLAND 10.01 ACRES
POND 10.36 ACRES
POND 26.56 ACRES
3
1
WETLAND 20.36 ACRESON-SITE
4WETLAND 31.90 ACRES
2
6
5
7
POND 30.62 ACRESON-SITE
POND 40.18 ACRESON-SITE
WATERS 12.10 ACRESON-SITE
WETLAND 4OFF-SITE
Prepared by: Project Name:
Prepared for:
Aerial Date:
Exhibit Title:
Highland Park County Club
Highland Park Park District
2017
Concept PlanProject Number: 18-0054
Scale: Orienta�on:
0 100Feet
Engineering, Ecology and Landscape Architecture
P:\1
8000
\18-
0054
PD
HP
HPC
C P
lann
ing\
Dat
a\C
AD\1
8-00
54 P
DH
P H
PCC
Pla
nnin
g- C
once
pt.d
wg,
Mas
ter P
lan,
9/2
7/20
18 1
2:40
:53
PM
Community Park at the Recreation Center of Highland Park | Park District of Highland Park Master Plan | 12/20/2019Project Number: 18-0054
0 100Feet
Engineering, Ecology and Landscape Architecture
FUTU
RE HALF D
AY ROAD
ACCESS TRAIL
GATEW
AY PATH
EXISTING
NO
RTH/SO
UTH
TRAIL (thruway)
Skokie River
Highland Park Woods
EXTENDSIDEWALK
Existing golf holeto remain
Legacy ClubCondos
Legacy Club
Future Citytree nursery
Skokie River
Park Avenue West
Half Day Road
TRAIL HEADW/PARKINGAND SIGNAGE
GOLF LEARNING CENTER
Qui
et/H
abita
t Zon
eFa
mily
Zon
eAc
tivity
Zon
e
Compton Ave
POTENTIAL FUTURE SENIOR CENTER PARKING
POTENTIALFUTURE RECREATIONAREA
Skokie River
X
VISTAOVERLOOK
Skokie River Woods
PondShoreline Restoration(EPA 319 Grant Funded)
Trees
Natural Features
Floodplain BoundaryFloodway Boundary
Hydrology
InteractivePathways
Connector Trail (.75 mile 8’ wide)
Gateway Path (.15 mile 10’ wide)
Destination Pathways(1 mile existing primary routes)
Observation Pathways (3 miles existing cart paths)
Proposed Pathways(.25 mile new pathway connections)
Cross-country Loop (1 mile mowed/soft surface)
Future Half Day Road Access Trail
IntergenerationalNature PlayTurf Gathering AreasSmall Group AreasBenchesPark SignagePark Entrance
Programming
X
FUTURE SEATINGWALL
RESTROOMFACILITY
GATEW
AY PATH
EXISTING
NO
RTH/SO
UTH
TRAIL (thruway)
Skokie River
Highland Park Woods
EXTENDSIDEWALK
Existing golf holeto remain
Legacy ClubCondos
Legacy Club
Future Citytree nursery
Skokie River
Park Avenue West
Half Day Road
TRAIL HEADW/PARKINGAND SIGNAGE
GOLF LEARNING CENTER
Qui
et/H
abita
t Zon
eFa
mily
Zon
eAc
tivity
Zon
e
RESTROOMFACILITY
Compton Ave
POTENTIAL FUTURE SENIOR CENTER PARKING
POTENTIALFUTURE RECREATIONAREA
Skokie River
X
VISTAOVERLOOK
Skokie River Woods
PondShoreline Restoration(EPA 319 Grant Funded)
Trees
Natural Features
InteractivePathways
Connector Trail (.75 mile 8’ wide)
Gateway Path (.15 mile 10’ wide)
Destination Pathways(1 mile existing primary routes)
Observation Pathways (3 miles existing cart paths)
Proposed Pathways(.25 mile new pathway connections)
Cross-country Loop (1 mile mowed/soft surface)
Future Half Day Road Access Trail
IntergenerationalNature PlayTurf Gathering AreasSmall Group AreasBenchesPark SignagePark Entrance
Programming
X
Floodplain BoundaryFloodway Boundary
Hydrology
Hemi-Marsh Footprint Mesic PrairieExtent of Excavation
ProposedHemi-Marsh
POTEN
TIAL HALF D
AY ROAD
ACCESS TRAIL
POTEN
TIAL HALF D
AY ROAD
ACCESS TRAIL
SAVANNAPICNIC GROVE
THE GREEN
THEGAZEBO
REFLECTIONGREEN
TURTLE MEADOW
GROUP EXERCISE
VIEWS/SEATING
PICNICAREA
VISTAOVERLOOK
ACOUSTIC CONNECTION
ENTRY PLAZA
FUTURE SEATINGWALL
SAND PLAY/PICNIC AREA
BERMS & CLIMBING
COUNCIL RING & NATURE MAZE
EXPLORATIONGARDEN
NORTH POND OVERLOOK
X
X
X
X
X
X
X
X
POND 26.56 ACRES
POND 1.36 ACRES
POND 3.62 ACRES ON-SITE
WETLAND 2.36 ACRES ON-SITE
POND 4.18 ACRES ON-SITE
WETLAND 1.01 ACRES
WETLAND 31.9 ACRES
WATERS 12.10 ACRES ON-SITE
WETLAND 4OFF-SITE