8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 1/14
Alcatel-Lucent GSM
Move Mixed CS/GPRS Link
into Dedicated GPRS Link
MPI95 / MDR6 - CCL
MFS Document
Reconfiguration Method
3BK 17430 0956 QZZZA Ed.05
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 2/14
Status RELEASED
Short title MPI95 / MDR6
All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.
BLANK PAGE BREAK
2 / 14 3BK 17430 0956 QZZZA Ed.05
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 3/14
Move Mixed CS/GPRS Link into Dedicated GPRS Link
MPI95 / MDR6 - CCL
Identification
Customer
Country
OMC-R Site Name: Address:
Name: Address:
Alcatel-Lucent Representative (s)
Customer Representative (s)
Customer Contractor Representative (s)
Date, Time and Duration of Work Start End Duration
General Remarks from Customer General Remarks from Alcatel-Lucent
3BK 17430 0956 QZZZA Ed.05 3 / 14
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 4/14
Applicable Documents
Fill in the edition of the applicable documents
Document Title Document Reference Edition
Move Mixed CS/GPRS Link into Dedicated GPRS Link 3BK 17430 0956 RJZZA
B10 BSS Methods Handbook 3BK 21268 AAAA PCZZA
BSS Configuration Handbook 3BK 21201 AAAA PCZZA
BSS Surveillance Handbook 3BK 21206 AAAA PCZZA
Network Reconfiguration Recommendations 3BK 21269 AAAA PCZZA
Applicable ITL
Information
Fill in the site data.
OMC-R Hostname
User Name
Password
Cases and Options
Enter a cross for the applicable case or option.
C1 Gb resources going through TC are moved to the dedicated MFS-SGSN link
C2 Gb resources going through TC are removed during the move of the link because Gb
capacity is not adapted to requirements
C3 The Ater Mux is a synchronizing one.
O1 New Gb resources are added on the new MFS-SGSN link, if the Gb capacity is not
sufficient
O2 Radio resources are increased because the capacity to support the GPRS is not
sufficient
O3 Reshuffle cell mapping if Multi-GPU/Multi-GP per BSS is used.
4 / 14 3BK 17430 0956 QZZZA Ed.05
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 5/14
Software & Documentation Versions
Fill in the appropriate INITIAL and FINAL software versions.
For BSS reshuffling methods, the INITIAL and FINAL versions are equal.For installation methods, the INITIAL version is "-" .
Initial Version Final Version
OMC-R
NPA
RNO
LASER
BSS
MFS
DocumentationVersion
3BK 17430 0956 QZZZA Ed.05 5 / 14
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 6/14
Results Table
Fill in the Results Table according to the following rules: YES: Put a cross here if the task was performed NO: Put a cross here if the task was not performed
N.A: Put a cross here if the task is not applicable S.A: Enter the number of solved anomalies N.S.A: Enter the number of non-solved anomalies
Scenario Description
Initial Checks
YES NO N.A S.A N.S.A
Global Checks
Print Gb Configuration
Print Transport Configuration
Performed by Site Date Start Time End Time Duration
C3: Set Synchronize PCM-TPP
YES NO N.A S.A N.S.A
C3: Set Synchronize PCM-TPP
Performed by Site Date Start Time End Time Duration
Stop Traffic on Ater Mux
YES NO N.A S.A N.S.A
Stop Traffic on Ater Mux
Performed by Site Date Start Time End Time Duration
6 / 14 3BK 17430 0956 QZZZA Ed.05
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 7/14
C1: Move Gb Resources
YES NO N.A S.A N.S.A
C1: Move Gb Resources
Performed by Site Date Start Time End Time Duration
C2: Delete Gb Resources
YES NO N.A S.A N.S.A
C2: Delete Gb Resources
Performed by Site Date Start Time End Time Duration
Configure Transport at MFS
YES NO N.A S.A N.S.A
Configure Transport at MFS
Performed by Site Date Start Time End Time Duration
Modify Mixed Ater Mux into Dedicated Ater Mux
YES NO N.A S.A N.S.A
Modify Mixed Ater Mux into Dedicated Ater Mux
Performed by Site Date Start Time End Time Duration
3BK 17430 0956 QZZZA Ed.05 7 / 14
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 8/14
Connect Physical Ater Mux
YES NO N.A S.A N.S.A
Connect Physical Ater Mux
Performed by Site Date Start Time End Time Duration
O1: Configure Gb
YES NO N.A S.A N.S.A
O1: Configure Gb
Performed by Site Date Start Time End Time Duration
Set Traffic on Ater Mux
YES NO N.A S.A N.S.A
Set Traffic on Ater Mux
Performed by Site Date Start Time End Time Duration
Set GPRS Traffic
YES NO N.A S.A N.S.A
Set GPRS Traffic
Performed by Site Date Start Time End Time Duration
8 / 14 3BK 17430 0956 QZZZA Ed.05
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 9/14
Test GPRS Service
YES NO N.A S.A N.S.A
Test GPRS Service
Performed by Site Date Start Time End Time Duration
O2: Configure Radio Interface
YES NO N.A S.A N.S.A
O2: Configure Radio Interface
Performed by Site Date Start Time End Time Duration
Final Checks
YES NO N.A S.A N.S.A
Final Checks
Performed by Site Date Start Time End Time Duration
Final Operations
YES NO N.A S.A N.S.A
Final Operations
Performed by Site Date Start Time End Time Duration
3BK 17430 0956 QZZZA Ed.05 9 / 14
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 10/14
Reverse Procedure
Stop GPRS Traffic on Ater Mux
YES NO N.A S.A N.S.A
Stop GPRS Traffic on Ater Mux
Performed by Site Date Start Time End Time Duration
C1, O1: Delete Gb Resources
YES NO N.A S.A N.S.A
C1, O1: Delete Gb Resources
Performed by Site Date Start Time End Time Duration
Modify Dedicated Ater Mux into Mixed Ater Mux
YES NO N.A S.A N.S.A
Modify Dedicated Ater Mux into Mixed Ater Mux
Performed by Site Date Start Time End Time Duration
Configure Transport at MFS
YES NO N.A S.A N.S.A
Configure Transport at MFS
Performed by Site Date Start Time End Time Duration
10 / 14 3BK 17430 0956 QZZZA Ed.05
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 11/14
Connect Physical Ater Mux
YES NO N.A S.A N.S.A
Connect Physical Ater Mux
Performed by Site Date Start Time End Time Duration
Configure GPRS
YES NO N.A S.A N.S.A
C1, C2: Configure Gb Interface
O2: Configure Radio Interface
Performed by Site Date Start Time End Time Duration
Set GPRS Traffic
YES NO N.A S.A N.S.A
Set GPRS Traffic
Performed by Site Date Start Time End Time Duration
Test Call and GPRS Service
YES NO N.A S.A N.S.A
Test Call and GPRS Service
Performed by Site Date Start Time End Time Duration
3BK 17430 0956 QZZZA Ed.05 11 / 14
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 12/14
Final Checks
YES NO N.A S.A N.S.A
Final Checks
Performed by Site Date Start Time End Time Duration
Final Operations
YES NO N.A S.A N.S.A
Final Operations
Performed by Site Date Start Time End Time Duration
C1, O1: Disconnect MFS-SGSN Link
YES NO N.A S.A N.S.A
C1, O1: Disconnect MFS-SGSN Link
Performed by Site Date Start Time End Time Duration
12 / 14 3BK 17430 0956 QZZZA Ed.05
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 13/14
Unavailability Duration Sheet
Fill in the unavailability duration sheet according to the following rule: Section Title Title of the paragraph where the unavailability occured Unavailability type T for traffic interruption , R for traffic reduction , S for loss of supervision
(T,R and S could be held simultaneously)Equipment Equipment with its number (eg BTS-1)Date Date expressed as: yy/mm/dd Start time Start time expressed as: hh/mm/ss End time End time expressed as: hh/mm/ss
UnavailabilityType
Equipment Date Start Time End Time
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
Section Title
3BK 17430 0956 QZZZA Ed.05 13 / 14
8/13/2019 174300956 Cc Le 05
http://slidepdf.com/reader/full/174300956-cc-le-05 14/14
Anomaly Sheet
Fill in the unavailability duration sheet according to the following rule: Section Title Title of the paragraph where the anomaly occured Brief description of the anomaly Summarize the anomaly (details must be in anomaly report)
Anomaly report Anomaly report was sent or no Solved by Name of the technician who solved the anomaly Date of anomaly solving
Description Solved by
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date:
Section Title:
Brief description of the anomaly:
Anomaly report: Y/N
Name:
Date: