12
Alcatel-Lucent GSM Move BTS/Abis, Different BSC, Different OMC-R MPI14 / MDR2 - CCL BTS Document Reconfiguration Method 3BK 17430 0142 QZZZA Ed.06

174300142 Cc Le 06

Embed Size (px)

Citation preview

Page 1: 174300142 Cc Le 06

Alcatel-Lucent GSM

Move BTS/Abis, Different

BSC, Different OMC-R

MPI14 / MDR2 - CCL

BTS Document

Reconfiguration Method

3BK 17430 0142 QZZZA Ed.06

Page 2: 174300142 Cc Le 06

Status RELEASED

Short title MPI14 / MDR2

All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.

BLANK PAGE BREAK

2 / 12 3BK 17430 0142 QZZZA Ed.06

Page 3: 174300142 Cc Le 06

Move BTS/Abis, Different BSC, Different OMC-RMPI14 / MDR2 - CCL

Identification

Customer

Country

OMC-R Site Name: Address:

Name: Address:

Alcatel-Lucent Representative (s)

Customer Representative (s)

Customer Contractor Representative (s)

Date, Time and Duration of Work Start End Duration

General Remarks from Customer General Remarks from Alcatel-Lucent

3BK 17430 0142 QZZZA Ed.06 3 / 12

Page 4: 174300142 Cc Le 06

Applicable DocumentsFill in the edition of the applicable documents

Document Title Document Reference Edition

Move BTS/Abis, Different BSC, Different OMC-R 3BK 17430 0142 RJZZA

BSS Methods Handbook 3BK 21268 AAAA PCZZA

BSS Configuration Handbook 3BK 21201 AAAA PCZZA

BSS Surveillance Handbook 3BK 21206 AAAA PCZZA

Network Reconfiguration Recommendations 3BK 21269 AAAA PCZZA

BSC Terminal User Guide 3BK 21220 AAAA PCZZA

BTS NEM User Guide 3BK 21228 AAAA PCZZA

Applicable ITL

InformationFill in the site data.

OMC-R Hostname

User Name

Password

4 / 12 3BK 17430 0142 QZZZA Ed.06

Page 5: 174300142 Cc Le 06

Cases and OptionsEnter a cross for the applicable case or option.

C1 Move BTS(s)

C1.1 New target Abis link must be created

C1.2 There are downstream BTS(s) on the source Abis link

C1.3 There will be downstream BTS(s) on the target Abis link (after move).

C2 Move a complete Abis link

C2.1Source and Target BSC are colocalized, so Abis link recabling is performed on theBSC site

C2.2Source and Target BSC are not colocalized, so Abis link recabling is performed on thefirst BTS site (chain) or on the first and last BTS sites (ring).

C3 Moved BTS supports at least one share cell

C3.1Each synchronized BTS supports at least one Main Sector and the procedure applies tothe first BTS to be moved

C3.2Each synchronized BTS supports at least one Main Sector and the procedure appliesto the second BTS to be moved

C3.3 One of synchronized BTS supports secondary sectors only.

C4 The source and target Abis links do not have the same connection type.

C5 BTS to be moved is synchronized with other BTS (no cell sharing)

C5.1 The procedure involves one BTS only or the first one of them.

C5.2 Both BTS have to be moved and the first one is already on the target OMC-R

O1 Transfer via an external support such as a diskette or a tape

O2 Transfer by ftp

O3 Delete Abis (if moved BTS was the last one on source BSC)

O4 Modify NExtra AbisTS (if HSDS is supported)

O5 Modify LAC of the moved cells

O6 Manual Transmission Programming

O7 Automatic Transmission Programming

3BK 17430 0142 QZZZA Ed.06 5 / 12

Page 6: 174300142 Cc Le 06

Software & Documentation VersionsFill in the appropriate INITIAL and FINAL software versions.

For BSS reshuffling methods, the INITIAL and FINAL versions are equal.For installation methods, the INITIAL version is "-".

Initial Version Final Version

OMC-R

NPA

RNO

LASER

BSS

MFS

DocumentationVersion

6 / 12 3BK 17430 0142 QZZZA Ed.06

Page 7: 174300142 Cc Le 06

Results Table

Fill in the Results Table according to the following rules:YES: Put a cross here if the task was performedNO: Put a cross here if the task was not performedN.A: Put a cross here if the task is not applicableS.A: Enter the number of solved anomaliesN.S.A: Enter the number of non-solved anomalies

Scenario Description

Initial Checks

YES NO N.A S.A N.S.A

Initial Checks

Performed by Site Date Start Time End Time Duration

Preparation

YES NO N.A S.A N.S.A

Prepare Backup for Reverse Procedure

C3.1, C5.1: BTS Reconfiguration

Create BTS / Abis on Target BSC

Preparing Inputs on Source and Target OMC-R

Performed by Site Date Start Time End Time Duration

3BK 17430 0142 QZZZA Ed.06 7 / 12

Page 8: 174300142 Cc Le 06

Switch BTS

YES NO N.A S.A N.S.A

Shut Down Cells on Source Impacted BTSs

Shut Down Cells on Target Impacted BTSs

Recable Impacted BTS

Unlock Cells on Downstream BTSs (on Source andTarget OMC-R)

Performed by Site Date Start Time End Time Duration

Set into Service Cells Belonging to Moved BTS

YES NO N.A S.A N.S.A

Inform MSC that Cells Are Moved

Unlock Cells on Moved BTS

C3.2, C5.2: BTS Reconfiguration

Performed by Site Date Start Time End Time Duration

Final Checks

YES NO N.A S.A N.S.A

Final Checks

Performed by Site Date Start Time End Time Duration

8 / 12 3BK 17430 0142 QZZZA Ed.06

Page 9: 174300142 Cc Le 06

Reverse Procedure

Shutdown Cell on Impacted BTSs

YES NO N.A S.A N.S.A

Shutdown Cell on Impacted BTSs

Performed by Site Date Start Time End Time Duration

Perform a Rollback Reconfiguration and Activate Backup PRCs

YES NO N.A S.A N.S.A

Perform a Rollback Reconfiguration and Activate BackupPRCs

Performed by Site Date Start Time End Time Duration

Reinsert Impacted BTS in Source BSC

YES NO N.A S.A N.S.A

Reinsert Impacted BTS in Source BSC

Performed by Site Date Start Time End Time Duration

Unlock Cells on Impacted BTSs

YES NO N.A S.A N.S.A

Unlock Cells on Impacted BTSs

Performed by Site Date Start Time End Time Duration

3BK 17430 0142 QZZZA Ed.06 9 / 12

Page 10: 174300142 Cc Le 06

Delete BTS on Target BSC

YES NO N.A S.A N.S.A

Delete BTS on Target BSC

Performed by Site Date Start Time End Time Duration

10 / 12 3BK 17430 0142 QZZZA Ed.06

Page 11: 174300142 Cc Le 06

Unavailability Duration Sheet

Fill in the unavailability duration sheet according to the following rule:Section Title Title of the paragraph where the unavailability occuredUnavailability type T for traffic interruption, R for traffic reduction, S for loss of supervision

(T,R and S could be held simultaneously)Equipment Equipment with its number (eg BTS-1)Date Date expressed as: yy/mm/ddStart time Start time expressed as: hh/mm/ssEnd time End time expressed as: hh/mm/ss

UnavailabilityType

Equipment Date Start Time End Time

Section Title

Section Title

Section Title

Section Title

Section Title

Section Title

Section Title

Section Title

Section Title

Section Title

Section Title

3BK 17430 0142 QZZZA Ed.06 11 / 12

Page 12: 174300142 Cc Le 06

Anomaly Sheet

Fill in the unavailability duration sheet according to the following rule:Section Title Title of the paragraph where the anomaly occuredBrief description of the anomaly Summarize the anomaly (details must be in anomaly report)Anomaly report Anomaly report was sent or noSolved by Name of the technician who solved the anomaly Date of anomaly solving

Description Solved by

Section Title:

Brief description of the anomaly:

Anomaly report: Y/N

Name:

Date:

Section Title:

Brief description of the anomaly:

Anomaly report: Y/N

Name:

Date:

Section Title:

Brief description of the anomaly:

Anomaly report: Y/N

Name:

Date:

Section Title:

Brief description of the anomaly:

Anomaly report: Y/N

Name:

Date:

Section Title:

Brief description of the anomaly:

Anomaly report: Y/N

Name:

Date:

Section Title:

Brief description of the anomaly:

Anomaly report: Y/N

Name:

Date:

12 / 12 3BK 17430 0142 QZZZA Ed.06