    Date 7/16/2013 Basic RateConvyanc

    rate

    Emulsion -

    SS 1 Packed57590.00 1.69

    Emulsion -

    RS 1 Packed36281.00 1.69

    Emulsion -SS 1 Packed

    57590.00 1.69

    Emulsion -

    RS 1 Packed36206.00 1.69

    Emulsion - SS 1 - Bulk 53648.00 1.50

    Emulsion - RS 1 - Bulk 32931.00 1.50

    60/70 39921.00 1.2763

    80/100 39121.00 1.2763

    60/70 40021.00 0.9924

    80/100 39221.00 0.9924

    60/70 40886.00 0.9924

    80/100 40086.00 0.9924

    54.51

    57.95

    49.00

    s3BB0 39715 38915

    1 2 3 4 5

    Emulsion - SS 1

    BulkEmulsion - RS 1 Bulk 60/70 80/100

    1-Jan-2013 52195.00 31165.00 37138.00 36338.00

    16-Jan-2013 52345.00 31365.00 37428.00 36628.00

    1-Feb-2013 52895.00 31415.00 37428.00 36628.00

    16-Feb-2013 52895.00 31415.00 37428.00 36628.00

    1-Mar-2013 53880.00 31477.00 37428.00 36628.00

    16-Mar-2013 53880.00 31477.00 37428.00 36628.00

    1-Apr-2013 52346.00 31465.00 37570.00 36770.0016-Apr-2013 52596.00 31775.00 38070.00 37270.00

    1-May-2013 51472.00 32000.00 38570.00 37770.00

    16-May-2013 51562.00 32112.00 38750.00 37950.001-Jun-2013 51843.00 32500.00 39380.00 38580.00

    16-Jun-2013 51753.00 32388.00 39200.00 38400.00

    1-Jul-2013 53153.00 32317.00 39200.00 38400.00

    16-Jul-2013 53648.00 32931.00 39921.00 39121.00

    Irungattukottai

    COIMBATORE

    Irungattukottai

    Cochin

    CHENNAI

    COIMBATORE

    Diesel

    Kerosene

    Furnace oil

    Date

    Irungattukottai Cochin

  • 7/27/2019 17.07.13 (new).xls

    2/106

    1-Aug-2013 55263.00 33032.00 39921.00 39121.00

    16-Aug-2013

    1-Sep-2013

    16-Sep-2013

    1-Oct-2013

    16-Oct-2013

    1-Nov-201316-Nov-2013

    1-Dec-2013

    16-Dec-2013

    0

    0 0 0 0

    5/12/2012

    Basic Price

    Detuct drum cost

    Sub total

    Excise Duty @ 14.00% 14.00%

    Education Cess ON ED @ 2.00% 2.00%

    Higher secondary Education

    Cess ON ED @1.00% 1.00%

    Billable Price

    VAT @ 5.00% 5.00%Total invoice value

    Storage Charges on basic price

    @5.00% 5.00%

    Detuct drum cost

    Sub total

    Name of work:

    Description Coimbatore Chennai

    Tamilnadu Vat @ 5%

  • 7/27/2019 17.07.13 (new).xls

    3/106

    Conveyance

    Cochin 60/70

    Cochin 80/100

    Sub total

    Aravakurichi Distance

    Avinashi Distance

    Bhavani Distance

    Dharapuram Distance

    Erode Distance

    Least rate

  • 7/27/2019 17.07.13 (new).xls

    4/106

    Kangeyam Distance

    Karur Distance

    Kodumudi Distance

    Krishnarayapuram Distance

    Kulithalai Distance

  • 7/27/2019 17.07.13 (new).xls

    5/106

    Madathukulam Distance

    Mulanoor Distance

    Palladam Distance

    Perundhurai Distance

    Tiruppurnorth Distance

  • 7/27/2019 17.07.13 (new).xls

    6/106

    Tiruppursouth Distance

    Udumalapet Distance

    Vellkovil Distance

    70024.28

    35670.29 34696.63

    1.10.12 15.11.12

    60/70 38737.50 35670.2980/100 37763.68 34696.63

    Emulsion SS 1 71095.82 70024.28

  • 7/27/2019 17.07.13 (new).xls

    7/106

    1-Oct-2012 49550.00 27815.0016-Oct-2012 52115.00 29490.001-Nov-2012

    16-Nov-2012 53145.00 30790.00

  • 7/27/2019 17.07.13 (new).xls

    8/106

    Distance

    coefficient

    Estimate

    rateDistance

    1 Irungattukott 77,552.00 428

    1 Irungattukott 48,570.00 428

    1 COIMBATORE

    1 COIMBATORE

    2 Irungattukottai

    2 Irungattukottai

    2 Cochin

    2 Cochin

    2 CHENNAI

    2 CHENNAI

    2 COIMBATORE

    2 COIMBATORE

    6 7 8 9 10 11

    60/70 80/100 60/70 80/100 Diesel Kerosene

    38103.00 37303.00 37238.00 36438.00 50.54 55.08

    38393.00 37593.00 37528.00 36728.00 50.54 58.37

    38393.00 37593.00 37528.00 36728.00 51.09 59.61

    38393.00 37593.00 37528.00 36728.00 51.64 57.83

    38393.00 37593.00 37528.00 36728.00 51.64 61.92

    38393.00 37593.00 37528.00 36728.00 51.64 61.92

    38535.00 37735.00 37670.00 36870.00 52.11 61.9239035.00 38235.00 38170.00 37370.00 52.18 61.92

    39535.00 38735.00 38670.00 37870.00 52.18 55.06

    39715.00 38915.00 38850.00 38050.00 53.28 55.06

    40345.00 39545.00 39480.00 38680.00 53.88 54.83

    40165.00 39365.00 39300.00 38500.00 53.88 54.83

    40165.00 39365.00 39300.00 38500.00 54.51 57.95

    40886.00 40086.00 40021.00 39221.00 54.51 57.95

    COIMBATORE CHENNAI Fuel charges

  • 7/27/2019 17.07.13 (new).xls

    9/106

  • 7/27/2019 17.07.13 (new).xls

    10/106

    120 Km

    x1.2763 x 2

    = 306.31

    461 Km

    x1.2763 x 2

    = 1176.75

    125 Km

    x1.69 x 1 =

    211.25

    125 Km

    x1.69 x 1 =

    211.25

    51223.02 51,223.08 51,073.18 77,039.93 47,955.36

    51073.2 0.92 0.82 0.07 0.64

    51,224.00 51,074.00 77,040.00 47,956.00

    50,916.77 49,896.43 76,828.68 47,744.11

    Aravakurichi 271.00km 271.00km 119.00km 119.00km

    271 Km

    x1.2763 x 2

    = 691.75

    271 Km

    x1.2763 x 2

    = 691.75

    119 Km

    x1.69 x 1 =

    201.11

    119 Km

    x1.69 x 1 =

    201.11

    51,608.52 50,588.18 77,029.79 47,945.22

    0.48 0.82 0.21 0.78

    51,609.00 50,589.00 77,030.00 47,946.00

    Karur 120.00km 120.00km 125.00km 125.00km

    120 Km

    x1.2763 x 2

    = 306.31

    120 Km

    x1.2763 x 2

    = 306.31

    125 Km

    x1.69 x 1 =

    211.25

    125 Km

    x1.69 x 1 =

    211.25

    51,223.08 50,202.74 77,039.93 47,955.36

    0.92 0.26 0.07 0.64

    51,224.00 50,203.00 77,040.00 47,956.00

    Palladam 284.00km 284.00km 94.30km 94.30km

    284 Kmx1.2763 x 2

    = 724.94

    284 Kmx1.2763 x 2

    = 724.94

    94.3 Kmx1.69 x 1 =

    159.37

    94.3 Kmx1.69 x 1 =

    159.37

    51,641.71 50,621.37 76,988.05 47,903.48

    0.29 0.63 0.95 0.52

    51,642.00 50,622.00 76,989.00 47,904.00

    Dharapuram 249.00km 249.00km 73.90km 73.90km

    249 Km

    x1.2763 x 2= 635.60

    249 Km

    x1.2763 x 2= 635.60

    73.9 Km

    x1.69 x 1 =124.89

    73.9 Km

    x1.69 x 1 =124.89

    51,552.37 50,532.03 76,953.57 47,869.00

    0.63 0.97 0.43 0.00

    51,553.00 50,533.00 76,954.00 47,869.00

    Erode 302.70km 302.70km 100.00km 100.00km

  • 7/27/2019 17.07.13 (new).xls

    11/106

    302.7 Km

    x1.2763 x 2

    = 772.67

    302.7 Km

    x1.2763 x 2

    = 772.67

    100 Km

    x1.69 x 1 =

    169.00

    100 Km

    x1.69 x 1 =

    169.00

    51,689.44 50,669.10 76,997.68 47,913.11

    0.56 0.90 0.32 0.89

    51,690.00 50,670.00 76,998.00 47,914.00

    Kangeyam 260.00km 260.00km 51.00km 51.00km

    260 Km

    x1.2763 x 2

    = 663.68

    260 Km

    x1.2763 x 2

    = 663.68

    51 Km x1.69

    x 1 = 86.19

    51 Km x1.69

    x 1 = 86.19

    51,580.45 50,560.11 76,914.87 47,830.30

    0.55 0.89 0.13 0.70

    51,581.00 50,561.00 76,915.00 47,831.00

    Karur 304.00km 304.00km 118.00km 118.00km

    304 Km

    x1.2763 x 2

    = 775.99

    304 Km

    x1.2763 x 2

    = 775.99

    118 Km

    x1.69 x 1 =

    199.42

    118 Km

    x1.69 x 1 =

    199.42

    51,692.76 50,672.42 77,028.10 47,943.53

    0.24 0.58 0.90 0.47

    51,693.00 50,673.00 77,029.00 47,944.00

    Kodumudi 284.00km 284.00km 110.00km 110.00km

    284 Kmx1.2763 x 2

    = 724.94

    284 Kmx1.2763 x 2

    = 724.94

    110 Kmx1.69 x 1 =

    185.90

    110 Kmx1.69 x 1 =

    185.90

    51,641.71 50,621.37 77,014.58 47,930.01

    0.29 0.63 0.42 0.99

    51,642.00 50,622.00 77,015.00 47,931.00

    Krishnarayapura 325.00km 325.00km 147.00km 147.00km

    325 Km

    x1.2763 x 2

    = 829.60

    325 Km

    x1.2763 x 2

    = 829.60

    147 Km

    x1.69 x 1 =

    248.43

    147 Km

    x1.69 x 1 =

    248.4351,746.37 50,726.03 77,077.11 47,992.54

    0.63 0.97 0.89 0.46

    51,747.00 50,727.00 77,078.00 47,993.00

    Kulithalai 395.00km 395.00km 182.00km 182.00km

  • 7/27/2019 17.07.13 (new).xls

    12/106

    395 Km

    x1.2763 x 2

    = 1008.28

    395 Km

    x1.2763 x 2

    = 1008.28

    182 Km

    x1.69 x 1 =

    307.58

    182 Km

    x1.69 x 1 =

    307.58

    51,925.05 50,904.71 77,136.26 48,051.69

    0.95 0.29 0.74 0.31

    51,926.00 50,905.00 77,137.00 48,052.00

    Madathukulam 206.00km 206.00km 86.80km 86.80km

    206 Km

    x1.2763 x 2

    = 525.84

    206 Km

    x1.2763 x 2

    = 525.84

    86.8 Km

    x1.69 x 1 =

    146.69

    86.8 Km

    x1.69 x 1 =

    146.69

    51,442.61 50,422.27 76,975.37 47,890.80

    0.39 0.74 0.63 0.20

    51,443.00 50,423.00 76,976.00 47,891.00

    Mulanoor 246.60km 246.60km 95.20km 95.20km

    246.6 Km

    x1.2763 x 2

    = 629.47

    246.6 Km

    x1.2763 x 2

    = 629.47

    95.2 Km

    x1.69 x 1 =

    160.89

    95.2 Km

    x1.69 x 1 =

    160.89

    51,546.24 50,525.90 76,989.57 47,905.00

    0.76 0.10 0.43 0.00

    51,547.00 50,526.00 76,990.00 47,905.00

    Palladam 215.00km 215.00km 31.30km 31.30km

    215 Kmx1.2763 x 2

    = 548.81

    215 Kmx1.2763 x 2

    = 548.81

    31.3 Kmx1.69 x 1 =

    52.90

    31.3 Kmx1.69 x 1 =

    52.90

    51,465.58 50,445.24 76,881.58 47,797.01

    0.42 0.76 0.42 0.99

    51,466.00 50,446.00 76,882.00 47,798.00

    Perundhurai 270.00km 270.00km 73.00km 73.00km

    270 Km

    x1.2763 x 2

    = 689.20

    270 Km

    x1.2763 x 2

    = 689.20

    73 Km x1.69

    x 1 = 123.37

    73 Km x1.69

    x 1 = 123.3751,605.97 50,585.63 76,952.05 47,867.48

    0.03 0.38 0.95 0.52

    51,606.00 50,586.00 76,953.00 47,868.00

    Tiruppurnorth 229.00km 229.00km 42.60km 42.60km

  • 7/27/2019 17.07.13 (new).xls

    13/106

    229 Km

    x1.2763 x 2

    = 584.55

    229 Km

    x1.2763 x 2

    = 584.55

    42.6 Km

    x1.69 x 1 =

    71.99

    42.6 Km

    x1.69 x 1 =

    71.99

    51,501.32 50,480.98 76,900.67 47,816.10

    0.68 0.02 0.33 0.90

    51,502.00 50,481.00 76,901.00 47,817.00

    Tiruppursouth 239.00km 239.00km 36.00km 36.00km

    239 Km

    x1.2763 x 2

    = 610.07

    239 Km

    x1.2763 x 2

    = 610.07

    36 Km x1.69

    x 1 = 60.84

    36 Km x1.69

    x 1 = 60.84

    51,526.84 50,506.50 76,889.52 47,804.95

    0.16 0.50 0.48 0.05

    51,527.00 50,507.00 76,890.00 47,805.00

    Udumalapet 195.00km 195.00km 75.70km 75.70km

    195 Km

    x1.2763 x 2

    = 497.76

    195 Km

    x1.2763 x 2

    = 497.76

    75.7 Km

    x1.69 x 1 =

    127.93

    75.7 Km

    x1.69 x 1 =

    127.93

    51,414.53 50,394.19 76,956.61 47,872.04

    0.47 0.81 0.39 0.96

    51,415.00 50,395.00 76,957.00 47,873.00

    Vellkovil 281.00km 281.00km 80.20km 80.20km

    281 Kmx1.2763 x 2

    = 717.28

    281 Kmx1.2763 x 2

    = 717.28

    80.2 Kmx1.69 x 1 =

    135.54

    80.2 Kmx1.69 x 1 =

    135.54

    51,634.05 50,613.71 76,964.22 47,879.65

    0.95 0.29 0.78 0.35

    51,635.00 50,614.00 76,965.00 47,880.00

    Difference 16.11.12 Difference

    -3067.21 38177.50 -560.00

    -3067.05 37203.83 -559.85

    -1071.54 70782.99 -312.83

  • 7/27/2019 17.07.13 (new).xls

    14/106

    31828.00 31028.00

    29308.00 28508.00

    29308.00 28508.00

    31368.00 30568.00

  • 7/27/2019 17.07.13 (new).xls

    15/106

    77,040.00 125

    47,956.00 125

    77,766.00 428

    48,231.00 428

    51,224.00 120

    51,074.00 461 114.42% 59784

    51,260.00 461 100.00% 52249.61

    50,259.00 461

    51,253.00 44 114.42% 37719

    50,252.00 44 100.00% 32965.39

    54.51

    57.95

    49.00

    55414

    12 13 14 15 16 17

    Chennai

    Furnace oilEmulsion -

    SS 1 Packed

    Emulsion -

    RS 1 Packed

    Emulsion -

    SS 1 Packed

    Emulsion -

    RS 1 Packed60/70

    43.34 56020.00 38665.00 56020.00 38665.00

    46.98 56170.00 34615.00 56170.00 34615.00

    46.80 56720.00 34665.00 56720.00 34665.00

    46.98 56720.00 34665.00 56720.00 34665.00

    47.97 57705.00 34727.00 57705.00 34727.00

    47.97 57705.00 34727.00 57705.00 34727.00

    47.58 56171.00 34715.00 56171.00 34715.0047.38 56421.33 36526.62 56171.00 34715.00

    47.39 55414.00 35350.00 55414.00 35350.00

    48.38 55504.00 35462.00 55504.00 35462.00

    46.42 55785.00 35850.00 55785.00 35850.00

    48.59 55695.00 35738.00 55695.00 35738.00

    50.95 57095.00 35667.00 57095.00 35667.00

    49.00 57590.00 36206.00 57590.00 36281.00

    Coimbatore Irungattukottai

  • 7/27/2019 17.07.13 (new).xls

    16/106

    48.54 59204.99 36307.67 59204.99 36382.00

    0 0 0 0 0

    Division Tiruppur

    b Division Avinashi

    60/70 80/100 60/70 80/100

    Emulsion -

    SS 1Packed

    Emulsion -

    RS 1Packed

    40,886.00 40,086.00 40,021.00 39,221.00 57,590.00 36,281.00

    0.00 0.00 0.00 0.00 0.00 0.00

    40,886.00 40,086.00 40,021.00 39,221.00 57,590.00 36,281.00

    5,724.04 5,612.04 5,602.94 5,490.94 8,062.60 5,079.34

    114.48 112.24 112.06 109.82 161.25 101.59

    57.24 56.12 56.03 54.91 80.63 50.79

    46,781.76 45,866.40 45,792.03 44,876.67 65,894.48 41,512.72

    2,339.09 2,293.32 2,289.60 2,243.83 9,554.70 6,019.3449,120.85 48,159.72 48,081.63 47,120.50 75,449.18 47,532.06

    2,044.30 2,004.30 2,001.05 1,961.05 2,879.50 1,814.05

    0.00 0.00 0.00 0.00 -1,500.00 -1,500.00

    51,165.15 50,164.02 50,082.68 49,081.55 76,828.68 47,846.11

    Coimbatore Chennai Irungattukottai

  • 7/27/2019 17.07.13 (new).xls

    17/106

    44 Km

    x0.9924 x 2

    = 87.33

    44 Km

    x0.9924 x 2

    = 87.33

    461 Km x1.5

    x 2 =

    1383.00

    461 Km x1.5

    x 2 =

    1383.00

    428 Km

    x1.69 x 1 =

    723.32

    428 Km

    x1.69 x 1 =

    723.32

    51,252.48 50,251.35 51,259.43 50,258.30 77,552.00 48,569.43

    0.52 0.65 0.57 0.70 0.00 0.57

    51,253.00 50,252.00 51,260.00 50,259.00 77,552.00 48,570.00

    51,165.15 50,164.02 50,082.68 49,081.55 76,828.68 47,846.11

    125.00km 125.00km 410.00km 410.00km 398.00km 398.00km

    125 Km

    x0.9924 x 2

    = 248.10

    125 Km

    x0.9924 x 2

    = 248.10

    410 Km x1.5

    x 2 =

    1230.00

    410 Km x1.5

    x 2 =

    1230.00

    398 Km

    x1.69 x 1 =

    672.62

    398 Km

    x1.69 x 1 =

    672.62

    51,413.25 50,412.12 51,129.25 50,128.12 77,501.30 48,518.73

    0.75 0.88 0.75 0.88 0.70 0.27

    51,414.00 50,413.00 51,130.00 50,129.00 77,502.00 48,519.00

    44.00km 44.00km 461.00km 461.00km 428.00km 428.00km

    44 Km

    x0.9924 x 2

    = 87.33

    44 Km

    x0.9924 x 2

    = 87.33

    461 Km x1.5

    x 2 =

    1383.00

    461 Km x1.5

    x 2 =

    1383.00

    428 Km

    x1.69 x 1 =

    723.32

    428 Km

    x1.69 x 1 =

    723.32

    51,252.48 50,251.35 51,259.43 50,258.30 77,552.00 48,569.43

    0.52 0.65 0.57 0.70 0.00 0.57

    51,253.00 50,252.00 51,260.00 50,259.00 77,552.00 48,570.00

    107.00km 107.00km 402.00km 402.00km 372.00km 372.00km

    107 Kmx0.9924 x 2

    = 212.37

    107 Kmx0.9924 x 2

    = 212.37

    402 Km x1.5x 2 =

    1206.00

    402 Km x1.5x 2 =

    1206.00

    372 Kmx1.69 x 1 =

    628.68

    372 Kmx1.69 x 1 =

    628.68

    51,377.52 50,376.39 51,108.83 50,107.70 77,457.36 48,474.79

    0.48 0.61 0.17 0.30 0.64 0.21

    51,378.00 50,377.00 51,109.00 50,108.00 77,458.00 48,475.00

    80.50km 80.50km 456.00km 456.00km 444.00km 444.00km

    80.5 Km

    x0.9924 x 2= 159.78

    80.5 Km

    x0.9924 x 2= 159.78

    456 Km x1.5

    x 2 =1368.00

    456 Km x1.5

    x 2 =1368.00

    444 Km

    x1.69 x 1 =750.36

    444 Km

    x1.69 x 1 =750.36

    51,324.93 50,323.80 51,246.67 50,245.54 77,579.04 48,596.47

    0.07 0.20 0.33 0.46 0.96 0.53

    51,325.00 50,324.00 51,247.00 50,246.00 77,580.00 48,597.00

    100.00km 100.00km 400.00km 400.00km 380.00km 380.00km

  • 7/27/2019 17.07.13 (new).xls

    18/106

    100 Km

    x0.9924 x 2

    = 198.48

    100 Km

    x0.9924 x 2

    = 198.48

    400 Km x1.5

    x 2 =

    1200.00

    400 Km x1.5

    x 2 =

    1200.00

    380 Km

    x1.69 x 1 =

    642.20

    380 Km

    x1.69 x 1 =

    642.20

    51,363.63 50,362.50 51,103.72 50,102.59 77,470.88 48,488.31

    0.37 0.50 0.28 0.41 0.12 0.69

    51,364.00 50,363.00 51,104.00 50,103.00 77,471.00 48,489.00

    70.00km 70.00km 444.00km 444.00km 446.00km 446.00km

    70 Km

    x0.9924 x 2

    = 138.94

    70 Km

    x0.9924 x 2

    = 138.94

    444 Km x1.5

    x 2 =

    1332.00

    444 Km x1.5

    x 2 =

    1332.00

    446 Km

    x1.69 x 1 =

    753.74

    446 Km

    x1.69 x 1 =

    753.74

    51,304.09 50,302.96 51,216.03 50,214.90 77,582.42 48,599.85

    0.91 0.04 0.97 0.10 0.58 0.15

    51,305.00 50,303.00 51,217.00 50,215.00 77,583.00 48,600.00

    129.00km 129.00km 383.00km 383.00km 371.00km 371.00km

    129 Km

    x0.9924 x 2

    = 256.04

    129 Km

    x0.9924 x 2

    = 256.04

    383 Km x1.5

    x 2 =

    1149.00

    383 Km x1.5

    x 2 =

    1149.00

    371 Km

    x1.69 x 1 =

    626.99

    371 Km

    x1.69 x 1 =

    626.99

    51,421.19 50,420.06 51,060.33 50,059.20 77,455.67 48,473.10

    0.81 0.94 0.67 0.80 0.33 0.90

    51,422.00 50,421.00 51,061.00 50,060.00 77,456.00 48,474.00

    107.00km 107.00km 411.00km 411.00km 427.00km 427.00km

    107 Kmx0.9924 x 2

    = 212.37

    107 Kmx0.9924 x 2

    = 212.37

    411 Km x1.5x 2 =

    1233.00

    411 Km x1.5x 2 =

    1233.00

    427 Kmx1.69 x 1 =

    721.63

    427 Kmx1.69 x 1 =

    721.63

    51,377.52 50,376.39 51,131.80 50,130.67 77,550.31 48,567.74

    0.48 0.61 0.20 0.33 0.69 0.26

    51,378.00 50,377.00 51,132.00 50,131.00 77,551.00 48,568.00

    154.00km 154.00km 358.00km 358.00km 345.00km 345.00km

    154 Km

    x0.9924 x 2

    = 305.66

    154 Km

    x0.9924 x 2

    = 305.66

    358 Km x1.5

    x 2 =

    1074.00

    358 Km x1.5

    x 2 =

    1074.00

    345 Km

    x1.69 x 1 =

    583.05

    345 Km

    x1.69 x 1 =

    583.0551,470.81 50,469.68 50,996.51 49,995.38 77,411.73 48,429.16

    0.19 0.32 0.49 0.62 0.27 0.84

    51,471.00 50,470.00 50,997.00 49,996.00 77,412.00 48,430.00

    170.00km 170.00km 365.00km 365.00km 332.00km 332.00km

  • 7/27/2019 17.07.13 (new).xls

    19/106

    170 Km

    x0.9924 x 2

    = 337.42

    170 Km

    x0.9924 x 2

    = 337.42

    365 Km x1.5

    x 2 =

    1095.00

    365 Km x1.5

    x 2 =

    1095.00

    332 Km

    x1.69 x 1 =

    561.08

    332 Km

    x1.69 x 1 =

    561.08

    51,502.57 50,501.44 51,014.38 50,013.25 77,389.76 48,407.19

    0.43 0.56 0.62 0.75 0.24 0.81

    51,503.00 50,502.00 51,015.00 50,014.00 77,390.00 48,408.00

    81.00km 81.00km 510.00km 510.00km 498.00km 498.00km

    81 Km

    x0.9924 x 2

    = 160.77

    81 Km

    x0.9924 x 2

    = 160.77

    510 Km x1.5

    x 2 =

    1530.00

    510 Km x1.5

    x 2 =

    1530.00

    498 Km

    x1.69 x 1 =

    841.62

    498 Km

    x1.69 x 1 =

    841.62

    51,325.92 50,324.79 51,384.51 50,383.38 77,670.30 48,687.73

    0.08 0.21 0.49 0.62 0.70 0.27

    51,326.00 50,325.00 51,385.00 50,384.00 77,671.00 48,688.00

    102.00km 102.00km 435.00km 435.00km 423.00km 423.00km

    102 Km

    x0.9924 x 2

    = 202.45

    102 Km

    x0.9924 x 2

    = 202.45

    435 Km x1.5

    x 2 =

    1305.00

    435 Km x1.5

    x 2 =

    1305.00

    423 Km

    x1.69 x 1 =

    714.87

    423 Km

    x1.69 x 1 =

    714.87

    51,367.60 50,366.47 51,193.06 50,191.93 77,543.55 48,560.98

    0.40 0.53 0.94 0.07 0.45 0.02

    51,368.00 50,367.00 51,194.00 50,192.00 77,544.00 48,561.00

    38.30km 38.30km 477.00km 477.00km 467.00km 467.00km

    38.3 Kmx0.9924 x 2

    = 76.02

    38.3 Kmx0.9924 x 2

    = 76.02

    477 Km x1.5x 2 =

    1431.00

    477 Km x1.5x 2 =

    1431.00

    467 Kmx1.69 x 1 =

    789.23

    467 Kmx1.69 x 1 =

    789.23

    51,241.17 50,240.04 51,300.27 50,299.14 77,617.91 48,635.34

    0.83 0.96 0.73 0.86 0.09 0.66

    51,242.00 50,241.00 51,301.00 50,300.00 77,618.00 48,636.00

    82.30km 82.30km 423.00km 423.00km 414.00km 414.00km

    82.3 Km

    x0.9924 x 2

    = 163.35

    82.3 Km

    x0.9924 x 2

    = 163.35

    423 Km x1.5

    x 2 =

    1269.00

    423 Km x1.5

    x 2 =

    1269.00

    414 Km

    x1.69 x 1 =

    699.66

    414 Km

    x1.69 x 1 =

    699.6651,328.50 50,327.37 51,162.43 50,161.30 77,528.34 48,545.77

    0.50 0.63 0.57 0.70 0.66 0.23

    51,329.00 50,328.00 51,163.00 50,162.00 77,529.00 48,546.00

    52.30km 52.30km 460.00km 460.00km 450.00km 450.00km

  • 7/27/2019 17.07.13 (new).xls

    20/106

    52.3 Km

    x0.9924 x 2

    = 103.81

    52.3 Km

    x0.9924 x 2

    = 103.81

    460 Km x1.5

    x 2 =

    1380.00

    460 Km x1.5

    x 2 =

    1380.00

    450 Km

    x1.69 x 1 =

    760.50

    450 Km

    x1.69 x 1 =

    760.50

    51,268.96 50,267.83 51,256.88 50,255.75 77,589.18 48,606.61

    0.04 0.17 0.12 0.25 0.82 0.39

    51,269.00 50,268.00 51,257.00 50,256.00 77,590.00 48,607.00

    52.30km 52.30km 460.00km 460.00km 450.00km 450.00km

    52.3 Km

    x0.9924 x 2

    = 103.81

    52.3 Km

    x0.9924 x 2

    = 103.81

    460 Km x1.5

    x 2 =

    1380.00

    460 Km x1.5

    x 2 =

    1380.00

    450 Km

    x1.69 x 1 =

    760.50

    450 Km

    x1.69 x 1 =

    760.50

    51,268.96 50,267.83 51,256.88 50,255.75 77,589.18 48,606.61

    0.04 0.17 0.12 0.25 0.82 0.39

    51,269.00 50,268.00 51,257.00 50,256.00 77,590.00 48,607.00

    70.00km 70.00km 496.00km 496.00km 483.00km 483.00km

    70 Km

    x0.9924 x 2

    = 138.94

    70 Km

    x0.9924 x 2

    = 138.94

    496 Km x1.5

    x 2 =

    1488.00

    496 Km x1.5

    x 2 =

    1488.00

    483 Km

    x1.69 x 1 =

    816.27

    483 Km

    x1.69 x 1 =

    816.27

    51,304.09 50,302.96 51,348.77 50,347.64 77,644.95 48,662.38

    0.91 0.04 0.23 0.36 0.05 0.62

    51,305.00 50,303.00 51,349.00 50,348.00 77,645.00 48,663.00

    86.80km 86.80km 425.00km 425.00km 413.00km 413.00km

    86.8 Kmx0.9924 x 2

    = 172.28

    86.8 Kmx0.9924 x 2

    = 172.28

    425 Km x1.5x 2 =

    1275.00

    425 Km x1.5x 2 =

    1275.00

    413 Kmx1.69 x 1 =

    697.97

    413 Kmx1.69 x 1 =

    697.97

    51,337.43 50,336.30 51,167.54 50,166.41 77,526.65 48,544.08

    0.57 0.70 0.46 0.59 0.35 0.92

    51,338.00 50,337.00 51,168.00 50,167.00 77,527.00 48,545.00

  • 7/27/2019 17.07.13 (new).xls

    21/106

  • 7/27/2019 17.07.13 (new).xls

    22/106

    66026

    Diesel Month Tiruppur Chennai

    60.46 1-Jan-13 50.54 50.13 14.0% 2%

    60.46 18-Jan-13 51.09 50.68 14.0% 2%

    60.96 15-Feb-13 51.64 51.23 14.0% 2%

    22-Mar-13 52.19 51.78 14.0% 2%

    61917.88 1-Apr-13 52.11 51.78 14.0% 2%

    15-Apr-13 52.18 51.82 14.0% 2%

    58.71 10-May-13 53.28 52.92 14.0% 2%31-May-13 53.88 52.92 14.0% 2%

    1-Jun-13 53.88 53.93 14.0% 2%

    14.0% 2%

    14.0% 2%

    14.0% 2%

    14.0% 2%

    14.0% 2%

    ExciseDuty

    @

    Educatio

    n

    CessON

    ED@

  • 7/27/2019 17.07.13 (new).xls

    23/106

  • 7/27/2019 17.07.13 (new).xls

    24/106

  • 7/27/2019 17.07.13 (new).xls

    25/106

    380 Km x1.5

    x 2 =

    1140.00

    380 Km x1.5

    x 2 =

    1140.00

    77,621.37 48,086.91

    0.63 0.09

    77,622.00 48,087.00

    446.00km 446.00km

    446 Km x1.5

    x 2 =

    1338.00

    446 Km x1.5

    x 2 =

    1338.00

    77,819.37 48,284.91

    0.63 0.09

    77,820.00 48,285.00

    371.00km 371.00km

    371 Km x1.5

    x 2 =

    1113.00

    371 Km x1.5

    x 2 =

    1113.00

    77,594.37 48,059.91

    0.63 0.09

    77,595.00 48,060.00

    427.00km 427.00km

    427 Km x1.5x 2 =

    1281.00

    427 Km x1.5x 2 =

    1281.00

    77,762.37 48,227.91

    0.63 0.09

    77,763.00 48,228.00

    345.00km 345.00km

    345 Km x1.5

    x 2 =

    1035.00

    345 Km x1.5

    x 2 =

    1035.0077,516.37 47,981.91

    0.63 0.09

    77,517.00 47,982.00

    332.00km 332.00km

  • 7/27/2019 17.07.13 (new).xls

    26/106

    332 Km x1.5

    x 2 = 996.00

    332 Km x1.5

    x 2 = 996.00

    77,477.37 47,942.91

    0.63 0.09

    77,478.00 47,943.00

    498.00km 498.00km

    498 Km x1.5

    x 2 =

    1494.00

    498 Km x1.5

    x 2 =

    1494.00

    77,975.37 48,440.91

    0.63 0.09

    77,976.00 48,441.00

    423.00km 423.00km

    423 Km x1.5

    x 2 =

    1269.00

    423 Km x1.5

    x 2 =

    1269.00

    77,750.37 48,215.91

    0.63 0.09

    77,751.00 48,216.00

    467.00km 467.00km

    467 Km x1.5x 2 =

    1401.00

    467 Km x1.5x 2 =

    1401.00

    77,882.37 48,347.91

    0.63 0.09

    77,883.00 48,348.00

    414.00km 414.00km

    414 Km x1.5

    x 2 =

    1242.00

    414 Km x1.5

    x 2 =

    1242.0077,723.37 48,188.91

    0.63 0.09

    77,724.00 48,189.00

    450.00km 450.00km

  • 7/27/2019 17.07.13 (new).xls

    27/106

    450 Km x1.5

    x 2 =

    1350.00

    450 Km x1.5

    x 2 =

    1350.00

    77,831.37 48,296.91

    0.63 0.09

    77,832.00 48,297.00

    450.00km 450.00km

    450 Km x1.5

    x 2 =

    1350.00

    450 Km x1.5

    x 2 =

    1350.00

    77,831.37 48,296.91

    0.63 0.09

    77,832.00 48,297.00

    483.00km 483.00km

    483 Km x1.5

    x 2 =

    1449.00

    483 Km x1.5

    x 2 =

    1449.00

    77,930.37 48,395.91

    0.63 0.09

    77,931.00 48,396.00

    413.00km 413.00km

    413 Km x1.5x 2 =

    1239.00

    413 Km x1.5x 2 =

    1239.00

    77,720.37 48,185.91

    0.63 0.09

    77,721.00 48,186.00

  • 7/27/2019 17.07.13 (new).xls

    28/106

  • 7/27/2019 17.07.13 (new).xls

    29/106

  • 7/27/2019 17.07.13 (new).xls

    30/106

    1% 14.5% 5% 2% 5% 1-Aug-2012

    1% 14.5% 5% 2% 5% 16-Aug-2012

    1% 14.5% 5% 2% 5% 1-Sep-2012

    1% 14.5% 5% 2% 5% 16-Sep-2012

    1% 14.5% 5% 2% 5% 1-Oct-2012

    1% 14.5% 5% 2% 5% 16-Oct-2012

    1% 14.5% 5% 2% 5% 1-Nov-20121% 14.5% 5% 2% 5% 16-Nov-2012

    1% 14.5% 5% 2% 5% 1-Dec-2012

    1% 14.5% 5% 2% 5% 16-Dec-2012

    1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%

    1% 14.5% 5% 2% 5%

  • 7/27/2019 17.07.13 (new).xls

    31/106

  • 7/27/2019 17.07.13 (new).xls

    32/106

  • 7/27/2019 17.07.13 (new).xls

    33/106

  • 7/27/2019 17.07.13 (new).xls

    34/106

  • 7/27/2019 17.07.13 (new).xls

    35/106

  • 7/27/2019 17.07.13 (new).xls

    36/106

    Chennai Diesel Price = 53.53 Rs/Ltr

    6/1/2013 53.53 Most Recent price change date: Saturday, June

    5/11/2013 52.92 Chennai Diesel Price = 52.92 Rs/Ltr

    4/1/2013 51.78 Historical Diesel price change date: Saturday, May

    3/23/2013 51.78 Chennai Diesel Price = 51.78 Rs/Ltr2/16/2013 51.23 Historical Diesel price change date: Monday, April

    1/18/2013 50.68 Chennai Diesel Price = 51.78 Rs/Ltr1/1/2013 50.13 Historical Diesel price change date: Saturday, Mar

    10/27/2013 50.16 Chennai Diesel Price = 51.23 Rs/Ltr9/14/2012 49.98 Historical Diesel price change date: Saturday, Feb

    8/1/2012 44.76 Chennai Diesel Price = 50.68 Rs/Ltr6/25/2012 43.83 Historical Diesel price change date: Friday, Januar

    7/1/2011 43.95 Chennai Diesel Price = 50.13 Rs/Ltr6/25/2011 43.8 Historical Diesel price change date: Tuesday, Janu

    11/2/2011 40.16 Chennai Diesel Price = 50.16 Rs/LtrHistorical Diesel price change date: Saturday, Oct

    Chennai Diesel Price = 50.16 Rs/LtrHistorical Diesel price change date: Saturday, Oct

    Chennai Diesel Price = 49.98 Rs/LtrHistorical Diesel price change date: Friday, Septe

    Chennai Diesel Price = 44.76 Rs/LtrHistorical Diesel price change date: Wednesday, A

    Chennai Diesel Price = 43.83 Rs/LtrHistorical Diesel price change date: Wednesday, J

    Chennai Diesel Price = 43.95 Rs/LtrHistorical Diesel price change date: Friday, July 01

    Chennai Diesel Price = 43.8 Ltr

    Historical Diesel price change date: Saturday, Jun Chennai Diesel Price = 40.16 Ltr

  • 7/27/2019 17.07.13 (new).xls

    37/106

  • 7/27/2019 17.07.13 (new).xls

    38/106

  • 7/27/2019 17.07.13 (new).xls

    39/106

  • 7/27/2019 17.07.13 (new).xls

    40/106

  • 7/27/2019 17.07.13 (new).xls

    41/106

  • 7/27/2019 17.07.13 (new).xls

    42/106

  • 7/27/2019 17.07.13 (new).xls

    43/106

  • 7/27/2019 17.07.13 (new).xls

    44/106

  • 7/27/2019 17.07.13 (new).xls

    45/106

    COIMBAT 80/100 44.00 Km 50,252.00

    Diesel Diesel 54.51

    Kerosene Kerosene 57.95

    Furnace oilFurnace

    oil49.00

    Least rateEmulsion -

    SS 1 Bulk

    51,073.20 c

    Emulsion -

    RS 1 Packed47,956.00 #N/A

    Kochi Refineries Ltd. Ambalamugal, Kochi - 682301

    HINDUST Data for Bitumenious concrete and SDBC 40 are to be revised with reference to the IRC-111-20

    Manali Refinery, Manali Chennai (Madras) - 600068

    Hindustan Colas Limited AA-9,SIPCOT Industrial Park, Irungattukottai - 602105.

    SDBC

  • 7/27/2019 17.07.13 (new).xls

    46/106

  • 7/27/2019 17.07.13 (new).xls

    47/106

  • 7/27/2019 17.07.13 (new).xls

    48/106

  • 7/27/2019 17.07.13 (new).xls

    49/106

  • 7/27/2019 17.07.13 (new).xls

    50/106

  • 7/27/2019 17.07.13 (new).xls

    51/106

    1. 247 km, Salem Ernakulam Highway/NH 544 (via) Trissur,V

    2. 248 km, Salem Ernakulam Highway/NH 544 and SH 21 (via

    1. 301 km, Salem Ernakulam Highway/NH 544 and SH 21 (via

    2. 306 km, Salem Ernakulam Highway/NH 544 and NH 81 (vi

    3. 344 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,

    1. 284 km, Salem Ernakulam Highway/NH 544 (via) Trissur,V

    2. 291 km, Salem Ernakulam Highway/NH 544 and SH 21 (via

    3. 316 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,

    1. 325 km, Salem Ernakulam Highway/NH 544 and SH 21 (via

    2. 331 km, Salem Ernakulam Highway/NH 544 and NH 81 (vi

    3. 369 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,

    1. 341 km, Salem Ernakulam Highway/NH 544 and SH 21(via

    2. 347 km, Salem Ernakulam Highway/NH 544 and NH 81 (vi

    3. 390 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,

    1. 206 km, Salem Ernakulam Highway/NH 544 (via) Trissur,P

    2. 213 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai

    1. 247 km, Salem Ernakulam Highway/NH 544 and SH 21 (via

    2. 281 km, Salem Ernakulam Highway/NH 544 (via) Trissur,P

    3. 261 km, NH 85 and SH 17 (via) Munar,Udumalai,Dharapur

    1. 215 km, Salem Ernakulam Highway/NH 544 (via) Trissur,P

    2. 215 km, Salem Ernakulam Highway/NH 544 and SH 19 (via

    3. 248 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai

    1. 259 km, Salem - Ernakulam Highway/NH 544 (via) Trissur,

    2. 269 km, Salem Ernakulam Highway/NH 544 (via) Trissur,V1. 229 km, Salem Ernakulam Highway/NH 544 (via) Trissur,P

    2. 232 km, Salem Ernakulam Highway/NH 544 and SH 19 (via

    3. 265 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai,

    1. 229 km, Salem Ernakulam Highway/NH 544 (via) Trissur,P

    2. 232 km, Salem Ernakulam Highway/NH 544 and SH 19 (via

    3. 265 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai,

    1. 195 km, Salem Ernakulam Highway/NH 544 (via) Trissur,V

    2. 201 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai

    1. 261 km, Salem Ernakulam Highway/NH 544 (via) Trissur,V

    2. 264 km, Salem Ernakulam Highway/NH 544 and NH 81 (vi3. 275 km, NH 85 and SH 17 (via) Trissur,Munnar,Udumalai,

    89 Km 282/4 of Salem - Cochin road to Ambalamugal (Refineries) Km 0

    70.6 Salem - Cochin road (Trissur - Mannuthu (Bypass) Km 168/4-239/0 (

    40 Vadakkancherry - Mudappallur - Nemmara - Kollengode - Muthalam

    71.2 Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenka

    296.2 0.6 Pollachi - Palladam loop road km 0/0-0/6

    20 Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenka

    Kangeyam

    Karur

    Kodumudi

    Krishnara

    yapuram

    Kulithalai

    Madathuk

    ulam

    Vellkovil

    Mulanoor

    Palladam

    Perundhur

    ai

    iruppurnort

    iruppursout

    Udumalap

    et

  • 7/27/2019 17.07.13 (new).xls

    52/106

    296.2 4.8

  • 7/27/2019 17.07.13 (new).xls

    53/106

  • 7/27/2019 17.07.13 (new).xls

    54/106

    adakancherry, Palakad,Coimbatore,Palladam

    ) Trissur,Vadakancherry,Pollachi,Palladam

    ) Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur,Aravakuraichi

    ) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam,Kangeyam, Vellaokoil

    adakancherry, Palakad,Coimbatore,Avinshi,Perundurai,Erode, Kodumudi

    adakancherry, Palakad,Coimbatore,Palladam,Kangeyam, Kodumudi

    ) Trissur,Vadakancherry, Pollachi,Dharapuram,Vellaokoil,Kodumudi

    adakancherry, Palakad,Coimbatore,Avinshi,Perundurai,Erode

    ) Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur,Aravakuraichi,Karur

    ) Trissur,Vadakancherry,Palakad,Coimbatore,Palladam,Kangeyam, Vellaokoil, Karur

    adakancherry, Palakad,Coimbatore,Avinshi,Perundurai,Erode

    Trissur,Vadakancherry, Pollachi,Dharapuram,Mulanur,Aravakuraichi,Karur

    ) Trissur,Vadakancherry, Palakad,Coimbatore,Palladam,Kangeyam,Vellakoil

    adakancherry, Palakad,Coimbatore,Avinashi, Perundurai,Bhavani,Namakkal

    llachi,Udumalai

    ) Trissur,Pollachi,Dharapuram,Mulanur

    llakadu,Malumichampatty,Sulur,Palladam,Koduvai Dharapuram

    m

    llakadu,Malumichampatty,Sulur

    ) Trissur,Vadakancherry, Pollachi

    allakadu,Malumichampatty,Avinashi,Perundhurai

    adakancherry,Pollachi,Palladam,Tiruppur,Perundhuraillakadu,Malumichampatty,Sulur,Karanampettai, Samalapuram,Avinashi

    ) Trissur,Vadakancherry,Pollachi,Palladam

    alladam

    llakadu,Malumichampatty,Sulur,Karanampettai, Samalapuram,Avinashi

    ) Trissur,Vadakancherry,Pollachi,Palladam

    alladam

    adakancherry,Pollachi

    adakancherry,Pollachi,Palladam,Dharapuram

    ) Trissur,Pallakadu,Malumichampatty,Sulur,Palladam,Kangeyamharapuram,Vellakoil

    /0-89/0

    Up to Vadakkanchery)

    da - Gopalapuram km 0/0 - 40/0 (Kerala SH 58)

    ai km 99/6-28/4

    ai km 27/4-7/4

  • 7/27/2019 17.07.13 (new).xls

    55/106

  • 7/27/2019 17.07.13 (new).xls

    56/106

  • 7/27/2019 17.07.13 (new).xls

    57/106

  • 7/27/2019 17.07.13 (new).xls

    58/106

  • 7/27/2019 17.07.13 (new).xls

    59/106

  • 7/27/2019 17.07.13 (new).xls

    60/106

    HIRECHARGES AND LABOUR CHARGES FOR GRANULAR SUB BASE

    Hire charges excluding fuel charges per day 1112.00

    26 Litres/da 54.51 per litre 1417.26

    2529.26

    Daily out turn of water sprinkler 1000 sqm or 100 cum

    2529.26 /100 25.29 (A)

    Hire charges excluding fuel charges per day 720.00

    Fuel charges per day at the rate of 2.50 Lr.per hour 20 Litres/da 54.51 per litre 1090.20

    1810.20

    95 cum

    1810.20 /95 19.05 (B)

    44.34

    6 Nos 258.00 each 1548.00

    24 Nos 231.00 each 5544.00

    7092.00

    7092.00 /95 74.65

    4 Nos 258.00 each 1032.00

    Total labour charges for mixing for 100 cum 1032.00

    1032.00 /100 10.32 (D)

    Total labour charges for 10 sqm of 100 mm th or 1 cum 84.97

    Total Hire charges and labour charges 10 sqm of 100 mm thic or 1 cu 129.31

    Mazdoors I class

    Rate for 10 sqm of 100 mm thick

    (A+B+C+D)

    Mazdoors I class

    Mazdoor II class

    Total labour charges for mixing for 950 sqm

    Rate for 10 sqm of 100 mm thick

    For spreading

    Labour charges for 100 cum

    Out turn of power roller 950 sqm of 100 mm thick or

    Hire charges of roller per 10 sqm of 100 mm thick

    Total hire charge (A+B)

    LABOUR CHARGES:

    For mixing

    Labour charges for 950 sqm

    WATER SPRINKLER:

    Fuel charges per day at the rate of 3.25 Lr.per hour

    Total hire charges including fuel per day

    Hire charges for 1 cum or 10 sqm of 100 mm thick

    POWER ROLLER:

    Total hire charges including fuel per day

  • 7/27/2019 17.07.13 (new).xls

    61/106

  • 7/27/2019 17.07.13 (new).xls

    62/106

  • 7/27/2019 17.07.13 (new).xls

    63/106

  • 7/27/2019 17.07.13 (new).xls

    64/106

  • 7/27/2019 17.07.13 (new).xls

    65/106

  • 7/27/2019 17.07.13 (new).xls

    66/106

    1212.00

    30 Litres 54.51 per Ltr. 1635.30

    25 Litres 49.00 per Ltr. 1225.00

    170 Litres 49.00 per Ltr. 8330.00

    12402.30

    135 sqm

    12402.30 x10 /135 918.69 (A)

    678.50

    2.5 Litres 54.51 per Ltr. 136.28

    814.78

    350 sqm

    814.78 x10 /350 23.28 (B)

    2447.00

    305.88

    6 Litres 54.51 per Ltr 327.06

    632.94

    135 sqm

    632.94 x10 /135 46.88

    1094.00

    136.75

    3.25 Litres 54.51 per Ltr 177.16

    313.91

    6 Nos

    135 sqm

    6 x 313.91 x10 /135 139.52 (D)

    Total hire charges of machinery per 10 sqm of BM 50 mm th.(A+B+C+D) 1128.37 (E)

    33 Nos 258.00 each 851425 Nos 231.00 each 5775

    10 Nos 258.00 each 2580

    16869

    16869.00 x10 /1200 140.58 (F)

    Total rate Hire and labour charges for 10 sqm BM 50 mm thick (E+F) 1268.95

    Bituminous Mecadam 50 mm thick with CMP and Paver finishing

    Total labour charges for 1200 sqm

    Labour charges per 10 sqm

    Out turn of tipper per hour

    Hire charges for tipper per 10 sqm

    LABOUR CHARGES FOR 1200 SQM

    For loading materials in to CMP Mazdoor IMazdoor II

    For attending paver finisher Mazdoor I

    4. Tipper Trucks

    Hire charge excluding fuel per day

    Hire charges per hour

    Fuel charges per hour 3.25 litres of diesel

    Total hire charges including cost of fuel

    Number of tipper required per CMP unit

    Hire charges excluding fuel charges per day

    Hire charges per hour

    Fuel charges per hour diesel

    Total hire charges including cost of fuel

    Out turn of Paver per hour for 50 mm thick BM

    Hire charges of paver for 10 sqm

    Hire charges including fuel charges per hour

    Cost of fuel diesel

    Total hire charges for power roller

    Out turn of power roller per hour for 50 mm thick B

    Hire charges of power roller for 10 sqm

    3 Paver finisher

    Heating the bitumen furnace oil

    Heating the aggregate furnace oil

    Total hire charges including cost of fuel

    Out turn of CMP per hour for 50 mm thick BM

    Hire charges of CMP for 10 sqm

    2. Vibratory Roller 80-100 KN

    HIRE CHARGES FOR MACHINERY

    1.Central Hot Mix Plant

    Hire charges excluding fuel charges per hour

    Cost of fuel diesel

  • 7/27/2019 17.07.13 (new).xls

    67/106

    Dense Bituminous Mecadam 75 mm thick with CMP and Paver finishing

    1212.00

    30 Litres 54.51 per Ltr. 1635.30

    25 Litres 49.00 per Ltr. 1225.00

    170 Litres 49.00 per Ltr. 8330.00

    12402.30

    90 sqm

    12402.30 x10 /90 1378.03 (A)

    5428 Day 678.50

    2.5 Litres 54.51 per Ltr. 136.28

    814.78

    220 sqm

    814.78 x10 /220 37.04 (B)

    2447.00

    305.88

    6 Litres 54.51 per Ltr 327.06

    632.94

    90 sqm

    632.94 x10 /90 70.33

    1094.00

    136.75

    3.25 Litres 54.51 per Ltr 177.16

    313.91

    6 Nos

    90 sqm

    6 x 313.91 x10 /90 209.27 (D)

    Total hire charges of machinery per 10 sqm of DBM 75 mm th.(A+B+C+D) 1694.67 (E)

    33 Nos 258.00 each 8514.0025 Nos 231.00 each 5775

    10 Nos 258.00 each 2580

    16869

    16869.00 x10 /1200 168.69 (F)

    Total rate Hire and labour charges for 10 sqm of DBM 75 mm thick (E+F) 1863.36

    Total labour charges for 1000 sqm

    Labour charges per 10 sqm

    Out turn of tipper per hour

    Hire charges for tipper per 10 sqm

    LABOUR CHARGES FOR 1000 SQM

    For loading materials in to CMP Mazdoor IMazdoor II

    For attending paver finisher Mazdoor I

    4. Tipper Trucks

    Hire charge excluding fuel per day

    Hire charges per hour

    Fuel charges per hour 3.25 litres of diesel

    Total hire charges including cost of fuel

    Number of tipper required per CMP unit

    Hire charges excluding fuel charges per day

    Hire charges per hour

    Fuel charges per hour diesel

    Total hire charges including cost of fuel

    Out turn of Paver per hour for 75 mm thick DBM

    Hire charges of power roller for 10 sqm

    Hire charges including fuel charges per hour

    Cost of fuel diesel

    Total hire charges for power roller

    Out turn of roller per hour for 75 mm thick DBM

    Hire charges of power roller for 10 sqm

    3 Paver finisher

    Heating the bitumen furnace oil

    Heating the aggregate furnace oil

    Total hire charges including cost of fuel

    Out turn of CMP per hour for 75 mm thick DBM

    Hire charges of CMP for 10 sqm

    2. Vibratory Roller

    HIRE CHARGES FOR MACHINERY

    1.Central Hot Mix Plant

    Hire charges excluding fuel charges per hour

    Cost of fuel diesel

  • 7/27/2019 17.07.13 (new).xls

    68/106

  • 7/27/2019 17.07.13 (new).xls

    69/106

    Bituminous Concrete 40 mm thick with CMP and Paver finishing

    1212.00

    30 Litres 54.51 per Ltr. 1635.30

    25 Litres 49.00 per Ltr. 1225.00

    170 Litres 49.00 per Ltr. 8330.00

    12402.30

    170 sqm

    12402.30 x10 /170 729.55 (A)

    5428 Day 678.50

    2.5 Litres 54.51 per Ltr. 136.28

    814.78

    400 sqm

    814.78 x10 /400 20.37 (B)

    2447.00

    305.88

    6 Litres 54.51 per Ltr 327.06

    632.94

    170 sqm

    632.94 x10 /170 37.23

    1094.00

    136.75

    3.25 Litres 54.51 per Ltr 177.16

    313.91

    6 Nos

    170 sqm

    6 x 313.91 x10 /170 110.79 (D)

    Total hire charges of machinery per 10 sqm of BC 40 mm th.(A+B+C+D) 897.94 (E)

    33 Nos 258.00 each 851425 Nos 231.00 each 5775

    10 Nos 258.00 each 2580

    16869

    16869.00 x10 /1200 140.58 (F)

    Total rate Hire and labour charges for 10 sqm BC 50 mm thick (E+F) 1038.52

    For attending paver finisher Mazdoor I

    Total labour charges for 1200 sqm

    Labour charges per 10 sqm

    Number of tipper required per CMP unit

    Out turn of tipper per hour

    Hire charges for tipper per 10 sqm

    LABOUR CHARGES FOR 1200 SQM

    For loading materials in to CMP Mazdoor IMazdoor II

    Hire charges of paver roller for 10 sqm

    4. Tipper Trucks

    Hire charge excluding fuel per day

    Hire charges per hour

    Fuel charges per hour 3.25 litres of diesel

    Total hire charges including cost of fuel

    3 Paver finisher

    Hire charges excluding fuel charges per day

    Hire charges per hour

    Fuel charges per hour diesel

    Total hire charges including cost of fuel

    Out turn of Paver per hour for 40 mm thick BC

    2. Vibratory Roller

    Hire charges including fuel charges per hour

    Cost of fuel diesel

    Total hire charges for power roller

    Out turn of roller per hour for 40 mm thick BC

    Hire charges of power roller for 10 sqm

    Cost of fuel diesel

    Heating the bitumen furnace oil

    Heating the aggregate furnace oil

    Total hire charges including cost of fuel

    Out turn of CMP per hour for 40 mm thick BC

    Hire charges of CMP for 10 sqm

    HIRE CHARGES FOR MACHINERY

    1.Central Hot Mix Plant

    Hire charges excluding fuel charges per hour

  • 7/27/2019 17.07.13 (new).xls

    70/106

    1212.00

    30 Litres 54.51 per Ltr. 1635.30

    25 Litres 49.00 per Ltr. 1225.00

    170 Litres 49.00 per Ltr. 8330.00

    12402.30

    170 sqm

    12402.30 x10 /170 729.55 (A)

    5428 Day 678.50

    2.5 Litres 54.51 per Ltr. 136.28

    814.78

    400 sqm

    814.78 x10 /400 20.37 (B)

    2447.00

    305.88

    6 Litres 54.51 per Ltr 327.06

    632.94

    170 sqm

    632.94 x10 /170 37.23

    1094.00

    136.75

    3.25 Litres 54.51 per Ltr 177.16

    313.91

    6 Nos

    170 sqm

    6 x 313.91 x10 /170 110.79 (D)

    Total hire charges of machinery per 10 sqm of BC 40 mm th.(A+B+C+D) 897.94 (E)

    33 Nos 258.00 each 851425 Nos 231.00 each 5775

    10 Nos 258.00 each 2580

    16869

    16869.00 x10 /1200 140.58 (F)

    Total rate Hire and labour charges for 10 sqm BC 50 mm thick (E+F) 1038.52

    Bituminous Concrete 50 mm thick with CMP and Paver finishing

    LABOUR CHARGES FOR 1200 SQM

    For loading materials in to CMP Mazdoor IMazdoor II

    Fuel charges per hour diesel

    Total hire charges including cost of fuel

    Out turn of Paver per hour for 40 mm thick BC

    Hire charges of paver roller for 10 sqm

    For attending paver finisher Mazdoor I

    Total labour charges for 1200 sqm

    Labour charges per 10 sqm

    Hire charges per hour

    Fuel charges per hour 3.25 litres of diesel

    Total hire charges including cost of fuel

    Number of tipper required per CMP unit

    Out turn of tipper per hour

    Hire charges for tipper per 10 sqm

    4. Tipper Trucks

    Hire charge excluding fuel per day

    Total hire charges for power roller

    Out turn of roller per hour for 40 mm thick BC

    Hire charges of power roller for 10 sqm

    3 Paver finisher

    Hire charges excluding fuel charges per day

    Hire charges per hour

    Total hire charges including cost of fuel

    Out turn of CMP per hour for 40 mm thick BC

    Hire charges of CMP for 10 sqm

    2. Vibratory Roller

    Hire charges including fuel charges per hour

    Cost of fuel diesel

    HIRE CHARGES FOR MACHINERY

    1.Central Hot Mix Plant

    Hire charges excluding fuel charges per hour

    Cost of fuel diesel

    Heating the bitumen furnace oil

    Heating the aggregate furnace oil

  • 7/27/2019 17.07.13 (new).xls

    71/106

    DBM 50 mm thick with CMP and Paver finishing (Pneumatic Tyred Roller)

    1212.00

    30 Litres 54.51 per Ltr. 1635.30

    25 Litres 49.00 per Ltr. 1225.00

    170 Litres 49.00 per Ltr. 8330.00

    12402.30

    135 sqm

    12402.30 x10 /135 918.69 (A)

    1243 Day 1243.00

    2.5 Litres 0.00 per Ltr. 0.00

    1243.00

    320 sqm

    1243.00 x10 /320 38.84 (B)

    2674.00

    2674.00

    6 Litres 0.00 per Ltr 0.00

    2674.00

    135 sqm

    2674.00 x10 /135 198.07

    1094.00

    136.75

    3.25 Litres 54.51 per Ltr 177.16

    313.91

    6 Nos

    135 sqm

    6 x 313.91 x10 /135 139.52 (D)

    Total hire charges of machinery per 10 sqm of DBM 50 mm th.(A+B+C+D) 1295.12 (E)

    33 Nos 258.00 each 851425 Nos 231.00 each 5775

    10 Nos 258.00 each 2580

    16869

    16869.00 x10 /1200 140.58 (F)

    1435.70

    HIRE CHARGES FOR MACHINERY

    1.Central Hot Mix Plant

    Hire charges excluding fuel charges per hour

    Cost of fuel diesel

    Heating the bitumen furnace oil

    Heating the aggregate furnace oil

    Total hire charges including cost of fuel

    Out turn of CMP per hour for 50 mm thick DBM

    Hire charges of CMP for 10 sqm

    2.Pneumatic Tyred Roller

    Hire charges including fuel charges per hour

    Cost of fuel diesel

    Total hire charges for power roller

    Out turn of roller per hour for 50 mm thick DBM

    Hire charges of power roller for 10 sqm

    3 Paver finisher (9m Width)

    Hire charges excluding fuel charges per day

    Hire charges per hour

    Fuel charges per hour diesel

    Total hire charges including cost of fuel

    Out turn of Paver per hour for 50 mm thick DBM

    Hire charges of paver for 10 sqm

    4. Tipper Trucks

    Hire charge excluding fuel per day

    Hire charges per hour

    Fuel charges per hour 3.25 litres of diesel

    Total hire charges including cost of fuel

    Number of tipper required per CMP unit

    Out turn of tipper per hour

    Hire charges for tipper per 10 sqm

    LABOUR CHARGES FOR 1200 SQM

    For loading materials in to CMP Mazdoor IMazdoor II

    For attending paver finisher Mazdoor I

    Total labour charges for 1200 sqm

    Labour charges per 10 sqm

    Total rate Hire and labour charges for 10 sqm of DBM 50 mm thick (E+F)

  • 7/27/2019 17.07.13 (new).xls

    72/106

  • 7/27/2019 17.07.13 (new).xls

    73/106

  • 7/27/2019 17.07.13 (new).xls

    74/106

  • 7/27/2019 17.07.13 (new).xls

    75/106

    Semi Dense Bituminous Concrete 25 mm thick with CMP and Paver finishing

    1212.00

    30 Litres 54.51 per Ltr. 1635.30

    25 Litres 49.00 per Ltr. 1225.00

    170 Litres 49.00 per Ltr. 8330.00

    12402.30

    270 sqm

    12402.30 x10 /270 459.34 (A)

    678.50

    2.5 Litres 54.51 per Ltr. 136.28

    814.78

    500 sqm

    814.78 x10 /500 16.30 (B)

    2447.00

    305.88

    6 Litres 54.51 per Ltr 327.06

    632.94

    270 sqm

    632.94 x10 /270 23.44

    1094.00

    136.75

    3.25 Litres 54.51 per Ltr 177.16

    313.91

    6 Nos

    270 sqm

    6 x 313.91 x10 /270 69.76 (D)

    Total hire charges of machinery per 10 sqm of SDBC 25 mm th.(A+B+C+D) 568.84 (E)

    33 Nos 258.00 each 8514.0025 Nos 231.00 each 5775.00

    10 Nos 258.00 each 2580.00

    16869.00

    16869.00 x10 /2000 84.35 (F)

    Total rate Hire and labour charges for 10 sqm SDBC 25 mm thick (E+F) 653.19

    For attending paver finisher Mazdoor I

    Total labour charges for 1200 sqm

    Labour charges per 10 sqm

    Number of tipper required per CMP unit

    Out turn of tipper per hour

    Hire charges for tipper per 10 sqm

    LABOUR CHARGES FOR 2000 SQM

    For loading materials in to CMP Mazdoor IMazdoor II

    Hire charges of paver for 10 sqm

    4. Tipper Trucks

    Hire charge excluding fuel per day

    Hire charges per hour

    Fuel charges per hour 3.25 litres of diesel

    Total hire charges including cost of fuel

    3 Paver finisher

    Hire charges excluding fuel charges per day

    Hire charges per hour

    Fuel charges per hour diesel

    Total hire charges including cost of fuel

    Out turn of Paver per hour for 25 mm thick SDBC

    2. Vibratory Roller 80-100 KN

    Hire charges including fuel charges per hour

    Cost of fuel diesel

    Total hire charges for power roller

    Out turn of roller per hour for 25 mm thick SDBC

    Hire charges of power roller for 10 sqm

    Cost of fuel diesel

    Heating the bitumen furnace oil

    Heating the aggregate furnace oil

    Total hire charges including cost of fuel

    Out turn of CMP per hour for 25 mm thick SDBC

    Hire charges of CMP for 10 sqm

    HIRE CHARGES FOR MACHINERY

    1.Central Hot Mix Plant

    Hire charges excluding fuel charges per hour

  • 7/27/2019 17.07.13 (new).xls

    76/106

    PC with seal coat Type A with CMP and Paver finishing

    1212.00

    30 Litres 54.51 per Ltr. 1635.30

    25 Litres 49.00 per Ltr. 1225.00

    170 Litres 49.00 per Ltr. 8330.00

    12402.30

    325 sqm

    12402.30 x10 /325 381.61 (A)

    678.50

    2.5 Litres 54.51 per Ltr. 136.28

    814.78

    1000 sqm

    814.78 x10 /1000 8.15 (B)

    500 sqm

    814.78 x10 /500 16.30 (C)

    2447.00

    305.88

    6 Litres 54.51 per Ltr 327.06

    632.94

    325 sqm

    632.94 x10 /325 19.48 (D)

    1094.00

    136.75

    3.25 Litres 54.51 per Ltr 177.16

    313.91

    6 Nos

    325 sqm

    6 x 313.91 x10 /325 57.95 (E)

    Total hire charges of machinery per 10 sqm of PC with seal coat.(A+B+C+D+E) 483.49 (F)

    33 Nos 258.00 each 8514

    25 Nos 231.00 each 5775

    10 Nos 258.00 each 2580

    16869

    16869.00 x10 /2000 84.35 (G)

    Total rate Hire and labour charges for 10 sqm PC with Seal coat (F+G) 567.84

    For loading materials in to CMP Mazdoor I

    Mazdoor II

    For attending paver finisher Mazdoor I

    Total labour charges for 1200 sqm

    Labour charges per 10 sqm

    Fuel charges per hour 3.25 litres of diesel

    Total hire charges including cost of fuel

    Number of tipper required per CMP unit

    Out turn of tipper per hour

    Hire charges for tipper per 10 sqm

    LABOUR CHARGES FOR 2000 SQM

    Total hire charges including cost of fuel

    Out turn of Paver per hour for 25 mm thick SDBC

    Hire charges of paver for 10 sqm

    4. Tipper Trucks

    Hire charge excluding fuel per day

    Hire charges per hour

    Out turn of roller per hour for seal coat

    Hire charges of Vibratory Roller for 10 sqm

    3 Paver finisher

    Hire charges excluding fuel charges per day

    Hire charges per hour

    Fuel charges per hour diesel

    2. Vibratory Roller

    Hire charges including fuel charges per hour

    Cost of fuel diesel

    Total hire charges for power roller

    Out turn of roller per hour for pre mix carpet

    Hire charges of Vibratory Roller for 10 sqm

    Cost of fuel diesel

    Heating the bitumen furnace oil

    Heating the aggregate furnace oil

    Total hire charges including cost of fuel

    Out turn of CMP per hour for premix carpet

    Hire charges of CMP for 10 sqm

    HIRE CHARGES FOR MACHINERY

    1.Central Hot Mix Plant

    Hire charges excluding fuel charges per hour

  • 7/27/2019 17.07.13 (new).xls

    77/106

    Premix Carpet with seal coat with Mini Hot Mix Plant

    209.25

    15 Litres 54.51 per Ltr. 817.65

    45 Litres 49.00 per Ltr. 2205.00

    3231.90

    180 sqm

    3231.90 x10 /180 179.55 (A)

    828.00

    20 Litres 54.51 per Ltr. 1090.20

    1918.20

    500 sqm

    1918.20 x10 /500 38.36 (B)

    1000 sqm

    1918.20 x10 /1000 19.18 (C)

    202.00

    25 Litres 57.95 Litre 1448.75

    1650.75

    1650.75 /8 206.34

    125 kg

    206.34 /125 1.65

    14.6 kg

    14.6 kg 1.65 kg 24.09 (D)

    9.8 kg

    9.8 kg 1.65 kg 16.17 (E)

    Total hire charges for PC and seal coat (A+B+C+D+E) 277.35 (F)

    0.75 No 258.00 each 193.50

    0.25 No 231.00 each 57.75

    251.25 (G)

    Total rate Hire and labour charges for 10 sqm of PC with seal coat (F+G) 528.60

    Bitumen required for 10 sqm of sealcoat type A

    Hire charges of bitumen boiler for 10 sqm of seal coa

    LABOUR CHARGES FOR 10 SQM

    For PC 10 sqm Mazdoor I

    For seal coat Mazdoor II

    Total Labour charges per 10 sqm PC with seal coat

    Total hire charges including cost of fuel

    Hire charges per hour

    Out turn of Bitumen boiler per hour

    Hire charges of bitumen boiler for 1 kg of bitumen

    Bitumen required for 10 sqm of PC

    Hire charges of bitumen boiler for PC 10 sqm

    Hire charges of power roller for 10 sqm

    Out turn of of seal coat per day

    Hire charges of power roller for 10 sqm

    3 Bitumen boiler

    Hire charges excluding fuel charges per day

    Fuel charges kerosine

    Hire charges of CMP for 10 sqm

    2.Power Roller 80-100 KN

    Hire charges including fuel charges per day

    Cost of fuel diesel

    Total hire charges for power roller

    Out turn of of PC per day

    1.Mini Hot Mix Plant

    Hire charges excluding fuel charges per hour

    Cost of fuel diesel

    Heating the aggregate furnace oil

    Total hire charges including cost of fuel

    Out turn of mini hot mix plant per hour for PC

    HIRE CHARGES FOR MACHINERY

  • 7/27/2019 17.07.13 (new).xls

    78/106

  • 7/27/2019 17.07.13 (new).xls

    79/106

    Tack coat over WBM surface using 4 kg bitumen emusion

    LABOUR CHARGES FOR 500 SQM

    10 Nos 258.00 each 2580.00

    Mazdoor II 16 Nos 231.00 each 3696.00

    4 Nos 231.00 each 924.00

    7200.00

    7200.00 /500/10 144.00

    Hirecharges for machinaries

    10.00

    Total hitre charges and labour charhes 64.10

    Mazdoor I

    For applying tack coat

    For preparing the surface

    Labour charges for 10 sqm

    Bitumen sprayer

    Mazdoor II

    Total labour charges for 500 sqm

  • 7/27/2019 17.07.13 (new).xls

    80/106

    Prime coat over WMM surface using 7 kg bitumen emusion

    LABOUR CHARGES FOR 500 SQM

    10 Nos 258.00 each 2580.00

    Mazdoor II 16 Nos 231.00 each 3696.00

    4 Nos 231.00 each 924.007200.00

    7200.00 /500/10 144.00

    Hirecharges for machinaries

    15.00

    Total hitre charges and labour charhes 159.00

    Tack coat over Prime Coat surface using 2.5 kg of VG 10

    LABOUR CHARGES FOR 500 SQM

    3 Nos 231.00 each 693.00

    693.00

    693.00 /500/10 13.86

    202.00

    25 Litres 57.95 Litre 1448.75

    1650.75

    1650.75 /8 206.34

    250 kg x 10 sqm / 3.5 714 Sqm

    206.34 x 10 / 714.29 2.89

    15.00

    31.75Tack coat over BT surface using 2.0 kg VG 10

    LABOUR CHARGES FOR 500 SQM

    5 Nos 258.00 each 1290.00

    5 Nos 231.00 each 1155.00

    2445.00

    2445.00 /500/10 48.90

    202.00

    25 Litres 57.95 Litre 1448.75

    1650.75

    1650.75 /8 206.34

    250 kg 250kgs x 10sqm / 3

    833.00 Sqm 206.34 2.48

    15.00

    66.38

    Total labour charges for 500 sqm

    Labour charges for 10 sqm

    Bitumen sprayer

    For preparing the surface

    Mazdoor I

    For applying tack coat

    Mazdoor II

    Hire charges of bitumen boiler for 3.0 kg / 10 sqm

    Hire charges of bitumen Sprayer

    Total Hire and Labour Charges for 10 sqm

    For preparing the surface

    Mazdoor I

    For applying tack coat

    Mazdoor II

    Total labour charges for 500 sqm

    Labour charges for 10 sqm

    Hire charges for Bitumen boiler 750 liters capacit

    Hire charges for Bitumen boiler 750 liters capacit

    Fuel charges kerosine

    Total hire charges including cost of fuel

    Hire charges per hour

    Out turn of Bitumen boiler per hour

    Fuel charges kerosine

    Total hire charges including cost of fuel

    Hire charges per hour

    Out turn of Bitumen boiler per hour

    Hire charges of bitumen boiler for 3.5 kg / 10 sqm

    Total Hire and Labour Charges for 10 sqm

    For applying tack coat

    Mazdoor II

    Total labour charges for 500 sqm

    Labour charges for 10 sqm

    Hire charges of bitumen sprayer

  • 7/27/2019 17.07.13 (new).xls

    81/106

    Tack coat over LCC surface using 3.0 kg of VG 10

    LABOUR CHARGES FOR 500 SQM

    3 Nos 231.00 each 693.00

    693.00

    693.00 /500/10 13.86

    202.00

    25 Litres 57.95 Litre 1448.75

    1650.75

    1650.75 /8 206.34

    250 kg 250kgs x 10sqm / 4

    625.00 Sqm 206.34 3.30

    15.00

    2500 32.16

    Tack coat over BT surface using 2.5 kg bitumen emusion

    LABOUR CHARGES FOR 500 SQM

    5 Nos 258.00 each 1290.00

    3 Nos 231.00 each 693.00

    1983.00

    1983.00 /500/10 39.66

    Hirecharges for machinaries

    15.00

    Total hitre charges and labour charhes 54.66

    Bitumen sprayer

    For preparing the surface

    Mazdoor I

    For applying tack coat

    Mazdoor II

    Total labour charges for 500 sqm

    Labour charges for 10 sqm

    For applying tack coat

    Mazdoor II

    Total labour charges for 500 sqm

    Labour charges for 10 sqm

    Hire charges of bitumen sprayer

    Total Hire and Labour Charges for 10 sqm

    Hire charges for Bitumen boiler 750 liters capacit

    Fuel charges kerosine

    Total hire charges including cost of fuel

    Hire charges per hour

    Out turn of Bitumen boiler per hour

    Hire charges of bitumen boiler for 4.0 kg / 10 sqm

  • 7/27/2019 17.07.13 (new).xls

    82/106

    80.00 Kg 79.94 MT 6.40

    220 kg (or) 0.11 cum #REF! cum #REF!

    160 kg (or) 0.08 cum 456.30 cum 36.50

    300 kg (or) 0.20 kg 1074.40 cum 214.88

    10.00 sqm 3247.70 10 sqm 3247.70

    10.00 sqm 917.39 10 sqm 917.39

    LS LS 6.91

    #REF!

    #REF!

    Bitumen Mastic Wearing Coat = 25mm thick

    Unit -- 1 1 Sqm and taking output as 17.40 Sqm

    200.00

    100 54.51 5451.00

    5651.00

    3247.70

    1.50 Nos 258.00 Each 387.00

    0.50 Nos 231.00 Each 115.50

    3.50 Nos 258.00 Each 903.00

    0.25 Nos 231.00 Each 57.75

    0.50 Nos 266.00 Each 133.00

    1596.25

    917.39

    Providing and Laying 25mm thick Mastic Asphalt Wearing Course with paving grade bitumen meeting the

    requirements given in table 500 -- 29 prepared by using mastic cooker and slope after cleaning the

    surface including providing and anto skid surface with bitumen percolated fine grained hard stone

    chipping of 13.2mm nominal size at the rate of 0.005 cum per 10sqm and at an approx spacing of 10 cm

    center to center in both directions pressed into surface when the temprature of surfaces is not less than

    the 100 centigrade protruding 1mm to 4mm over mastic surface all complete as per standard

    specification.

    DATA

    BITUMEN MASTIC WEARING COAT 25 MM THICK

    Cost of Bitumen of 30 / 40 Grade

    Cost of Lime Powder

    Cost of Quarry Dust

    Cost of 13.20 mm IRC Metal

    Hire Charges for Machineries

    Mastic Cooker

    Hire Charges / Day ( Local Rate )

    Full Charges @ 100 Litres of Diesel @

    Hire Charges per 10 Sqm

    Total Labour Charges for 17.40 Sqm

    Labour Charges

    Rate For 10sqm of 25mm thick

    Rate per 1 Sqm

    Labour Charges for 10.00 Sqm

    Hire Charges per 17.40 Sqm

    For 20mm stones for grips

    LABOUR CHARGES

    Mazdoor I Class for allowing mastic covers

    Mazdoor II Class

    Mazdoor I Class for spraying

    Mazdoor II Class for surface

    Head Mazdoor

    HIRE CHARGES FOR MACHINERIES

  • 7/27/2019 17.07.13 (new).xls

    83/106

    60 / 70

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    79.94

    0.00

    79.94

  • 7/27/2019 17.07.13 (new).xls

    84/106

    0.74 cum Cost of sand 284.50 cum 210.53

    0.54 cum Cost of gravel 134.40 cum 72.58

    10.00 sqm Hire charges 44.34 10 sqm 44.34

    10.00 sqm Labour charges 84.97 10 sqm 84.97

    412.42

    Providing granular surface to required thickness including cost and conveyance of all

    materials from approved quarry and consolidation by power roller as per clause 401 of

    MoRTH specification

    Rate for 10 sqm of 100 mm thick or 1 cum

  • 7/27/2019 17.07.13 (new).xls

    85/106

    1.00 cum Earthwork Excavation (Item No 62) 41.85 cum 41.85

    3.00 Km Conveyance 7.80 Km 23.40

    Total 65.25

    Data for Earthwork Excavation

  • 7/27/2019 17.07.13 (new).xls

    86/106

    1

    144.00 cum 53 mm to 22.40 mm metal 878.77 cum 126542.88

    57.00 cum 9.50mm to 2.36mm metal 571.70 cum 32586.90

    86.40 cum 2.36 mm and below 538.10 cum 46491.84

    27.00 Kl Water 120.00 Kl 3240.00

    225.00 cum Hire charges 65199.39 225 cum 65199.39

    225.00 cum Labour charges 2470.40 225 cum 2470.40

    Total rate for 225 cum 276531.41

    Rate for one cum 1229.03

    Providing granular surface to required thickness including cost and conveyance of all

    materials from approved quarry and consolidation by power roller as per clause 401 of

    MORTH Rev -- 5 specification- Rate for 100 mm thick or 1 cum

    DATA FOR GSB

  • 7/27/2019 17.07.13 (new).xls

    87/106

  • 7/27/2019 17.07.13 (new).xls

    88/106

    Rate for 1 cum of binding materials

    0.74 cum Cost of sand 634.00 cum 469.16

    0.54 cum Cost of gravel 88.80 cum 47.95

    1.00 cum Labour charges for mixing 74.65 cum 74.65

    591.76

    1.00 cum 63-45 mm graded metal #REF! cum #REF!

    0.24 cum Binding materials 591.76 cum 142.02

    10.00 sqm Labour and Hire charges 302.61 10 sqm 302.61

    #REF!

    #REF!

    1.00 cum 53-22.40 mm graded metal #REF! cum #REF!

    0.24 cum Binding materials 591.76 cum 142.02

    10.00 sqm Labour and Hire charges 302.61 10 sqm 302.61

    #REF!#REF!

    Rate for 10 sqm of 75 mm thick

    Rate for 10 sqm of 75 mm thick

    Providing WBM Grade II 75 mm consolidated thick icluding cost and conveyance of all materials and

    consolidation by power roller as per clause 404 of MoRTH specification

    Providing WBM Grade III 75 mm consolidated thick icluding cost and conveyance of all materials and

    consolidation by power roller as per clause 404 of MoRTH specification

    For binding materials to WBM

    Rate per 1 cum

  • 7/27/2019 17.07.13 (new).xls

    89/106

    WBM Grade II 2 1000 1.625 0.225 731.25 817.34 597680

    WBM Grade III 2 1000 1.625 0.075 243.75 1027.47 250446

    Total 848126

    WMM 2 1000 1.625 0.300 975 911.64 888849

    Total 888849

  • 7/27/2019 17.07.13 (new).xls

    90/106

    1

    7.00 kg Cost of Emulsion SS1 76828.68 Mt 537.80

    10.00 sqm Hire and labour charges 159.00 10 sqm 159.00

    696.80

    69.68

    2

    2.50 kg Cost of bitumen emulsion RS1 47744.11 Mt 119.36

    10.00 sqm Hire and labour charges 31.75 10 sqm 31.75

    151.11

    15.11

    3

    3.00 kg Cost of bitumen emulsion RS1 47744.11 Mt 143.23

    10.00 sqm Hire and labour charges 32.16 10 sqm 32.16

    175.39

    17.54

    4

    2.00 kg Cost of bitumen emulsion RS1 47744.11 Mt 95.49

    10.00 sqm Hire and labour charges 66.38 10 sqm 66.38

    161.87

    16.19

    DATA FOR PRIME COAT & TACK COAT

    Providing and laying Prime Coat over WMM surface using 7 kgs. of bitumen emulsion

    SS1 for 10 sqm.area including cost and conveyance of bituminous binder including

    labour charges for preparing the surface and applying the required quantity of bitumen

    as tack coat by bitumen sprayer etc., complete as per clause 502 of MORTH Rev -- 5

    Rate for 1 Sqm

    Providing and laying Tack coat over PC with WMM surface treated with prime coat

    using 2.50 kgs of bitumen emulsion RS1/Bulk Bitumen VG 10 for 10sqm area including

    cost and conveyance of bituminous binder including labour charges for preparing the

    surface and applying the required quantity of bitumen as tack coat by bitumen sprayer

    etc., complete As per clause 503 MORTH Rev -- 5 Specification

    Rate for 1 Sqm

    Rate for 10 Sqm

    Rate for 10 Sqm

    Providing and Laying of Tack Coat using bitumen emulsion RS1/Bulk Bitumen of VG 10

    at the rate of 3.0Kg / 10 sqm over the LCC surface treated with primer preparatory to

    another bituminous construction over it. As per clause 503 MORTH Rev -- 5 specification

    Rate for 10 Sqm

    Rate for 1 Sqm

    Providing and laying of Tack Coat using bitumen emulsion RS1/VG 10 Bulk Bitumen at

    the rate of 2.00 kg per ten square meter over the BT surface treated with primerpreparatory to another bituminous construction over it. As per clause 503 MORTH Rev --

    Rate for 10 Sqm

    Rate for 1 Sqm

  • 7/27/2019 17.07.13 (new).xls

    91/106

    1

    0.24 cum 37.50-13.20 mm graded metal 1001.89 cum 240.45

    0.25 cum 13.20-2.36 mm graded metal 578.72 cum 144.68

    0.23 cum 2.36 mm and below 538.10 cum 123.76

    53.20 kg Bitumen 60/70 grade 50519.11 Mt 2687.62

    10.00 sqm Labour and Hire charges 1271.13 10 sqm 1271.13

    Total rate of 50 mm thick for 10 sqm 4467.64

    Rate for one cum 8935.28

    26.50 - 13.20 mm metal

    0.16 cum 26.50 mm metal 822.40 cum 131.58

    0.37 cum 25.00 & 22.40 mm metal 987.40 cum 365.34

    0.47 cum 13.20 mm metal 1074.40 cum 504.97

    Rate for one cum 1001.89

    13.20 - 2.36 mm metal

    0.55 cum 11.20, 6.70, 6, 5.60 & 4.75mm metal 611.94 cum 336.57

    0.45 cum 2.36 mm metal 538.10 cum 242.15

    Rate for one cum 578.72

    2.36 mm and below 538.10 538.10

    Rate for one cum 538.10

    DATA FOR DBM 50

    Dense Bituminous macadam 50 -- 75 mm consolidated thickness using 4 % of bitumen

    60/70 grade as per clause 505 of MORTH Rev -- 5 specification

    WORKING OUT METAL RATE

  • 7/27/2019 17.07.13 (new).xls

    92/106

    1

    0.24 cum 26.50-13.20 mm graded metal 1001.89 cum 240.45

    0.25 cum 13.20-2.36 mm graded metal 578.72 cum 144.68

    0.23 cum 2.36 mm and below 538.10 cum 123.76

    53.20 kg Bitumen 60/70 grade 50519.11 Mt 2687.62

    10.00 sqm Labour and Hire charges 1435.70 10 sqm 1435.70

    Total rate of 50 mm thick for 10 sqm 4632.21

    Rate for one cum 9264.42

    26.50 -- 13.20 mm metal

    0.16 cum 26.50 mm metal 822.40 cum 131.58

    0.37 cum 25.00 & 22.40 mm metal 987.40 cum 365.34

    0.47 cum 13.20 mm metal 1074.40 cum 504.97

    Rate for one cum 1001.89

    13.20 -- 2.36 mm metal

    0.55 cum 11.20, 6.70, 6, 5.60 & 4.75mm metal 611.94 cum 336.57

    0.45 cum 2.36 mm metal 538.10 cum 242.15

    Rate for one cum 578.72

    2.36 mm and below 538.10 538.10

    Rate for one cum 538.10

    WORKING OUT METAL RATE

    DATA FOR DBM 50 (9m Paver and Pneumatic Tyred Roller)

    Dense Bituminous macadam 50 -- 80 mm consolidated thickness using 4 % of bitumen

    60/70 gradeas per clause 507 of MoRTH specification

  • 7/27/2019 17.07.13 (new).xls

    93/106

    1

    0.40 cum 37.50-13.20 mm graded metal 900.07 cum 360.03

    0.35 cum 13.20-2.36 mm graded metal 565.42 cum 197.90

    0.36 cum 2.36 mm and below 538.10 cum 193.72

    71.30 kg Bitumen 60/70 grade 50519.11 Mt 3602.01

    10.00 sqm labour and Hire charges 1863.36 10 sqm 1863.36

    Total rate of 75 mm thick for 10 sqm 6217.02

    Rate for one cum 8289.36

    37.50 - 13.20 mm metal

    0.14 cum 37.50 mm metal 864.40 cum 121.02

    0.49 cum 26.50 mm metal 822.40 cum 402.98

    0.37 cum 25, 22.40 & 13.20 mm metal 1016.40 cum 376.07

    Total rate for 1 cum 900.07

    13.20 - 2.36 mm metal

    0.37 cum 11.20, 6.7, 6, 5.60 & 4.75 mm metal 611.94 cum 226.42

    0.63 cum 2.36 mm metal 538.10 cum 339.00

    Total rate for 1 cum 565.42

    2.36 mm and below 538.10 538.10

    Total rate for 1 cum 538.10

    DATA FOR DBM 100

    WORKING OUT METAL RATE

    Dense Bituminous macadam 80 - 100 mm consolidated thickness using 4.5 % of bitumen

    60/70 gradeas per clause 505 of MORTH Rev -- 5 specification

  • 7/27/2019 17.07.13 (new).xls

    94/106

    1

    0.40 cum 37.50-13.20 mm graded metal 900.07 cum 360.03

    0.35 cum 13.20-2.36 mm graded metal 565.42 cum 197.90

    0.36 cum 2.36 mm and below 538.10 cum 193.72

    71.30 kg Bitumen 60/70 grade 50519.11 Mt 3602.01

    10.00 sqm labour and Hire charges 2109.60 10 sqm 2109.60

    Total rate of 75 mm thick for 10 sqm 6463.26

    Rate for one cum 8617.68

    37.50 - 13.20 mm metal

    0.14 cum 37.50 mm metal 864.40 cum 121.02

    0.49 cum 26.50 mm metal 822.40 cum 402.98

    0.37 cum 25, 22.40 & 13.20 mm metal 1016.40 cum 376.07

    Total rate for 1 cum 900.07

    13.20 - 2.36 mm metal

    0.37 cum 11.20, 6.7, 6, 5.60 & 4.75 mm metal 611.94 cum 226.42

    0.63 cum 2.36 mm metal 538.10 cum 339.00

    Total rate for 1 cum 565.42

    2.36 mm and below 538.10 538.10

    Total rate for 1 cum 538.10

    WORKING OUT METAL RATE

    DATA FOR DBM 100 (9m Paver and Pneumatic Tyred Roller)

    Dense Bituminous macadam 80 - 100 mm consolidated thickness using 4.5 % of bitumen

    60/70 gradeas per clause 507 of MoRTH specification

  • 7/27/2019 17.07.13 (new).xls

    95/106

  • 7/27/2019 17.07.13 (new).xls

    96/106

    1

    0.64 Cum 927.48 Cum 593.59

    0.44 Cum 507.91 Cum 223.48

    0.13 Cum 538.10 Cum 69.95

    62.00 Kg 50519.11 Mt 3132.18

    10.00 Sqm 1841.36 10 sqm 1841.36

    Total rate of 75 mm thick for 10 sqm 5860.56

    Rate for one cum 7814.08

    37.50 -- 13.20 mm metal

    0.10 Cum 37.50 mm metal 864.40 Cum 86.44

    0.38 Cum 822.40 Cum 312.510.52 Cum 1016.40 Cum 528.53

    927.48

    13.20 -- 2.36 mm metal

    0.83 Cum 11.20, 6.70, 6, 5.6 & 4.75 mm metal 611.94 Cum 507.91

    0.17 Cum 2.36 mm metal 538.10 Cum 91.48

    599.39

    2.36 mm metal & Below

    1 Cum 2.36 mm metal 538.10 Cum 538.10

    Total 538.10

    Rate for 1 Cum

    Rate for 1 Cum

    Rate for 1 Cum

    DATA FOR BM 100MM

    Bituminous macadam 75 mm consolidated thickness using bitumen 60/70 grade as per

    clause 504 of MORTH Rev -- 5 specification

    26.50 mm metal

    37.50 -- 13.20 mm graded metal

    13.20 -- 2.36 mm graded metal

    2.36 mm and below

    WORKING OUT METAL RATE

    Bitumen 60/70 grade

    25, 22.40 & 13.20 mm metal

    labour and Hire charges for machinaries

  • 7/27/2019 17.07.13 (new).xls

    97/106

    1

    0.13 cum 19.00 -- 9.50 mm IRC metal 835.00 cum 108.55

    0.17 cum 9.50 - 2.36 mm IRC metal 562.50 cum 95.63

    0.26 cum 2.36mm and Below 538.10 cum 139.91

    50.30 kg Bitumen 60/70 grade 50519.11 Mt 2541.11

    10.00 sqm Labour and Hire charges 1038.52 10 sqm 1038.52

    3923.72

    392.37

    9809.30

    Working out metal rate

    19.00 - 9.50 mm

    0.24 cum 13.20 mm metal 1074.40 cum 257.86

    0.76 cum 11.20 mm metal 759.40 cum 577.14

    835.00

    9.50 - 2.36 mm metal

    0.66 cum 6.70, 6, 5.60 & 4.75 mm metal 575.08 cum 379.55

    0.34 cum 2.80 mm metal 538.10 cum 182.95

    562.50

    2.36 mm metal Below

    1 cum 2.36 mm metal 538.10 cum 538.10

    538.10Rate for one cum

    Rate for one cum

    Rate for one cum

    Bituminous concrete 40 mm consolidated thickness using 5.1 % of bitumen 60/70grade

    as per clause 507 of MORTH Rev -- V specification

    DATA FOR BC 40MM

    Rate per 10 sqm of 40 mm compacted thick

    Rate for 10 Sqm

    Rate for 1 Sqm

    Rate for 1 Cum

  • 7/27/2019 17.07.13 (new).xls

    98/106

    1

    0.22 cum 26.50 -- 13.20 mm IRC metal 1060.48 cum 233.31

    0.24 cum 13.20 - 2.36 mm IRC metal 592.01 cum 142.08

    0.26 cum 2.36mm and Below 538.10 cum 139.91

    62.40 kg Bitumen 60/70 grade 50519.11 Mt 3152.39

    10.00 sqm Labour and Hire charges 0.00 10 sqm 1038.52

    4706.21

    470.62

    9412.42

    26.50 -- 13.20 mm

    0.16 Cum 25 & 22.40 mm metal 987.40 Cum 157.98

    0.84 Cum 13.20 mm metal 1074.40 Cum 902.50

    1060.48

    13.20 -- 2.36 mm metal

    0.73 cum 11.2, 6.70, 6, 5.60 & 4.75 mm 611.94 cum 446.72

    0.27 cum 2.80 mm metal 538.10 cum 145.29

    592.01

    2.36 mm metal Below

    1 cum 2.36 mm metal 538.10 cum 538.10

    538.10

    DATA FOR BC 50MM

    Bituminous concrete 50 mm consolidated thickness using 5.1 % of bitumen 60/70grade

    as per clause 507 of MORTH Rev -- V specification

    Rate per 10 sqm of 40 mm compacted thick

    Rate for 10 Sqm

    Rate for 1 Sqm

    Rate for 1 Cum

    Rate for one cum

    Rate for one cum

    Rate for one cum

    WORKING OUT METAL RATE

  • 7/27/2019 17.07.13 (new).xls

    99/106

    1

    0.13 cum 19.00 -- 9.5 mm IRC metal 835.00 cum 108.55

    0.17 cum 9.50 -- 2.36 mm IRC metal 562.50 cum 95.63

    0.26 cum 2.36 mm and Below IRC metal 538.10 cum 139.91

    50.30 kg Bitumen 60/70 grade 50519.11 Mt 2541.11

    10.00 sqm Labour and Hire charges 1169.29 10 sqm 1169.29

    4054.49

    405.45

    10136.23

    19.00 -- 9.50 mm

    0.24 cum 13.20 mm metal 1074.40 cum 257.86

    0.76 cum 11.20 mm metal 759.40 cum 577.14

    835.00

    9.50 -- 2.36 mm metal

    0.66 cum 6.70, 6, 5.6 & 4.75 mm metal 575.08 cum 379.55

    0.34 cum 2.36 mm metal 538.10 cum 182.95

    562.50

    2.36 mm metal Below

    1 cum 2.36 mm metal 538.10 cum 538.10

    538.10

    DATA FOR BC 40MM (USING PENUMATIC TYRED ROLLER & 9 M WIDTH PAVER)

    Bituminous concrete 40 mm consolidated thickness using 5.1 % of bitumen 60/70grade

    as per clause 507 of MORTH Rev -- 5 specification

    Rate per 10 sqm of 40 mm compacted thick

    Rate for 10 Sqm

    Rate for 1 Sqm

    Rate for 1 Cum 40

    Rate for 1 Cum

    Rate for 1 Cum

    WORKING OUT METAL RATE

    Rate for one Cum

  • 7/27/2019 17.07.13 (new).xls

    100/106

    2

    Rate per 10 sqm of 25 mm compacted thick

    0.25 cum 19--9.5 mm IRC metal 810.9 cum 202.73

    0.14 cum 9.5 - 2.36 mm IRC metal 427.84 cum 59.90

    28.00 kg Bitumen 60/70 grade 50519.11 Mt 1414.54

    10.00 sqm Labour and Hire charges 684.85 10 sqm 684.85

    Rate for 10 sqm 2362.02

    Rate for 1 sqm 236.20

    Working out metal rate

    19.0mm-9.5 mm

    1.00 cum Cost of 13.2 mm metal 810.90 cum 810.9

    Rate for one cum 810.9

    9.50 - 2.80 mm metal

    0.58 cum 6.70 mm metal 445.90 cum 258.62

    0.42 cum 2.80 mm metal 402.90 cum 169.22

    Rate for one cum 427.84

    Bituminous concrete 25 mm consolidated thickness using 5.1 % of bitumen 60/70grade

    as per clause 512 of MoRTH specification

    DATA FOR BC 25MM

  • 7/27/2019 17.07.13 (new).xls

    101/106

    1

    0.10 cum 11.20 mm metal 759.40 cum 75.94

    0.16 cum 6.7 mm metal 587.40 cum 93.98

    0.11 cum 2.8 mm and below metal 538.10 cum 59.19

    30.00 kg Bitumen 60 / 70 grade 50519.11 Mt 1515.57

    10.00 sqm Labour and Hire chargescharges 653.19 10 sqm 653.19

    2397.88

    239.79

    Semi Dense Bituminous Concrete 25 mm consolidated thickness using % of 60 / 70 grade

    bitumen per clause 508 of MoRTH specification

    DATA FOR SDBC

    Rate for 10 Sqm

    Rate for 1Sqm

  • 7/27/2019 17.07.13 (new).xls

    102/106

    1

    1.00 cum Cost of 53mm -- 13.2mm metal 969.34 cum 969.34

    0.13 cum Cost of 22.4mm -- 2.8mm metal 935.13 cum 121.57

    30 Kg Cost of bitumen 60/70 50519.11 mt 1515.57

    10.00 sqm Labour Charges 610.55 10 sqm 610.55

    10.00 sqm Hire charges 146.75 10 sqm 146.75

    3363.78

    4485.04

    Working out metal rate

    0.60 cum Cost of 45 mm Metal 855.10 cum 513.06

    0.34 cum Cost of 22.40 mm metal 1152.40 cum 391.82

    0.06 cum Cost of 13.20 mm metal 1074.40 cum 64.46

    969.34

    0.60 cum Cost of 13.2 mm Metal 1074.40 cum 644.64

    0.34 cum Cost of 11.20 mm metal 759.40 cum 258.20

    0.06 cum Cost of 2.80 mm metal 538.10 cum 32.29

    935.13Rate for one cum

    Rate for 10 sqm 0.075 thick

    Rate for one Cum

    DATA FOR BUSG

    Providing and laying "BUSG" Buit Up Spray Grout -- 75 mm thick

    Rate for one cum

    Rate per 10 sqm of 40 mm compacted thick

    53 mm -- 13.2 mm

    22.4 mm -- 2.80 mm

  • 7/27/2019 17.07.13 (new).xls

    103/106

    1

    0.18 cum 1074.40 cum 193.39

    0.09 cum 759.40 cum 68.35

    0.09 cum 587.40 cum 52.87

    24.40 kg. 50519.11 mt. 1232.67

    10.00 sqm 567.84 10 sqm 567.84

    2115.11

    211.51

    2820.15

    DATA FOR PCWSC

    Rate for 10 Sqm

    Rate for 1 Sqm

    Cost of 11.20 mm metal

    Cost of 6.70 mm metal

    Cost of bitumen 60/70

    Labur & Hire charges for machineries

    Rate for 1 Cum

    Providing and laying premix carpet with seal coat type A including cost and conveyance of

    all materials as per clause 509 of MoRTH specification WITH Mini Hot mix Plant

    Cost of 13.20 mm metal

  • 7/27/2019 17.07.13 (new).xls

    104/106

    Qty Size Rate Amount Qty Size Rate Amount

    0.050 90 mm 322.00 16.10 0.025 63 mm 465.00 11.63

    0.450 63 mm 465.00 209.25 0.200 53 mm 565.00 113.00

    0.425 53 mm 565.00 240.13 0.725 45 mm 757.00 548.83

    0.050 45 mm 757.00 37.85 0.025 22.4 mm 1061.00 26.53

    0.025 22.4 mm 1061.00 26.53 0.025 11.20 mm 668.00 16.70

    1.000 529.86 1.000 716.69

    Size of metal Rate Size of metal Rate

    53.00 mm 565.00 45.00 mm 757.00

    46.50 mm 757.00 37.50 mm 773.00

    45.00 mm 757.00 26.50 mm 731.00

    37.50 mm 773.00 25.00 mm 731.00

    26.50 mm 731.00 22.40 mm 1061.00

    25.00 mm 731.00 Total 4053.00

    22.40 mm 1061.00 Average rate 810.60

    13.20 mm 983.00 22.40 - 2.36 mm

    11.20 mm 668.00 22.40 mm 1061.00

    Total 7026.00 13.20 mm 983.00

    Average rate 780.67 11.20 mm 668.00

    Quantity 134.4 cum for 6.70 mm 496.00

    6.00 mm 496.00

    6.70 mm 496.00 5.60 mm 496.00

    6.00 mm 496.00 4.75 mm 440.00

    5.60 mm 496.00 Total 4640.00

    4.75 mm 440.00 Average rate 662.86

    2.36 mm 440.00 2.36 and below

    Total 2368.00 2.36 mm 440.00

    Average rate 473.60

    172.80 cum for

    4.75 and below 440.00

    45 - 22.40 mm

    225 cum of granular

    9.50 - 2.36 mm

    225 cum of granular

    WBM metal rate-2013 -- 2014

    Grade II Grade III

    53 - 9.50 mm

    Cost of Granular material Cost of material for WMM

  • 7/27/2019 17.07.13 (new).xls

    105/106

    1

    1.00 cum Cost of 13.20mm IRC Metal 1081.10 cum 1081.10

    44.00 Kgs Cost of 60 / 70 Bulk Bitumen 49530.75 cum 2179.35

    1.00 cum Labour Charges 182.08 cum 182.08

    Total 3442.53

    Cum

    1

    1.00 cum Cost of 45mm IRC Metal 855.10 cum 855.10

    44.00 Kgs Cost of 60 / 70 Bulk Bitumen 49530.75 cum 2179.35

    1.00 cum Labour Charges 182.08 cum 182.08

    Total 3216.53

    Cum

    1.08 (1/6) Labour for patches and cutting Maz -- I 258.00 Each 46.44

    1.08 (1/8) Removed the picked up stuff Maz -- I 258.00 Each 34.83

    Brushing and Cleaning the Surface LS 3.78

    Spreading and cleaning the surface 3.10

    Providing Premix Bitumen Patches to 50mm thick using 45mm IRC metal including cost

    and conveyance of metal from approved quarry to work site and stacking them at the

    site to the departmental gauge using 44kg of bitumen for premixing including cost of

    bitumen which will be supplied by contractor including labour charges for heating the

    bitumen and mixing with metal and labour charges for attending bitumen patches etc.,

    complete

    LABOUR CHARGES

    DATA FOR ADVANCE PATCHES

    Providing Premix Bitumen Patches to 25mm thick using 13.20mm IRC metal including

    cost and conveyance of metal from approved quarry to work site and stacking them at

    the site to the departmental gauge using 44kg of bitumen for premixing including cost of

    bitumen which will be supplied by contractor including labour charges for heating the

    bitumen and mixing with metal and labour charges for attending bitumen patches etc.,complete

  • 7/27/2019 17.07.13 (new).xls

    106/106

    Premixing the chips with hot

    bitumen in the drum mixer and

    laying of 0.625 cum of metal

    with 44kg of Bitumen

    LS 15.75

    Levelling and Tambing thepremix in the patches and pot

    holes rolling etc

    LS

    4.73

    Special tools such as wire

    brushLS

    2.31

    Regulation Traffic LS 2.31

    Sundries such as barricading

    arrangementsLS

    0.55

    0.625 Cum 113.80

    1 Cum 182.08