XL TECHNOLOGY LTDTurbogenset House, Heathrow Summit Centre
Skyport Drive, West Drayton UB7 0LJ UKwww.xltl.com
Tel 0208 607 5887Fax 0208 607 5888
XLTL.COM 2006 ALL RIGHTS RESERVED
8th September 2006
DEA(E) MILAN
For
Feasibility StudySureSEAL - Rigless well abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
22/20/20 Commercial in Confidence Commercial in Confidence
SURESEAL Rigless Well
Abandonment
Rigless well abandonment process using a down hole electric pump deployed on an umbilical
No Rig No casing removal from well All zones tested Guaranteed annular cemented seal (for all casings)
Summary
Duration Total cost
12 months k60
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
33/20/20 Commercial in Confidence Commercial in Confidence
SURESEAL Rigless Well
Abandonment
Isolates all zones and casing annuli with 100% permanent seal
Eliminate disposal of tubulars
Efficiently remove wellhead and other hardware to required depth below the mudline
Operable from a DSV or 'vessel of opportunity with wireline and pumping capabilities
Significantly reduce abandonment costs
Objective
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
44/20/20 Commercial in Confidence Commercial in Confidence
1. Once connected to the wellhead and tested does not require disconnection regardless of the number of times the equipment needs to be recovered to the surface vessel
2. Plug retrieval barrel (could allow wellhead plugs to retrieved and stored at the wellhead) Saves time and vessel cost.
Well Intervention
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
55/20/20 Commercial in Confidence Commercial in Confidence
3. Lubricator and BOPs remain connected to wellhead at all times.
4. Tools are run on umbilical and located into lubricator using funnel guide. High pressure umbilical seal conveyed with the assembly from surface vessel and located in funnel section
Well Intervention
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
66/20/20 Commercial in Confidence Commercial in Confidence
7
Packer
Reservoir fluids
Residual mud
Brine kill fluid
9.5/8
13.3/8
20
30
Production tubing
Well Arrangement
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
77/20/20 Commercial in Confidence Commercial in Confidence
1. Fire first set of guns to create equalisation ports at surface
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
88/20/20 Commercial in Confidence Commercial in Confidence
2. Continue to TD
3. Set NRV in talpipe
4. Fire 2nd set of guns to access liner lap
5. Fire 3rd set of guns to access tubing annulus
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
99/20/20 Commercial in Confidence Commercial in Confidence
6. Use electric pump to displace tubing and tubing annulus contents into reservoir
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1010/20/20 Commercial in Confidence Commercial in Confidence
7. Once contents displaced pump cement slurry into reservoir to seal.
8. Finally displace slurry into annulus.
9. Flush with water and WOC
10. Pressure test
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1111/20/20 Commercial in Confidence Commercial in Confidence
11. Place cement plug on top of NRV
12. Displace with water
13. WOC
14. Pressure test
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1212/20/20 Commercial in Confidence Commercial in Confidence
15. Come back to surface and fit new guns.
16. Perforate 9.5/8casing at or near surface
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1313/20/20 Commercial in Confidence Commercial in Confidence
17. RIH to suitable depth and perforate 9.5/8casing
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1414/20/20 Commercial in Confidence Commercial in Confidence
18. Let 9.5/8 annulus drain into sump
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1515/20/20 Commercial in Confidence Commercial in Confidence
19. Displace cement into tubing and 9.5/8 annulii
20. Flush with water
21. WOC
22. Pressure test
23. Repeat with other annuli as required
Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1616/20/20 Commercial in Confidence Commercial in Confidence
Result of first generation SureSEAL process performed on a land well.
Results from process performed on UK land well
Results of Process
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1717/20/20 Commercial in Confidence Commercial in Confidence
Well head abrasive jet cutting tool deployed to sever all casing and allow the recovery of the wellhead.
Full logging capability
Wellhead Removal
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1818/20/20 Commercial in Confidence Commercial in Confidence
Cuts on multi casing assemblies
Well and all exposed annuli 100% sealed and all hardware removed from at least 10ft below the mud line
.
Wellhead Removal
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
1919/20/20 Commercial in Confidence Commercial in Confidence
All annuli 100% sealed for a category 3 well without the need for a rig.
Each seal can be independently tested.
No casing and minimum fluid removed from the well.
All hardware removed from at least 10ft below the mud line.
Key Points
SURESEAL Rigless Well
Abandonment
WWW.XLTL.COM WWW.XLTL.COM All rights reserved 2006All rights reserved 2006
2020/20/20 Commercial in Confidence Commercial in Confidence
1. Detailed process evaluation2. Vessel requirements3. Down hole hardware 5. Hazops and Hazids7. If viable phase 2 planning and costing
Total project cost
10,000 10,000 20,000 15,000 5,000
60,000
Feasibility Study Budget