Page 1: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

1/63

Lean SystemsLean Systems

Page 2: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

2/63

How Lean Systems fits the Operations Management

Philosophy

Operations As a Competitive Weapon

Operations StrategyProject Management Process Strategy

Process AnalysisProcess Performance and Quality

Constraint ManagementProcess LayoutLean Systems

Supply Chain StrategyLocation

Inventory ManagementForecasting

Sales and Operations PlanningResource Planning

Scheduling

Page 3: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

3/63

Toyota Production System (TPS)

Developed at Toyota Co. by Taiichi Ohno(Developed at Toyota Co. by Taiichi Ohno( 大野大野耐一耐一 )

Toyota Production System (TPS) is one of the most admired lean manufacturing systems in existence.

They have a process of continuous improvement.Work is completely specified as to content,

sequence, timing, and outcome.

Page 4: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

4/63

Toyota Production System (TPS)

Services and goods do not flow to the next available person or machine, but to a specific person or machine.

Employees are stimulated to experiment to find better ways to do their jobs.

Improvements to the system must be made in accordance with the scientific method, under the guidance of a teacher, at the lowest possible organizational level.

Page 5: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

5/63

Lean Systems

Lean systems are operations systems that maximize the value added by each of a company’s activities by paring unnecessary resources and delays from them.

Just-in-time (JIT) philosophy The belief that waste can be eliminated by cutting unnecessary capacity or inventory and removing non-value-added activities in operations.

Page 6: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

6/63

Lean Systems

JIT system: A system that organizes the resources, information flows, and decision rules that enable a firm to realize the benefits of JIT principles.

Page 7: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

7/63

Pull method of work flow Quality at the source

Small lot sizes

Uniform workstation loads

Standardized components & work methods

Close supplier ties

Flexible workforce

Line flows

Automation

Five S

Preventive maintenance

Characteristics of Lean Systems

Page 8: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

8/63

Push and Pull Systems of Work Flow

Push method: A method in which production of the item begins in advance of customer needs.Example: A buffet where food is prepared in

advance.

Pull Method: A method in which customer demand activates production of the service or item.Example: A restaurant where food is only prepared

when orders are placed.

Lean systems use the pull method of work flow.

Page 9: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

9/63

Pull method of materials flow Quality at the source Small lot sizes Uniform workstation loads Standardized components & work methods Close supplier ties Flexible workforce Line flows Automation Five S Preventive maintenance

Characteristics of Lean Systems

Page 10: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

10/63

Quality at the Source

Quality at the source is an organization-wide effort to improve the quality of a firm’s products by having employees act as their own quality inspectors, and never pass defective units to next stage.

One approach for implementing quality at the source is to use poka-yoke, mistake-proofing methods aimed at designing fail safe systems that minimize human error.

Page 11: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

11/63

Quality at the Source

Another approach for implementing quality at the source is a practice the Japanese call jidoka, and andon, which gives machines and machine operators the ability to detect when an abnormal condition has occurred.

Page 12: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

12/63

Pull method of materials flow Quality at the source Small lot sizes Uniform workstation loads Standardized components & work methods Close supplier ties Flexible workforce Line flows Automation Five S Preventive maintenance

Characteristics of Lean Systems

Page 13: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

13/63

Small Lot Sizes

Lot: A quantity of items that are processed together.

Setup: The group of activities needed to change or readjust a process between successive lots of items.

Single-digit setup: The goal of having a setup time of less than 10 minutes.

Page 14: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

14/63

Lot Size and Cycle InventoryLot Size and Cycle Inventory

Page 15: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

15/63

Lot Size and Cycle InventoryLot Size and Cycle Inventory

Lot size = 100

On

-han

d in

ven

tory

5 10 15 20 25 30

Time (hours)

100 –

75 –

50 –

25 –

0 –

Average cycle inventory

Page 16: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

16/63

Lot Size and Cycle InventoryLot Size and Cycle Inventory

Average cycle inventory

Lot size = 100

On

-han

d in

ven

tory

5 10 15 20 25 30

Time (hours)

100 –

75 –

50 –

25 –

0 –

Page 17: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

17/63

Lot Size and Cycle InventoryLot Size and Cycle Inventory

Average cycle inventory

Lot size = 100

Lot size = 50On

-han

d in

ven

tory

5 10 15 20 25 30

Time (hours)

100 –

75 –

50 –

25 –

0 –

Page 18: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

18/63

Lot Size and Cycle InventoryLot Size and Cycle Inventory

Average cycle inventory

Lot size = 100

Lot size = 50On

-han

d in

ven

tory

5 10 15 20 25 30

Time (hours)

100 –

75 –

50 –

25 –

0 –

Page 19: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

19/63

Lot Size and Cycle InventoryLot Size and Cycle Inventory

Average cycle inventory

Lot size = 100

Lot size = 50On

-han

d in

ven

tory

5 10 15 20 25 30

Time (hours)

100 –

75 –

50 –

25 –

0 –

Page 20: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

20/63

Setup Time Reduction1. Determine the existing method

2. Separate the internal elements from the external element

3. Convert the internal elements to the external elements

4. Reduce or eliminate the internal elements

5. Apply method analysis and practice doing setups

6. Eliminate adjustments

7. Abolish the setup itself

Page 21: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

21/63

Pull method of materials flow Quality at the source Small lot sizes Uniform workstation loads Standardized components & work methods Close supplier ties Flexible workforce Line flows Automation Five S Preventive maintenance

Characteristics of Lean Systems

Page 22: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

22/63

Uniform Workstation Loads

A lean system works best if the daily load on individual workstations is relatively uniform.

Service processes can achieve uniform workstation loads by using reservation systems (e.g., scheduled surgeries) and differential pricing to manage the demand.

For manufacturing processes, uniform loads can be achieved by assembling the same type and number of units each day, thus creating a uniform daily demand at all workstations.

Mixed-model assembly produces a mix of models in smaller lots.

Page 23: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

23/63

Manufacturing Cell

1. Machines are arranged in the process sequence

2. The cell is designed in U-shape

3. One piece at a time is made within the cell

4. The workers are trained to handle more than one process

5. The cycle time for the system dictates the production rate for the cell

Page 24: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

24/63

Manufacturing Cell

Page 25: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

25/63

Manufacturing Cell

Page 26: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

26/63

Manufacturing Cell

Page 27: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

27/63

Manufacturing Cell

Page 28: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

28/63

Manufacturing Cell

Page 29: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

29/63

Manufacturing Cell

Page 30: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

30/63

Pull method of materials flow Quality at the source Small lot sizes Uniform workstation loads Standardized components & work methods Close supplier ties Flexible workforce Line flows Automation Five S Preventive maintenance

Characteristics of Lean Systems

Page 31: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

31/63

Line Flows and Automation

Line Flows: Managers of hybrid-office and back-office service processes can organize their employees and equipment to provide uniform work flows through the process and, thereby, eliminate wasted employee time.

Another tactic used to reduce or eliminate setups is the one-worker, multiple-machines (OWMM) approach, which essentially is a one-person line.

Automation plays a big role in lean systems and is a key to low-cost operations.

Page 32: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

32/63

Pull method of materials flow Quality at the source Small lot sizes Uniform workstation loads Standardized components & work methods Close supplier ties Flexible workforce Line flows Automation Five S Preventive maintenance

Characteristics of Lean Systems

Page 33: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

33/63

Five S (5S)

Five S (5S) A methodology consisting of five workplace practices conducive to visual controls and lean production.

1. Sort: Separate needed from unneeded items (including tools, parts, materials, and paperwork), and discard the unneeded.

2. Straighten: Neatly arrange what is left, with a place for everything and everything in its place. Organize the work area so that it is easy to find what is needed.

3. Shine: Clean and wash the work area and make it shine.4. Standardize: Establish schedules and methods of performing the

cleaning and sorting. Formalize the cleanliness that results from regularly doing the first three S practices so that perpetual cleanliness and a state of readiness is maintained.

5. Sustain: Create discipline to perform the first four S practices, whereby everyone understands, obeys, and practices the rules when in the plant. Implement mechanisms to sustain the gains by involving people and recognizing them via a performance measurement system.

Page 34: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

34/63

5S 活動的意義

1. 整理整理 (Seili)(Seili):區分要用與不要用的物品,將不要用的物品丟棄。 *紅牌作戰:對不用物品貼上紅色標籤,標示品名、數量、停止使用時間

及理由。

2.  整頓整頓 (Seitou)(Seitou):把要用的物品維持在良好的管理狀態。 *看板作戰:以看板標示庫存的場所、品名、及數量 ( 目視管理 ) 。

3.  清掃清掃 (Seisoo)(Seisoo):掃除垃圾、灰塵,使成乾淨狀態。 *垃圾、灰塵、污髒會造成機器設備故障,亦縮短其壽命。

4.  清潔清潔 (Seiketsu)(Seiketsu):維持無垃圾、無灰塵、無污髒的狀態。 *乾淨的場所才能製造品質安定的產品,並有利於發現工作上之問題點。

5.  教養教養 (Shitsuke)(Shitsuke):教導員工保持敬業樂群,奉公守法的良好習慣與態度。

Page 35: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

35/63

Continuous Improvement with Lean Systems

Page 36: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

36/63© 2007 Pearson Education

The Single-Card Kanban System

Kanban means “card” or “visible record” in Japanese & refers to cards used to control the flow of production through a factory.

General Operating Rules:Ø Each container must have a card.

Ø The assembly line always withdraws materials from fabrication (pull system).

Ø Containers of parts must never be removed from a storage area without a kanban being posted on the receiving post.

Ø The containers should always contain the same number of good parts. The use of nonstandard containers or irregularly filled containers disrupts the production flow of the assembly line.

Ø Only nondefective parts should be passed along.

Ø Total production should not exceed the total amount authorized on the kanbans in the system.

Page 37: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

37/63

Kanban card for Kanban card for product 1product 1

Kanban card for Kanban card for product 2product 2

Fabrication Fabrication cellcell

OO11

OO22

OO33

OO22

Storage Storage areaarea

Empty containersEmpty containers

Full containersFull containers

Assembly line 1Assembly line 1

Assembly line 2Assembly line 2

The Single-Card Kanban System

Receiving postReceiving post

Page 38: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

38/63

Storage Storage areaarea

Empty containersEmpty containers

Full containersFull containers

Kanban card for Kanban card for product 1product 1

Kanban card for Kanban card for product 2product 2

Fabrication Fabrication cellcell

OO11

OO22

OO33

OO22

Assembly line 1Assembly line 1

Assembly line 2Assembly line 2

Receiving postReceiving post

The Single-Card Kanban System

Page 39: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

39/63

Storage Storage areaarea

Empty containersEmpty containers

Full containersFull containers

Kanban card for Kanban card for product 1product 1

Kanban card for Kanban card for product 2product 2

Fabrication Fabrication cellcell

OO11

OO22

OO33

OO22

Assembly line 1Assembly line 1

Assembly line 2Assembly line 2

Receiving postReceiving post

The Single-Card Kanban System

Page 40: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

40/63

Storage Storage areaarea

Empty containersEmpty containers

Full containersFull containers

Kanban card for Kanban card for product 1product 1

Kanban card for Kanban card for product 2product 2

Fabrication Fabrication cellcell

OO11

OO22

OO33

OO22

Assembly line 1Assembly line 1

Assembly line 2Assembly line 2

Receiving postReceiving post

The Single-Card Kanban System

Page 41: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

41/63

Storage Storage areaarea

Empty containersEmpty containers

Full containersFull containers

Kanban card for Kanban card for product 1product 1

Kanban card for Kanban card for product 2product 2

Fabrication Fabrication cellcell

OO11

OO22

OO33

OO22

Assembly line 1Assembly line 1

Assembly line 2Assembly line 2

Receiving postReceiving post

The Single-Card Kanban System

Page 42: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

42/63

Storage Storage areaarea

Empty containersEmpty containers

Full containersFull containers

Kanban card for Kanban card for product 1product 1

Kanban card for Kanban card for product 2product 2

Fabrication Fabrication cellcell

OO11

OO22

OO33

OO22

Assembly line 1Assembly line 1

Assembly line 2Assembly line 2

Receiving postReceiving post

The Single-Card Kanban System

Page 43: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

43/63

Storage Storage areaarea

Empty containersEmpty containers

Full containersFull containers

Kanban card for Kanban card for product 1product 1

Kanban card for Kanban card for product 2product 2

Fabrication Fabrication cellcell

OO11

OO22

OO33

OO22

Assembly line 1Assembly line 1

Assembly line 2Assembly line 2

Receiving postReceiving post

The Single-Card Kanban System

Page 44: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

44/63

Dual Card Kanban SystemK

AN

BA

N

Part N

um

ber:

1234567Z

Lo

cation

:A

isle 5B

in 47

Lo

t Qu

antity:

6

Su

pp

lier:W

S 83

Cu

stom

er:W

S 116

Page 45: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

45/63

Example 9.1 Westerville Auto Parts Company produces rocker-arm assemblies for use in the steering and suspension systems of four-wheel-drive trucks.

A typical container of parts spends 0.02 day in processing and 0.08 day in materials handling and waiting during its manufacturing cycle.

Daily demand for the part is 2,000 units. Management believes that demand for the rocker-arm assembly is uncertain enough to warrant a safety stock equivalent of 10 percent of inventory.

Determining the Determining the Number of ContainersNumber of Containers

Page 46: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

46/63

Calculations forCalculations for Example 9.1Example 9.1

k k = = dd( ( ww + + pp )( 1 + )( 1 + ) )

cc

dd = = 20002000 units/day units/day pp = = 0.020.02 day day = 0.10 = 0.10ww = = 0.080.08 day day cc = = 2222 units units

Westerville Auto PartsWesterville Auto Parts

k k = = 20002000( ( 0.080.08 + + 0.020.02 )( 1 + 0.10 ) )( 1 + 0.10 )

2222

k k = 10 containers= 10 containers

a. If each container contains 22 parts, how many containers should be authorized?

Page 47: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

47/63

Calculations forCalculations for Example 9.1Example 9.1

k k = = dd( ( ww + + pp )( 1 + )( 1 + ) )

cc

dd = = 20002000 units/day units/day pp = = 0.020.02 day day = 0.10 = 0.10ww = = 0.060.06 day day cc = = 2222 units units

Westerville Auto PartsWesterville Auto Parts

k k = = 20002000( ( 0.060.06 + + 0.020.02 )( 1 + 0.10 ) )( 1 + 0.10 )

2222

k k = 8 containers= 8 containers

Proposed change from 0.08

b. A proposal to revise the plant layout would cut materials handling and waiting time per container to 0.06 day. How many containers would be needed?

Page 48: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

48/63

Application 9.1Application 9.1

k k = = dd( ( ww + + pp )( 1 + )( 1 + ) )

cc

Determining the Number of ContainersDetermining the Number of Containers for Item B52Rfor Item B52R

k k = = 10001000( ( 0.50.5 + + 0.10.1 )( 1 + 0.10 ) )( 1 + 0.10 )

100100

k k = 6.6 or 7 containers= 6.6 or 7 containers

dd = = 10001000 units/day units/day pp = = 0.100.10 day day = 0.10 = 0.10ww = = 0.50.5 day day cc = = 100100 units units

Page 49: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

49/63

Value Stream Mapping

Value stream mapping (VSM) is a qualitative lean tool for eliminating waste (or muda) that involves a current state drawing, a future state drawing, and an implementation plan.

Product family

Current state drawing

Current state drawing

Future state drawing

Future state drawing

Work plan & implementation

Work plan & implementation

Value stream mapping (VSM) spans the entire value chain, from the firm’s receipt of raw materials to the delivery of finished goods to the customer.

Page 50: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

50/63

Selected Set of Value Stream Mapping Icons

Page 51: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

51/63

A Representative Current State Map for a Family of Retainers at a Bearings Manufacturing Company

Page 52: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

52/63

Organizational Considerations

The human costs: Lean system implementation requires a high degree of regimentation, and sometimes it can stress the workforce.

Cooperation & Trust: Workers and first-line supervisors must take on responsibilities formerly assigned to middle managers and support staff.

Reward systems and labor classifications must often be revamped when a lean system is implemented.

Existing layouts may need to be changed.

Page 53: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

53/63

Process ConsiderationsInventory & Scheduling

Schedule Stability: Daily production schedules in high-volume, make-to-stock environments must be stable for extended periods.

Setups: If the inventory advantages of a lean system are to be realized, small lot sizes must be used.

Purchasing and Logistics: If frequent, small shipments of purchased items cannot be arranged with suppliers, large inventory savings for these items cannot be realized.

Page 54: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

54/63

Comparison of JIT and Traditional

Factor Traditional JIT

Inventory Much to offset forecast errors, late deliveries

Minimal necessary to operate

Deliveries Few, large Many, small

Lot sizes Large Small

Setup; runs Few, long runs Many, short runs

Vendors Long-term relationships are unusual

Partners

Workers Necessary to do the work Assets

Page 55: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

55/63

Transitioning to a JIT System

Get top management commitment

Decide which parts need most effort

Obtain support of workers

Start by trying to reduce setup times

Gradually convert operations

Convert suppliers to JIT

Prepare for obstacles

Page 56: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

56/63

Obstacles to Conversion

Management may not be committed

Workers/management may not be cooperative

Suppliers may resist Why?

Page 57: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

57/63

JIT II(1/3)

• Implemented by Bose, IBM, Intel, AT&T, …• In-Plant Representative is on site

full time at the suppliers expense• Representatives duties:

- issuing purchase orders to his/her own firms- working on design ideas to help save costs and improve manufacturing processes- managing production schedules for suppliers, materials contractors, and other subcontractors.

Page 58: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

58/63

JIT II(2/3)• Benefits to the customers:

- liberated from administrative tasks, the purchasing staff is able to work on improving efficiencies in other areas of procurement- communication and purchase order placement are improve dramatically- The cost of materials is reduced immediately, and the savings are ongoing- Preferred suppliers are brought into product design process earlier-A natural foundation is provided for electronic data interchange(EDI), effective paperwork, and administrative savings.

Page 59: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

59/63

JIT II(3/3)

• Benefits to the suppliers:- eliminate sales effort- Communication and purchase order placement are improved dramatically- The volume of business rises at the start of the program and continues to grow as new products are introduced-An evergreen contract is provided, with no end date and no rebidding

Page 60: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

60/63

JIT II(3/3)JIT II(3/3)

• Benefits to the suppliers:-The supplier can communicate with and sell directly to engineering-Invoicing and payment administration are efficient

Page 61: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

61/63

Lean Systems in ServicesLean Systems in Services

Consistently high quality Uniform facility loads Standardized work methods Close supplier ties Flexible workforce Automation Preventive maintenance Pull method of materials flow Line flows

Page 62: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

62/63

Operational BenefitsOperational Benefits Reduce space requirements Reduce inventory investment Reduce lead times Increase labor productivity Increase equipment utilization Reduce paperwork and simple

planning systems Valid priorities for scheduling Workforce participation Increase product quality

Page 63: 1/63 Lean Systems. 2/63 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management

63/63

Implementation IssuesImplementation Issues Organizational Consideration:

- Human costs of JIT systems- Cooperation and trust- Reward systems and labor classifications

Process Considerations Inventory and Scheduling

-MPS stability-Setups-Purchasing and Logistics