DC status, 18.07.2007, je 1 16 DC’s on the support !!

16 DC’s on the support !!

  • Upload
    evita

  • View
    31

  • Download
    1

Embed Size (px)

DESCRIPTION

16 DC’s on the support !!. 4 Levels of test Pretest HV Air + tightness Aquarium : functionality + tightness Cosmics Lab : other preamps + correct signal assignment inside COBRA up to panel == preamp calibration Cosmics p E5, with and without COBRA == preamp calibration + alignment. - PowerPoint PPT Presentation

Citation preview

Page 1: 16 DC’s on the support !!

DC status, 18.07.2007, je 1

16 DC’s on the support !!

Page 2: 16 DC’s on the support !!

DC status, 18.07.2007, je 2

4 Levels of test

1. Pretest HV Air + tightness

2. Aquarium : functionality + tightness

3. Cosmics Lab : other preamps + correct signal assignment inside COBRA up to panel== preamp calibration

4. Cosmics E5, with and without COBRA== preamp calibration + alignment

17 DC‘s through level 2 + 13 DC‘s through level 3 + 3 DC’s partially level 3

Page 3: 16 DC’s on the support !!

DC status, 18.07.2007, je 3

Tightness

a) Clean old pair with He

b) New DC pair in

c) Flush with 50%-50%

HV in pure He (Aquarium closed)

• As above

• Flush He in Aquarium

• Open Aquarium

49.5%

48.6 %

~1 %

Page 4: 16 DC’s on the support !!

DC status, 18.07.2007, je 4

Sr90 , slits of > 5 cm

a) All signals present (anode asymmetry only if up and down)

b) Circle only with 4 correct cathodes

c) separation of 2 periods

Assy cath up

Assy cath down

Assy anodes

Page 5: 16 DC’s on the support !!

DC status, 18.07.2007, je 5

Calibration

AsyAn0 = [{(l/2+x)r + R} - {(l/2-x)r + R}] / [{(l/2+x)r + R} +{(l/2-x)r + R}]

= 2x / ( l + R/r)

AsyCat/(sum anode) = a+bsin(2*pix/period + phase)

DC geometry Ok to +-.05 mm

Iteratively : a) Project with and optimize ratio of anode preamp gain or thin slit in the middle

b) Fit cathn /(sum Anode)

Clever fit like Boris and Sacha

Page 6: 16 DC’s on the support !!

DC status, 18.07.2007, je 6

Page 7: 16 DC’s on the support !!

DC status, 18.07.2007, je 7

Page 8: 16 DC’s on the support !!

DC status, 18.07.2007, je 8

DC test with Cosmic ray (in Lab.)

Page 9: 16 DC’s on the support !!

DC status, 18.07.2007, je 9

Page 10: 16 DC’s on the support !!

DC status, 18.07.2007, je 10

cosmic ray counters for DC wire alignment• 10 counters (10 plastic scintillators + 20 PMTs) are prepared

• DC wire alignment will be performed w/o COBRA field

Page 11: 16 DC’s on the support !!

DC status, 18.07.2007, je 11

•event rate is estimated by MC

•beyond hit rate map is corresponding to 5 hours running

•“1 counter hit & 2 DC hit” are required

•if we request 10k tracks for 1 wire at least, 90 hours are necessary

cosmic ray counter for DC wire alignment (2)

# o

f hit

/ 5

hours

Page 12: 16 DC’s on the support !!

DC status, 18.07.2007, je 12

cosmic ray in the COBRA field• event examples

μ+ : 746MeV/c μ- : 607MeV/c

Page 13: 16 DC’s on the support !!

DC status, 18.07.2007, je 13

DC trigger (Michel)== energy and resolution calib.

01

23

45

67

8

910

11

12

13

14

15

16

17

•optional trigger :

(1)standard trigger + 1 hit in the “outer sector”

(2)standard trigger + TC hit (bar & fibre)

inner

outer

e+

The definition of the standard Michel trigger :just requiring the # of hit sector ≥ 4 , does NOT care “inner/outer”

Page 14: 16 DC’s on the support !!

DC status, 18.07.2007, je 14

momentum spectra (standard trigger)

Page 15: 16 DC’s on the support !!

DC status, 18.07.2007, je 15

momentum spectra (optional trigger)

Page 16: 16 DC’s on the support !!

DC status, 18.07.2007, je 16

Control of DC geometry

a) 2 print crosses measured relative to reference bolts in mech. Workshop

b) Same in COBRA by survey group

• On the platform

• Without end cap

• (next days !)

• Without COBRA

Page 17: 16 DC’s on the support !!

DC status, 18.07.2007, je 17

photos

Page 18: 16 DC’s on the support !!

DC status, 18.07.2007, je 18

photos

Page 19: 16 DC’s on the support !!

DC status, 18.07.2007, je 19

Backgrounds

a) HV units, disappear with linear regulator for low supply

b) “Front end program” not polling but online time calibration

c) Up-down negligible with better up-down print grounding

• print ground to metallic cover of Carbon support

• Al contact between frames from up support to down support

d) Rate (temperature) dependence of DRS calibration next Chip

Page 20: 16 DC’s on the support !!

DC status, 18.07.2007, je 20

Data reduction

reject cells

a) peak to peak of anode sum < 2*threshold in time window

b) 2 neighbors with peak to peak of anode sum < 2*threshold in time window

Data reduction with limit on peak to peak [cosmic]

0

0.2

0.4

0.6

0.8

1

1.2

0 20 40 60 80 100 120

4a/trigger[%]

4A+4B)/trigger[%]

datasize/event/DC[%] 115 kB at 0

Page 21: 16 DC’s on the support !!

DC status, 18.07.2007, je 21

Second optimistic migration possibility to COBRA : today

Realistic migration to COBRA : Thursday, Friday

Aquarium

a) flushing gas (5 hours) + HV (last 3 hours of gas flushing)

b) measurement and analysis (2 hours )

c) flush He in Aquarium (3 hours)

d) eventually measurement and analysis( 2 Hours)

total of 12 Hours

Support

a) flushing gas (7 hours) + HV (last <3 hours of gas flushing)

b) measurement and analysis of previous run (3-6 hours 40000 events)

c) change connection and cosmic Scintillator position(1 hour)

Total of 11 hours for the first after Aquarium run, < 7 hours for the others ( without repair)

Page 22: 16 DC’s on the support !!

DC status, 18.07.2007, je 22

1. Finish testing on support

2. Transport and insert in COBRA

3. Measure geometry by survey group

4. Cabling in E5 2 days

5. Test DAQ complete system

6. Cosmic without COBRA field (alignment)

7. Cosmic with COBRA field (when COBRA on)

> 4 working days

Page 23: 16 DC’s on the support !!

DC status, 18.07.2007, je 23

End

Page 24: 16 DC’s on the support !!

DC status, 18.07.2007, je 24

photos

Page 25: 16 DC’s on the support !!

DC status, 18.07.2007, je 25

photos