SPECTEXT® 2003, Copyright January 2003 Revised 01/2003 The Construction Sciences Research Foundation SECTION 15640 PACKAGED COOLING TOWERS ****************************************** This section includes factory packaged forced draft and induced draft, cooling towers and their accessories including control packages normally supplied with towers are available in sizes up to approximately 1000 nominal cooling tons per cell. Manufacturers listed in this section were identified as representative and not as an endorsement for meeting this specification. For additional product information, visit 4Specs at www.4specs.com , ARCAT at www.arcat.com , CMD First Source at www.cmdfirstsource.com , SpecSource at www.specsource.com , and Sweets at www.sweets.construction.com . This section includes performance, proprietary, and descriptive type specifications. Edit to avoid conflicting requirements. Contact the CSRF Support Center at [email protected] to submit comments or suggestions for improvements to this specification. Visit the SPECTEXT web site at www.spectext.com for current product announcements. ****************************************** PART 1 GENERAL 1.1 SUMMARY A. Section includes packaged cooling tower with structure, casing, fill and basin, controls, heaters fans, motors and drive equipment, condensing water inlet and outlet with internal distribution and ladder and handrails. B. Related Sections: 1. Section 03300 - Cast-in-Place Concrete: Execution requirements for concrete bases specified by this section. Packaged Cooling Towers 15640 - 1

15640ST Cooling Tower

  • Upload
    raaann

  • View
    216

  • Download
    1

Embed Size (px)

Citation preview

Page 1: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

SECTION 15640

PACKAGED COOLING TOWERS

******************************************This section includes factory packaged forced draft and induced draft, cooling towers and their accessories including control packages normally supplied with towers are available in sizes up to approximately 1000 nominal cooling tons per cell.

Manufacturers listed in this section were identified as representative and not as an endorsement for meeting this specification. For additional product information, visit 4Specs at www.4specs.com, ARCAT at www.arcat.com, CMD First Source at www.cmdfirstsource.com, SpecSource at www.specsource.com, and Sweets at www.sweets.construction.com.

This section includes performance, proprietary, and descriptive type specifications. Edit to avoid conflicting requirements.

Contact the CSRF Support Center at [email protected] to submit comments or suggestions for improvements to this specification. Visit the SPECTEXT web site at www.spectext.com for current product announcements.******************************************

PART 1 GENERAL

1.1 SUMMARY

A. Section includes packaged cooling tower with structure, casing, fill and basin, controls, heaters fans, motors and drive equipment, condensing water inlet and outlet with internal distribution and ladder and handrails.

B. Related Sections:1. Section 03300 - Cast-in-Place Concrete: Execution requirements for concrete

bases specified by this section.2. Section 15060 - Hangers and Supports: Execution requirements for steel support

bases specified by this section.3. Section 15070 - Mechanical Sound, Vibration, and Seismic Control: Product

requirements for vibration isolators for placement by this section.4. Section 15140 - Domestic Water Piping: Execution requirements for make up

water and drain piping specified by this section.5. Section 15185 - Chemical Water Treatment: Product and execution requirements

for cooling tower water chemical treatment equipment.6. Section 15180 - Heating and Cooling Piping: Product requirements for condenser

water piping for placement by this section.7. Section 16150 - Wiring Connections: Execution requirements for electrical

connections specified by this section.8. Section 16225 - Motors: Product requirements for electric drive motors for

placement by this section.

Packaged Cooling Towers15640 - 1

Page 2: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

1.2 REFERENCES

******************************************List reference standards included within text of this section. Edit the following for Project conditions.******************************************

A. American Bearing Manufacturers Association:1. ABMA 9 - Load Ratings and Fatigue Life for Ball Bearings.2. ABMA 11 - Load Ratings and Fatigue Life for Roller Bearings.

B. American Society of Mechanical Engineers:1. ASME PTC 23 - Atmospheric Water Cooling Equipment.

C. ASTM International:1. ASTM A90/A90M - Standard Test Method for Weight Mass of Coating on Iron

and Steel Articles with Zinc or Zinc-Alloy Coatings.2. ASTM E84 - Standard Test Method for Surface Burning Characteristics of

Building Materials.

D. Cooling Technology Institute:1. CTI 105 - Acceptance Test Code/Water Cooling Towers.2. CTI 201 - Certification of Water-Cooling Tower Thermal Performance.

E. National Electrical Manufacturers Association:1. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum).

1.3 SUBMITTALS

******************************************Only request submittals needed to verify compliance with Project requirements.******************************************

A. Section 01330 - Submittal Procedures: Submittal procedures.

B. Shop Drawings: Indicate structural steel supports including dimensions and locations for mounting-bolt holes.

C. Product Data: Submit rated capacities, dimensions, weights and point loads, accessories, required clearances, electrical requirements and wiring diagrams, and location and size of field connections. Submit schematic indicating capacity controls. Submit performance curve plotting leaving water temperature against wet bulb temperature.

D. Field Test Reports: Indicate compliance with specified performance.

E. Manufacturer's Certificate: Certify cooling tower performance meets or exceeds specified requirements.

F. Manufacturer’s Field Reports: Submit start-up report [for each unit]. Indicate compliance with field test.

Packaged Cooling Towers15640 - 2

Page 3: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

1.4 CLOSEOUT SUBMITTALS

A. Section 01700 - Execution Requirements: Closeout procedures.

B. Operation and Maintenance Data: Submit start-up instructions, maintenance data, parts lists, controls, and accessories.

1.5 QUALITY ASSURANCE

A. Perform Work in accordance with [State] [Municipality] of [________] [Highways] [Public Work's] standard.

****** [OR] ******

B. Perform in accordance with CTI 105 and CTI 201.

******************************************Include the following paragraph only when cost of acquiring specified standards is justified.******************************************

C. Maintain one copy of each document on site.

1.6 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years [documented] experience

B. Installer: Company specializing in performing Work of this section with minimum three years [documented] experience [approved by manufacturer].

1.7 PRE-INSTALLATION MEETINGS

A. Section 01300 - Administrative Requirements: Pre-installation meeting.

B. Convene minimum [one] [________] week prior to commencing work of this section.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 - Product Requirements: Product storage and handling requirements.

B. Follow manufacturer's installation instructions for rigging, unloading, and transporting units.

1.9 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.10 WARRANTY

Packaged Cooling Towers15640 - 3

Page 4: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

******************************************This article extends warranty period beyond one year. Extended warranties increase construction costs and Owner enforcement responsibilities. Specify warranties with caution.******************************************

A. Section 01700 - Execution Requirements: Product warranties and product bonds.

B. Furnish [five] [________] year manufacturer warranty for [corrosion resistance of cooling tower structure] [cooling tower package] [fan drive] [motor] [labor only] [materials only] [labor and materials].

1.11 MAINTENANCE SERVICE

A. Section 01700 - Execution Requirements: Requirements for maintenance service.

******************************************Evaluate need for maintenance and emergency service based Project requirements. If desired, retain the following paragraphs.******************************************

B. Furnish service and maintenance of cooling tower for [one] [five] [________] years from Date of Substantial Completion.

C. Examine unit components [weekly] [semi-monthly] [monthly] [bi-monthly]. Clean, adjust, and lubricate equipment.

D. Include systematic examination, adjustment, and lubrication of unit, including fan belt replacement, and controls checkout and adjustments. Repair or replace parts in accordance with manufacturer's operating and maintenance data. Use parts produced by manufacturer of original equipment.

E. Perform work without removing units from service during building normal occupied hours.

F. Provide emergency call back service [at all hours] [during working hours] for this maintenance period.

G. Maintain locally, near Place of the Work, adequate stock of parts for replacement or emergency purposes. Have personnel available to ensure fulfillment of this maintenance service, without unreasonable loss of time.

H. Perform maintenance work using competent and qualified personnel under supervision [and in direct employ] of manufacturer or original installer.

I. Do not assign or transfer maintenance service to agent or subcontractor without prior written consent of [Owner.] [________.]

Packaged Cooling Towers15640 - 4

Page 5: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

1.12 EXTRA MATERIALS

A. Section 01700 - Execution Requirements: Spare parts and maintenance products.

B. Furnish [two] [________] sets of matched fan belts.

C. Furnish [two] [________] spray nozzles for each cell.

D. Furnish [two] [________] gaskets for each access door.

E. Furnish [one] [________] valve seat for each make-up or control valve.

PART 2 PRODUCTS

2.1 COOLING TOWERS

******************************************In this article, list manufacturers acceptable for this Project.******************************************

A. Manufacturers:1. [Baltimore Aircoil Company] Model [________].2. [Ceramic Cooling Towers Co.] Model [________].3. [Marley Cooling Towers] Model [________].4. [____________________] Model [________].5. Substitutions: [Section 01600 - Product Requirements] [Not Permitted].

****** [OR] ******

B. Furnish materials in accordance with [State] [Municipality] of [________] [Highways] [Public Work's] standards.

******************************************Edit the following descriptive specifications to identify Project requirements and to eliminate conflicts with manufacturers specified above. A proprietary steel blow through tower with air introduced into and through tower by water injection process is available. To specify that tower type, remove detailed construction paragraphs in the following articles.******************************************

C. Product Description: factory assembled, sectional, [cross flow] [or] [counter flow], [blow through] [induced draft] design, with fan and motor assemblies, built with pan, casing, fill and drift eliminators.

2.2 STEEL COOLING TOWERS

A. Framing, Pan and Casing: Galvanized steel, [12 gage (2.5 mm)] [14 gage (1.8 mm)] for casing and 8 gage (4.0 mm) for reinforcing angles and channels with access doors at both ends of tower to air plenum.

Packaged Cooling Towers15640 - 5

Page 6: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

******************************************The casing and air inlet louvers of steel-structure induced- draft towers may also be constructed of Fiberglass Reinforced Polyester (FRP). Use paragraphs below to include this option.******************************************

B. Casing: Fiberglass reinforced polyester panels with UV inhibitors, bolted to steel supports.

C. Louvers: [Corrugated glass reinforced polyester] [Formed galvanized steel, sight tight] spaced to minimize air resistance and splash out. [Fiberglass reinforced polyester with UV inhibitors, bolted to steel supports.]

D. Blow Through Fans: [Multi blade, cast aluminum, axial type] [Forward curved centrifugal type mounted on steel shaft], with belt drive, bearings with ABMA 9 or ABMA 11 L-10 life at 30,000 hours, with extended grease fittings.1. Motor: [Single-speed] [Two-speed] [(1800/900 rpm)] mounted on adjustable

steel base.

****** [OR] ******

E. Induced Draft Fan: Axial cast aluminum multi-blade, [fixed] [adjustable] pitch.1. Drive: Geared, right angle drive with ABMA 9 or ABMA 11 L-10 life

expectancy of 40,000 hours bearings and drive shaft equipped with non-lubricated flexible couplings.

2. Motor: [Single-speed] [Two-speed] [(1800/900 rpm)] with special moisture protection, mounted on welded steel frame in fan deck.

3. Fan Cylinder: One-piece, welded steel, hot dipped galvanized fan assembly.

F. Belt Drive: Designed for minimum 150 percent motor nameplate power.

G. Fan Guard: Welded steel rod and wire guard, hot dipped galvanized after fabrication.

H. Safety: Safety railings, and ladder [with safety cage] from [grade] [roof] to fan deck.

I. Distribution Section: [Polyvinyl chloride] [Galvanized steel] piping header and branches with [ABS] plastic spray nozzles.

****** [OR] ******

J. Distribution Basin: Open, gravity type distribution basin utilizing weirs and plastic metering orifices [, with flow control valves].

K. Fill material: Self-supporting, fluted, polyvinyl chloride [with ASTM E84 flame spread rating of [5] [10]].

L. Drift Eliminators: Two or three pass hot dipped galvanized steel, drift loss limited to [0.7] [0.2] percent of total water circulated.

Packaged Cooling Towers15640 - 6

Page 7: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

****** [OR] ******

M. Drift Eliminators: Two or three-pass polyvinyl chloride plastic to limit drift loss to [0.7] [0.2] percent of total water circulated.

N. Float Valves: Brass or bronze [balanced piston type] make-up valve with plastic or copper float.

O. Hardware: [Galvanized steel nuts, bolts, and washers.] [Stainless steel nuts, bolts, and washers.] [Assemble with phenolic epoxy coated, cadmium plated washer head fasteners.]

P. Finish of steel components: ASTM A90/A90M G210 hot dipped galvanized steel with zinc chromatized aluminum paint. [Finish with electrostatic spray, thermosetting, polymer.]

Q. Accessories:1. Electric Immersion Heaters: Maintains temperature of water in pan at 42 degrees

F (5 degrees C) when outside temperature is 0 degrees F (-17 degrees C) and wind velocity is 15 mph (25 kph). Immersion thermostat and float control operates heaters on low temperature when pan is filled.

******************************************The following accessories are for blow through operation.******************************************

2. Electric Temperature Controller: In pan; with sensor to cycle fans.3. Time Delay Relay: Limits fan motor starts to not more than six per hour.4. Capacity Control with Scroll Damper and Modulating Electronic Damper Motor:

Controlled by temperature controller, sensor in pan.5. Control Panel: NEMA 250 [Type 12] [Type 4], containing:

a. Non-fused disconnect switch.b. Combination motor controllers.c. Interlocks and relays.

******************************************Use for one or identical units. When specifying units of differing sizes, use schedules.******************************************

R. Capacity:1. Water Flow: [________] gpm ([________] L/sec).2. Entering Water Temperature: [________] degrees F ([________] degrees C).3. Leaving Water Temperature: [________] degrees F ([________] degrees C).4. Entering Air WB Temperature: [________] degrees F ([________] degrees C).5. External Static Pressure: [________] inch wg ([________] Pa).

2.3 FRP TOWERS

A. Framework and Casing: Fiberglass reinforced polyester shell with UV inhibitors, cylindrically formed with bolted sections [with galvanized steel support stand].

Packaged Cooling Towers15640 - 7

Page 8: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

B. Louvers: [Corrugated glass reinforced polyester] [or] [Formed galvanized steel, sight tight] spaced to minimize air resistance and splash out.

C. Fan: Direct driven axial multi-blade, cast aluminum adjustable pitch.

D. Motor: [Single-speed] [Two-speed] [(1800/900 rpm)] [totally enclosed air over (TEAO) type] with special moisture protection [with vibration switch].

E. Fan Guard: One piece welded steel rod and wire guard and motor mount hot dipped galvanized after fabrication.

F. Sprinkler System: Automatic system with standpipe and rotary head with non-clogging sprinkler pipes.

G. Fill material: [Self-supporting fluted polyvinyl chloride plastic] [Self-supporting ceramic clay tile].

H. Collection Basin: FRP basin with integral sump and mounting feet, with openings for supply, return with strainer, overflow, make-up water, and drain.

I. Float Valves: Brass or bronze [balanced piston type] make-up valve with plastic or copper float.

J. Hardware, nuts, bolts, and washers: [Galvanized steel] [Stainless steel].

K. Accessories1. Electric Immersion Heaters: Maintains temperature of water in basin at 42

degrees F (5 degrees C) when outside temperature is 0 degrees F (-17 degrees C) and wind velocity is 15 mph (25 kph). Immersion thermostat and low level control to operate heaters on low temperature.

2. Electric Temperature Controller: In collection basin, with sensor to cycle fans.3. Time Delay Relay: Limits fan motor starts to not more than six per hour.4. Capacity Control with Scroll Damper and Modulating Electronic Damper Motor:

Controlled by temperature controller, sensor in pan.5. Control Panel: NEMA 250 [Type 12] [Type 4], containing:

a. Non-fused disconnect switch.b. Combination motor controllers.c. Interlocks and relays.

******************************************Use the following paragraphs only when schedule is not used.******************************************

L. Capacity:1. Water Flow: [________] gpm ([________] L/sec).2. Entering Water Temperature: [________] degrees F ([________] degrees C).3. Leaving Water Temperature: [________] degrees F ([________] degrees C).4. Entering Air WB Temperature: [________] degrees F ([________] degrees C).5. External Static Pressure: [________] inch wg ([________] Pa).

Packaged Cooling Towers15640 - 8

Page 9: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

2.4 ELECTRICAL CHARACTERISTICS AND COMPONENTS

******************************************Select one or more of the following subparagraphs appropriate to equipment requirements.******************************************

A. Section 16150 - Wiring Connections: Requirements for electrical characteristics.1. [[________] hp ([________] W).] [[________] rated load amperes.]2. [________] volts, [single] [three] phase, 60 Hz.3. [________] amperes maximum [fuse size] [circuit breaker size] [overcurrent

protection].4. [________] minimum circuit ampacity.5. [________] percent minimum power factor at rated load.

B. Section 16225 - Motors: Requirements for motors.

C. Disconnect Switch: Factory-mount [in control panel] [on equipment].

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify support is ready to accept tower.

B. Verify dimensions of support are as shown on shop drawings.

3.2 INSTALLATION

A. Install tower on [structural steel beams] [concrete base] in accordance with manufacturer’s published instructions.

B. Install tower on vibration isolators. Refer to Section 15070.

C. Install condenser water piping with flanged connections to tower. Pitch condenser water supply to tower and condenser water suction away from tower. Refer to Section 15180.

D. Install make-up water piping with flanged or union connections to tower. Pitch to tower. Refer to Section 15140.

E. Install overflow, bleed, and drain, to [floor drain.] [storm sewer.] [________.]

F. Install tower fire protection system [as indicated on Drawings]. Refer to Section [________].

****** [OR] ******

G. Install Work in accordance with [State] [Municipality] of [________] [Highways] [Public Work's] standards.

Packaged Cooling Towers15640 - 9

Page 10: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

3.3 FIELD QUALITY CONTROL

A. Section [01400 - Quality Requirements: Testing and Inspection Services] [01700 - Execution Requirements: Testing, adjusting, and balancing].

******************************************Manufacturers Certificate showing CTI certification as shown in “Part 1 General” could be used in lieu of the following optional paragraph.******************************************

B. Test for capacity under actual operating conditions [in accordance with CTI 105] and verify specified performance.

3.4 MANUFACTURER'S FIELD SERVICES

A. Section 01400 - Quality Requirements: Manufacturers’ field services.

B. Supervise rigging, hoisting, and installation; include [________] eight-hour days per tower.

C. Inspect tower after installation and submit report prior to start-up, verifying installation is in accordance with specifications and manufacturers recommendations.

3.5 ADJUSTING

A. Section 01700 - Execution Requirements: Testing, adjusting, and balancing.

B. Adjust bleed, control settings and airflow.

3.6 DEMONSTRATION AND TRAINING

A. Section 01700 - Execution Requirements: Requirements for demonstration and training.

B. Demonstrate starting, maintenance and operation of tower.

3.7 SCHEDULES

******************************************Include schedules when more than one unit is required. Complete schedule in conjunction with identification method used on Drawings or include schedules on Drawings. No units of measurement are indicated; these may be added to schedule legend or included within each insert.

Consider the following examples when developing Project schedule.******************************************

COOLING TOWERS

Drawing Code CT-1 CT-2 CT-3

Packaged Cooling Towers15640 - 10

Page 11: 15640ST Cooling Tower

SPECTEXT® 2003, Copyright January 2003 Revised 01/2003The Construction Sciences Research Foundation

Location[Manufacturer][Model Number]

Cooling CapacityWater Flow RateEntering Water TempLeaving Water TempEntering Air WB Temp

Fan Motor NumberExternal Static PressureFan Motor Size

Heater Type and Number

END OF SECTION

Packaged Cooling Towers15640 - 11